CN201318027Y CNU200820227900XU CN200820227900U CN201318027Y CN 201318027 Y CN201318027 Y CN 201318027Y CN U200820227900X U CNU200820227900X U CN U200820227900XU CN 200820227900 U CN200820227900 U CN 200820227900U CN 201318027 Y CN201318027 Y CN 201318027Y
Authority
CN
China
Prior art keywords
stretch
draw
core bar
special
anchor slab
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU200820227900XU
Other languages
Chinese (zh)
Inventor
董光辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNU200820227900XU priority Critical patent/CN201318027Y/en
Application granted granted Critical
Publication of CN201318027Y publication Critical patent/CN201318027Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Reinforcement Elements For Buildings (AREA)

Abstract

The utility model relates to a stretching prestressed strand coupler for manufacturing concrete prestressed components, wherein a limiting support base is supported on the outer side of a common anchor plate, the external edge opening of the limiting support base is used to support a tensioning jack through a connection bushing, and the internal edge opening thereof is used to support a special anchor plate, a clip fixed plate is connected on the special anchor plate, a stretching core bar is connected with threads on the other end of a sleeve which is connected with the external circular threads of the special anchor plate, and the stretching core bar is penetrated through the core hole of the tensioning jack, and a nut which is screwed on the external end portion of the stretching core bar is pressed on the external side end of an oil cylinder arranged in the tensioning jack. Through the use of the coupler, the working reserve length of strands can be reduced, the construction cost is reduced, and the quality and the safety of the stretching operation are improved.

Description

Stretch-draw prestressing force steel strand coupling
Technical field
The utility model relates to a kind of apparatus of making the concrete pre-stress member, specifically a kind of stretch-draw prestressing force steel strand coupling.
Background technology
In concrete structure engineering, prestressed member has obtained extensive use.Apply prestressing force to concrete component, can improve the supporting capacity and the rigidity of concrete component, reduce the use of plain bars.At present, adopting the most widely, prestressed material is exactly a prestress wire; Be arranged on steel strand in the concrete component prestressing force that can make the concrete component affix after by stretch-draw; And the stretch-draw of steel strand is to rely on the stretch-draw jack be arranged on the concrete component two ends to come implementation and operation and finish.Steel strand are when blanking, and certain active length all will be reserved in two ends, are installed on the stretch-draw jack in order to connection.Usually this length is controlled at about 70-80cm, and this part steel strand will be cut off behind the stretch-draw end-of-job, has both caused bigger waste of material, has also increased construction cost.
The utility model content
The purpose of this utility model just provides a kind of stretch-draw prestressing force steel strand coupling, by the use of this coupling, can reduce the work length in reserve of steel strand, thereby reduces construction cost.
The utility model is achieved in that a kind of stretch-draw prestressing force steel strand coupling, support limited position supporting seat in the outside of common anchor slab, the outer bead of spacing supporting seat supports the stretch-draw jack by splice sleeve, the interior bead of spacing supporting seat supports special-purpose anchor slab, on special-purpose anchor slab, be connected to the intermediate plate fixed head, the other end of the sleeve that is threaded with the special-purpose anchor slab cylindrical stretch-draw core bar that is threaded, the stretch-draw core bar passes the core hole of stretch-draw jack, and the nut that spins in the outer end of stretch-draw core bar withstands on the oil cylinder outboard end in the stretch-draw jack.
Essence of the present utility model has provided the coupling arrangement between steel strand and the stretch-draw jack.This coupling arrangement can be installed on the present conventional stretch-draw jack that uses, and steel strand and stretch-draw jack is linked up by this coupling arrangement again, reaches the purpose that reduces steel strand work length in reserve, reduces construction cost thus.
Use of the present utility model can reduce to 25-30cm to the single-ended work length in reserve of steel strand from 70-80cm, and like this, every steel strand that are embedded in the concrete component can reduce about 80-100cm (two ends) more altogether.With the special 32 rice bin beams of railway visitor is example, and every Pin case beam need be with the steel strand about 240, every meter heavily about 1.05Kg of steel strand, and every Pin case beam can be saved steel strand 200-250Kg altogether, examines 1000-1200 unit.For a Liang Chang who produces 600 Pin case beams per year, can year increase 600,000 yuan of profits.
Simultaneously, use the utility model steel wire bundle can be sealed stretch-draw, therefore, when taking place to break the stripped thread situation, steel strand are difficult for flying out, and have also improved the safety of stretch-draw operation thus.The setting of intermediate plate fixed head in the utility model can improve the installation accuracy of special-purpose anchor slab, and then improves the stressed uniformity with each root steel strand of bundle, has improved the stretch-draw operation quality.
Description of drawings
Fig. 1 is a structural representation of the present utility model.
The specific embodiment
As shown in Figure 1, in concrete component, be embedded with 4, three steel strand of three a branch of steel strand after stretch-draw, finally located, become prestressed member by the common anchor slab 1 and the intermediate plate 2 of the cross-under of outer end institute.
The utility model is as the coupling arrangement between steel strand 4 and the stretch-draw jack 10, and its structure is:
Support limited position supporting seat 3 in the outside of common anchor slab 1, bead and outer bead in the outboard end of this spacing supporting seat 3 is provided with, outer bead supports stretch-draw jack 10 by splice sleeve 8, and interior bead supports special-purpose anchor slab 5; Be provided with the steel strand jack hole on special-purpose anchor slab 5, this jack hole is passed and by the intermediate plate clamping and positioning in the termination of steel strand 4; End face at special-purpose anchor slab 5 is connected with intermediate plate fixed head 6 by screw, and the intermediate plate on the special-purpose anchor slab 5 is located; Outer circumference surface car at special-purpose anchor slab 5 is shaped on external screw thread, and an end of sleeve 7 is threaded with special-purpose anchor slab 5, the other end of the sleeve 7 stretch-draw core bar 9 that is threaded; Stretch-draw core bar 9 passes the core hole of stretch-draw jack 10; Be connected with nut 12 in the outer end of stretch-draw core bar 9, nut 12 withstands on the outboard end of the oil cylinder 11 in the stretch-draw jack 10.
Use the concrete tension operation process of this coupling to be:
(1) size is carried out blanking, system bundle and the lashing of steel strand 4 on request, and the cutting length error of steel strand is controlled in the 10mm, and the lashing error is controlled in the 10mm;
(2) common anchor slab 1, spacing supporting seat 3, special-purpose anchor slab 5 and intermediate plate fixed head 6 are installed successively;
(3) when needs stretch-draw, earlier sleeve 7 is screwed onto on the special-purpose anchor slab 6, again stretch-draw core bar 9 is connected on the sleeve 7, put splice sleeve 8 then, stretch-draw jack 10 is installed, at the outboard end fastening nut 12 of stretch-draw core bar 9, after this can begin the stretch-draw operation again;
(4) control stretch-draw jack 10, make oil cylinder 11 overhanging, by core bar 9, sleeve 7 and special-purpose anchor slab 5, the control tonnage is arrived in steel strand 4 stretch-draw, afterwards, the oil cylinder oil return of stretch-draw jack 10, the intermediate plate 2 on the common anchor slab 1 are anchored at (the single-ended retraction of steel strand is not more than 6mm generally speaking) on the common anchor slab 1 to steel strand 4 along with the retraction of steel strand 4;
(5) stretch-draw jack 10 continues oil return, contract in the oil cylinder 11, nut 12 breaks away from stretch-draw jack 10, and can remove nut 12, core bar 9, splice sleeve 8, sleeve 7, intermediate plate fixed head 6, special-purpose anchor slab 5 and support limit device 3 this moment successively, and prepares the tension operation of a branch of steel strand down.

Claims (1)

1, a kind of stretch-draw prestressing force steel strand coupling, it is characterized in that supporting limited supporting seat (3) in the outside of common anchor slab (1), the outer bead of spacing supporting seat (3) supports stretch-draw jack (10) by splice sleeve (8), the interior bead of spacing supporting seat (3) supports special-purpose anchor slab (5), on special-purpose anchor slab (5), be connected to intermediate plate fixed head (6), the other end of the sleeve (7) that is threaded with special-purpose anchor slab (5) the cylindrical stretch-draw core bar (9) that is threaded, stretch-draw core bar (9) passes the core hole of stretch-draw jack, and the nut (12) that spins in the outer end of stretch-draw core bar (9) withstands on oil cylinder (11) outboard end in the stretch-draw jack (10).
CNU200820227900XU 2008-12-12 2008-12-12 Stretching prestressed strand coupler Expired - Fee Related CN201318027Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU200820227900XU CN201318027Y (en) 2008-12-12 2008-12-12 Stretching prestressed strand coupler

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU200820227900XU CN201318027Y (en) 2008-12-12 2008-12-12 Stretching prestressed strand coupler

Publications (1)

Publication Number Publication Date
CN201318027Y true CN201318027Y (en) 2009-09-30

Family

ID=41196793

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU200820227900XU Expired - Fee Related CN201318027Y (en) 2008-12-12 2008-12-12 Stretching prestressed strand coupler

Country Status (1)

Country Link
CN (1) CN201318027Y (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101886477A (en) * 2010-07-09 2010-11-17 中冶建工有限公司 Prestressed tensioning group anchorage single-hole limiting plate
CN102704967A (en) * 2012-05-21 2012-10-03 严红 A structure and method for preventing collapse of chamber roof with crossed big sections
CN112160506A (en) * 2020-09-10 2021-01-01 中冶建筑研究总院有限公司 Secondary tensioning anchor for unbonded prestressed steel strand and tensioning device and method
CN113684769A (en) * 2021-08-03 2021-11-23 江阴法尔胜住电新材料有限公司 Temporary buckling cable force adjusting device for construction of bilateral cantilever type main beam and using method thereof
CN113832866A (en) * 2021-10-29 2021-12-24 杭州富锚机械有限公司 Steel strand stretching device for prestressed anchorage device

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101886477A (en) * 2010-07-09 2010-11-17 中冶建工有限公司 Prestressed tensioning group anchorage single-hole limiting plate
CN101886477B (en) * 2010-07-09 2011-08-17 中冶建工有限公司 Prestressed tensioning group anchorage single-hole limiting plate
CN102704967A (en) * 2012-05-21 2012-10-03 严红 A structure and method for preventing collapse of chamber roof with crossed big sections
CN102704967B (en) * 2012-05-21 2015-09-09 中国矿业大学 One prevents from intersecting large-section underground top board and to collapse method for leakage
CN112160506A (en) * 2020-09-10 2021-01-01 中冶建筑研究总院有限公司 Secondary tensioning anchor for unbonded prestressed steel strand and tensioning device and method
CN113684769A (en) * 2021-08-03 2021-11-23 江阴法尔胜住电新材料有限公司 Temporary buckling cable force adjusting device for construction of bilateral cantilever type main beam and using method thereof
CN113684769B (en) * 2021-08-03 2023-01-13 江阴法尔胜住电新材料有限公司 Temporary buckling cable force adjusting device for construction of bilateral cantilever type main beam and using method thereof
CN113832866A (en) * 2021-10-29 2021-12-24 杭州富锚机械有限公司 Steel strand stretching device for prestressed anchorage device

Similar Documents

Publication Publication Date Title
CN201318027Y (en) Stretching prestressed strand coupler
CN202401772U (en) Supporting lug with clip top pressing and top loosing functions and clip limit
CN203769342U (en) Rigid self-locking pre-stress carbon fiber plate anchoring system
CN101260741A (en) Short bundle cable stretching caging device and method for stretching and anchoring
CN202705897U (en) High strength low retracting anchorage device
CN102505858B (en) Pre-stressing carbon-cloth tension system and tension reinforcing method
CN207193776U (en) A kind of bridge prestress tensioning equipment
CN102127950A (en) Automatic centering tensioning and anchoring device for prestressed sheet clamping anchorage
CN2392836Y (en) Pretensioned beam special clamp
CN102953378B (en) Single-hole and double-beam prestressed anchor tensioning device
CN203007855U (en) Stretch-draw anchoring system of pre-stress fiber composite plate
CN201033945Y (en) Short strand wire stretching stopping means
CN110184954B (en) Bridge prestressed body outer cable dismantling method
CN202063668U (en) Jack of integrated anchor tool
CN202925544U (en) Single-hole double-bundle pre-stress anchor bolt tensioning device
CN201972410U (en) Integrated tool anchor
CN208763304U (en) Stretching rope constructing device in a kind of prestressed steel structure
CN102561599A (en) Connector of steel stranded wires and finished twisted steel
CN204019725U (en) A kind of concrete box girder prestressing force drawing steel stranded wire move back anchor device
CN108103946B (en) Tensioning equipment applied to the construction of small space
CN206646407U (en) Prestress wire p-type anchor stopping means
CN111719407B (en) Stay cable and concrete bridge tower anchoring structure of pre-buried steel plate
CN108222376B (en) Steel strand connector of pretensioned beam for constructional engineering and use method thereof
CN201343867Y (en) Sleeve-type wire connector
CN210025769U (en) Prestressed reinforcement tensioning and anchoring mechanism for cement electric pole

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090930