KR20120001856A - Method for reinforcing soft ground using geosynthetics and open channel - Google Patents

Method for reinforcing soft ground using geosynthetics and open channel Download PDF

Info

Publication number
KR20120001856A
KR20120001856A KR1020100062453A KR20100062453A KR20120001856A KR 20120001856 A KR20120001856 A KR 20120001856A KR 1020100062453 A KR1020100062453 A KR 1020100062453A KR 20100062453 A KR20100062453 A KR 20100062453A KR 20120001856 A KR20120001856 A KR 20120001856A
Authority
KR
South Korea
Prior art keywords
geosynthetics
channel
soft ground
trench
concrete
Prior art date
Application number
KR1020100062453A
Other languages
Korean (ko)
Inventor
어영자
김숙미
Original Assignee
어영자
김숙미
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 어영자, 김숙미 filed Critical 어영자
Priority to KR1020100062453A priority Critical patent/KR20120001856A/en
Publication of KR20120001856A publication Critical patent/KR20120001856A/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B11/00Drainage of soil, e.g. for agricultural purposes
    • E02B11/005Drainage conduits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/06Foundation trenches ditches or narrow shafts
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/28Stressing the soil or the foundation structure while forming foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/02Improving by compacting
    • E02D3/10Improving by compacting by watering, draining, de-aerating or blasting, e.g. by installing sand or wick drains
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0004Synthetics
    • E02D2300/0018Cement used as binder
    • E02D2300/002Concrete
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0084Geogrids

Abstract

PURPOSE: A surface reinforcing method of soft ground using geo-synthetics and an open path is provided to reduce construction cost and time and ensure stability and safety of construction by maintaining stable bearing force from earth load and equipment load. CONSTITUTION: A surface reinforcing method of soft ground using geo-synthetics and an open path is as follows. Open paths(20,20'), which are permeable and dischargeable, are installed so that reclaimed soft ground(10) can discharge surface water and pore water. A surface layer and soft ground near the open paths are solidified due to the permeable and dischargeable actions of the open paths and evapotranspiration by sunlight. If a solidified area is created on the surface layer and near the open paths, the open paths are uses as working paths to transport geo-synthetics(30) and deploy it on soft ground.

Description

지오신세틱스와 개수로를 이용한 연약지반 표층 보강공법 {Method for reinforcing soft ground using geosynthetics and open channel}Soft ground surface reinforcement method using geosynthetics and water channel {Method for reinforcing soft ground using geosynthetics and open channel}

본 발명은 연약지반의 표층을 보강하기 위한 것으로, 더욱 상세하게는 개수로에 의해 고화시킨 연약지반과 그 개수로에 정착된 지오신세틱스 구조를 연약지반에 적용함에 따라 상부 하중에 의한 연약지반의 과도한 융기 또는 침하가 억제되도록 하므로 복토 포설 및 지반 개량공사 시 연약지반의 파괴를 방지할 수 있게 한 것이다.
The present invention is for reinforcing the surface layer of the soft ground, and more particularly, the soft ground solidified by the channel and the geosynthetics structure settled in the channel are applied to the soft ground. Excessive ridges or settlements can be suppressed to prevent the destruction of soft ground during cover laying and soil renovation.

최근 국,내외적으로 산업화와 경제발전에 따른 항만건설 및 가용토지의 확보 등을 위하여 해안 매립사업이 활발하게 추진되고 있다.Recently, shore reclamation projects have been actively promoted in order to secure port construction and free land due to industrialization and economic development at home and abroad.

이때의 매립재료는 주로 해저에 쌓인 해성점토를 이용하며 준설선 등에 의해 물과 토립자가 섞인 상태로 상기의 해성점토를 이송시켜 해당지역에 대한 매립공사를 시행하게 되는 것이다.At this time, the landfill material mainly uses marine clay accumulated on the seabed, and transfers the above-mentioned marine clay in a state in which water and granules are mixed by dredgers, etc., to carry out landfill construction for the corresponding area.

이러한 매립지의 준설토는 공사 완료 직후의 함수비가 200~300% 전,후를 나타내고, 지반의 강도가 거의 없는 슬러지 상태이므로 건설기계는 물론이고 사람도 진입하기 쉽지 않다.In the dredged soil of such landfills, the water content is 200-300% before and after the completion of the construction, and since it is a sludge state with little ground strength, it is not easy for not only construction machinery but also people to enter.

이에 상기 준설매립지반을 개량하기 위한 표층 보강공법은 복토 하중 및 장비 진입이 가능할 정도의 지지력 즉, 융기 및 침하로 인한 지반파괴가 일어나지 않을 정도의 지지력을 발휘하는 연약지반 표층 보강공법이 요구되는 것이다.Accordingly, the surface reinforcement method for improving the dredged landfill requires a soft ground surface reinforcement method that exhibits a support force capable of covering the soil and entering the equipment, that is, a support force that does not occur due to the elevation and settlement. .

최근 가장 보편화 된 연약지반 표층 보강공법은 지오신세틱스를 이용한 표층 보강공법이며 이는 지오신세틱스를 연약지반 상에 펼쳐 전개하고 그 지오신세틱스 위에 소형장비로 양질의 토석을 단계적으로 복토하여 중장비의 통행이 가능하게 할 수 있는 공법으로서 연약지반 표층 보강공법 중 가장 일반화되어 있어 시공 경험과 실적이 풍부하다.Recently, the most common soft ground surface reinforcement method is geosynthetics using surface layer reinforcement method. It spreads and spreads geosynthetics on the soft ground and covers the soil of high quality with small equipments step by step on the geosynthetics. As the construction method that can make this possible, it is the most common among the soft ground surface reinforcement methods, which has abundant construction experience and track record.

상기의 지오신세틱스(Geosynthetics)란 토석류 등의 환경에서 토목공사에 이용되는 제품이며 일반적인 지오신세틱스의 종류로는 지오그리드(Geogrids), 지오텍스타일(Geotextiles), 지오멤브레인(Geomembranes), 지오네트(Geonets), 지오매트(Geomats), 지오파이프(Geopipes), 지오컴포지트(Geodomposites), 코어넷(Coir net) 등이 있다.Geosynthetics is a product that is used for civil works in the environment such as civil engineering, etc. Types of general geosynthetics are Geogrids, Geotextiles, Geomembranes, Geonetets ), Geomats, Geopipes, Geocomposites, Corenet, etc.

이와 같은 지오신세틱스는 지반의 분리와 여과 및 보강과 배수 등의 목적으로 주로 이용되며 최근에는 연약지반 보강 등의 목적으로 활발하게 이용되고 있다.Such geosynthetics is mainly used for the purpose of separation, filtration, reinforcement and drainage of the ground, and recently, it is actively used for the purpose of reinforcing soft ground.

지오신세틱스를 연약지반 위에 매설하면 지오신세틱스 자체가 갖고 있는 인장강도에 의한 저항과 흙(연약지반)과 지오신세틱스 간의 마찰력에 의해 더욱 증진된 보강효과를 발휘한다.When geosynthetics is buried on the soft ground, the reinforcement effect is further enhanced by the resistance due to the tensile strength of the geosynthetics itself and the friction between the soil (soft ground) and the geosynthetics.

그 결과 연약지반과 지오신세틱스 복합체는 강도가 증가하여 연약지반 위의 복토 하중과 장비 하중에 대한 안정성의 향상과 침하의 경감을 도모할 수 있게 되는 것이다.As a result, the soft ground and geosynthetic composites are increased in strength, thereby improving stability and reducing settlements on the cover and equipment loads on the soft ground.

이와 같이 지오신세틱스의 보강 기능은 인장강도에 의해 복토 하중과 장비 하중에 대한 안정성과 침하의 경감을 증진시키는 기능으로 자체의 인장강도는 물론이고 연약지반과의 충분한 마찰력이 확보되어야 할 것이다.As such, the reinforcement function of geosynthetics is to enhance the stability and settlement of cover load and equipment load by tensile strength, and its own tensile strength as well as sufficient frictional force with soft ground should be secured.

이때, 연약지반과 지오신세틱스 간의 마찰력이 외부로부터 작용하는 인장력보다 작다면 지오신세틱스가 연약지반 내부로 빨려들어가는 큰 침하가 발생하게 되면서 연약지반에 대한 함몰이 일어날 것이므로 지오신세틱스의 인장력이 발휘되지 않게 된다. 이에, 지오신세틱스는 인장강도가 클수록 또한 흙(연약지반)과 마찰력이 클수록 더욱 높은 지지력과 안정성 및 큰 효과를 나타내는 것이다.At this time, if the frictional force between the soft ground and the geosynthetics is less than the tensile force acting from the outside, the geosynthetics will be sucked into the soft ground and a large settlement will occur, causing the depression of the soft ground. Will not be. Thus, geosynthetics shows that the greater the tensile strength and the greater the friction force with soil (soft ground), the higher the bearing capacity, stability, and greater effect.

지오신세틱스를 이용한 연약지반 표층 보강공법에서 지오신세틱스의 자체 인장력에 의한 보강기능은 연약지반 등에서 광범위하게 활용되어 오고 있으므로, 지오신세틱스의 재료적인 측면 즉, 인장강도의 발전이 눈부시게 고도화되어 고품질의 지오신세틱스 제품을 선택하여 사용할 수 있는 시점에 이르게 되었다.
In the soft ground surface reinforcement method using geosynthetics, the reinforcement function of geosynthetics itself has been widely used in soft ground. Therefore, the material aspect of geosynthetics, that is, the development of tensile strength has been remarkably advanced and high quality. It is time to select and use Geosynthetics.

그러나, 흙(연약지반)과 지오신세틱스 간의 마찰력은 과도한 복토 및 장비의 하중을 지지하기에는 매우 제한적인 것이 사실인데, 상기 지오신세틱스 제품은 연성인 상태이고 연약지반은 지지력이 거의 없는 흙에 의해 이루어져 있어 이와 같은 연약지반과 지오신세틱스 간의 마찰력은 매우 미미한 수준이므로, 연약지반에서 지오신세틱스 자체가 갖고 있는 인장강도에 의한 저항과 흙(연약지반)과 지오신세틱스 간의 마찰력 만으로는 복토 하중과 장비 하중을 충분히 안정적으로 지지하기에는 매우 제한적인 동시에 거의 불가능한 수준이다.However, it is true that the friction between soil (soft ground) and geosynthetics is very limited to support excessive cover and equipment loads. The geosynthetics product is soft and soft ground is hardly supported by soil. Since the frictional force between the soft ground and the geosynthetics is very small, the resistance to the tensile strength of the geosynthetics itself in the soft ground and the frictional force between the soil (soft ground) and the geosynthetics alone are applied. It is very limited and almost impossible to support the load stably.

이에, 부족한 마찰력을 보강하기 위한 효율적인 방법으로서 호안 또는 연약지반에 지오신세틱스를 정착시켜 보다 향상된 지오신세틱스의 보강기능을 기대할 수 있을 것이다.Thus, as an efficient method for reinforcing the insufficient friction force, geosynthetics can be settled on the revetment or soft ground, so that the improved reinforcement of geosynthetics can be expected.

그러나, 이와 같은 보강구조 역시 호안 사이의 길이가 긴 대규모의 준설매립지에서는 적용할 수 없는 것이어서 현재에는 과도한 복토 및 장비 하중이 발생하지 않는 호안 사이의 거리가 좁은 소규모의 준설매립지 또는 지지력이 높은 지반에서만 제한적으로 지오신세틱스를 이용한 복토공법이 활용되고 있는 추세이다.However, this reinforcement is also not applicable to large dredged landfills with long lengths between shores, and is currently only available on small dredged landfills with narrow distances between shores without excessive cover and equipment loading. There is a limited trend to use geosynthetics using geosynthetics.

이에 따라, 호안 사이의 길이가 긴 대규모의 준설매립지에서도 복토 하중 및 장비 하중으로부터 안정적인 지지력을 갖출 수 있도록 한 표층 보강공법이 절실하게 요구되고 있는 실정인 것이다.
Accordingly, the surface reinforcement method is urgently required to provide a stable support force from the cover load and equipment load even in large dredging landfills with long lengths between shores.

본 발명은 전기한 바와 같은 문제점을 개선한 것으로서, 연약지반 천층에 일정간격으로 개수로를 설치하고 일정기간 동안 자연배수 또는 양수기 등을 이용하여 표층수와 간극수를 배수시켜 고화시킨 연약지반과 상기의 개수로에 정착(Anchor)된 지오신세틱스 구조를 적용하여 상부 하중에 의한 연약지반이 과도한 융기 및 침하가 억제되도록 하므로 복토 포설 및 지반 개량시 장비의 주행성(Trafficability)을 확보하고 연약지반의 파괴를 방지하여 기존 연약지반 표층 보강 공법의 문제점을 개선시켜 경제적이며 시공의 안정성을 확보할 수 있도록 한 지오신세틱스와 개수로를 이용한 연약지반 표층 보강공법을 제공함에 본 발명의 목적이 있는 것이다.
The present invention has been made to solve the problems as described above, the number of soft ground and the number of the solid ground by installing a water channel at a predetermined interval on the soft ground top floor and draining the surface water and the gap water by using a natural drainage or a water pump for a certain period of time. By applying the geosynthetics structure anchored in the furnace, the soft ground caused by the upper load is suppressed to prevent excessive uplift and settlement, thus ensuring the trafficability of the equipment when laying cover and improving the ground, and preventing the soft ground from being destroyed. It is an object of the present invention to provide a soft ground surface reinforcement method using geosynthetics and channel to improve the problems of the existing soft ground surface reinforcement method to ensure economic and construction stability.

상기한 바와 같은 목적을 달성하기 위한 본 발명은, 매립이 완료된 연약지반의 표층수와 간극수를 배출시킬 수 있도록 투수 및 배수가 가능한 개수로를 설치하는 단계와; 상기 개수로의 투수 및 배수작용과 일광에 의한 증발산으로 인해 개수로 주위의 연약지반과 표층이 고화되게 하는 단계와; 개수로 주위와 표층에 대한 고화영역이 생성되면 개수로를 작업로로 활용하여 지오신세틱스를 운반 및 연약지반 상에 펼쳐 전개시키는 단계와; 펼쳐 전개된 지오신세틱스를 개수로 및 고화영역에 정착시키는 단계와; 복토재 포설장비를 통해 지오신세틱스 상에 복토작업을 수행하는 단계;를 순차적으로 수행하여 이루어지는 것이다.
The present invention for achieving the object as described above, the step of installing a channel that can be permeable and drained so as to discharge the surface water and gap water of the soft ground is completed; Causing the soft ground and surface layer around the channel to solidify due to the permeation and drainage of the channel and the evaporation by sunlight; Deploying geosynthetics on a soft ground and transporting the geosynthetics by using the channel as a working path when a solidified area about the channel and the surface layer is generated; Fixing the unfolded geosynthetics to the channel and the solidified area; Performing a cover work on the geosynthetics through the cover material installation equipment; is performed by sequentially.

본 발명은, 고함수비의 슬러지 상태로 된 연약지반에서의 복토 공사시 기존 표층 보강공법의 문제점을 개선하는 동시에 호안 사이의 길이가 긴 대규모의 준설매립지에서도 복토 하중 및 장비 하중으로부터 안정적인 지지력을 갖출 수 있도록 하여 공사비의 절감 및 시공의 안정 및 안전성의 확보와 공사 기간의 단축이 가능한 것이다.
The present invention improves the problems of the existing surface reinforcement method when covering soils in soft ground with high water content sludge, and can provide stable bearing capacity from covering loads and equipment loads even in large dredging landfills with long lengths between shores. It is possible to reduce construction cost, secure stability and safety of construction, and shorten construction period.

도 1은 본 발명에 따른 표층 보강공법에 의한 연약지반의 시공 단면도
도 2a 내지 도 2d는 본 발명에 따른 표층 보강공법의 순차공정도로서,
도 2a는 연약지반에 개수로를 형성한 상태도
도 2b는 연약지반의 개수로에 의한 고화영역이 생성된 상태도
도 2c는 연약지반 상에 지오신세틱스를 펼쳐 전개시킨 상태도
도 2d는 지오신세틱스 상에 복토재를 포설한 상태도
도 3a 내지 도 3d는 본 발명에 따른 표층 보강공법에서의 지오신세틱스 정착예시도로서,
도 3a는 압성토에 의한 정착 상태도
도 3b는 트렌치 및 중량물에 의한 정착 상태도
도 3c는 트렌치 및 중량물에 의한 정착상태의 다른 실시예도
도 3d는 트렌치 및 중량물에 의한 정착상태의 또 다른 실시예도
도 3e는 트렌치와 구조물에 의한 정착 상태도
도 3f는 트렌치와 구조물에 의한 정착상태의 다른 실시예도
도 3g는 트렌치와 구조물에 의한 정착상태의 또 다른 실시예도
도 3h는 로프에 의한 정착 상태도
1 is a cross-sectional view of the construction of the soft ground by the surface reinforcement method according to the present invention
2a to 2d is a sequential process diagram of the surface reinforcement method according to the present invention,
Figure 2a is a state diagram forming a channel on the soft ground
2B is a state diagram in which a solidified area is generated by the number of soft ground channels
2c is a state in which the geosynthetics is expanded on the soft ground
Figure 2d is a state diagram laying cover material on geosynthetics
3a to 3d is an exemplary view of geosynthetics fixing in the surface reinforcement method according to the present invention,
3a is a state diagram of fixing by the soil
Figure 3b is a state of fixation by the trench and the weight
Figure 3c is another embodiment of the fixing state by the trench and the weight
Figure 3d is another embodiment of the fixing state by the trench and the weight
Figure 3e is a state of fixation by the trench and the structure
Figure 3f is another embodiment of the fixing state by the trench and the structure
Figure 3g is another embodiment of the fixing state by the trench and the structure
Figure 3h is a state of fixation by the rope

본 명세서 및 청구범위에 사용된 용어나 단어는 통상적이거나 사전적인 의미로 한정해서 해석되어서는 아니 되며, 발명자는 자신의 발명을 가장 최선의 방법으로 설명하기 위해 용어의 개념을 적절하게 정의할 수 있다는 원칙에 입각하여 본 발명의 기술적 사상에 부합하는 의미와 개념으로 해석되어야만 한다.
The terms and words used in the present specification and claims should not be construed as limited to ordinary or dictionary meanings and the inventor may properly define the concept of the term to describe its invention in the best possible way And should be construed in accordance with the principles and meanings and concepts consistent with the technical idea of the present invention.

이하 첨부된 도면을 참조하여 본 발명의 바람직한 실시예를 상세히 설명하기로 한다.Hereinafter, exemplary embodiments of the present invention will be described in detail with reference to the accompanying drawings.

도 1은 본 발명에 따른 표층 보강공법에 의한 연약지반의 시공 단면도이다.1 is a cross-sectional view of the construction of the soft ground by the surface reinforcement method according to the present invention.

통상적으로 슬러지 상태 즉, 고함수이면서 변형성이 크며 지지력이 거의 없는 해성점토로 매립한 연약지반을 부지로 조성하기 위해서는 우선적으로 건설장비의 진입 및 복토하중을 지지하기 위해 표층 보강공법을 이용하여 복토공법을 시행하게 되는데, 이때 연약지반 위에 연약지반의 지지력 이상의 하중이 실리게 되면 연약지반이 변형 및 침하되어 함몰 사고가 발생하게 되므로 공사 수행이 불가능하게 된다.In general, in order to construct a soft ground filled with marine clay, which is highly functional, highly deformable, and hardly supportive, as a site, first of all, it is a cover method using surface reinforcement method to support the entry and construction load of construction equipment. In this case, if the load of the soft ground load over the soft ground is loaded, the soft ground will be deformed and settled, and the accident will occur and the construction will be impossible.

이를 방지하기 위하여 일반적으로는 연약지반 위에 지오신세틱스를 포설 후 지지력을 보강한 후 복토를 시행한다.In order to prevent this, generally, geosynthetics is installed on the soft ground, reinforcement of bearing capacity, and then covered.

그러나 해성점토로 매립한 매립장 면적이 대규모이고 고함수 상태 및 변형성이 크며 지지력이 거의 없는 슬러지 상태의 연약지반에서 지오신세틱스 자체의 인장강도와 연약지반과 지오신세틱스 간의 마찰력에 의존하여 복토하중 및 장비의 과도한 하중을 지지하는 것은 사실상 불가능하다.However, in soft soils with large-scale, high-function, deformable, and little support, landfilled with marine clays depend on the tensile strength of geosynthetics itself and the frictional force between the soft ground and geosynthetics. It is virtually impossible to support an excessive load of equipment.

이와 같은 조건의 연약지반에서 인장강도가 매우 높은 지오신세틱스가 제 기능을 발휘하기 위한 효율적인 방법은 지오신세틱스를 지지력이 높은 지반 또는 구조물에 정착(Anchor)하는 방법일 것이다.In the soft ground under such conditions, an efficient method for the geosynthetics having a very high tensile strength to function properly may be to anchor the geosynthetics to a highly supportive ground or structure.

즉, 과도한 장비 및 복토 하중으로 인한 지반의 침하와 변형이 발생하면 기존의 방법은 흙(연약지반)과 지오신세틱스 간의 마찰력과 지오신세틱스 자체의 인장강도에 의해 상부 하중을 지지하므로 지오신세틱스 자체가 가지고 있는 인장강도를 충분히 발휘할 수 없어 함몰 사고가 발생하지만, 지오신세틱스를 지지력이 높은 지반 또는 구조물에 정착하면 기존의 미미하고 불안정한 흙(연약지반)과 지오신세틱스 간의 마찰력과 더불어 지오신세틱스에 효율적이고 확실한 정착력이 부가될 것이다.That is, when settlement and deformation of the ground due to excessive equipment and cover load occur, the existing method supports the upper load by the frictional force between the soil (soft ground) and the geosynthetics and the tensile strength of the geosynthetics itself. If the geosynthetics is settled on a highly supportive ground or structure, the geosynthetics is not only able to exert its tensile strength, but the geosynthesis is accompanied by friction between the existing and unstable soil (soft ground) and geosynthetics. An efficient and reliable fixation will be added to the ticks.

따라서 지오신세틱스 자체의 인장강도를 충분히 발휘하여 표층 보강기능이 획기적으로 높아지므로 장비 및 복토하중의 침하로 인한 지반 변형을 확실하게 억제하여 함몰 사고가 발생하지 않아 효율적이고 안전하게 연약지반에서 복토공법을 시행할 수 있는 것이다.Therefore, the surface reinforcement function is dramatically increased by showing the tensile strength of geosynthetics itself. Therefore, the ground deformation caused by the settlement of the equipment and the cover load is suppressed reliably, so that no sinking accident occurs. It can be done.

그러므로 해성점토로 매립한 매립장 면적이 대규모이고 고함수 상태 및 변형성이 크며 지지력이 거의 없는 슬러지 상태의 연약지반에서 인장강도가 매우 높은 지오신세틱스가 제 기능을 발휘하기 위한 효율적이고 확실한 방법은 지오신세틱스를 지지력이 높은 지반 또는 구조물에 정착(Anchor)하는 방법인 것이다.Therefore, geosynthetics, which has a very high tensile strength, is an efficient and reliable way for the function of landfills buried with marine clays to be very large in high strength, deformable, and little supportive sludge. It is a method of anchoring tics to ground or structures with high bearing capacity.

따라서, 해성점토로 매립한 매립장 면적이 대규모이고 고함수 상태 및 변형성이 크며 지지력이 거의 없는 슬러지 상태의 연약지반에 지오신세틱스를 지지력이 높은 지반 또는 구조물에 정착(Anchor)하기 위한 효율적이고 확실한 방법은 상기의 연약지반에서 지오신세틱스가 가지고 있는 인장강도를 발휘할 수 있도록 상부의 하중과 지오신세틱스의 인장 강도, 시공성, 경제성 등을 고려하여 일부분 또는 일정 간격으로 강도가 거의 없는 연약지반을 우선적으로 고화시켜야 한다.Therefore, an efficient and reliable method for anchoring geosynthetics to highly supportive grounds or structures in soft soils with large-scale, high-function, deformable, and little-supporting sludge landfilled with marine clay In order to exert the tensile strength possessed by geosynthetics in the above soft ground, the soft ground having little strength at a part or at regular intervals is considered in consideration of the load on the top and the tensile strength, workability, and economic efficiency of the geosynthetics. It must solidify.

이때 사용되는 지오신세틱스(30)의 종류로는, 지오그리드(Geogrids) 또는 지오텍스타일(Geotextiles), 지오멤브레인(Geomembranes), 지오네트(Geonets), 지오매트(Geomats), 지오파이프(Geopipes), 지오컴포지트(Geodomposites), 코어넷(Coir net) 중 선택된 하나 이상의 것을 적용하면 되는 것으로, 상기와 같은 지오신세틱스(30)는 적용분야 및 물리적 특성에 따라 다양한 소재와 물성을 갖고 널리 제작되어 있으므로 현장 상황에 따라 적합한 형태의 것을 선택하여 사용하면 될 것이다.
At this time, the type of geosynthetics 30 is used, such as Geogrids or Geotextiles, Geomembranes, Geonets, Geomats, Geopipes, Geopipes One or more selected from composites and core nets may be applied. The geosynthetics 30 as described above is widely manufactured with various materials and physical properties depending on the application field and physical characteristics, and thus is widely used. Depending on the type of the appropriate choice will be used.

이를 토대로 본 발명의 연약지반 표층 보강공법에 대하여 작업 공정별로 설명하면 다음과 같다.Based on this, the soft ground surface reinforcement method of the present invention will be described as follows.

* 1단계* Stage 1

연약지반(10)에 지오신세틱스(30)를 지지력이 높은 지반 또는 구조물에 정착(Anchor)하기 위해 상부의 하중과 지오신세틱스의 인장 강도, 시공성, 경제성 등을 고려하여 연약지반을 고화시키기 위해 매립이 완료된 연약지반에 표층수와 간극수를 배수 시킬 수 있도록 도 2a의 도시와 같이 투수 및 배수가 가능한 개수로(20)(20')를 일부분 또는 일정 간격으로 연약지반에 설치한다.In order to anchor the geosynthetics 30 to the highly supportive ground or structure in the soft ground 10 in order to solidify the soft ground in consideration of the load of the upper part and the tensile strength, workability and economic efficiency of the geosynthetics. In order to drain the surface water and the gap water to the completed soft ground, the water passages 20 and 20 'which are permeable and drainable as shown in FIG. 2A are installed on the soft ground at a part or regular intervals.

이때의 개수로(20)(20')는 본 발명의 출원인에 의해 안출된 특허등록 제784174호 등이 이상적인 것으로서, 필요에 따라서는 상기와 같은 개수로의 하부에 교차 방향으로의 배수재를 추가로 구성할 수도 있을 것이다. 또한, 상기의 개수로에 대한 간격이나 규격 등은 연약지반의 함수비나 공사기간, 지반상태 등을 고려하여 적절하게 조정 설치할 수 있을 것이다.At this time, the channel (20, 20 ') is ideal, such as patent registration No. 784174 devised by the applicant of the present invention, if necessary, additional drainage in the cross direction at the bottom of the channel as described above. It may be configured. In addition, the spacing and specifications for the channel can be adjusted appropriately in consideration of the water content of the soft ground, the construction period, the ground condition and the like.

* 2단계* Step 2

일부분 또는 일정 간격으로 상기 개수로(20)(20')를 연약지반(10)에 설치하고 개수로 내부로 유입된 물을 연약지반 외부로 배출시키며 일광에 의한 증발산으로 개수로 주위의 연약지반과 표층이 고화되면서 연약지반의 강도가 증가하게 된다.Install the waterways 20, 20 'in the soft ground 10 at a part or at regular intervals and discharge the water introduced into the water through the soft ground to the outside of the soft ground, and with the soft ground around the water channel with the evaporation of sunlight. As the surface layer solidifies, the strength of the soft ground increases.

따라서, 도 2b의 도시와 같이 연약지반(10)의 상부로부터 작용하는 하중의 지지와 지오신세틱스(30)의 인장 강도 발휘에 필요한 정착력을 확보하기 위해 점진적으로 개수로(20)(20') 주위의 연약지반과 표층의 고화영역(11)이 확대되도록 일정한 고화 처리기간이 경과되도록 한다. Therefore, in order to secure the fixing force necessary for supporting the load acting from the upper part of the soft ground 10 and exerting the tensile strength of the geosynthetics 30 as shown in FIG. After a certain solidification treatment period has elapsed so that the soft ground and the solidification area 11 of the surface layer are expanded.

이때, 상기의 고화영역(11)에 대한 함수비는 100% 이하가 가장 이상적인 것으로서, 고화영역(11)에 대한 함수비가 높은 경우에는 지오신세틱스(30)의 인장 강도 발휘에 필요한 정착력이 약화되므로 상기 고화영역에 대한 함수비는 낮을수록 유리할 것이다.At this time, 100% or less of the water content ratio of the solidification region 11 is the most ideal. When the water content ratio of the solidification region 11 is high, the fixing force necessary for exerting the tensile strength of the geosynthetics 30 is weakened. The lower the water content for the solidified region, the better.

* 3단계* Step 3

투수 및 배수가 가능한 개수로(20)(20')에 의해 고화된 연약지반 위에 현장 조건에 적합한 지오신세틱스(30)를 적용시키되, 도 2c의 도시와 같이 전기한 개수로(20)(20')를 작업로로 활용하여 지오신세틱스(30)를 운반하고 접합하여 포설한다.The geosynthetics 30 suitable for the site conditions is applied on the soft ground solidified by the water passages 20 and 20 'which can be permeated and drained, and the water passages 20 and 20 which are shown in FIG. ') Is used as a work path to transport and bond the geosynthetics (30).

* 4단계* 4 levels

일부분 또는 일정 간격으로 설치한 상기 개수로(20)(20') 및 연약지반의 고화영역(11)에 지오신세틱스(30)를 펼쳐 전개시켜 이를 개수로(200(20') 또는 고화영역(11)을 이용하여 정착시킨다.Geosynthetics 30 is unfolded and unfolded in the waterways 20 and 20 'and at the solidified area 11 of the soft ground, which are installed at a portion or at regular intervals, and the waterways 200 (20') or the solidified areas ( Settle using 11).

이때, 상기의 지오신세틱스에 대한 정착방법으로는,At this time, as a fixing method for the geosynthetics,

1. 도 3a의 도시와 같이 개수로(20)(20') 및 고화영역(11)을 갖는 연약지반(10) 상에 지오신세틱스(30)를 펼쳐 전개시킨 상태에서 이들 개수로(20)(20')의 상부 또는 고화영역(11)의 상부이거나 이들 개수로(20)(20') 및 고화영역(11)의 상부에 해당하는 지오신세틱스(30)의 표면 위치에 압성토(21)를 포설하여 압성토(21)의 중량에 의해 지오신세틱스(30)가 정착되게 하는 방법.1. As shown in FIG. 3A, in the state in which the geosynthetics 30 is unfolded and deployed on the soft ground 10 having the channel 20, 20 'and the solidification area 11, these channel 20 The pressure-sensitive soil 21 at the surface position of the geosynthetics 30 at the top of the 20 or the top of the solidified region 11 or corresponding to the channel 20, 20 ′ and the top of the solidified region 11. ) To install the geosynthetics (30) by the weight of the compacted soil (21).

2. 도 3b의 도시와 같이 개수로(20)(20')에 트렌치(22;trench)를 형성하고, 그 트렌치(22)의 내측으로 지오신세틱스(30)가 삽입되게 한 후 트렌치(22) 내에 양질의 토석 또는 콘크리트로 된 중량물(23)을 메워 정착시키는 방법.2. As shown in FIG. 3B, a trench 22 is formed in the channel 20 and 20 ', and the geosynthetics 30 is inserted into the trench 22, and then the trench 22 is formed. Method of filling a heavy material (23) of high quality soil or concrete in the inside).

3. 도 3c의 도시와 같이 고화영역(11)에 트렌치(22';trench)를 형성하고 이에 지오신세틱스(30)를 삽입한 후 트렌치(22')를 양질의 토석 또는 콘크리트로 된 중량물(23')을 메워 정착시키는 방법.3. As shown in FIG. 3C, a trench 22 'is formed in the solidified region 11 and the geosynthetics 30 is inserted into the trench 22'. 23 ') to fill and settle.

4. 도 3d의 도시와 같이 개수로(20)(20')와 고화영역(11)에 각각 트렌치(22)(22')를 형성하고, 그 트렌치(22)(22')의 내측으로 지오신세틱스(30)가 삽입되게 한 후, 상기의 트렌치(22)(22')를 양질의 토석이나 콘크리트로 된 중량물(23)(23')로 메워 정착시키는 방법.4. As shown in FIG. 3D, trenches 22 and 22 'are formed in the channel 20, 20' and the solidified region 11, respectively, and the inside of the trenches 22 and 22 'is geometried. After the synthetics (30) is inserted, the trench (22) (22 ') is filled with high quality earth or concrete weight (23) (23') to fix.

5. 도 3e의 도시와 같이 지오신세틱스(30)가 충분한 인장강도를 갖는 경우 개수로(20)(20')에 트렌치(22)를 형성한 후 그 트렌치(22) 내에 콘크리트 구조물(24)을 형성하고, 콘크리트 구조물(24)에 매립되어진 앵커볼트(도면에서의 부호는 생략함) 등을 이용하여 지오신세틱스(30)를 정착시키는 방법.5. If the geosynthetics 30 has a sufficient tensile strength as shown in FIG. 3E, the trenches 22 are formed in the channel 20 and 20 ′, and then the concrete structure 24 is formed in the trenches 22. Forming, and fixing the geosynthetics (30) using an anchor bolt (not shown in the drawings) embedded in the concrete structure (24).

6. 도 3f의 도시와 같이 지오신세틱스(30)가 충분한 인장강도를 갖는 경우 고화영역(11)에 트렌치(22')를 형성한 후 그 트렌치(22') 내에 콘크리트에 의해 양생된 콘크리트 구조물(24')을 형성하고, 콘크리트 구조물(24')에 매립되어진 앵커볼트(도면에서의 부호는 생략함) 등을 이용하여 지오신세틱스(30)를 정착시키는 방법.6. As shown in FIG. 3F, when the geosynthetics 30 has sufficient tensile strength, the trench 22 'is formed in the solidified region 11, and then the concrete structure cured by concrete in the trench 22'. A method of fixing the geosynthetics (30) by using an anchor bolt (not shown in the drawing) and the like formed in (24 ') and embedded in the concrete structure (24').

7. 도 3g의 도시와 같이 지오신세틱스(30)가 충분한 인장강도를 갖는 경우 개수로(20)(20')의 상부 및 고화영역(11)에 각각의 트렌치(22)(22')를 형성한 후 그 트렌치(22)(22') 내에 콘크리트 구조물(24)(24')을 형성하고, 콘크리트 구조물(24)(24')에 매립되어진 앵커볼트(도면에서의 부호는 생략함) 등을 이용하여 지오신세틱스(30)를 정착시키는 방법.7. If the geosynthetics 30 has sufficient tensile strength, as shown in FIG. 3G, the respective trenches 22, 22 'are placed in the upper part of the channel 20 and 20' and in the solidified area 11. After the formation, the concrete structures 24 and 24 'are formed in the trenches 22 and 22', and anchor bolts (the symbols in the drawings are omitted) are embedded in the concrete structures 24 and 24 '. How to fix the geosynthetics 30 using.

8. 도 3h의 도시와 같이 개수로(20)(20')와 지오신세틱스(30)를 로프(25) 등으로 결합하여 정착시키는 방법이 있을 수 있다.8. As shown in FIG. 3H, there may be a method of fixing the waterways 20, 20 'and the geosynthetics 30 by a rope 25 or the like.

* 5단계* 5 levels

지오신세틱스(30)의 정착이 완료되면 도 2d의 도시와 같이 복토재 포설장비로 지오신세틱스(30) 상에 중앙부로부터 복토재(40)를 포설하는 복토작업을 수행한 후 양측부로 번갈아 가면서 점차 외측으로 복토작업을 수행한다. 여기서, 상기와 같은 복토재 포설방법은 본 발명의 출원인에 의해 안출된 특허등록 제0760653호에 의한 것인데 상기의 복토작업을 중앙으로부터 양측으로 번갈아 작업함에 따라 연약지반에 작용하는 장비 및 복토재의 중량에 의한 압력이 편중되는 것을 방지하여 지반의 침하나 융기를 방지하고자 하는 것이다.After the settlement of the geosynthetics 30 is completed, as shown in FIG. 2D, the cover work is carried out to install the cover material 40 from the center on the geosynthetics 30 by using the cover material installation equipment, and then gradually alternately to both sides. To cover the soil. Here, the method of laying the cover material as described above is based on the patent registration No. 0760653 issued by the applicant of the present invention by the weight of the equipment and the cover material acting on the soft ground by alternating the cover work from the center to both sides It is to prevent the pressure from being biased to prevent settlement or elevation of the ground.

따라서, 상기와 같은 각 단계별 작업공정을 통해 호안 사이의 길이가 긴 대규모의 준설매립지에서도 복토 하중 및 장비 하중으로부터 안정적인 지지력을 갖출 수 있는 것이다.
Therefore, even through the step-by-step work process as described above, even a large dredging landfill with a long length between the revetment can have a stable bearing capacity from the cover load and equipment load.

이상과 같은 본 명세서에 기재된 실시예와 도면에 도시된 구성은 본 발명의 가장 바람직한 일실시예에 불과할 뿐이고 본 발명의 기술적 사상을 모두 대변하는 것은 아니므로, 이들을 대체할 수 있는 다양한 균등물과 변형 예들이 있을 수 있음을 이해하여야 한다.
It is to be understood that both the foregoing general description and the following detailed description of the present invention are exemplary and explanatory and are intended to provide further explanation of the present invention as defined by the appended claims. Examples should be understood.

10 : 연약지반 11 : 고화영역
20,20' : 개수로 21 : 압성토
22,22' : 트렌치 23,23' : 중량물
24,24' : 콘크리트 구조물 25 : 로프
30 : 지오신세틱스
40 : 복토재
10: soft ground 11: solidification area
20,20 ': By the number 21: Absorption soil
22,22 ': Trench 23,23': Heavy
24,24 ': concrete structure 25: rope
30: Geosynthetics
40: cover material

Claims (11)

매립이 완료된 연약지반의 표층수와 간극수를 배출시킬 수 있도록 투수 및 배수가 가능한 개수로를 설치하는 단계와;
상기 개수로의 투수 및 배수작용과 일광에 의한 증발산으로 인해 개수로 주위의 연약지반과 표층이 고화되게 하는 단계와;
개수로 주위와 표층에 대한 고화영역이 생성되면 개수로를 작업로로 활용하여 지오신세틱스를 운반 및 연약지반 상에 펼쳐 전개시키는 단계와;
펼쳐 전개된 지오신세틱스를 개수로와 고화영역에 정착시키는 단계와;
복토재 포설장비를 통해 지오신세틱스 상에 복토작업을 수행하는 단계;를 순차적으로 수행하여 이루어짐을 특징으로 하는 지오신세틱스와 개수로를 이용한 연약지반 표층 보강공법.
Installing a channel for permeation and drainage so as to discharge the surface water and the gap water of the soft ground in which the landfill is completed;
Causing the soft ground and surface layer around the channel to solidify due to the permeation and drainage of the channel and the evaporation by sunlight;
Deploying geosynthetics on a soft ground and transporting the geosynthetics by using the channel as a working path when a solidified area about the channel and the surface layer is generated;
Fixing the unfolded geosynthetics to the channel and the solidified area;
Soft soil surface reinforcement method using the geosynthetics and channel through the step of performing the cover work on the geosynthetics through the cover material installation equipment.
제 1항에 있어서,
지오신세틱스는, 지오그리드(Geogrids) 또는 지오텍스타일(Geotextiles), 지오멤브레인(Geomembranes), 지오네트(Geonets), 지오매트(Geomats), 지오파이프(Geopipes), 지오컴포지트(Geodomposites), 코어넷(Coir net) 중 선택된 하나 이상의 것으로 이루어짐을 특징으로 하는 지오신세틱스와 개수로를 이용한 연약지반 표층 보강공법.
The method of claim 1,
Geosynthetics is Geogrids or Geotextiles, Geomembranes, Geonets, Geomats, Geopipes, Geocomposites, Coirnets net) soft ground surface reinforcement method using a geosynthetics and channel.
제 1항에 있어서,
지오신세틱스의 정착 단계는, 개수로와 고화영역에 해당하는 지오신세틱스의 상부에 압성토를 포설하여 이루어짐을 특징으로 하는 지오신세틱스와 개수로를 이용한 연약지반 표층 보강공법.
The method of claim 1,
Geosynthetics fixing step is a soft ground surface reinforcement method using geosynthetics and channel, characterized in that the pressure of the soil is installed on top of the geosynthetics corresponding to the channel and the solidified area.
제 1항에 있어서,
지오신세틱스의 정착 단계는, 개수로의 상측에 트렌치를 형성하고 그 트렌치에 지오신세틱스를 삽입한 후 트렌치에 토석이나 콘크리트의 중량물을 메워 이루어짐을 특징으로 하는 지오신세틱스와 개수로를 이용한 연약지반 표층 보강공법.
The method of claim 1,
The geosynthetics fixing step is characterized by the formation of a trench on the upper side of the channel, inserting the geosynthetics into the trench, and filling the heavy material of earth or concrete in the trench. Ground surface reinforcement method.
제 1항에 있어서,
지오신세틱스의 정착 단계는, 고화영역에 트렌치를 형성하고 그 트렌치에 지오신세틱스를 삽입한 후 트렌치에 토석이나 콘크리트의 중량물을 메워 이루어짐을 특징으로 하는 지오신세틱스와 개수로를 이용한 연약지반 표층 보강공법.
The method of claim 1,
Geosynthetics fixation step is to form a trench in the solidified area, geosynthetics is inserted into the trench, and the ground layer of soft ground using geosynthetics and channel is characterized by filling the heavy material of earth or concrete in the trench. Reinforcement method.
제 1항에 있어서,
지오신세틱스의 정착 단계는, 개수로 및 고화영역에 트렌치를 형성하고 그 트렌치에 지오신세틱스를 삽입한 후 트렌치에 토석이나 콘크리트의 중량물을 메워 이루어짐을 특징으로 하는 지오신세틱스와 개수로를 이용한 연약지반 표층 보강공법.
The method of claim 1,
Geosynthetics fixing step is to form a trench in the channel and the solidification area, insert the geosynthetics in the trench and fill the heavy weight of earth or concrete in the trench using geosynthetics and channel Soft ground surface reinforcement method.
제 1항에 있어서,
지오신세틱스의 정착 단계는, 개수로의 상부에 트렌치를 형성하고 그 트렌치에 콘크리트 구조물을 양생한 후 콘크리트와 지오신세틱스를 앵커볼트로 서로 고정시켜 이루어짐을 특징으로 하는 지오신세틱스와 개수로를 이용한 연약지반 표층 보강공법.
The method of claim 1,
The geosynthetics fixing step consists of forming a trench in the upper part of the channel, curing the concrete structure in the trench, and fixing the concrete and the geosynthetics with anchor bolts. Soft ground surface reinforcement method.
제 1항에 있어서,
지오신세틱스의 정착 단계는, 고화영역에 트렌치를 형성하고 그 트렌치에 콘크리트 구조물을 양생한 후 콘크리트와 지오신세틱스를 앵커볼트로 서로 고정시켜 이루어짐을 특징으로 하는 지오신세틱스와 개수로를 이용한 연약지반 표층 보강공법.
The method of claim 1,
Geosynthetics fixation step is a weakness using geosynthetics and channel, which is formed by forming trenches in the solidified area, curing concrete structures in the trenches, and fixing concrete and geosynthetics with anchor bolts. Ground surface reinforcement method.
제 1항에 있어서,
지오신세틱스의 정착 단계는, 개수로의 상부와 고화영역에 트렌치를 형성하고 그 트렌치에 콘크리트 구조물을 양생한 후 콘크리트와 지오신세틱스를 앵커볼트로 서로 고정시켜 이루어짐을 특징으로 하는 지오신세틱스와 개수로를 이용한 연약지반 표층 보강공법.
The method of claim 1,
Geosynthetics and geosynthetics is characterized in that the fixing step of the geosynthetics is formed by forming a trench in the upper part and the solidified area of the channel, curing the concrete structure in the trench, and fixing the concrete and the geosynthetics with anchor bolts. Soft ground surface reinforcement method using channel.
제 1항에 있어서,
지오신세틱스의 정착 단계는, 로프에 의해 개수로와 지오신세틱스를 서로 결속하여 이루어짐을 특징으로 하는 지오신세틱스와 개수로를 이용한 연약지반 표층 보강공법.
The method of claim 1,
Geosynthetics settlement step is a soft ground surface reinforcement method using a geosynthetics and a canal, characterized in that the coupling between the channel and the geosynthetics by a rope.
제 1항에 있어서,
복토 단계는, 연약지반의 상부 중앙으로부터 양측으로 번갈아가며 점차 외측으로 수행하여 이루어짐을 특징으로 하는 지오신세틱스와 개수로를 이용한 연약지반 표층 보강공법.
The method of claim 1,
The cover layer step is a soft ground surface reinforcement method using a geosynthetics and channel, characterized in that it is carried out gradually alternately to both sides from the upper center of the soft ground.
KR1020100062453A 2010-06-30 2010-06-30 Method for reinforcing soft ground using geosynthetics and open channel KR20120001856A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020100062453A KR20120001856A (en) 2010-06-30 2010-06-30 Method for reinforcing soft ground using geosynthetics and open channel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020100062453A KR20120001856A (en) 2010-06-30 2010-06-30 Method for reinforcing soft ground using geosynthetics and open channel

Publications (1)

Publication Number Publication Date
KR20120001856A true KR20120001856A (en) 2012-01-05

Family

ID=45609352

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020100062453A KR20120001856A (en) 2010-06-30 2010-06-30 Method for reinforcing soft ground using geosynthetics and open channel

Country Status (1)

Country Link
KR (1) KR20120001856A (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102733366A (en) * 2012-07-09 2012-10-17 江苏顺通建设集团有限公司 Soft soil curing construction method
KR101459703B1 (en) * 2014-01-29 2014-11-12 주식회사 항도엔지니어링 Method for draining and reinfrocing dredged reclaimed land
KR101659608B1 (en) * 2015-12-10 2016-09-26 주식회사 혜인이엔씨 Spoil block and method for treating outer layer of soft ground using thereof
CN107829425A (en) * 2017-11-06 2018-03-23 汤连生 One kind tool circulation air emptying function column type forced-ventilated water pipe, device and method
JP2018131743A (en) * 2017-02-13 2018-08-23 岡三リビック株式会社 Reinforcement structure for box culvert foundation and construction method thereof, and design verification system
KR101981497B1 (en) * 2018-11-29 2019-05-23 허옥이 Poor ground improvement method
US11129422B2 (en) 2016-07-18 2021-09-28 The H.D. Lee Company, Inc. Body-enhancing garment and garment construction
USD945121S1 (en) 2016-01-29 2022-03-08 The H.D. Lee Company, Inc. Pant with anatomy enhancing pockets
US11344071B2 (en) 2013-10-18 2022-05-31 The H.D. Lee Company, Inc. Anatomy shading for garments
CN116695676A (en) * 2023-06-16 2023-09-05 中国水利水电第三工程局有限公司 High-water-level shallow foundation pit soft foundation treatment construction method

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102733366A (en) * 2012-07-09 2012-10-17 江苏顺通建设集团有限公司 Soft soil curing construction method
US11344071B2 (en) 2013-10-18 2022-05-31 The H.D. Lee Company, Inc. Anatomy shading for garments
KR101459703B1 (en) * 2014-01-29 2014-11-12 주식회사 항도엔지니어링 Method for draining and reinfrocing dredged reclaimed land
KR101659608B1 (en) * 2015-12-10 2016-09-26 주식회사 혜인이엔씨 Spoil block and method for treating outer layer of soft ground using thereof
USD945121S1 (en) 2016-01-29 2022-03-08 The H.D. Lee Company, Inc. Pant with anatomy enhancing pockets
US11129422B2 (en) 2016-07-18 2021-09-28 The H.D. Lee Company, Inc. Body-enhancing garment and garment construction
JP2018131743A (en) * 2017-02-13 2018-08-23 岡三リビック株式会社 Reinforcement structure for box culvert foundation and construction method thereof, and design verification system
CN107829425A (en) * 2017-11-06 2018-03-23 汤连生 One kind tool circulation air emptying function column type forced-ventilated water pipe, device and method
CN107829425B (en) * 2017-11-06 2023-12-29 汤连生 Device and method for soft foundation drainage consolidation
KR101981497B1 (en) * 2018-11-29 2019-05-23 허옥이 Poor ground improvement method
CN116695676A (en) * 2023-06-16 2023-09-05 中国水利水电第三工程局有限公司 High-water-level shallow foundation pit soft foundation treatment construction method
CN116695676B (en) * 2023-06-16 2024-03-15 中国水利水电第三工程局有限公司 High-water-level shallow foundation pit soft foundation treatment construction method

Similar Documents

Publication Publication Date Title
KR20120001856A (en) Method for reinforcing soft ground using geosynthetics and open channel
CN102433876B (en) Multi-compartment casing composite pile and construction method thereof
JP2006225926A (en) Banking construction method utilizing backfilling material such as fluidized soil, pit sand, local soil and crushed stone
JP2008138446A (en) Construction method of retaining wall
CN109577365A (en) A kind of pile formula drainage anchor rod barrier wall structure and its construction method
CN206204880U (en) A kind of side slope comprehensive regulation structure of prevention river channel erosion
CN103233444A (en) Underwater riprap foundation bed and side slope erosion resisting structure and construction method thereof
CN105804007A (en) Reinforced soil bank wall structure based on beach soft foundation
CN106400744A (en) Comprehensive side-slope treatment structure for preventing river channel erosion and construction method thereof
JP2007070820A (en) Landfill reinforcing method and landfill
JP6164949B2 (en) Filling reinforcement structure
KR101975297B1 (en) Multi-wall construction method using multi-wall construction supporting files and supporting files used for construction of harbors, rivers, dams and concrete that can prevent the inflow of soil and water
KR101531799B1 (en) Repair reinforcement method of the waterfront structure
CN103590390B (en) A kind of stream is moulded shape reinforced soft soil ground structure and adds solid method
KR101459703B1 (en) Method for draining and reinfrocing dredged reclaimed land
CN108914959B (en) Foundation structure suitable for mountain house building and construction method thereof
JP2004204581A (en) Water sealing method for controlled revetment
KR101117924B1 (en) Composite type steel temporary construction and construction method thereof
KR101789450B1 (en) Underground structures using overlapped pile wall and construction method thereof
CN113494074B (en) Building foundation treatment method for area with liquefied soil bearing stratum
KR20110046209A (en) Method Of Construction For Scour Prevension And Reinforcement Of Bridge Pier, And Structure Of The Same
JP4315620B2 (en) Impermeable treatment method for managed waste landfill revetment
CN211228563U (en) Assembled groundwater drainage blind ditch drainage system that oozes
JP4504864B2 (en) Dam body reinforcement structure with wave-dissipating function
CN108611941B (en) Method for processing saturated high-fill roadbed

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E601 Decision to refuse application