CN102704507A - Construction method of cover-and-cut reverse construction concrete walls and columns with vertical structures - Google Patents

Construction method of cover-and-cut reverse construction concrete walls and columns with vertical structures Download PDF

Info

Publication number
CN102704507A
CN102704507A CN2012101701194A CN201210170119A CN102704507A CN 102704507 A CN102704507 A CN 102704507A CN 2012101701194 A CN2012101701194 A CN 2012101701194A CN 201210170119 A CN201210170119 A CN 201210170119A CN 102704507 A CN102704507 A CN 102704507A
Authority
CN
China
Prior art keywords
wall
construction
returning
construction method
section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012101701194A
Other languages
Chinese (zh)
Other versions
CN102704507B (en
Inventor
裴鸿斌
亓立刚
闫克启
袁跃华
杨超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN201210170119.4A priority Critical patent/CN102704507B/en
Publication of CN102704507A publication Critical patent/CN102704507A/en
Application granted granted Critical
Publication of CN102704507B publication Critical patent/CN102704507B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention discloses a construction method of cover-and-cut reverse construction concrete walls and columns with vertical structures. The construction method comprises the following steps that a top plate is constructed, a lower returnable segment is arranged in the position of the top plate corresponding to a lower-layer wall and column, and sleeves and overlap-connected steel bars are reserved in the lower returnable segment; after the top plate is constructed, a layer of soil is excavated downwards from the top plate, wall and column steel bars are bound, and then, are connected to the overlap-connected steel bars, and a bottom plate is constructed; after the bottom plate is constructed, wall and column templates are supported to be closely attached to the lower returnable segment; and walls and columns can be formed by pouring concrete downwards in the sleeves reserved in the lower returnable segment. According to the invention, the construction method solves the problem that cover-and-cut reverse construction concrete walls and columns form a horn mouth shape in a supporting mode, or the construction process of a post filling method is complex, and the compactness of concrete in joints is difficult to control. The construction method reduces the construction difficulty, ensures the construction quality and accelerates the construction progress.

Description

A kind of lid digs contrary do vertical structure concrete wall, column construction method
Technical field
The present invention relates to the engineering construction field, relate in particular to a kind of lid and dig contrary do vertical structure concrete wall, column construction method.
Background technology
Lid digs and contrary makes the vertical structure concrete wall, the general construction of post has two kinds: after returning certain altitude under first kind of employing, will just make wall, suitable for reading of column template is set as toroidal, waters walling, post concrete from horn mouth; After concrete setting, cut the unnecessary concrete in horn mouth place, and repair smooth; Though the method can better solve joint concrete compactness suitable for reading; But formwork erection is complicated, need cut unnecessary horn mouth concrete and repair smoothly, and presentation quality is bad; After returning certain altitude under second kind of employing wall, the post; To just do wall, post concreting to apart under return the concrete certain distance; Be pressed into cement paste with high grade slightly expanded concrete filling or employing again and fill, this kind method needs repeatedly construction, and concrete construction joint is more; Back packing material compactness is wayward, and concrete quality is wayward.Therefore dig for lid and contraryly make the vertical structure concrete wall, post is necessary to propose a kind of new job practices.
Summary of the invention
Technical problem to be solved by this invention provides a kind of lid that improves and digs contrary concrete wall, the column construction method of making vertical structure concrete wall, post seam crossing construction quality.
For realizing above-mentioned technique effect, the invention discloses a kind of lid and dig against making vertical structure concrete wall, column construction method, said job practices may further comprise the steps:
The construction top board is provided with the section of returning in the corresponding lower floor of said top board wall, post position, under said, reserves the sleeve pipe and the reinforcing bar of plugging in the section of returning;
Constructed behind the said top board, excavated one deck earthwork downwards, tied up wall, the post reinforcing bar is connected with the said reinforcing bar of plugging into from said top board, and the construction base plate;
Constructed behind the said base plate, install wall, column template and said under the section of returning closely connected;
Build wall, post downwards in the section of the returning reservation sleeve pipe under said.
The present invention further improves and is, the said bottom profit retention of the section of returning is down stopped shoulder shape to handle the bottom-up constuction joint that connects of vertical primary structure member.
The present invention further improves and is that corresponding wall, post position are provided with the section of returning on said base plate.
The present invention further improves and is, offers the hole of vibrating at the middle part of said wall, column template, cooperates the said hole of vibrating that one vibrating spear is set.
The present invention has been owing to adopted above technical scheme, makes it have following beneficial effect to be: at first accomplish every floor plated construction according to the designing requirement construction, and reserved under wall or the post return, on return height and shape; Reserved reinforcing bar; Keep at a certain distance away in wall or the post to reserve and build sleeve pipe, install wall or column template at last again, concrete is built downwards, is vibrated from building in the sleeve pipe of reserving; Avoided lid to dig and contraryly made wall, post installs complicated, the joint concrete compactness unmanageable problem of working procedure that is toroidal or back completion method; Reduce difficulty of construction, guaranteed construction quality, accelerated construction speed.
Description of drawings
For the benefit of to the further understanding of structure of the present invention, the present invention is that example is explained with underground two-layer structure construction.
Fig. 1 is contrary vertical structure concrete wall, the negative one deck top board construction sketch map of post done for lid of the present invention digs.
Fig. 2 is contrary vertical structure concrete wall, the negative one deck base plate construction of the post sketch map done for lid of the present invention digs.
Fig. 3 is contrary vertical structure concrete wall, the negative two layers of base plate construction of the post sketch map done for lid of the present invention digs.
Fig. 4 is contrary do vertical structure concrete wall, post concreting view for lid of the present invention digs.
The specific embodiment
At first see also Fig. 1; According to the negative one deck top board 11 of designing requirement construction; Following the return section 13 of one height greater than 500mm is set in top board 11 corresponding lower floor walls, post position; The bottom profit retention of the section of returning 13 is stopped shoulder shape to handle the bottom-up constuction joint that connects of vertical primary structure member down, and the shoulder shape shape of stopping can prolong the seepage channel of constuction joint place water, and constuction joint place concrete can be easier to fill full, vibration compacting.Interval 1000mm is apart from reserving diameter 150mm sleeve pipe 12 in wall, post; Be used to water walling, post concrete; The downward length in reserve of reinforcing bar exceeds the reinforcing bar 14 of plugging into of the section of returning 100mm-150mm under the shoulder shape of stopping in wall, the post, and the protection when being convenient to lower floor's soil excavation is connected with lower floor's reinforcing bar.
Consult Fig. 2, wait negative one deck top board 11 structural concretes to reach design strength after, the negative one deck earthwork of excavation, the negative one deck base plate 21 of construction.This stage; The negative one deck wall of construction earlier, post reinforcing bar 25; After the reinforcing bar of reserving when construct with negative one deck top board 11 in the upper end 251 of reinforcing bar 25 14 of plugging into is connected completion; Again in negative one deck base plate 21 reinforcing bars of the lower end of reinforcing bar 25 252 colligations; Corresponding negative 11 times sections of returning 13 of one deck top board on negative one deck base plate 21 be provided with a height greater than 300mm on anti-section 26, the downside at negative one deck base plate 21 is provided with following the return section 24 of a height greater than 500mm accordingly, under the section of returning 24 bottoms be to stop and take on shape; 1000mm reserves diameter 150mm sleeve pipe 22 at interval in wall, post, and the lower end 252 of reinforcing bar 25 forms the reinforcing bar 23 of plugging into that downward length in reserve exceeds the section of returning 100mm-150mm under the shoulder shape of stopping in wall, the post.
Consult Fig. 3, wait negative one deck base plate 21 structural concretes to reach design strength after, the negative two layers of earthwork of excavation, the negative two layers of base plate 31 of construction.This stage; The negative two layers of wall of construction earlier, post reinforcing bar 32; Wall, the post that the upper end 321 of reinforcing bar 32 is reserved downwards during with 21 constructions of negative one deck base plate plugged into after reinforcing bar 23 is connected completion; Again in negative two layers of base plate 31 reinforcing bar of the lower end of reinforcing bar 32 322 colligations, corresponding negative 21 times sections of returning 24 of one deck base plate on negative two layers of base plate 31 be provided with a height greater than 300mm on anti-section 33.
Consult Fig. 4, wait negative two layers of base plate 31 structural concrete to reach certain intensity after, accomplish the thin portion of constuction joint waterproof way according to designing requirement after; Begin to install negative two layers of wall, column template 41; Template 41 adopts the single surface formwork modes, and the vibrating spear hole 42 of vibrating is offered at middle part 1000mm at interval, vibrate hole 42 with reserve sleeve pipe 22 and be laid staggeredly; Anti-section 33 is closely connected on template 41 bottoms and the negative two layers of base plate 31; Template 41 tops and 21 times sections of returning 24 of negative one deck base plate are closely connected, lay in the sleeve pipe 22 that the concrete pump line reserves from negative one deck base plate 21 concretings downwards, and concrete vibrates with the hole 42 of vibrating, template 41 middle parts in the sleeve pipe 22.
Consult Fig. 4, wait negative two layers of wall, post concrete construction to accomplish after, adopt similar approach; After the thin portion of designing requirement completion constuction joint waterproof way; Begin to install negative one deck wall, column template 51, template 51 adopts the single surface formwork modes, and the vibrating spear hole 52 of vibrating is offered at middle part 1000mm at interval; Anti-section 26 is closely connected on template 51 bottoms and the negative one deck base plate 21; Template 51 tops and 11 times sections of returning 13 of negative one deck top board are closely connected, lay in the sleeve pipe 12 that the concrete pump line reserves from negative one deck top board 11 concretings downwards, and concrete vibrates with the hole 52 of vibrating, template 51 middle parts in the sleeve pipe 12.Avoided lid to dig and contraryly made wall, post installs complicated, the joint concrete compactness unmanageable problem of working procedure that is toroidal or back completion method, has reduced difficulty of construction, has guaranteed construction quality, has accelerated construction speed.
More than combine accompanying drawing embodiment that the present invention is specified, those skilled in the art can make the many variations example to the present invention according to above-mentioned explanation.Thereby some details among the embodiment should not constitute qualification of the present invention, and the scope that the present invention will define with appended claims is as protection scope of the present invention.

Claims (4)

1. a lid digs against making vertical structure concrete wall, column construction method, it is characterized in that said job practices may further comprise the steps:
The construction top board is provided with the section of returning in the corresponding lower floor of said top board wall, post position, under said, reserves the sleeve pipe and the reinforcing bar of plugging in the section of returning;
Constructed behind the said top board, excavated one deck earthwork downwards, tied up wall, the post reinforcing bar is connected with the said reinforcing bar of plugging into from said top board, and the construction base plate;
Constructed behind the said base plate, install wall, column template and said under the section of returning closely connected;
Build wall, post downwards in the section of the returning reservation sleeve pipe under said.
2. lid as claimed in claim 1 digs against making vertical structure concrete wall, column construction method, it is characterized in that: the said bottom profit retention of the section of returning is down stopped shoulder shape to handle the bottom-up constuction joint that connects of vertical primary structure member.
3. lid as claimed in claim 1 digs against making vertical structure concrete wall, column construction method, and it is characterized in that: corresponding wall, post position are provided with the section of returning on said base plate.
4. lid as claimed in claim 1 digs contrary makes vertical structure concrete wall, column construction method, it is characterized in that: offer the hole of vibrating at the middle part of said wall, column template, cooperate the said hole of vibrating that one vibrating spear is set.
CN201210170119.4A 2012-05-28 2012-05-28 Construction method of cover-and-cut reverse construction concrete walls and columns with vertical structures Active CN102704507B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210170119.4A CN102704507B (en) 2012-05-28 2012-05-28 Construction method of cover-and-cut reverse construction concrete walls and columns with vertical structures

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210170119.4A CN102704507B (en) 2012-05-28 2012-05-28 Construction method of cover-and-cut reverse construction concrete walls and columns with vertical structures

Publications (2)

Publication Number Publication Date
CN102704507A true CN102704507A (en) 2012-10-03
CN102704507B CN102704507B (en) 2015-04-29

Family

ID=46897539

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210170119.4A Active CN102704507B (en) 2012-05-28 2012-05-28 Construction method of cover-and-cut reverse construction concrete walls and columns with vertical structures

Country Status (1)

Country Link
CN (1) CN102704507B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103866789A (en) * 2014-03-19 2014-06-18 重庆大学 Control method for cracks generated during construction period of basement baseboard
CN104131579A (en) * 2014-05-27 2014-11-05 中国建筑第四工程局有限公司 Method for quickening earthwork digging and transporting in top-down construction
CN111058477A (en) * 2019-12-06 2020-04-24 中国人民解放军军事科学院国防工程研究院工程防护研究所 Cover-excavation full-reverse construction design construction method for urban underground engineering
CN114232686A (en) * 2021-12-03 2022-03-25 中铁四院集团西南勘察设计有限公司 Construction method for underground structure cover excavation and top-down construction
CN114232683A (en) * 2022-01-11 2022-03-25 华东建筑设计研究院有限公司 Support changing and structural connecting method during conflict between temporary separation enclosure wall and structural frame column
CN114934544A (en) * 2022-07-25 2022-08-23 中国建筑第六工程局有限公司 Construction method for covering and digging top-down side wall
CN115262631A (en) * 2022-08-03 2022-11-01 中国水利水电第十工程局有限公司 Concrete pouring device and method for upright column construction by cover-excavation method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1563612A (en) * 2004-03-15 2005-01-12 中国第二十冶金建设公司 Construction method for underground structure through half reverse course of action of inverting connection
KR20060096705A (en) * 2005-03-02 2006-09-13 (주)엠오아이 Retaining wall method using the reaction of anchor force in site
CN102191779A (en) * 2010-03-05 2011-09-21 中国京冶工程技术有限公司厦门分公司 Topdown construction method of basement exterior wall
CN102433894A (en) * 2011-12-30 2012-05-02 中铁二局股份有限公司 Construction method for station side wall by covered top-down excavation method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1563612A (en) * 2004-03-15 2005-01-12 中国第二十冶金建设公司 Construction method for underground structure through half reverse course of action of inverting connection
KR20060096705A (en) * 2005-03-02 2006-09-13 (주)엠오아이 Retaining wall method using the reaction of anchor force in site
CN102191779A (en) * 2010-03-05 2011-09-21 中国京冶工程技术有限公司厦门分公司 Topdown construction method of basement exterior wall
CN102433894A (en) * 2011-12-30 2012-05-02 中铁二局股份有限公司 Construction method for station side wall by covered top-down excavation method

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
张文渊: "混凝土顶板埋管灌浆补强技术", 《建筑技术》 *
方俊波,李平安: "22m深基坑东南亚最大地铁车站盖挖半逆筑法施工技术", 《中国土木工程协学会隧道及地下工程分会地下铁道专业委员会第十三届学术交流会》 *
赵源,杨素钦等: ""‘逆作法’施工关键节点的处理"", 《现代企业文化》 *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103866789A (en) * 2014-03-19 2014-06-18 重庆大学 Control method for cracks generated during construction period of basement baseboard
CN104131579A (en) * 2014-05-27 2014-11-05 中国建筑第四工程局有限公司 Method for quickening earthwork digging and transporting in top-down construction
CN111058477A (en) * 2019-12-06 2020-04-24 中国人民解放军军事科学院国防工程研究院工程防护研究所 Cover-excavation full-reverse construction design construction method for urban underground engineering
CN114232686A (en) * 2021-12-03 2022-03-25 中铁四院集团西南勘察设计有限公司 Construction method for underground structure cover excavation and top-down construction
CN114232683A (en) * 2022-01-11 2022-03-25 华东建筑设计研究院有限公司 Support changing and structural connecting method during conflict between temporary separation enclosure wall and structural frame column
CN114232683B (en) * 2022-01-11 2023-02-10 华东建筑设计研究院有限公司 Support changing and structural connecting method during conflict between temporary separation enclosure wall and structural frame column
CN114934544A (en) * 2022-07-25 2022-08-23 中国建筑第六工程局有限公司 Construction method for covering and digging top-down side wall
CN114934544B (en) * 2022-07-25 2022-11-04 中国建筑第六工程局有限公司 Construction method for covering and digging top-down side wall
CN115262631A (en) * 2022-08-03 2022-11-01 中国水利水电第十工程局有限公司 Concrete pouring device and method for upright column construction by cover-excavation method

Also Published As

Publication number Publication date
CN102704507B (en) 2015-04-29

Similar Documents

Publication Publication Date Title
CN102704507A (en) Construction method of cover-and-cut reverse construction concrete walls and columns with vertical structures
CN106121090B (en) The method of anchor connection reinforcing bar in 3D printing filled wall
CN102561402B (en) Treatment method for construction joint between top plate and wall of individual underground civil air defense project constructed by covered top-down excavation method
CN104153295A (en) Self-compacting concrete jack-up pouring construction method for steel tube arch bridges
CN102383628A (en) Construction device and construction method for post construction of depressing cone of silo structure
CN101775844A (en) Connecting joint of ring beam of steel core concrete column used for topdown construction method foundation pit engineering
CN102587663A (en) Concrete construction process of steel tube columns of super-high-rise building
CN107059920A (en) Loess formation piping lane construction technology
CN102605773B (en) Construction method of slip-casting expanded-base cast-in-situ bored pile and extruding-extending device thereof
CN106894587A (en) Precast stair connection method
CN101560766B (en) Grid-like underground continuous wall plate and production method thereof
CN107022940A (en) Sidewalk structure and its construction method
CN103161474A (en) Construction method of down hole interchange roadway
CN105275013A (en) Core tube inverse superimposed underground diaphragm wall and construction method thereof
CN107675838A (en) Assembled architecture sidewalk brick precast beam embedded sleeve barrel joint bar construction method
CN100443673C (en) Method of construction
CN108457190A (en) Anchor ceiling board construction method before anchorage
CN103334771A (en) Concrete pouring method of side wall and joint of middle plate and vault by means of underground excavation reverse construction method
CN108532939A (en) Shear wall single side formwork method
CN202543908U (en) Extruding and enlarging device of slip casting enlarged cast-in-situ bored pile
CN105756377A (en) Swimming pool and construction method thereof
CN206189389U (en) Underground continuous wall structure for reverse construction method
CN201598734U (en) Concrete filled steel tubular column ring beam joint for topdown construction method foundation pit engineering
CN205591210U (en) Formula cast member and construction assembly are spliced to underground
CN103758122A (en) Environment-friendly modular concrete tubular column and construction method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant