CN102704967B - One prevents from intersecting large-section underground top board and to collapse method for leakage - Google Patents

One prevents from intersecting large-section underground top board and to collapse method for leakage Download PDF

Info

Publication number
CN102704967B
CN102704967B CN201210156911.4A CN201210156911A CN102704967B CN 102704967 B CN102704967 B CN 102704967B CN 201210156911 A CN201210156911 A CN 201210156911A CN 102704967 B CN102704967 B CN 102704967B
Authority
CN
China
Prior art keywords
steel strand
top board
many arc
bitubular
coupling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201210156911.4A
Other languages
Chinese (zh)
Other versions
CN102704967A (en
Inventor
严红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology CUMT
Original Assignee
China University of Mining and Technology CUMT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology CUMT filed Critical China University of Mining and Technology CUMT
Priority to CN201210156911.4A priority Critical patent/CN102704967B/en
Publication of CN102704967A publication Critical patent/CN102704967A/en
Application granted granted Critical
Publication of CN102704967B publication Critical patent/CN102704967B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

One prevents from intersecting large-section underground top board and to collapse method for leakage, is applicable to construction of tunnel and coal mining underground passage engineering.Comprise many arc couplings, antiskid friction resistant ring washer, steel strand and lockset, many arc hookups are airtight, the inner symmetrical arc core structures for hollow circuit cylinder of upper surface.One end of steel strand is through the bitubular, the other end athwart roof bolting is stablized in rock stratum in country rock deep, design annular plastics packing ring between internal layer steel strand to concentrate to prevent steel strand contact portion stress, lockset is utilized to lock after applying high pretightening force to steel strand, coupling is anchored on chamber top board central region, greatly increase roof strata entire compression intensity, effective control large-section underground crushes and collapses and emits, supporting area is large, safety factor is high, structure is simply graceful, convenience quick for installation, easy processing, cost is low, effective, there is practicality widely.

Description

One prevents from intersecting large-section underground top board and to collapse method for leakage
Technical field
The present invention relates to one to prevent from intersecting large-section underground top board and to collapse method for leakage, be particularly useful for intersecting in tunnel and coal road big cross section roof timbering.
Background technology
In construction of tunnel or mining supporting, the intersection large-section underground of formation is because quantity is large, scope is wide, pattern is many, and accident rate is high, becomes one of production scene problem needing solution badly.This kind of chamber common trait shows as: the unsettled area of top board is large, high and the stressed complexity of regional stress, top board collapse accident is many, especially combined for intersection big cross section thick-layer Compound Roof, mud stone or trickle type top board, blowing out under the Engineering Disturbances such as vibrations by contiguous work plane mining influence or contiguous tunnelling, adopt traditional support unit to arrange and easily cause top board even sudden the collapsing that significantly sink to emit accident, bury great potential safety hazard to field operation personnel.Generally speaking, on-the-spot conventional intersection large-section underground roof timbering method comprises two classes: slip casting+casting+whitewashing+U-shaped steel etc. and superposition anchor pole steel band supporting+single-point cable bolting, also replace steel band supporting with channel-section steel sometimes.The former is better to intersection big cross section Roof Control effect, but due to operation very complicated, inter process cooperation requires that the high and factors such as cost intensive affect, and except for except a small amount of permanent rock gangway chamber support, is generally difficult to promote in a large amount of coal road big cross section adopt; The latter can basic guarantee roof timbering safety under Engineering Disturbance little, the stability of cavern roof of impact and the situation such as buried depth is more shallow, but needed for support material costly, for the intersection large-section underground top board more and more in deep-well supporting with complex characteristic, under Engineering Disturbance, steel band is very easily torn, and channel-section steel control range is little, the supporting and protection structure that the more difficult formation of monomer anchor cable is good, can not effectively controlroof large deformation and collapse accident.
Summary of the invention
One. goal of the invention
The object of the invention is the deficiency existed for prior art, there is provided one to prevent from intersecting large-section underground top board to collapse method for leakage, it can effectively sink by controlroof, the intersection large-section underground roof rock after digging is made to transfer approximate three dimension stress to by bi-directional compression, increase the compressive strength of roof rock, prevent from intersection large-section underground top board from collapsing to emit, ensure the supporting safety in chamber intersection big cross section region.
Two. technical scheme
The preventing of the application is intersected the large-section underground top board method for leakage that collapses and is comprised many arc couplings 1, antiskid friction resistant ring washer 2, steel strand 3 and lockset 4.One group of steel strand 3 one end top board be anchored in deep and stablize in rock stratum athwart, the other end, through a pair bitubular in many arc couplings 1, is locked with lockset 4 after applying high pretightening force; Another group steel strand 3 one end top board be anchored in deep and stablize in rock stratum athwart, the other end through another in many arc couplings 1 to the bitubular, the two groups of steel strand 3 in front and back have antiskid friction resistant ring washer 2 to separate at many arc coupling 1 interior contact portion, lock after applying high pretightening force with lockset 4.Described many arc couplings 1, from this coupling upper surface direction vertical, for on the basis of a rectangle, four angles are the thin board type steel work of identical circular arc chamfer shape, a pair straight-through bitubular runs through a pair relative coupling side straight flange, another runs through another side straight flange to relative coupling to the straight-through bitubular, many arc coupling 1 upper surfaces are plane-sealed structure, soffit is the plane structure containing open circles, inner containing a hollow circuit cylinder, hollow circuit cylinder is positioned at many arc coupling 1 soffit central region, hollow circuit cylinder top is through to the region that the straight-through bitubular is crossing with two.The plastic washer that antiskid friction resistant ring washer 2 is made for macromolecular material.Steel strand 3 diameter is 15-21mm, and steel strand 3 length is 6-12m.Concrete implementation step is: tunnel or underground coal mine intersect after large-section underground digging, anchor cable rig is utilized to beat angling hole to top board, one end of steel strand 3 is stretched into and holes interior and utilize resin anchoring agent to stablize in rock stratum by steel strand 3 end anchorage in deep, stretch out steel strand 3 outside aperture from many arc couplings 1 in a pair bitubular a end of monotubular 5 through b end, and to lock with lockset 4 after utilizing anchor cable tensioning machine tool to apply high pretightening force, equally, punching at the intersection large-section underground top board other end and steel strand 3 one end is anchored in deep stablizes in rock stratum, stretch out steel strand 3 outside aperture from many arc couplings 1 in the bitubular c end of monotubular 6 hold through d, and lock with lockset 4 after utilizing anchor cable tensioning machine tool to apply high pretightening force, adjust many arc coupling 1 positions in locking process, make many arc couplings 1 be anchored on chamber top board central region, antiskid friction resistant ring washer 2 is installed on many arc coupling 1 internal steel twisted wire 3 surfaces, and according to same mounting method, by one end in other two steel strand 3 through top board internal drilling, the other end passes through another e to monotubular in the bitubular 7 in many arc couplings 1 and holds and f end, another root one end in two steel strand 3 is through top board internal drilling, the g that the other end passes through monotubular 8 in the bitubular in many arc couplings 1 holds h end, from many arc coupling 1 internal steel twisted wire 3 positions, above two steel strand 3 contact surfaces two steel strand 3 installed below being in position install above, contact area is separated by antiskid friction resistant ring washer 2, and lock with lockset 4 after utilizing anchor cable tensioning machine tool to apply high pretightening force.
Three. technique effect
One of the present invention prevents from intersecting large-section underground top board and to collapse method for leakage, is applicable to construction of tunnel and coal mining underground passage engineering.Comprise many arc couplings, antiskid friction resistant ring washer, steel strand and lockset, many arc couplings are that upper surface is airtight, and inside is the symmetrical arc core structure of hollow circuit cylinder.One end of steel strand is through the bitubular, the other end athwart roof bolting is stablized in rock stratum in country rock deep, design ring washer between internal layer steel strand to concentrate to prevent steel strand contact portion stress, lockset is utilized to lock after applying high pretightening force to steel strand, coupling is anchored on chamber top board central region, greatly increase roof strata entire compression intensity, effective control large-section underground crushes and collapses and emits, supporting area is large, safety factor is high, structure is simply graceful, convenience quick for installation, easy processing, cost is low, supporting effect is good, there is practicality widely.
Accompanying drawing explanation
Accompanying drawing 1 is structural representation of the present invention.
Accompanying drawing 2 is cross-sectional view of Fig. 1.
Detailed description of the invention
Below in conjunction with the embodiment of in accompanying drawing, the invention will be further described:
One of the present invention prevents from intersecting large-section underground top board and to collapse method for leakage, uses many arc couplings 1, antiskid friction resistant ring washer 2, steel strand 3 and lockset 4 that macromolecular material is made.Described many arc couplings 1, from this coupling upper surface direction vertical, for on the basis of a rectangle, four angles are the thin board type steel work of identical circular arc unfilled corner shape, a pair straight-through bitubular runs through a pair relative coupling side straight flange, another runs through another side straight flange to relative coupling to the straight-through bitubular, many arc coupling 1 upper surfaces are plane-sealed structure, soffit is the plane structure containing open circles, inner containing a hollow circuit cylinder, hollow circuit cylinder is positioned at many arc coupling 1 soffit central region, hollow circuit cylinder top is through to the region that the straight-through bitubular is crossing with two.Concrete supporting step is: tunnel or underground coal mine intersect after large-section underground digging, anchor cable rig is utilized to beat angling hole to top board, one end of steel strand 3 is stretched into and holes interior and utilize resin anchoring agent to stablize in rock stratum by steel strand 3 end anchorage in deep, stretch out steel strand outside aperture from many arc couplings 1 in a pair bitubular a end of monotubular 5 through b end, and to lock with lockset 4 after utilizing anchor cable tensioning machine tool to apply high pretightening force, equally, punching at the intersection large-section underground top board other end and a steel strand one end is anchored in deep stablizes in rock stratum, this holds the c of relative opposite side to hold with a to hold the d of same side to hold through with a to another monotubular 6 in the bitubular from many arc couplings 1 to stretch out steel strand outside aperture, and lock with lockset 4 after utilizing anchor cable tensioning machine tool to apply high pretightening force, adjust many arc coupling 1 positions in locking process, make many arc couplings 1 be anchored on chamber top board central region, antiskid friction resistant ring washer 2 is installed on the many inner steel strand surfaces of arc coupling 1, and according to same mounting method, by one end in other two steel strand 3 through top board internal drilling, the other end passes through another e to monotubular in the bitubular 7 in many arc couplings 1 and holds and f end, another root one end in two steel strand 3 is through top board internal drilling, from described in many arc couplings 1, another holds the g of relative opposite side to hold with e to hold the h of same side to hold through with e to another monotubular 8 bitubular other end, from many arc coupling 1 internal steel strand locations, above two steel strand 3 contact surfaces two steel strand 3 installed below being in position install above, contact area is separated by antiskid friction resistant ring washer 2, and lock with lockset 4 after utilizing anchor cable tensioning machine tool to apply high pretightening force.The plastic washer that antiskid friction resistant ring washer 2 is made for macromolecular material, steel strand 3 diameter is 15-21mm, and steel strand 3 length is 6-12m.

Claims (4)

1. one kind prevents from intersecting large-section underground top board and to collapse method for leakage, it comprises many arc couplings (1), antiskid friction resistant ring washer (2), steel strand (3) and lockset (4), one group of steel strand (3) one end top board be anchored in deep and stablize in rock stratum athwart, the other end, through a pair bitubular in many arc couplings (1), is locked with lockset (4) after applying high pretightening force, another group steel strand (3) one end top board be anchored in deep and stablize in rock stratum athwart, the other end through another in many arc couplings (1) to the bitubular, the two groups of steel strand (3) in front and back have antiskid friction resistant ring washer (2) to separate at many arc coupling (1) interior contact portion, lock with lockset (4) after applying high pretightening force, described many arc couplings (1), from this coupling upper surface direction vertical, for on the basis of a rectangle, four angles are the thin board type steel work of identical circular arc unfilled corner shape, a pair straight-through bitubular runs through a pair relative coupling side straight flange, another runs through another side straight flange to relative coupling to the straight-through bitubular, many arc coupling (1) upper surfaces are plane-sealed structure, soffit is the plane structure containing open circles, inner containing a hollow circuit cylinder, hollow circuit cylinder is positioned at many arc coupling (1) soffit central region, hollow circuit cylinder top is through to the region that the straight-through bitubular is crossing with two.
2. one according to claim 1 prevents from intersecting large-section underground top board and to collapse method for leakage, it is characterized in that: the plastic washer that described antiskid friction resistant ring washer (2) is made for macromolecular material.
3. one according to claim 1 prevents from intersecting large-section underground top board and to collapse method for leakage, and it is characterized in that: described steel strand (3) diameter is 15-21mm, steel strand (3) length is 6-12m.
4. application rights requires that one described in 1-3 prevents from intersecting large-section underground top board and to collapse method for leakage, it is characterized in that: tunnel or underground coal mine intersect after large-section underground digging, anchor cable rig is utilized to beat angling hole to top board, one end of a steel strand (3) is stretched into and holes interior and utilize resin anchoring agent to stablize in rock stratum by steel strand (3) end anchorage in deep, stretch out steel strand outside aperture from many arc couplings (1) in a pair bitubular a end of monotubular (5) hold through b, and lock with lockset (4) after utilizing anchor cable tensioning machine tool to apply high pretightening force, equally, punching at the intersection large-section underground top board other end and a steel strand one end is anchored in deep stablizes in rock stratum, this holds the c of relative opposite side to hold with a to hold the d of same side to hold through with a to another monotubular (6) in the bitubular from many arc couplings (1) to stretch out steel strand outside aperture, and lock with lockset (4) after utilizing anchor cable tensioning machine tool to apply high pretightening force, adjust many arc coupling (1) positions in locking process, make many arc couplings (1) be anchored on chamber top board central region, antiskid friction resistant ring washer (2) is installed on the many inner steel strand surfaces of arc coupling (1), and according to same mounting method, by one end in other two steel strand (3) through top board internal drilling, the other end passes through another e to monotubular in the bitubular (7) in many arc couplings (1) and holds and f end, another root one end in two steel strand (3) is through top board internal drilling, from described in many arc couplings (1), another holds the g of relative opposite side to hold with e to hold the h of same side to hold through with e to another monotubular (8) the bitubular other end, from many arc coupling (1) internal steel strand locations, above two steel strand (3) contact surfaces two steel strand (3) of installing below being in position install above, contact area is separated by antiskid friction resistant ring washer (2), and lock with lockset (4) after utilizing anchor cable tensioning machine tool to apply high pretightening force.
CN201210156911.4A 2012-05-21 2012-05-21 One prevents from intersecting large-section underground top board and to collapse method for leakage Expired - Fee Related CN102704967B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210156911.4A CN102704967B (en) 2012-05-21 2012-05-21 One prevents from intersecting large-section underground top board and to collapse method for leakage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210156911.4A CN102704967B (en) 2012-05-21 2012-05-21 One prevents from intersecting large-section underground top board and to collapse method for leakage

Publications (2)

Publication Number Publication Date
CN102704967A CN102704967A (en) 2012-10-03
CN102704967B true CN102704967B (en) 2015-09-09

Family

ID=46897992

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210156911.4A Expired - Fee Related CN102704967B (en) 2012-05-21 2012-05-21 One prevents from intersecting large-section underground top board and to collapse method for leakage

Country Status (1)

Country Link
CN (1) CN102704967B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104100282A (en) * 2014-06-17 2014-10-15 山西晋城无烟煤矿业集团有限责任公司 Method for driving anchor cables to maintain triangular area of roadways
CN112523791B (en) * 2020-12-25 2024-05-10 江苏宝利路面材料技术有限公司 Annular anchor rope supporting system for reinforcing rock wall in highway small clear distance tunnel

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2585918Y (en) * 2002-07-02 2003-11-12 柳州市威尔姆预应力有限公司 Integrally butt group anchor coupler
CN1594834A (en) * 2004-07-12 2005-03-16 中国矿业大学 Truss supporting technology for ingredient top slope deformation control
CN2708037Y (en) * 2004-07-09 2005-07-06 中国矿业大学 Double tensile steel strand coupler
RU2281398C2 (en) * 2004-06-09 2006-08-10 Виктор Евгеньевич Ануфриев Tightening device for rope anchoring bolt
CN101302937A (en) * 2008-02-26 2008-11-12 中国矿业大学(北京) Girders anchorage cable arcuated connection locking device
CN201236719Y (en) * 2008-02-26 2009-05-13 中国矿业大学(北京) Arc-connection locker for girder anchor cable
DE102008006236A1 (en) * 2008-01-25 2009-07-30 Friedr. Ischebeck Gmbh Injection head for injection drill anchor
CN201318027Y (en) * 2008-12-12 2009-09-30 董光辉 Stretching prestressed strand coupler
CN102121389A (en) * 2010-06-02 2011-07-13 中国矿业大学(北京) Method for preventing and treating roof falling and side collapsing of coal roadway surrounding rock by anchor rope truss
CN102425439A (en) * 2012-01-17 2012-04-25 中国矿业大学 Method for reinforcing bidirectional staged stretched anchor cable of preset steel strand
CN202731955U (en) * 2012-05-21 2013-02-13 严红 Device for preventing roof of crossed great section cave dwelling room from collapsing

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2585918Y (en) * 2002-07-02 2003-11-12 柳州市威尔姆预应力有限公司 Integrally butt group anchor coupler
RU2281398C2 (en) * 2004-06-09 2006-08-10 Виктор Евгеньевич Ануфриев Tightening device for rope anchoring bolt
CN2708037Y (en) * 2004-07-09 2005-07-06 中国矿业大学 Double tensile steel strand coupler
CN1594834A (en) * 2004-07-12 2005-03-16 中国矿业大学 Truss supporting technology for ingredient top slope deformation control
DE102008006236A1 (en) * 2008-01-25 2009-07-30 Friedr. Ischebeck Gmbh Injection head for injection drill anchor
CN101302937A (en) * 2008-02-26 2008-11-12 中国矿业大学(北京) Girders anchorage cable arcuated connection locking device
CN201236719Y (en) * 2008-02-26 2009-05-13 中国矿业大学(北京) Arc-connection locker for girder anchor cable
CN201318027Y (en) * 2008-12-12 2009-09-30 董光辉 Stretching prestressed strand coupler
CN102121389A (en) * 2010-06-02 2011-07-13 中国矿业大学(北京) Method for preventing and treating roof falling and side collapsing of coal roadway surrounding rock by anchor rope truss
CN102425439A (en) * 2012-01-17 2012-04-25 中国矿业大学 Method for reinforcing bidirectional staged stretched anchor cable of preset steel strand
CN202731955U (en) * 2012-05-21 2013-02-13 严红 Device for preventing roof of crossed great section cave dwelling room from collapsing

Also Published As

Publication number Publication date
CN102704967A (en) 2012-10-03

Similar Documents

Publication Publication Date Title
WO2020192055A1 (en) Two-step grouting modified water-protective coal mining method for roof aquifers
CN101603431B (en) Method for reinforcing outburst-prone coal seam cross-cut coal uncovering
CN205689229U (en) A kind of recyclable pressure-release anchor cable
CN103899329B (en) A kind of administering method of large deformation breaking surrounding rock tunnel
CN103306713B (en) Networked reinforcement method for cross-layer drilling of outburst coal seam
CN107143338B (en) A kind of coal mine roadway driving and method for protecting support
CN104895072B (en) A kind of prestress anchorage cable and prestress anchorage cable one-pass molding construction method
CN102704965B (en) One prevents violent mining influence back to collapse method for leakage
CN105781597A (en) Method for performing anchoring and grouting reinforcement inside deep well soft rock gob-side entry retaining
CN104879149A (en) Bolt-grouting support method for roadway in three-soft high-stress region
CN104612729B (en) A kind of asymmetric anchor beam structure and its method for protecting support for gob side entry top plate
CN102635377A (en) Tensile reinforcement concrete spray body supporting method for deep soft roadway
CN205689228U (en) A kind of pressure-release anchor cable
CN103590845A (en) Impact-resistant interval grouting anchor cable and use method thereof
CN104453944A (en) Coal-pillar-impacting-preventing roadway protecting method
CN107165661A (en) A kind of high-ground stress weak surrounding rock large deformation tunnel overlength enlarged footing anchor cable construction method
CN108049899A (en) A kind of gob side entry driving thin coal pillar breaking surrounding rock reinforcement means
CN110145305A (en) A kind of method pressed to the lane waterpower Qie Dingliu prevention and treatment roadway bump
CN103382850B (en) Roof crack water guiding device and method
CN110656936A (en) Mine roof directional roof cutting pressure relief method based on static expanding agent
CN106050302A (en) Constructing system and method for coal mine permanent sealing wall
CN104533483A (en) Roadway total-space prestress truss, anchor cable and anchor rod coordinated supporting method
CN205422761U (en) Lower closely coal road supporting construction of coal mine goaf
CN102704967B (en) One prevents from intersecting large-section underground top board and to collapse method for leakage
CN203584447U (en) Anti-impact interval grouting anchor cable

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
DD01 Delivery of document by public notice

Addressee: Yan Hong

Document name: Notification of Patent Invention Entering into Substantive Examination Stage

DD01 Delivery of document by public notice

Addressee: Yan Hong

Document name: the First Notification of an Office Action

ASS Succession or assignment of patent right

Owner name: CHINA UNIVERSITY OF MINING + TECHNOLOGY

Free format text: FORMER OWNER: YAN HONG

Effective date: 20150723

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20150723

Address after: 221116 Xuzhou Province,, China University of Mining and Technology, the southern loop of science and Technology Department of the three

Applicant after: China University of Mining & Technology

Address before: 100083 Beijing City, Haidian District Institute of Rutosids China University of Mining and Technology No. 11 (Beijing) Baoyuan apartment A1-17032

Applicant before: Yan Hong

C14 Grant of patent or utility model
GR01 Patent grant
DD01 Delivery of document by public notice

Addressee: Yan Hong

Document name: Notification of Passing Examination on Formalities

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150909

Termination date: 20180521