CN102720129A - Steel bridge deck of prefabricated epoxy asphalt pavement layer - Google Patents
Steel bridge deck of prefabricated epoxy asphalt pavement layer Download PDFInfo
- Publication number
- CN102720129A CN102720129A CN2012102133564A CN201210213356A CN102720129A CN 102720129 A CN102720129 A CN 102720129A CN 2012102133564 A CN2012102133564 A CN 2012102133564A CN 201210213356 A CN201210213356 A CN 201210213356A CN 102720129 A CN102720129 A CN 102720129A
- Authority
- CN
- China
- Prior art keywords
- steel bridge
- bridge deck
- asphalt pavement
- epoxy asphalt
- prefabricated
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
- Road Paving Structures (AREA)
Abstract
The invention discloses a steel bridge deck of a prefabricated epoxy asphalt pavement layer and belongs to a prefabricated steel bridge deck which is not produced in construction sites. The bottom of the bridge surface is provided with orthotropic steel bridge surfaces, and a rust-proof paint layer, a bonding layer, an epoxy asphalt pavement layer, a bonding layer and a surface layer are sequentially arranged on the orthotropic steel bridge surfaces. Two to four 50-500mm installing joints are arranged on each prefabricated element of the steel bridge deck of the prefabricated epoxy asphalt pavement layer, the position of each installing joint is a split joint position of every two orthotropic steel bridge surfaces, and any structure layer is not arranged on the orthotropic steel bridge surfaces in the position. The steel bridge deck of the prefabricated epoxy asphalt pavement layer provided by the invention integrates the advantages of the modern industrial complete set technology, the technical problems that the on-site epoxy asphalt pavement construction difficulty is great, the environment condition requirement is harsh, the maintenance is difficult, and the quality cannot be easily controlled are solved, and the industrial prefabricated production and the steel bridge surface pavement modernization are realized.
Description
Technical field
The invention relates to epoxy asphalt pavement layer steel bridge deck, relate in particular to a kind of prefabricated epoxy asphalt pavement layer steel bridge deck.
Background technology
Because bituminous epoxy has superior durability, so steel bridge face epoxy asphalt pavement technology obtains application more and more widely in China at present.
But during epoxy asphalt pavement, because higher to the engineering-environment temperature requirement, very strict to construction technical requirement etc., thereby the site operation difficulty is very big, and this just limits and hindered popularizing and using of this technology in actual engineering.
The present invention proposes under the prefabricated notion of industrialization of construction industry; Steel bridge deck is prefabricated in the factory; Make in the workshop of control relatively more easily indoor, under the environment of stricter limit temperature, humidity, to steel plate eliminate rust, anticorrosion, bonding, epoxy asphalt mixture making, maintenance; On engineering structures, weld the steel bridge deck of accomplishing epoxy asphalt pavement again; And carry out PROCESS FOR TREATMENT such as the welding, rust cleaning of seam crossing, anticorrosion, joint filling, make the technological difficulties of paving steel bridge deck under the environment of indoor relatively easy control, accomplish, thus realize fast, efficient, guarantee that the steel bridge face epoxy of quality mats formation.
At present, national industrialization of construction industry is in progressively the propelling.The assemblingization rapidly and efficiently of bridge construction will receive the attention of design, construction and owner unit.The modernized prefabricated epoxy asphalt mixture bridge steel bridge deck technology of mating formation simultaneously; Can adopt large-scale indoor industrially production model; In computer program control down, the cutting of completion sheet material, cutting, die mould, welding, rust cleaning, anticorrosion, epoxy asphalt mixture is mated formation, maintenance.Also can be implemented in the factory's indoor environmental condition control under the computer control condition.And under the logistics transportation technology platform model of changing in modern times, realize transporting of product to bridge construction site; Assembling fast at the construction field (site); Accomplish the bridge construction process fast and efficiently.
Summary of the invention
Patent of the present invention is to the weak point in the above background technology; Epoxy asphalt pavement steel bridge deck under the prefabricated notion of a kind of industrialization is provided; Being intended to solve in the present engineering reality steel bridge face, to carry out the epoxy asphalt pavement difficulty of construction big; Ambient conditions requires harsh, and maintenance is difficult, the wayward technical barrier that waits of quality.The prefabricated production of industrialization of the steel bridge deck through prefabricated epoxy asphalt pavement layer realizes the modernization of paving steel bridge deck.
The present invention is achieved through following technical scheme:
A kind of steel bridge deck of prefabricated epoxy asphalt pavement layer; Comprise Orthotropic Steel Bridge Deck and epoxy asphalt pavement layer; It is characterized in that; The steel bridge deck of described prefabricated epoxy asphalt pavement layer is the steel bridge deck of a kind of prefabricated epoxy asphalt pavement layer do not produced at the construction field (site), and the bottom of this steel bridge deck is provided with orthotropic steel bridge deck 6, is disposed with rust preventive coating 5, adhesive linkage 4, epoxy asphalt pavement layer 3, adhesive linkage 2 and surface layer 1 above the orthotropic steel bridge deck 6;
Described surface layer 1 is that epoxy asphalt pavement layer or SMA are the asphalt-mastic-broken stone mixed layer;
The steel bridge deck of described prefabricated epoxy asphalt pavement layer is provided with the field joint of the 50~500mm of 2~4 places on each prefabricated component.Its field joint position, promptly the splicing position of pairwise orthogonal opposite sex steel bridge face 6 is not provided with any structure layer on the orthotropic steel bridge deck 6 at this position.
The board dimension of said steel bridge deck is: long 100mm~100000mm, wide 100mm~50000mm, thick 10mm~1000mm.
The invention has the beneficial effects as follows; The advantage of the steel bridge deck set modern industrialization complete set technology of the prefabricated epoxy asphalt pavement that is provided; Solved that on-the-spot epoxy asphalt pavement difficulty of construction is big, ambient conditions requires harsh; Maintenance is difficult, and the uppity technical barrier of quality has been realized the modernization of prefabricated production of industrialization and paving steel bridge deck.
Description of drawings
Fig. 1 is the steel bridge deck structural representation of the prefabricated epoxy asphalt pavement layer of the present invention;
Fig. 2 is the steel bridge deck joint area structural representation of the prefabricated epoxy asphalt pavement layer of the present invention.
Reference numeral is following:
1---surface layer 2---adhesive linkage
3---epoxy asphalt pavement layer 4---adhesive linkage
5---rust preventive coating 6---orthotropic steel bridge deck
The specific embodiment
The steel bridge deck of a kind of prefabricated epoxy asphalt pavement layer of the present invention is a kind of steel bridge deck of a kind of prefabricated epoxy asphalt pavement layer of not producing at the construction field (site).Like Fig. 1, shown in Figure 2, the bottom of this bridge floor is provided with orthotropic steel bridge deck 6, is disposed with rust preventive coating 5, adhesive linkage 4, epoxy asphalt pavement layer 3, adhesive linkage 2 and surface layer 1 above the orthotropic steel bridge deck 6.
Described surface layer 1 is epoxy asphalt pavement layer or SMA (asphalt-mastic-broken stone mixed layer); If topping laying SMA can be prefabricated in the factory, also can directly lay at the construction field (site);
The steel bridge deck of described prefabricated epoxy asphalt pavement layer; Its field joint position; Be the splicing position of pairwise orthogonal opposite sex steel bridge face 6, the top any structure layer that is not provided with of this outside, position 50~500mm is provided with 2~4 place's joints according to different engineerings position on each prefabricated component.
Preparation method of the present invention is conventional preparation method; After steel plate cutting, die mould, welding; Process the Orthotropic Steel Bridge Deck that meets requirement of engineering; Mating formation of rust preventive coating 5, tack coat 4 and epoxy asphalt pavement layer 3 accomplished one by one through after injection or centrifugal blast cleaning are handled completely in the surface, and maintenance makes bituminous epoxy accomplish curing in curing kilns.Wherein every steel bridge deck joint area is all reserved 50-500mm and is not laid epoxy asphalt concrete and other structure, wait until the job site welded and installed after, carry out the processing of mating formation of plate seam by the existing epoxy asphalt concrete mode of mating formation again.
Concrete preparation method is following:
(1) steel plate cutting, die mould, welding
In conjunction with concrete steel bridge design, carry out according to the national standard of correspondence.
(2) rust cleaning
Steel bridge deck layer is sprayed or centrifugal blast cleaning completely, and surface of steel plate does not have attachments such as visible grease, dirt, oxide skin, rust and painting layer, and the surface is even metal gloss.The be up to state standards Sa3 level of GB8923-88 of rust cleaning cleannes.
(3) rustproof paint application (anticorrosion)
After the rust cleaning quality reaches requirement, carry out spraying operation in the 4h, application first road priming paint or the rustproof paint.
According to engineering-environment classification and environmental activity grade, choose reasonable rustproof paint kind and application pass.
(4) pitch stirs and mats formation
Carry out according to the existing epoxy asphalt concrete mode of mating formation.
(5) maintenance
In temperature 60-200 ℃ curing kilns, accomplish the curing of bituminous epoxy, concrete curing time is confirmed through the Marshall Test result.
(6) check
Can dispatch from the factory after the assay was approved in precast yard.
At last, the steel bridge deck veneer of the prefabricated epoxy asphalt pavement layer of processing is transported to the job site, carries out the processing of mating formation of welded and installed, plate seam.Mating formation by existing epoxy asphalt concrete, mode eliminates rust, anticorrosion, epoxy asphalt concrete is mated formation processing.Can adopt common epoxy asphalt concrete, take 60-150 ℃ of heating mantles that plate seam place epoxy asphalt concrete is carried out the high temperature maintenance; Also can adopt the epoxy asphalt concrete that solidified in 1-4 days under the natural conditions.
Claims (2)
1. the steel bridge deck of a prefabricated epoxy asphalt pavement layer; Comprise Orthotropic Steel Bridge Deck and epoxy asphalt pavement layer; It is characterized in that; The steel bridge deck of described prefabricated epoxy asphalt pavement layer is the steel bridge deck of a kind of prefabricated epoxy asphalt pavement layer do not produced at the construction field (site); The bottom of this steel bridge deck is provided with orthotropic steel bridge deck (6), is disposed with rust preventive coating (5), adhesive linkage (4), epoxy asphalt pavement layer (3), adhesive linkage (2) and surface layer (1) above the orthotropic steel bridge deck (6);
Described surface layer (1) is that epoxy asphalt pavement layer or SMA are the asphalt-mastic-broken stone mixed layer;
The steel bridge deck of described prefabricated epoxy asphalt pavement layer is provided with the field joint of the 50~500mm of 2~4 places on each prefabricated component; Its field joint position, i.e. the splicing position of pairwise orthogonal opposite sex steel bridge face (6), the orthotropic steel bridge deck at this position is not provided with any structure layer on (6).
2. according to the steel bridge deck of the prefabricated epoxy asphalt pavement layer of claim 1, it is characterized in that the board dimension of said steel bridge deck is: long 100mm~100000mm, wide 100mm~50000mm, thick 10mm~1000mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012102133564A CN102720129A (en) | 2012-06-26 | 2012-06-26 | Steel bridge deck of prefabricated epoxy asphalt pavement layer |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012102133564A CN102720129A (en) | 2012-06-26 | 2012-06-26 | Steel bridge deck of prefabricated epoxy asphalt pavement layer |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102720129A true CN102720129A (en) | 2012-10-10 |
Family
ID=46945984
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2012102133564A Pending CN102720129A (en) | 2012-06-26 | 2012-06-26 | Steel bridge deck of prefabricated epoxy asphalt pavement layer |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102720129A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103114525A (en) * | 2013-02-07 | 2013-05-22 | 华南理工大学 | Steel bridge deck paving structure and paving method |
CN103194968A (en) * | 2013-04-07 | 2013-07-10 | 长沙理工大学 | Orthotropic steel bridge deck structure |
CN108729321A (en) * | 2018-05-25 | 2018-11-02 | 东南大学 | A kind of prefabricated Orthotropic steel plate paving structure and its method for paving |
CN110453558A (en) * | 2019-07-30 | 2019-11-15 | 郑州暖树实业有限公司 | Assembled terrace plate and construction site road construction method |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1928243A (en) * | 2006-09-20 | 2007-03-14 | 山东省路桥集团有限公司 | Method for constructing epoxy resin pitch concrete steel bridge surface |
JP2010095849A (en) * | 2008-10-14 | 2010-04-30 | Toray Ind Inc | Method for reinforcing steel floor slab |
CN201459603U (en) * | 2009-04-29 | 2010-05-12 | 重庆鹏方路面工程技术研究院有限公司 | Epoxy modified asphalt concrete steel bridge deck pavement structure |
CN201843075U (en) * | 2010-08-27 | 2011-05-25 | 长安大学 | Wooden bridge panel integrally prefabricated with paving layer |
JP2011106176A (en) * | 2009-11-18 | 2011-06-02 | Kawasaki Heavy Ind Ltd | Method for waterproofing and waterproof structure of upper surface of concrete floor slab, and fiber plate |
CN102383374A (en) * | 2011-11-28 | 2012-03-21 | 湖南大学 | Fabricated fibrous concrete combined deck structure and construction method thereof |
CN202688874U (en) * | 2012-06-26 | 2013-01-23 | 天津大学 | Steel bridge panel of prefabricated epoxy resin asphalt pavement layer |
-
2012
- 2012-06-26 CN CN2012102133564A patent/CN102720129A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1928243A (en) * | 2006-09-20 | 2007-03-14 | 山东省路桥集团有限公司 | Method for constructing epoxy resin pitch concrete steel bridge surface |
JP2010095849A (en) * | 2008-10-14 | 2010-04-30 | Toray Ind Inc | Method for reinforcing steel floor slab |
CN201459603U (en) * | 2009-04-29 | 2010-05-12 | 重庆鹏方路面工程技术研究院有限公司 | Epoxy modified asphalt concrete steel bridge deck pavement structure |
JP2011106176A (en) * | 2009-11-18 | 2011-06-02 | Kawasaki Heavy Ind Ltd | Method for waterproofing and waterproof structure of upper surface of concrete floor slab, and fiber plate |
CN201843075U (en) * | 2010-08-27 | 2011-05-25 | 长安大学 | Wooden bridge panel integrally prefabricated with paving layer |
CN102383374A (en) * | 2011-11-28 | 2012-03-21 | 湖南大学 | Fabricated fibrous concrete combined deck structure and construction method thereof |
CN202688874U (en) * | 2012-06-26 | 2013-01-23 | 天津大学 | Steel bridge panel of prefabricated epoxy resin asphalt pavement layer |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103114525A (en) * | 2013-02-07 | 2013-05-22 | 华南理工大学 | Steel bridge deck paving structure and paving method |
CN103114525B (en) * | 2013-02-07 | 2016-01-06 | 华南理工大学 | A kind of bridge deck pavement structure and paving method thereof |
CN103194968A (en) * | 2013-04-07 | 2013-07-10 | 长沙理工大学 | Orthotropic steel bridge deck structure |
CN108729321A (en) * | 2018-05-25 | 2018-11-02 | 东南大学 | A kind of prefabricated Orthotropic steel plate paving structure and its method for paving |
CN108729321B (en) * | 2018-05-25 | 2020-12-29 | 东南大学 | Prefabricated orthotropic plate steel bridge deck pavement structure and pavement method thereof |
CN110453558A (en) * | 2019-07-30 | 2019-11-15 | 郑州暖树实业有限公司 | Assembled terrace plate and construction site road construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101852031B (en) | Construction method of soil covering tank | |
CN102392413B (en) | Pavement structure of combined steel bridge deck and pavement method thereof | |
CN102720129A (en) | Steel bridge deck of prefabricated epoxy asphalt pavement layer | |
CN102444066B (en) | Asphalt pavement prefabricated block and construction method for prefabricated asphalt pavement | |
CN103331817A (en) | 3D (Three-dimensional) printing method of engineering structure | |
CN202247580U (en) | Asphalt pavement precast block | |
CN106003416A (en) | Construction technique of prefabricated runway panels of airfield runway | |
CN204701223U (en) | A kind of NEW TYPE OF COMPOSITE sandwich plate | |
CN205272290U (en) | Pc component production line | |
CN102383374A (en) | Fabricated fibrous concrete combined deck structure and construction method thereof | |
Bock | Construction automation and robotics | |
CN203440752U (en) | Steel bridge deck pavement structure | |
CN202688874U (en) | Steel bridge panel of prefabricated epoxy resin asphalt pavement layer | |
CN103696366B (en) | Pavement structure and pavement method of combined steel bridge deck | |
Gong et al. | Prospect of 3D printing technologies in maintenance of asphalt pavement cracks and potholes | |
CN106192757A (en) | A kind of paving steel bridge deck method of assembling | |
CN104195955B (en) | A kind of big-span steel bridge unit construction bridge surface paving method | |
CN109338885A (en) | There are the bridge deck pavement structure and its construction method of transition of stress layer | |
CN105670317A (en) | Emulsible epoxy bitumen material and preparation method thereof | |
CN102922600A (en) | Preparation method of floor plate | |
CN205474673U (en) | Steel fabricated construction temporary road | |
CN202865996U (en) | Room modular structure for nuclear power plant | |
CN203755154U (en) | Steel bridge deck pavement structure of cross-sea bridge | |
CN101666143B (en) | Construction method of polyurethane thermal insulation system by taking large-size face brick as finishing coat | |
CN201574353U (en) | Bridge deck paving structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20121010 |