CN102733366B - Soft soil curing construction method - Google Patents

Soft soil curing construction method Download PDF

Info

Publication number
CN102733366B
CN102733366B CN201210234675.3A CN201210234675A CN102733366B CN 102733366 B CN102733366 B CN 102733366B CN 201210234675 A CN201210234675 A CN 201210234675A CN 102733366 B CN102733366 B CN 102733366B
Authority
CN
China
Prior art keywords
soil
well
charity
depth
bucket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210234675.3A
Other languages
Chinese (zh)
Other versions
CN102733366A (en
Inventor
王梦恕
葛加君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU SHUNTONG CONSTRUCTION GROUP CO Ltd
Original Assignee
JIANGSU SHUNTONG CONSTRUCTION GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU SHUNTONG CONSTRUCTION GROUP CO Ltd filed Critical JIANGSU SHUNTONG CONSTRUCTION GROUP CO Ltd
Priority to CN201210234675.3A priority Critical patent/CN102733366B/en
Publication of CN102733366A publication Critical patent/CN102733366A/en
Application granted granted Critical
Publication of CN102733366B publication Critical patent/CN102733366B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The invention discloses a soft soil curing construction method, comprising the following steps: braking and discharging water on soil surface; sinking by dewatering and draining; preparing dry fixing agents; planting into dry fixing agents; spraying foaming agents, detecting and so on. The soft soil curing construction method provided by the invention has the advantages of convenience in construction, high construction efficiency and good work effects, and a soil structure with low water content, strong degree of density and high bearing force is formed by the method, so that former soft weak soils qualitatively change.

Description

Weak soil solidifies construction method
Technical field
The present invention relates to a kind of weak soil and solidify construction method.
Background technology
In recent years, country and Jiangsu Province rise to strategic height coastal economy development, pay much attention to coastal economy development problem, and take series of measures to advance coastal economy development, and China coastline is long, be the longest country in coastline in the world, Jiangsu is in You10Duo Ge counties and cities, riverbank, the Yellow River near seashore, thereby coastal economy development potentiality is very large.But because coastal soil property is alluvial deposit, quality is soft, water content is high, modulus in compression coefficient is large, density is poor, low bearing capacity, this to building engineering, highway engineering construction difficulty is large, cost is high, has restricted coastal economy development.
Summary of the invention
The object of the present invention is to provide a kind of easy construction, the weak soil of good working effect solidifies construction method.
Technical solution of the present invention is:
A kind of weak soil solidifies construction method, it is characterized in that: comprising:
(1) soil table is stopped and is determined draining: according to test report, soil moisture content >=50 o'clock, dispense alum at soil property shallow-layer, and every 100 ㎡ charity 1.2kg alum carry out mix with every 1.2kg alum and 100kg yellow ground when charity even, then adopt artificial charity; Before charity, take 1000 ㎡ regions as one is got a little, the pool of drawing water is set, hand excavation draws water after 48 hours when charity river sulfur acid aluminium potassium.Reduce soil layer moisture content by drawing water;
(2) draining falls in open caisson: through soil table stop determine drainage procedure after or while confirming soil 35%≤moisture content≤50% by test, adopt deep-well precipitation water discharge method to carry out that well point layout, well bucket are made, well bucket is installed, the program of drawing water; Well point is arranged as a well point is set in every 50 ㎡, well bucket designs according to proposed building ground level planned well bucket height, the half that well bucket height is depth of building, well bucket is cylinder, well internal diameter Ф >=1m, and well bucket adopts common brick to make, gap mortar-chalked joint, jointing mortar is pressed sand and cement proportion 3:1 configuration, and sand is medium coarse sand, and cement is 325 ordinary Portland cements; Well bucket is installed and is adopted within mechanicalness mounting shaft casing enters steel drum, then squeezes in soil along thin wall tubular pile machine with vibration, then holds together out steel drum, and so bucket is rear with the draining of drawing water of sunk water pump, and soil moisture in layer is down to below 20%;
(3) solidating agent configuration: carrying out deep-well while falling row, simultaneously carry out the configuration of weak soil solidating agent; Weak soil solidating agent is made up of cement, the sand of 30-60%, the lime of 0-40%, the flyash of 0-40%, the slag of 0-20%, the gypsum of 0-8%, the 0-5% smalls silicon-base oxide of 30-40%, and various materials are stirred;
(4) implant solidating agent: adopt dry spray method to implant, promote powder spraying stirring, the demand height of rising to bores again, rises to demand absolute altitude and shuts down, then carry out in this order second group of implantation.Implantation depth is 50% of depth of building, and diameter is 50cm; Implantation spacing is 1.8m;
(5) spray polyurethane foams: spray with spraying infusion air gun, spraying the degree of depth is 50% of depth of building, and spraying spacing is 1.8m;
(6) expire 25 days when above operation completes, detect, then enter construction-engineering project construction sequence.
Particle diameter >=the 1mm of described alum.
Easy construction of the present invention, efficiency of construction is high, and good working effect, by this technical finesse, forms the soil structures that water content is low, compactness is strong, bearing capacity is high, makes former weak soil that the variation of matter occur.
Below in conjunction with embodiment, the invention will be further described.
The specific embodiment
Embodiment 1:
A kind of weak soil solidifies construction method, comprising:
(1) soil table is stopped and is determined draining: according to test report, soil moisture content >=50 o'clock, dispense alum at soil property shallow-layer (the soil property degree of depth 20 ~ 50cm position), every 100 ㎡ charity 1.2kg alum, when charity, carry out mix with every 1.2kg alum and 100kg yellow ground even, then adopt artificial charity; Before charity, take 1000 ㎡ regions as one is got a little, the pool of drawing water is set, hand excavation draws water after 48 hours when charity river sulfur acid aluminium potassium.Reduce soil layer moisture content by drawing water;
(2) draining falls in open caisson: through soil table stop determine drainage procedure after or while confirming soil 35%≤moisture content≤50% by test, adopt deep-well precipitation water discharge method to carry out that well point layout, well bucket are made, well bucket is installed, the program of drawing water; Well point is arranged as a well point is set in every 50 ㎡, well bucket designs according to proposed building ground level planned well bucket height, the half that well bucket height is depth of building, well bucket is cylinder, well internal diameter Ф >=1m, and well bucket adopts common brick to make, gap mortar-chalked joint, jointing mortar is pressed sand and cement proportion 3:1 configuration, and sand is medium coarse sand, and cement is 325 ordinary Portland cements; Well bucket is installed and is adopted within mechanicalness mounting shaft casing enters steel drum, then squeezes in soil along thin wall tubular pile machine with vibration, then holds together out steel drum, and so bucket is rear with the draining of drawing water of sunk water pump, and soil moisture in layer is down to below 20%;
(3) solidating agent configuration: carrying out deep-well while falling row, simultaneously carry out the configuration of weak soil solidating agent; Weak soil solidating agent is made up of 30% cement, 40% sand, 10% lime, 10% flyash, 5% slag, 3% gypsum, 2% smalls silicon-base oxide, and various materials are stirred;
(4) implant solidating agent: adopt dry spray method to implant, promote powder spraying stirring, the demand height of rising to bores again, rises to demand absolute altitude and shuts down, then carry out in this order second group of implantation.Implantation depth is 50% of depth of building, and diameter is 50cm; Implantation spacing is 1.8m;
(5) spray polyurethane foams: spray with spraying infusion air gun, spraying the degree of depth is 50% of depth of building, and spraying spacing is 1.8m;
(6) expire 25 days when above operation completes, detect, then enter construction-engineering project construction sequence.
Particle diameter >=the 1mm of described alum.
Embodiment 2:
Weak soil solidating agent is made up of 40% cement, 50% sand, 5% lime, 2% flyash, 1% slag, 1% gypsum, 1% smalls silicon-base oxide.All the other are with embodiment 1.
Embodiment 3:
Weak soil solidating agent is made up of 35% cement, 55% sand, 0% lime, 0% flyash, 5% slag, 1% gypsum, 4% smalls silicon-base oxide.All the other are with embodiment 1.
Embodiment 4:
Weak soil solidating agent is made up of 30% cement, 30% sand, 20% lime, 20% flyash.All the other are with embodiment 1.

Claims (2)

1. weak soil solidifies a construction method, it is characterized in that: comprising:
(1) soil table is stopped and is determined draining: according to test report, when soil moisture content>=50%, dispense alum at soil property shallow-layer, every 100m 2charity 1.2kg alum, carries out mix with every 1.2kg alum and 100kg yellow ground when charity even, then adopts artificial charity; Before charity with 1000m 2region is one gets a little, and the pool of drawing water is set, and hand excavation, when charity river sulfur acid aluminium potassium drew water after 48 hours; Reduce soil layer moisture content by drawing water;
(2) draining falls in open caisson: through soil table stop determine drainage procedure after or while confirming soil 35%≤moisture content≤50% by test, adopt deep-well precipitation water discharge method to carry out that well point layout, well bucket are made, well bucket is installed, the program of drawing water; Well point is arranged as every 50m 2a well point is inside set, well bucket designs according to proposed building ground level planned well bucket height, the half that well bucket height is depth of building, well bucket is cylinder, well internal diameter Ф>=1m, and well bucket adopts common brick to make, gap mortar-chalked joint, jointing mortar is pressed sand and cement proportion 3:1 configuration, and sand is medium coarse sand, and cement is 325 ordinary Portland cements; Well bucket is installed and is adopted within mechanicalness mounting shaft casing enters steel drum, then squeezes in soil along thin wall tubular pile machine with vibrating, and then holds together out steel drum, then, with the draining of drawing water of sunk water pump, soil moisture in layer is down to below 20%;
(3) solidating agent configuration: carrying out deep-well while falling row, simultaneously carry out the configuration of weak soil solidating agent; Weak soil solidating agent is made up of cement, the sand of 30-60%, the lime of 0-40%, the flyash of 0-40%, the slag of 0-20%, the gypsum of 0-8%, the 0-5% smalls silicon-base oxide of 30-40%, and various materials are stirred;
(4) implant solidating agent: adopt dry spray method to implant, promote powder spraying stirring, the demand height of rising to bores again, rises to demand absolute altitude and shuts down, then carry out in this order second group of implantation; Implantation depth is 50% of depth of building, and diameter is 50cm; Implantation spacing is 1.8m;
(5) spray polyurethane foams: spray with spraying infusion air gun, spraying the degree of depth is 50% of depth of building, and spraying spacing is 1.8m;
(6) expire 25 days when above operation completes, detect, then enter construction-engineering project construction sequence.
2. weak soil according to claim 1 solidifies construction method, it is characterized in that: the particle diameter >=1mm of described alum.
CN201210234675.3A 2012-07-09 2012-07-09 Soft soil curing construction method Active CN102733366B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210234675.3A CN102733366B (en) 2012-07-09 2012-07-09 Soft soil curing construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210234675.3A CN102733366B (en) 2012-07-09 2012-07-09 Soft soil curing construction method

Publications (2)

Publication Number Publication Date
CN102733366A CN102733366A (en) 2012-10-17
CN102733366B true CN102733366B (en) 2014-06-04

Family

ID=46989623

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210234675.3A Active CN102733366B (en) 2012-07-09 2012-07-09 Soft soil curing construction method

Country Status (1)

Country Link
CN (1) CN102733366B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103992799B (en) * 2013-09-06 2017-10-10 宁波万土环保科技有限公司 Ooze curing agent and its production method
CN105780764A (en) * 2016-03-30 2016-07-20 东南大学 Light cemented soil composite mixing pile
CN108729436A (en) * 2017-04-19 2018-11-02 连云港港口工程设计研究院有限公司 A kind of quick consolidation method suitable for silt soft foundation
CN108221529A (en) * 2018-01-15 2018-06-29 赤峰诚联市政工程有限责任公司 Urban road mud base squeezes curing construction method
CN108330950A (en) * 2018-02-08 2018-07-27 沙焕焕 In-situ soil is modified the method for manufacturing artificial mud stone

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4066340B2 (en) * 2002-12-16 2008-03-26 鹿島建設株式会社 Ground improvement method
CN101215141B (en) * 2008-01-02 2010-06-16 邓亚光 Soft soil curing agent
KR20120001856A (en) * 2010-06-30 2012-01-05 어영자 Method for reinforcing soft ground using geosynthetics and open channel
CN101949148A (en) * 2010-09-25 2011-01-19 中国十九冶集团有限公司武汉分公司 Method for constructing artificial dug pile at reduced well point ground water level

Also Published As

Publication number Publication date
CN102733366A (en) 2012-10-17

Similar Documents

Publication Publication Date Title
CN102733366B (en) Soft soil curing construction method
CN102898107B (en) Concrete healant
CN108675699A (en) A kind of corrosion-resistant geopolymer filling concrete pile material and preparation method thereof and construction technology
CN105036789B (en) A kind of lightweight foam soil applied to Metro station excavation backfill
CN101581093B (en) Composite high performance soil cement mortar pile construction method
CN111995339A (en) Anti-scouring solidified soil for ocean platform and preparation method thereof
CN104404838B (en) The above railway collapsible loess subgrade substrate treating method of speed 200km
CN107989032A (en) A kind of construction method of punching interlocking pile
CN111851527B (en) Foundation trench backfill construction method based on premixed fluidized solidified soil
CN102155012A (en) Foundation reinforcing construction method employing powder high-pressure injection grouting
CN101845830B (en) Open caisson deviation rectification construction method
CN104818707A (en) Method for solidifying and curing dredger sludge and new dredger fill by applying cotton stalks
CN106192666A (en) A kind of permeable mortar and utilize the porous pavement that permeable mortar makes
CN103723968A (en) Concrete for volute casing pump structure of nuclear power plant PX pump room and pouring forming method of concrete
CN101186480A (en) Vibration-free self-flowing dense concrete
CN102815902A (en) Preparation and application method of high-strength large-flow shrinkage-free cement slurry
CN105347751A (en) Preparation method of high-strength concrete
CN105040683A (en) Informatization construction method for cement mixing piles
CN111676987A (en) Construction method for backfilling construction of construction fertilizer tank by vibrating, slurry-flushing and ramming method
JP5390060B2 (en) Ground strengthening method
CN104762957A (en) Construction method for spiral hole forming ram-expanded CFG pile
CN201065526Y (en) Starching and laying rock block fade and reinforced concrete wall combined shore-protection wall structure
CN106045424A (en) Method for producing prefabricated member of concrete ditch by using construction waste
CN110409255A (en) Town road and constructing operation method
CN103603355B (en) The empty stake processing method of a kind of bored pile

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Soft soil solidification construction method

Effective date of registration: 20220427

Granted publication date: 20140604

Pledgee: China Construction Bank Corporation Rudong sub branch

Pledgor: JIANGSU SHUNTONG CONSTRUCTION GROUP Co.,Ltd.

Registration number: Y2022980004919