CN102722797A - Power dispatching automation system information layering method based on responsibility area - Google Patents

Power dispatching automation system information layering method based on responsibility area Download PDF

Info

Publication number
CN102722797A
CN102722797A CN2012101923537A CN201210192353A CN102722797A CN 102722797 A CN102722797 A CN 102722797A CN 2012101923537 A CN2012101923537 A CN 2012101923537A CN 201210192353 A CN201210192353 A CN 201210192353A CN 102722797 A CN102722797 A CN 102722797A
Authority
CN
China
Prior art keywords
responsibility
zone
message
log
station
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012101923537A
Other languages
Chinese (zh)
Other versions
CN102722797B (en
Inventor
赵家庆
张珂珩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHINA REALTIME DATABASE CO LTD
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Suzhou Power Supply Co of State Grid Jiangsu Electric Power Co Ltd
Original Assignee
CHINA REALTIME DATABASE Co Ltd
Suzhou Power Supply Co Ltd of Jiangsu Electric Power Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHINA REALTIME DATABASE Co Ltd, Suzhou Power Supply Co Ltd of Jiangsu Electric Power Co filed Critical CHINA REALTIME DATABASE Co Ltd
Priority to CN201210192353.7A priority Critical patent/CN102722797B/en
Publication of CN102722797A publication Critical patent/CN102722797A/en
Application granted granted Critical
Publication of CN102722797B publication Critical patent/CN102722797B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention discloses a power dispatching automation system information layering method based on a responsibility area, which belongs to the technical field of power dispatching automation. A responsibility area is added in the station and equipment lists of a system database, and every station and equipment are divided to the affiliated responsibility areas. Each workstation node selects the responsibility area through a system main control platform, and sends the responsibility area to a responsibility area registration service to be registered. The application program adds the responsibility area value of the affiliated station or equipment of the massage in the various generated real-time messages then sends the messages to a message processing server, and the message is distributed to the corresponding workstation node according the responsibility area value in the message. The method realizes the effective information distribution, the message flow of the network is lowered, the whole system performance and information throughput are improved, each workstation only processes the information which is required to be processed in the responsibility area, and accordingly, the functions of information layering and safe and effective isolation are realized.

Description

Based on the information layered method of the electric power scheduling automatization system of zone of responsibility
Technical field
The invention belongs to the dispatching automation of electric power systems technical field, particularly relate to a kind of information layered method based on the zone of responsibility.
Background technology
In the electric system actual schedule; From safety, information isolation equal angles; Different dispatchers is responsible for the different piece of electrical network, and the operation of power networks information of need obtain in the work, following the tracks of is difference to some extent also, that is to say that each yardman only need be in charge of a zone in the system; This zone just is called does the zone of responsibility, and other regional operation of power networks information are transparent to this yardman.
Yet; Original electric power scheduling automatization system does not have the notion of zone of responsibility; All not transmission in network of information that system is all with distinguishing, this mode information redundancy amount is big, does not accomplish information layered, subregion transmission; Both cause the overall operation efficiency of system low, reduced the security of system again.
Summary of the invention
The objective of the invention is provides a kind of based on the information layered method of the electric power scheduling automatization system of zone of responsibility to above-mentioned deficiency of the prior art.
Technical matters to be solved by this invention is: a kind of information layered method is provided; Make dispatch automated system effectively to shunt, realize the effect of information layered and safe and effective isolation between each workstation nodes simultaneously for the information that arrives different zones of responsibility.In order to solve the problems of the technologies described above, technical scheme of the present invention comprises following step:
1) increases an area of responsibility in the station of the factory in system database, the equipment list; And according to the zone of responsibility splitting scheme that presets; Through in the area of responsibility of factory station, equipment list, corresponding zone of responsibility value being set, each factory that relates to station, equipment are divided into affiliated zone of responsibility.
2) each workstation nodes is always controlled platform through system and is carried out single-sign-on, carries out the zone of responsibility and select; And the zone of responsibility of selecting saved as local the setting; Corresponding relation with this workstation nodes zone of responsibility selected with it sends to the zone of responsibility registration service as log-on message simultaneously; Whether the zone of responsibility registration service is correctly checked each log-on message; If certain nodal information coupling and the current operation of this node is normal, node needs related zone of responsibility also in tabulating in ready-portioned zone of responsibility in the log-on message simultaneously in the nodal information in the log-on message and the system node database; This log-on message is correct so, and deposit this log-on message in the system database in this moment, and the result that will succeed in registration feeds back to the workstation nodes of sending this log-on message; Otherwise then this log-on message mistake directly feeds back to the workstation nodes of sending this log-on message with the registration failure result at this moment, and this workstation nodes is reselected the zone of responsibility and log-on message is sent to the zone of responsibility registration service until succeeding in registration.
3) application program is when carrying out the real-time information processing; The factory station perhaps is worth the zone of responsibility of corresponding device under in all kinds of real-time information messages that produce, increasing message; This value obtains through the station of the factory in the access system data storehouse, equipment list; Application program is sent to message with message and handles service then; The message processing is served the zone of responsibility value in the corresponding relation of each workstation nodes zone of responsibility selected with it of storing in the value of zone of responsibility in the message and the system database is compared, and according to comparative result, message is diverted to corresponding workstation nodes.
The binary expression means can be adopted in factory station in the system database among the present invention, the area of responsibility of equipment list, and the zone of responsibility value is 4 byte integers.
Zone of responsibility among the present invention can be divided into primary responsibility district and compound zone of responsibility, and the primary responsibility district divides one or several factory station that obtains and/or the set of equipment according to yardman's specific responsibility, and compound zone of responsibility then is one or several primary responsibility district sum.
Beneficial effect of the present invention is: the present invention has two kinds of functions, and one is the division and the management of area of responsibility, and another is to carry out corresponding information layered processing according to the area of responsibility.Based on this method, can realize that the yardman can only carry out manually-operated to station of the factory in the zone of responsibility that oneself belongs to or equipment.Through the present invention; All real-time information setting according to the zone of responsibility after being processed in the electric power scheduling automatization system is sent on the different nodes; Thereby realized the effective shunting of information; Reduce the message flow on the network, improved the performance and the information throughput of total system.Because each workstation can only be handled in this area of responsibility and needs information processed, the present invention has also played the effect of information layered and safe and effective isolation between each workstation nodes, thus the security that has also improved system.
Description of drawings
Fig. 1 is the synoptic diagram that the zone of responsibility is divided in the electrical network.
Fig. 2 is the synoptic diagram of node to the registration of zone of responsibility management service.
Fig. 3 is information layered data flow diagram.
Embodiment
Below in conjunction with accompanying drawing and embodiment, the inventive method is described in detail.
The functional specification of electric power scheduling automatization system is followed in technical scheme strictness of the present invention.The step 1 of the inventive method does; Increase an area of responsibility in factory station in system database, the equipment list; And according to the zone of responsibility splitting scheme that presets; Through in the area of responsibility of factory station, equipment list, corresponding zone of responsibility value being set, each factory that relates to station, equipment are divided into affiliated zone of responsibility.
In this step, the binary expression means can be adopted in the area of responsibility, and for example this territory can be set to 4 byte integers, at this moment can represent the array configuration of 32 zones of responsibility.
Through step 1; Electric power scheduling automatization system is divided into the information of all accesses different area of responsibilitys and is its name according to transformer station and electric pressure; Thereby each node setting is corresponded to a zone of responsibility that has defined, and these can be provided with the interface through one and come to define easily and flexibly and realize.The zone of responsibility can be all factories stations, can be the station set of part factory, the various syntagmatics that also can be the factory station stand with different electric pressure factory; Element in the zone of responsibility can be one or more factories station, even is fine to equipment such as transformer, electrical impedance, indicator.The user can also according to circumstances be provided with its area of responsibility ownership to certain concrete equipment; For example; In order to realize in particular cases the yardman to system-wide maintenance management, server, front end processor and the maintenance work station etc. of main website end are changed to a kind of special zone of responsibility, be the servicing area; Comprise all factory station or equipment in the servicing area, so just can satisfy the demand that the maintainer analyzes and handles all information.And for example, also can monitor's workstation of centralized control system be changed to a plurality of zones of responsibility according to demand, this zone of responsibility is monitored space, so just can satisfy the monitor and the operation of electric system controlled, regulated demands such as operation.Through such definition, make that in fact each equipment in the system has all been set up the related of own and zone of responsibility with the remote signalling telemetry station.Same equipment can belong to a plurality of different area of responsibilitys simultaneously with the remote signalling telemetry station.For example, certain switch can belong to servicing area and monitored space simultaneously.
Zone of responsibility among the present invention can be divided into primary responsibility district and compound zone of responsibility.The primary responsibility district divides or the set at a few factory station (equipment) that obtains according to yardman's specific responsibility; Compound zone of responsibility then is one or several primary responsibility district sum; Factory station that compound zone of responsibility is administered or equipment are factory's station (equipment) sum of its primary responsibility district that comprises administration; Can effectively satisfy the step regulatory requirement of zone of responsibility like this, support each factory station or apparatus manager's function and distinguish.The division of zone of responsibility and the configuration of operating strategy can realize through a zone of responsibility definition and maintenance interface.
Fig. 1 has provided an example that the zone of responsibility is divided.As shown in Figure 1, zone of responsibility A, zone of responsibility B, zone of responsibility C and zone of responsibility D are the primary responsibility district.If zone of responsibility A and zone of responsibility B sum are defined as zone of responsibility E again, then E is compound zone of responsibility.Zone of responsibility A, B, C, D also are monitored spaces simultaneously, and the summation of four zones of responsibility is the servicing area.It is thus clear that, be the servicing area if maintenance work station is provided with the zone of responsibility of oneself, can carry out analyzing and processing to all system informations on this workstation so.If it is zone of responsibility A that monitor workstation is provided with the zone of responsibility of oneself, can and only can obtain factory station or the information of equipment among the A of zone of responsibility so on this workstation.
Fig. 2 has provided the synoptic diagram of the inventive method step 2.As shown in Figure 2; The step 2 of the inventive method does; Each workstation nodes is always controlled platform through system and is carried out single-sign-on, carries out the zone of responsibility and select; And the zone of responsibility of selecting saved as local the setting, and the corresponding relation with this workstation nodes zone of responsibility selected with it sends to the zone of responsibility registration service as log-on message simultaneously, and whether the zone of responsibility registration service is correctly checked each log-on message; If certain nodal information coupling and the current operation of this node is normal, node needs related zone of responsibility also in tabulating in ready-portioned zone of responsibility in the log-on message simultaneously in the nodal information in the log-on message and the system node database; This log-on message is correct so, and deposit this log-on message in the system database in this moment, and the result that will succeed in registration feeds back to the workstation nodes of sending this log-on message; Otherwise then this log-on message mistake directly feeds back to the workstation nodes of sending this log-on message with the registration failure result at this moment, and this workstation nodes is reselected the zone of responsibility and log-on message is sent to the zone of responsibility registration service until succeeding in registration.
Fig. 3 has provided the synoptic diagram of the inventive method step 3.As shown in Figure 3; The step 3 of the inventive method does; Application program is when carrying out the real-time information processing, and the factory station perhaps is worth the zone of responsibility of corresponding device under the increase message in all kinds of real-time information messages that produce, and this value is passed through factory station, the equipment list acquisition in the access system data storehouse; Application program is sent to message with message and handles service then; The message processing is served the zone of responsibility value in the corresponding relation of each workstation nodes zone of responsibility selected with it of storing in the value of zone of responsibility in the message and the system database is compared, and according to comparative result, message is diverted to corresponding workstation nodes.
Through step 3; All real-time information (full remote signalling, remote signalling displacement, full remote measurement, variation remote measurement, factory's station operating mode, out-of-limit information and various warning information) can send on the different nodes according to the setting of zone of responsibility after being processed, and this is actually the shunting of the information of having carried out.After information having been carried out effective shunting and layering processing, the message flow on the network alleviates greatly, and response speed is improved accordingly, thereby the performance of total system and information throughput also are improved accordingly.Used after the shunting information technology, each workstation is only handled in this area of responsibility needs information processed, and irrelevant picture, form, historical data etc. can not appear in this monitoring station.The warning information window also only shows the warning information relevant with this area of responsibility; Remote control, put that yardman's operation such as to count, block, list also only effective to the equipment in the area of responsibility; The equipment that does not belong to this area of responsibility on the picture and information will be by blanking or shieldings (very useful according to the situation that electric pressure adheres to different zones of responsibility separately for a factory station), thereby played the effect of information layered and safe and effective isolation between each workstation nodes.
Though the present invention is with preferred embodiment openly as above, embodiment be not be used for limiting of the present invention.In spirit that does not break away from the present invention and scope, any equivalence of being done changes or retouching, belongs to the present invention's protection domain equally.Therefore protection scope of the present invention should be standard with the application's the content that claim was defined.

Claims (3)

1. based on the information layered method of the electric power scheduling automatization system of zone of responsibility, may further comprise the steps:
1) increases an area of responsibility in the station of the factory in system database, the equipment list; And based on the zone of responsibility splitting scheme that presets; Through in the area of responsibility of factory station, equipment list, corresponding zone of responsibility value being set, each factory that relates to station, equipment are divided into affiliated zone of responsibility;
2) each workstation nodes is always controlled platform through system and is carried out single-sign-on, carries out the zone of responsibility and select; And the zone of responsibility of selecting saved as local the setting; Corresponding relation with this workstation nodes zone of responsibility selected with it sends to the zone of responsibility registration service as log-on message simultaneously; Whether the zone of responsibility registration service is correctly checked each log-on message; If certain nodal information coupling and the current operation of this node is normal, node needs related zone of responsibility also in tabulating in ready-portioned zone of responsibility in the log-on message simultaneously in the nodal information in the log-on message and the system node database; This log-on message is correct so, and deposit this log-on message in the system database in this moment, and the result that will succeed in registration feeds back to the workstation nodes of sending this log-on message; Otherwise then this log-on message mistake directly feeds back to the workstation nodes of sending this log-on message with the registration failure result at this moment, and this workstation nodes is reselected the zone of responsibility and log-on message is sent to the zone of responsibility registration service until succeeding in registration;
3) application program is when carrying out the real-time information processing; The factory station perhaps is worth the zone of responsibility of corresponding device under in all kinds of real-time information messages that produce, increasing message; This value obtains through the station of the factory in the access system data storehouse, equipment list; Application program is sent to message with message and handles service then; The message processing is served the zone of responsibility value in the corresponding relation of each workstation nodes zone of responsibility selected with it of storing in the value of zone of responsibility in the message and the system database is compared, and according to comparative result, message is diverted to corresponding workstation nodes.
2. the information layered method of the electric power scheduling automatization system based on the zone of responsibility according to claim 1 is characterized in that, the binary expression means are adopted in the factory station in the said system database, the area of responsibility of equipment list, and the zone of responsibility value is 4 byte integers.
3. the information layered method of the electric power scheduling automatization system based on the zone of responsibility according to claim 1; It is characterized in that; Said zone of responsibility is divided into primary responsibility district and compound zone of responsibility; The primary responsibility district divides one or several factory station that obtains and/or the set of equipment according to yardman's specific responsibility, and compound zone of responsibility then is one or several primary responsibility district sum.
CN201210192353.7A 2012-06-12 2012-06-12 The information layered method of electric power scheduling automatization system based on zone of responsibility Active CN102722797B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210192353.7A CN102722797B (en) 2012-06-12 2012-06-12 The information layered method of electric power scheduling automatization system based on zone of responsibility

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210192353.7A CN102722797B (en) 2012-06-12 2012-06-12 The information layered method of electric power scheduling automatization system based on zone of responsibility

Publications (2)

Publication Number Publication Date
CN102722797A true CN102722797A (en) 2012-10-10
CN102722797B CN102722797B (en) 2015-09-16

Family

ID=46948545

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210192353.7A Active CN102722797B (en) 2012-06-12 2012-06-12 The information layered method of electric power scheduling automatization system based on zone of responsibility

Country Status (1)

Country Link
CN (1) CN102722797B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104516953A (en) * 2014-12-12 2015-04-15 国家电网公司 Black box system for mass power dispatching automation message
CN106375459A (en) * 2016-09-12 2017-02-01 国网江苏省电力公司南京供电公司 Mass data analysis device and method in isolated networks
CN106600168A (en) * 2016-12-29 2017-04-26 国网浙江省电力公司温州供电公司 Power grid responsibility area information verification method, device and system
CN110942159A (en) * 2019-11-21 2020-03-31 贵州电网有限责任公司 Maintenance and verification method for responsibility area of main network OCS (online charging System)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1424843A (en) * 2001-12-07 2003-06-18 株式会社日立制作所 Household electrical appliances corresponding network, inspecting system and service for the same
CN1680817A (en) * 2005-01-31 2005-10-12 南京迪玛斯电气有限公司 Metering and charging system of electric energy amount
CN101572443A (en) * 2009-06-11 2009-11-04 绍兴电力局 Anti-misoperation method for automation personnel in electric power system
CN101807818A (en) * 2010-02-25 2010-08-18 华北电力大学 Device access authentication method of distribution network automated communication system based on ID
CN102238477A (en) * 2010-04-30 2011-11-09 华为终端有限公司 Method for triggering group of MTC (Machine Type Communication) devices to communicate with MTC server and MTC device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1424843A (en) * 2001-12-07 2003-06-18 株式会社日立制作所 Household electrical appliances corresponding network, inspecting system and service for the same
CN1680817A (en) * 2005-01-31 2005-10-12 南京迪玛斯电气有限公司 Metering and charging system of electric energy amount
CN101572443A (en) * 2009-06-11 2009-11-04 绍兴电力局 Anti-misoperation method for automation personnel in electric power system
CN101807818A (en) * 2010-02-25 2010-08-18 华北电力大学 Device access authentication method of distribution network automated communication system based on ID
CN102238477A (en) * 2010-04-30 2011-11-09 华为终端有限公司 Method for triggering group of MTC (Machine Type Communication) devices to communicate with MTC server and MTC device

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
黄炜等: "调度集控一体化系统责任区管理和告警解决方案", 《电网技术》 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104516953A (en) * 2014-12-12 2015-04-15 国家电网公司 Black box system for mass power dispatching automation message
CN104516953B (en) * 2014-12-12 2016-03-09 国家电网公司 A kind of black box subsystem for power dispatching automation magnanimity message
CN106375459A (en) * 2016-09-12 2017-02-01 国网江苏省电力公司南京供电公司 Mass data analysis device and method in isolated networks
CN106375459B (en) * 2016-09-12 2021-07-16 国网江苏省电力公司南京供电公司 Mass data analysis device and method in isolation network
CN106600168A (en) * 2016-12-29 2017-04-26 国网浙江省电力公司温州供电公司 Power grid responsibility area information verification method, device and system
CN110942159A (en) * 2019-11-21 2020-03-31 贵州电网有限责任公司 Maintenance and verification method for responsibility area of main network OCS (online charging System)
CN110942159B (en) * 2019-11-21 2023-05-30 贵州电网有限责任公司 Maintenance and verification method for responsibility area of master network OCS system

Also Published As

Publication number Publication date
CN102722797B (en) 2015-09-16

Similar Documents

Publication Publication Date Title
CN102570602A (en) Fault comprehensive processing platform and method of distribution network
CN202159369U (en) Information processing device for improving fault repairing work order merging rate of electrical power system
CN105049223B (en) A kind of power telecom network defect troubleshooting decision assistant analysis method
CN202475009U (en) Comprehensive processing system of failure of power distribution and supply grid
CN104601383B (en) A kind of power telecom network fault piecewise analysis method
CN101877656B (en) Network management and monitoring system and method for realizing parallel processing of fault alarms thereof
CN103023147B (en) Electric power main website based on CIM data model and transformer station's remote viewing interlock method
CN105119950A (en) Power distribution network communication method
CN107995051A (en) Secondary equipment of intelligent converting station visualized O&M module information interactive system and method
CN102722797A (en) Power dispatching automation system information layering method based on responsibility area
CN104104723A (en) Distributed collaboration monitoring system
CN103813141A (en) Video comprehensive monitoring system and monitoring method based on stream media
CN108574696A (en) A kind of command dispatching system and working method based on GIS map
CN109472476A (en) A kind of power failure identifying and analyzing method and system
CN202550669U (en) Data acquisition system for power equipment
CN105049253A (en) Method for obtaining mobile network fault location and fault early warning
CN103366245B (en) Electric network fault information issuing method based on OSB bus and system
CN202077136U (en) Superposing device for elevator
EP3444913B1 (en) Energy distribution method
CN103337859A (en) Splitting control method of large-scale regional power grids
CN102209231B (en) Equipment information output method and system
JP2014233060A (en) Plant remote monitoring control device
CN102231754A (en) Monitoring management method of transformer substation auxiliary facilities and environment, and system thereof
CN105743695A (en) Monitoring method and system based on IEC 104 protocol
WO2018091260A1 (en) Method for setting up a database for mapping the network topology of an electrical distribution network, and use of this database

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: STATE GRID CORPORATION OF CHINA

Free format text: FORMER OWNER: CHINA REALTIME DATABASE CO., LTD.

Effective date: 20121228

Owner name: CHINA REALTIME DATABASE CO., LTD. SUZHOU POWER SUP

Free format text: FORMER OWNER: SUZHOU POWER SUPPLY CO., LTD. OF JIANGSU ELECTRIC POWER COMPANY

Effective date: 20121228

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 210003 NANJING, JIANGSU PROVINCE TO: 100031 XICHENG, BEIJING

TA01 Transfer of patent application right

Effective date of registration: 20121228

Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Applicant after: State Grid Corporation of China

Applicant after: CHINA REALTIME DATABASE Co.,Ltd.

Applicant after: STATE GRID SUZHOU POWER SUPPLY Co.

Address before: 210003 19F, building A, 5 new model road, Gulou District, Jiangsu, Nanjing

Applicant before: CHINA REALTIME DATABASE Co.,Ltd.

Applicant before: STATE GRID SUZHOU POWER SUPPLY Co.

ASS Succession or assignment of patent right

Owner name: SUZHOU POWER SUPPLY CO., LTD. OF JIANGSU ELECTRIC

Free format text: FORMER OWNER: CHINA REALTIME DATABASE CO., LTD. SUZHOU POWER SUPPLY CO., LTD. OF JIANGSU ELECTRIC POWER COMPANY

Effective date: 20140107

C41 Transfer of patent application or patent right or utility model
C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Zhao Jiaqing

Inventor after: Li Chun

Inventor after: Ding Hongen

Inventor after: Qian Kejun

Inventor after: Yu Jianzhong

Inventor after: Xu Chunlei

Inventor after: Li Huiqun

Inventor after: Jiang Yongping

Inventor after: Yang Hong

Inventor after: Zhao Jinghu

Inventor after: Zhang Kehang

Inventor after: Chen Ning

Inventor before: Zhao Jiaqing

Inventor before: Zhang Kehang

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: ZHAO JIAQING ZHANG KEHENG TO: ZHAO JIAQING YU JIANZHONG XU CHUNLEI LI HUIQUN JIANG YONGPING YANG HONG ZHAO JINGHU ZHANG KEHENG CHEN NING LI CHUN DING HONGEN QIAN KEJUN

TA01 Transfer of patent application right

Effective date of registration: 20140107

Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Applicant after: State Grid Corporation of China

Applicant after: STATE GRID SUZHOU POWER SUPPLY Co.

Applicant after: CHINA REALTIME DATABASE Co.,Ltd.

Applicant after: JIANGSU ELECTRIC POWER Co.

Address before: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Applicant before: State Grid Corporation of China

Applicant before: CHINA REALTIME DATABASE Co.,Ltd.

Applicant before: STATE GRID SUZHOU POWER SUPPLY Co.

C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Patentee after: State Grid Corporation of China

Patentee after: SUZHOU POWER SUPPLY COMPANY OF STATE GRID JIANGSU ELECTRIC POWER Co.

Patentee after: CHINA REALTIME DATABASE Co.,Ltd.

Patentee after: STATE GRID JIANGSU ELECTRIC POWER Co.

Address before: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Patentee before: State Grid Corporation of China

Patentee before: STATE GRID SUZHOU POWER SUPPLY Co.

Patentee before: CHINA REALTIME DATABASE Co.,Ltd.

Patentee before: JIANGSU ELECTRIC POWER Co.

CP03 Change of name, title or address

Address after: 215004 Suzhou labor Road, Jiangsu, No. 555

Patentee after: SUZHOU POWER SUPPLY COMPANY OF STATE GRID JIANGSU ELECTRIC POWER Co.

Patentee after: CHINA REALTIME DATABASE Co.,Ltd.

Patentee after: STATE GRID JIANGSU ELECTRIC POWER Co.

Patentee after: State Grid Corporation of China

Address before: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Patentee before: State Grid Corporation of China

Patentee before: SUZHOU POWER SUPPLY COMPANY OF STATE GRID JIANGSU ELECTRIC POWER Co.

Patentee before: CHINA REALTIME DATABASE Co.,Ltd.

Patentee before: STATE GRID JIANGSU ELECTRIC POWER Co.