CN102722759A - 基于bp神经网络的电网供电可靠性预测方法 - Google Patents

基于bp神经网络的电网供电可靠性预测方法 Download PDF

Info

Publication number
CN102722759A
CN102722759A CN2012101560444A CN201210156044A CN102722759A CN 102722759 A CN102722759 A CN 102722759A CN 2012101560444 A CN2012101560444 A CN 2012101560444A CN 201210156044 A CN201210156044 A CN 201210156044A CN 102722759 A CN102722759 A CN 102722759A
Authority
CN
China
Prior art keywords
neural network
supply reliability
influence factor
input vector
vector
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012101560444A
Other languages
English (en)
Other versions
CN102722759B (zh
Inventor
卫志农
刘亚南
孙国强
孙永辉
韦延方
杨雄
袁阳
陆子刚
王越
陈婷
杨友情
江龙才
吴常胜
钱瑛
周军
李进
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hohai University HHU
Chizhou Power Supply Co of State Grid Anhui Electric Power Co Ltd
Original Assignee
Hohai University HHU
Chizhou Power Supply Co of State Grid Anhui Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hohai University HHU, Chizhou Power Supply Co of State Grid Anhui Electric Power Co Ltd filed Critical Hohai University HHU
Priority to CN201210156044.4A priority Critical patent/CN102722759B/zh
Publication of CN102722759A publication Critical patent/CN102722759A/zh
Application granted granted Critical
Publication of CN102722759B publication Critical patent/CN102722759B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

本发明公开了一种基于BP神经网络的电网供电可靠性预测方法。本发明利用BP神经网络进行建模预测,以电网供应能力和电网面临的自然灾害等因素作为模型的输入变量,以影响供电可靠性的电网故障停电时间作为模型的输出量,训练并建立电网可靠性预测模型;并在此基础上使用主成分分析对输入样本进行降维处理,简化了人工神经网络的输入结构,提高了网络的学习速率及精度。

Description

基于BP神经网络的电网供电可靠性预测方法
技术领域
本发明涉及一种电网供电可靠性预测方法,属于电力系统技术领域。
背景技术
供电可靠性是指供电系统对用户连续供电的能力。随着社会的发展和人民生活水平的提高,社会对供电可靠性的要求也越来越高,提高供电可靠性既是用户的需要,也是供电企业自身发展所追求的目标。近年来,国内外大电网发生的大面积长时间停电事故,不但造成巨大的经济损失,而且危及社会秩序。因此定量地评价和改善电力系统的供电可靠性,对可靠性的研究显得更加必要和迫切,可以说,电力系统可靠性的形成和发展是电力工业本身发展的客观规律所决定的。同时其它工业部门在研究和应用可靠性技术方面取得了积极成果,给电力系统供电可靠性的发展起到巨大的推动作用。
随着“十一五”规划接近尾声,电网公司希望通过科学建立可靠性预测模型来总结评估工作,同时更有效果的制定发展规划和目标。尤其通过加大电网投资,来达到提过供电可靠性的目的,否则投资变得没有意义。同时有必要分析各个因素对供电可靠性的影响,使得电网公司的投资可以根据不同的影响程度相应的增加或减少,对投资进行一定的规划,具有实际的意义。
传统的可靠性预测方法需要准确的电网结构和多年的元件可靠性指标历史数据,然而电网结构复杂,数据量很大,再加上目前无法确定目标年的具体网络结构,因此无法采用传统方法对整个电网的供电可靠性进行预测。
发明内容
本发明所要解决的技术问题在于克服现有技术不足,提供一种基于BP神经网络的电网供电可靠性预测方法,利用BP神经网络良好的非线性函数逼近能力,改善了预测模型的精度和泛化能力。
本发明具体采用以下技术方案解决上述技术问题。
基于BP神经网络的电网供电可靠性预测方法,包括以下步骤:
步骤A、分析并选取电网供电可靠性的影响因素;
步骤B、根据所选取的影响因素的历史数据生成输入向量,以所对应的平均故障停电时间的历史数据作为输出,得到训练样本;
步骤C、利用所述训练样本对BP神经网络进行训练,得到训练后的BP神经网络;所述神经网络的输入层节点数为所述输入向量的特征维数,输出层节点数为1;
步骤D、根据所选取的影响因素的待预测时刻的实际数据生成测试输入向量,并将测试输入向量输入训练后的BP神经网络,其输出即为待预测时刻的平均故障停电时间的预测值。
上述技术方案中,所述输入向量可由各影响因素的数据直接生成,但当所选取的影响因素较多时,过多的变量会导致计算复杂度高,从而影响预测效率。为此,作为本发明的进一步改进方案,所述根据所选取的影响因素的历史数据生成输入向量,具体按照以下方法:首先,利用所选取的影响因素的历史数据构造特征向量;然后,对该特征向量进行降维处理,得到输入向量;所述根据所选取的影响因素的待预测时刻的实际数据生成测试输入向量,具体按照以下方法:首先,利用所选取的影响因素的待预测时刻的实际数据构造测试特征向量;然后,对该测试特征向量进行降维处理,得到测试输入向量。即通过对原始数据样本进行降维处理(特征提取)来降低预测的计算复杂度,提高效率。
优选地,所述降维处理采用主成分分析(Principal ComponentAnalysis,PCA)方法。
优选地,所述影响因素包括:220kV架空线可用系数、110kV架空线可用系数、220kV变压器可用系数、110kV变压器可用系数、220kV断路器可用系数、110kV断路器可用系数、220kV容载比、110kV容载比、220kV供电半径、110kV供电半径、单位增供负荷220kV变电容量、单位增供负荷110kV变电容量、拉限电损失电量、农村供电可靠率、城市供电可靠率、雷击日数、暴雨日数、风灾日数、高温日数。
本发明的电网供电可靠性预测方法利用BP神经网络进行建模预测,利用其良好的非线性函数逼近能力,改善预测模型的精度和泛化能力;并在此基础上使用主成分分析对输入样本进行降维处理,降低了算法复杂度,提高了预测效率。
附图说明
图1为本发明预测模型的结构示意图;
图2为本发明方法中BP神经网络训练过程的流程图。
具体实施方式
下面结合附图对本发明的技术方案进行详细说明:
本发明的思路是利用人工智能神经网络构建一个电网可靠性预测模型,利用该预测模型对待预测时刻的电网可靠性进行预测。下面对该预测模型的建立过程进行详细说明。
输入变量的选择:
由于电网的供电可靠性主要与电网自身的供应能力和电网所处的自然环境密不可分,因此,本发明选取了体现电网自身供应能力的电网设备可用系数、供电可靠率、供电半径、容载比、拉限电损失电量、单位增供负荷新增变电容量,同时加入气象因素。具体的有19个因素:220kV和110kV架空线可用系数、220kV和110kV变压器可用系数、220kV和110kV断路器可用系数、220kV和110kV容载比、220kV和110kV供电半径、单位增供负荷220kV和110kV变电容量、农村和城市供电可靠率、雷击日数、暴雨日数、风灾日数和高温日数。
输出变量的选择:
在日常生产中,影响供电可靠性的原因主要又两个方面:一是故障停电,二是预安排停电。电网系统各种因素对电网产生的最终直观表现为电网停电事故,因此本发明以年平均故障停电时间作为电网供电可靠性预测模型的输出量。
人工神经网络是人工智能技术的一种,具有大规模分布式并行处理、非线性、自组织、自学习、联想记忆等优良特性,因此可以作为一种预测手段。BP算法是训练人工神经网络的基本方法,其基本思想是最小二乘算法。它采用梯度搜索技术,以期使网络的实际输出值与期望输出值的误差均方值为最小。x1,x2,…,xk为BP神经网络的输入变量,d1,d2,…,dn为BP神经网络的预测值,wij为输入层与隐含层的权值,wjk为隐含层与输出层的权值。输入节点为n,隐含层节点可设为l=2n,输出节点为m。其训练的具体步骤如下:
(1)BP神经网络初始化:根据模型确定输入层节点数、隐含层节点数和输出层节点数,初始化wij、wjk、隐含层阀值a、输出层阀值b,给定学习速率和神经元激励函数;
(2)隐含层输出计算:根据输入向量,输入层和隐含层连接权值wij以及隐含层阀值a,计算隐含层输出H:
H = f ( Σ i = 1 k w ij x i - a j ) j = 1,2 , · · · , l
式中:l为隐含层节点数;f为隐含层激励函数,本发明选函数为:
f ( x ) = 1 1 + e - x
(3)输出层输出计算:根据隐含层输出H,连接权值wjk和阀值b,计算BP神经网络预测输出O:
O k = Σ j = 1 m H j w jk - b k k = 1,2 , · · · , m
(4)误差计算:根据网络预测输出O和期望输出d,计算网络预测误差e:
ek=dk-Ok  k=1,2,…,m
(5)权值更新:根据网络预测误差e更新网络连接权值wij和wjk
w ij = w ij + η H j ( 1 - H j ) x ( i ) Σ k = 1 m w jk e k i = 1,2 , · · · , n ; j = 1,2 , · · · , l
wjk=wjk+ηHjek    j=1,2,…,l;k=1,2,…,m
式中:η为学习速率,0≤η≤1;
(6)阀值更新:根据网络预测误差e更新网络节点阀值a,b:
a j = a j + η H j ( 1 - H j ) Σ k = 1 m w jk e k j = 1,2 , · · · , l
bk=bk+ek  k=1,2,…,m
(7)判断算法迭代是否结束,若没有介绍,返回步骤(2)。
由于本发明选择了19个影响因素作为输入变量,因此可将BP神经网络的输入层节点设为19,输出层节点数设为1。但采用该方案时,较多变量会导致计算复杂度高,影响预测效率。因此,本发明对输入变量先进行降维处理。可采用的降维方法较多,例如可以采用现有的主成分分析、非负矩阵分解、粗糙集约简和灰色关联度等方法。本发明优选采用主成分分析方法。其具体过程如下:
(1)原始数据标准化:本发明的输入变量由电网设备可用系数、供电可靠率、供电半径、容载比、拉限电损失电量、单位增供负荷新增变电容量、高温日数、雷击日数、风灾日数和暴雨日数组成,输出变量是年平均故障停电时间。原始数据组成的矩阵记为
X = x 11 x 12 · · · x 1 p x 21 x 22 · · · x 2 p · · · · · · · · · · · · x n 1 x n 2 · · · x np
式中:n是样本个数,p是每个样本的维数,xij为第i个样本的第j维取值。用x1,x2,…,xp分别表示矩阵X的各列矢量,有
x j * = x j - E ( x j ) Var ( x j ) ( j = 1,2 , · · · , p )
式中:E(xj)和Var(xj)分别表示xj的均值和方差。
(2)计算样本各维间相关系数矩阵R=(rij)p×p
r ij = Cov ( x i , x j ) Var ( x i ) Var ( x j ) = 1 n Σ k = 1 n x ki * x kj * ( i , j = 1,2 , · · · , p )
式中:Cov(xi,xj)表示原始数据矩阵中第i列与第j列之间的协方差。
上式等价于
R = 1 N - 1 ( X * ) T ( X * )
式中:X*是将X标准化后的数据矩阵,可以看出,R为半正定对称矩阵。
(3)求R的特征值为λ1≥λ2≥…≥λp和其对应的单位化特征向量μ12,…,μp
(4)确定主成分个数。分别计算方差贡献率ηi和累计方差贡献率βi
η i = λ i / Σ i = 1 p λ i × 100 %
β i = Σ k = 1 i λ k / Σ k = 1 p λ k × 100 %
选取主成分的个数取决于累计方差贡献率,通常累计方差贡献率大于85%-90%,对应的前k个主成分便包含p个原始变量所能提供的绝大部分信息,则主成分个数就是k个,从而实现了Rp →Rk的线性变换,达到特征提取和降维的目的。
本发明完整的预测模型结构如图1所示。图2显示了BP神经网络的训练过程。
本发明在人工神经网络的基础上引入主成分分析法对样本进行特征提取,消除变量间的相关性再进行建模,这样既结合了主成分分析(PCA)的特征提取能力,又利用了人工神经网络良好的非线性函数逼近能力,从而改善了预测模型的精度和泛化能力。
为了验证本发明方法的有效性,进行以下实验:以华东某市2003年-2008年19个影响因素和年平均故障停电时间作为模型的训练样本,以2009年的实际数据作为测试样本,在Matlab环境下训练并建立该地区电网供电可靠性预测模型。首先利用主成分分析方法对2003年-2008年19个影响因素的历史数据进行降维处理。包括以下步骤:
步骤1:将输入变量标准化处理,计算相关系数矩阵。
步骤2:由相关系数矩阵计算特征值、各个主成分的贡献率以及累计贡献率,具体见表1(这里只列举7个主成分)。
表1特征值及主成分贡献率
Figure BDA00001650153900061
由表1可知,前5个主成分的累计贡献率已高达96.99%(大于95%),说明前5个主成分提供了原始数据比较充足的信息,因此提取5个主成分进行预测,对于5个特征值分别求出其特征向量,再计算各对于5个特征值分别求出其特征向量,再计算各变量在主成分上的载荷,具体的计算结果见表2。
表2主成分负载
Figure BDA00001650153900062
Figure BDA00001650153900071
将前5个主成分构成的新样本空间作为BP神经网络的输入量进行训练和预测,BP神经网络初始学习率设为0.1,输入层节点数为5,隐含层节点数为11,输出层节点数为1。预测结果见表3,其中“BP”是指不采用降维处理,直接以传统BP神经网络进行预测;“PCA_BP”是指本具体实施方式中所述方法。
表3预测结果分析
Figure BDA00001650153900072
从表3可以看出,采用PCA方法对神经网络的输入进行降维,不但减少了输入变量维数,降低了计算复杂度,而且提高了预测精度。

Claims (5)

1.基于BP神经网络的电网供电可靠性预测方法,其特征在于,包括以下步骤:
步骤A、分析并选取电网供电可靠性的影响因素;
步骤B、根据所选取的影响因素的历史数据生成输入向量,以所对应的平均故障停电时间的历史数据作为输出,得到训练样本;
步骤C、利用所述训练样本对BP神经网络进行训练,得到训练后的BP神经网络;所述神经网络的输入层节点数为所述输入向量的特征维数,输出层节点数为1;
步骤D、根据所选取的影响因素的待预测时刻的实际数据生成测试输入向量,并将测试输入向量输入训练后的BP神经网络,其输出即为待预测时刻的平均故障停电时间的预测值。
2.如权利要求1所述基于BP神经网络的电网供电可靠性预测方法,其特征在于,
所述根据所选取的影响因素的历史数据生成输入向量,具体按照以下方法:首先,利用所选取的影响因素的历史数据构造特征向量;然后,对该特征向量进行降维处理,得到输入向量;
所述根据所选取的影响因素的待预测时刻的实际数据生成测试输入向量,具体按照以下方法:首先,利用所选取的影响因素的待预测时刻的实际数据构造测试特征向量;然后,对该测试特征向量进行降维处理,得到测试输入向量。
3.如权利要求2所述基于BP神经网络的电网供电可靠性预测方法,其特征在于,所述降维处理采用主成分分析方法。
4.如权利要求3所述基于BP神经网络的电网供电可靠性预测方法,其特征在于,在采用主成分分析方法进行降维时,选取累计方差贡献率大于一预设阈值的主成分,所述阈值的取值范围为85%—90%。
5.如权利要求1-4任一项所述基于BP神经网络的电网供电可靠性预测方法,其特征在于,所述影响因素包括:220kV架空线可用系数、110kV架空线可用系数、220kV变压器可用系数、110kV变压器可用系数、220kV断路器可用系数、110kV断路器可用系数、220kV容载比、110kV容载比、220kV供电半径、110kV供电半径、单位增供负荷220kV变电容量、单位增供负荷110kV变电容量、拉限电损失电量、农村供电可靠率、城市供电可靠率、雷击日数、暴雨日数、风灾日数、高温日数。
CN201210156044.4A 2012-05-17 2012-05-17 基于bp神经网络的电网供电可靠性预测方法 Expired - Fee Related CN102722759B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210156044.4A CN102722759B (zh) 2012-05-17 2012-05-17 基于bp神经网络的电网供电可靠性预测方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210156044.4A CN102722759B (zh) 2012-05-17 2012-05-17 基于bp神经网络的电网供电可靠性预测方法

Publications (2)

Publication Number Publication Date
CN102722759A true CN102722759A (zh) 2012-10-10
CN102722759B CN102722759B (zh) 2015-01-14

Family

ID=46948508

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210156044.4A Expired - Fee Related CN102722759B (zh) 2012-05-17 2012-05-17 基于bp神经网络的电网供电可靠性预测方法

Country Status (1)

Country Link
CN (1) CN102722759B (zh)

Cited By (31)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102938742A (zh) * 2012-11-08 2013-02-20 广东电网公司电力调度控制中心 基于电力业务需求的通信带宽预测方法及装置
CN103559556A (zh) * 2013-10-31 2014-02-05 浙江大学 一种在线预测电力系统负荷能力极限的方法
CN104167816A (zh) * 2014-07-15 2014-11-26 广东电网公司东莞供电局 一种电网事故自动分析处理系统
CN104346659A (zh) * 2014-11-26 2015-02-11 北京邮电大学 应用于高倍聚光光伏发电系统的短期发电量预测方法
CN105469156A (zh) * 2014-09-11 2016-04-06 国网四川省电力公司电力科学研究院 Moa健康管理和故障预测方法及系统
CN105574604A (zh) * 2015-11-12 2016-05-11 国家电网公司 一种面向电网运行事件的监控预判分析系统
CN106203800A (zh) * 2016-06-30 2016-12-07 中国电力科学研究院 一种配电网运行可靠性指标提取方法
CN106408016A (zh) * 2016-09-13 2017-02-15 广西电网有限责任公司北海供电局 一种配电网停电时间自动识别模型构造方法
CN106446016A (zh) * 2016-08-29 2017-02-22 中国电力科学研究院 一种基于并行关联规则挖掘的配电网运行可靠性预测方法
CN106845711A (zh) * 2017-01-22 2017-06-13 南方电网科学研究院有限责任公司 供电可靠性数据的处理方法及处理装置
CN107451675A (zh) * 2017-06-21 2017-12-08 国网辽宁省电力有限公司 一种基于大数据提升供电可靠性的系统及方法
CN107704918A (zh) * 2017-09-19 2018-02-16 平安科技(深圳)有限公司 驾驶模型训练方法、驾驶人识别方法、装置、设备及介质
CN107766876A (zh) * 2017-09-19 2018-03-06 平安科技(深圳)有限公司 驾驶模型训练方法、驾驶人识别方法、装置、设备及介质
CN108090613A (zh) * 2017-12-18 2018-05-29 南京航空航天大学 一种进近管制扇区管制员工作负荷预测方法
CN108375715A (zh) * 2018-03-08 2018-08-07 中国电力科学研究院有限公司 一种配电网线路故障风险日预测方法及系统
CN108460479A (zh) * 2018-01-23 2018-08-28 国网安徽省电力有限公司阜阳供电公司 一种公共楼宇空调短时基线负荷预测方法
CN108665090A (zh) * 2018-04-06 2018-10-16 东北电力大学 基于主成分分析与Verhulst模型的城市电网饱和负荷预测方法
CN108830406A (zh) * 2018-05-29 2018-11-16 贵州黔驰信息股份有限公司 一种基于数据挖掘的主配网预停电配置方法
CN108898249A (zh) * 2018-06-28 2018-11-27 鹿寨知航科技信息服务有限公司 一种电网故障预测方法
CN109087031A (zh) * 2018-09-25 2018-12-25 国电南瑞南京控制系统有限公司 基于风电场多维指标分析的综合能效评估方法
CN109242150A (zh) * 2018-08-15 2019-01-18 中国南方电网有限责任公司超高压输电公司南宁监控中心 一种电网可靠性预测方法
CN109473985A (zh) * 2019-01-16 2019-03-15 江苏圣通电力新能源科技有限公司 一种基于bp神经网络智能电网配电方法
CN109615169A (zh) * 2018-11-08 2019-04-12 国家电网有限公司 一种基于MEA-IElman神经网络的配电网可靠性评估方法
CN109858663A (zh) * 2018-11-19 2019-06-07 中国农业大学 基于bp神经网络的配电网故障停电影响因素敏感度分析
CN110400233A (zh) * 2019-07-05 2019-11-01 国网山东省电力公司枣庄供电公司 一种基于神经网络的配电网损失电量计算方法及装置
CN110942401A (zh) * 2019-11-21 2020-03-31 黑龙江电力调度实业有限公司 一种电力物联网智能通讯方法
CN111160204A (zh) * 2019-12-23 2020-05-15 山东大学 基于主元分析bp神经网络的地质雷达图像识别方法及系统
CN111585671A (zh) * 2020-04-15 2020-08-25 国网河南省电力公司郑州供电公司 电力lte无线专网电磁干扰监测及识别方法
CN111678679A (zh) * 2020-05-06 2020-09-18 内蒙古电力(集团)有限责任公司电力调度控制分公司 一种基于pca-bpnn的断路器故障诊断方法
CN112036682A (zh) * 2020-07-10 2020-12-04 广西电网有限责任公司 一种频繁停电的预警方法及装置
CN112801365A (zh) * 2021-01-27 2021-05-14 广东电网有限责任公司广州供电局 一种配电网可靠性预测方法、装置、设备和介质

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102231144A (zh) * 2011-06-03 2011-11-02 中国电力科学研究院 一种基于Boosting算法的配电网理论线损预测方法
CN102270279A (zh) * 2011-07-27 2011-12-07 华北电力大学 一种短期电力负荷预测方法

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102231144A (zh) * 2011-06-03 2011-11-02 中国电力科学研究院 一种基于Boosting算法的配电网理论线损预测方法
CN102270279A (zh) * 2011-07-27 2011-12-07 华北电力大学 一种短期电力负荷预测方法

Cited By (38)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102938742B (zh) * 2012-11-08 2015-07-22 广东电网公司电力调度控制中心 基于电力业务需求的通信带宽预测方法及装置
CN102938742A (zh) * 2012-11-08 2013-02-20 广东电网公司电力调度控制中心 基于电力业务需求的通信带宽预测方法及装置
CN103559556A (zh) * 2013-10-31 2014-02-05 浙江大学 一种在线预测电力系统负荷能力极限的方法
CN103559556B (zh) * 2013-10-31 2016-05-11 浙江大学 一种在线预测电力系统负荷能力极限的方法
CN104167816A (zh) * 2014-07-15 2014-11-26 广东电网公司东莞供电局 一种电网事故自动分析处理系统
CN105469156A (zh) * 2014-09-11 2016-04-06 国网四川省电力公司电力科学研究院 Moa健康管理和故障预测方法及系统
CN104346659A (zh) * 2014-11-26 2015-02-11 北京邮电大学 应用于高倍聚光光伏发电系统的短期发电量预测方法
CN105574604B (zh) * 2015-11-12 2020-05-05 国家电网公司 一种面向电网运行事件的监控预判分析系统
CN105574604A (zh) * 2015-11-12 2016-05-11 国家电网公司 一种面向电网运行事件的监控预判分析系统
CN106203800A (zh) * 2016-06-30 2016-12-07 中国电力科学研究院 一种配电网运行可靠性指标提取方法
CN106446016A (zh) * 2016-08-29 2017-02-22 中国电力科学研究院 一种基于并行关联规则挖掘的配电网运行可靠性预测方法
CN106408016A (zh) * 2016-09-13 2017-02-15 广西电网有限责任公司北海供电局 一种配电网停电时间自动识别模型构造方法
CN106845711A (zh) * 2017-01-22 2017-06-13 南方电网科学研究院有限责任公司 供电可靠性数据的处理方法及处理装置
CN107451675A (zh) * 2017-06-21 2017-12-08 国网辽宁省电力有限公司 一种基于大数据提升供电可靠性的系统及方法
CN107704918A (zh) * 2017-09-19 2018-02-16 平安科技(深圳)有限公司 驾驶模型训练方法、驾驶人识别方法、装置、设备及介质
CN107766876A (zh) * 2017-09-19 2018-03-06 平安科技(深圳)有限公司 驾驶模型训练方法、驾驶人识别方法、装置、设备及介质
CN108090613A (zh) * 2017-12-18 2018-05-29 南京航空航天大学 一种进近管制扇区管制员工作负荷预测方法
CN108460479A (zh) * 2018-01-23 2018-08-28 国网安徽省电力有限公司阜阳供电公司 一种公共楼宇空调短时基线负荷预测方法
CN108375715A (zh) * 2018-03-08 2018-08-07 中国电力科学研究院有限公司 一种配电网线路故障风险日预测方法及系统
CN108375715B (zh) * 2018-03-08 2023-11-03 中国电力科学研究院有限公司 一种配电网线路故障风险日预测方法及系统
CN108665090A (zh) * 2018-04-06 2018-10-16 东北电力大学 基于主成分分析与Verhulst模型的城市电网饱和负荷预测方法
CN108830406A (zh) * 2018-05-29 2018-11-16 贵州黔驰信息股份有限公司 一种基于数据挖掘的主配网预停电配置方法
CN108898249A (zh) * 2018-06-28 2018-11-27 鹿寨知航科技信息服务有限公司 一种电网故障预测方法
CN109242150A (zh) * 2018-08-15 2019-01-18 中国南方电网有限责任公司超高压输电公司南宁监控中心 一种电网可靠性预测方法
CN109087031A (zh) * 2018-09-25 2018-12-25 国电南瑞南京控制系统有限公司 基于风电场多维指标分析的综合能效评估方法
CN109615169A (zh) * 2018-11-08 2019-04-12 国家电网有限公司 一种基于MEA-IElman神经网络的配电网可靠性评估方法
CN109858663A (zh) * 2018-11-19 2019-06-07 中国农业大学 基于bp神经网络的配电网故障停电影响因素敏感度分析
CN109473985A (zh) * 2019-01-16 2019-03-15 江苏圣通电力新能源科技有限公司 一种基于bp神经网络智能电网配电方法
CN110400233A (zh) * 2019-07-05 2019-11-01 国网山东省电力公司枣庄供电公司 一种基于神经网络的配电网损失电量计算方法及装置
CN110942401A (zh) * 2019-11-21 2020-03-31 黑龙江电力调度实业有限公司 一种电力物联网智能通讯方法
CN110942401B (zh) * 2019-11-21 2023-12-19 黑龙江电力调度实业有限公司 一种电力物联网智能通讯方法
CN111160204A (zh) * 2019-12-23 2020-05-15 山东大学 基于主元分析bp神经网络的地质雷达图像识别方法及系统
CN111160204B (zh) * 2019-12-23 2024-01-30 山东大学 基于主元分析bp神经网络的地质雷达图像识别方法及系统
CN111585671B (zh) * 2020-04-15 2022-06-10 国网河南省电力公司郑州供电公司 电力lte无线专网电磁干扰监测及识别方法
CN111585671A (zh) * 2020-04-15 2020-08-25 国网河南省电力公司郑州供电公司 电力lte无线专网电磁干扰监测及识别方法
CN111678679A (zh) * 2020-05-06 2020-09-18 内蒙古电力(集团)有限责任公司电力调度控制分公司 一种基于pca-bpnn的断路器故障诊断方法
CN112036682A (zh) * 2020-07-10 2020-12-04 广西电网有限责任公司 一种频繁停电的预警方法及装置
CN112801365A (zh) * 2021-01-27 2021-05-14 广东电网有限责任公司广州供电局 一种配电网可靠性预测方法、装置、设备和介质

Also Published As

Publication number Publication date
CN102722759B (zh) 2015-01-14

Similar Documents

Publication Publication Date Title
CN102722759B (zh) 基于bp神经网络的电网供电可靠性预测方法
CN110070226A (zh) 基于卷积神经网络与元学习的光伏功率预测方法及系统
CN104037943B (zh) 一种提高电网电压质量的电压监测方法及系统
CN105069692A (zh) 准确的电网安全风险评估方法
CN106295899B (zh) 基于遗传算法与支持向量分位数回归的风电功率概率密度预测方法
CN103218674A (zh) 基于bp神经网络模型的光伏发电系统输出功率预测方法
CN112116130B (zh) 一种基于可变结构深度学习框架的短期调度规则提取方法
CN105243259A (zh) 基于极限学习机的脉动风速快速预测方法
CN103065202A (zh) 一种基于组合核函数的风电场超短期风速预测方法
CN103985000A (zh) 基于函数型非参数回归的中长期典型日负荷曲线预测方法
CN103425874B (zh) 一种基于率模可靠性理论的航天器健康评估方法
CN104463356A (zh) 一种基于多维信息人工神经网络算法的光伏发电功率预测方法
CN104573857A (zh) 一种基于智能算法优化组合的电网负荷率预测方法
CN104598765A (zh) 一种基于弹性自适应神经网络的建筑物能耗预测方法
CN106126944A (zh) 一种电力变压器顶层油温区间预测方法及系统
CN104820877A (zh) 基于云自适应pso-snn的光伏系统发电功率预测方法
CN103530700B (zh) 城区配电网饱和负荷综合预测方法
CN116205425A (zh) 一种基于典型数据库的低碳园区冷热电气负荷预测方法
CN110969312A (zh) 基于变分模态分解和极端学习机的短期径流预测耦合方法
CN105279582B (zh) 基于动态相关性特征的超短期风电功率预测方法
CN105184306A (zh) 评价指标反映评价结果的输电杆塔塔材实际强度计算方法
CN104268802B (zh) 采用神经网络模型确定城市居民小区用电需用系数的方法
CN115879652B (zh) 能源网络分级协同规划方法、装置、电子设备及存储介质
CN103544362B (zh) 一种基于二维曲线预测的谐波中长期预测方法
Zheng et al. A novel power system reliability predicting model based on PCA and RVM

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150114

Termination date: 20150517

EXPY Termination of patent right or utility model