CN102701462A - Multi-element ecological balance biological remediation method - Google Patents

Multi-element ecological balance biological remediation method Download PDF

Info

Publication number
CN102701462A
CN102701462A CN2012101893334A CN201210189333A CN102701462A CN 102701462 A CN102701462 A CN 102701462A CN 2012101893334 A CN2012101893334 A CN 2012101893334A CN 201210189333 A CN201210189333 A CN 201210189333A CN 102701462 A CN102701462 A CN 102701462A
Authority
CN
China
Prior art keywords
water
river
water body
engineering
framework
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012101893334A
Other languages
Chinese (zh)
Other versions
CN102701462B (en
Inventor
邱建贺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yuhuang Ecological Technology Co ltd
Original Assignee
FOSHAN YUHUANG ECOLOGICAL ENVIRONMENT TECHNOLOGY CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FOSHAN YUHUANG ECOLOGICAL ENVIRONMENT TECHNOLOGY CO LTD filed Critical FOSHAN YUHUANG ECOLOGICAL ENVIRONMENT TECHNOLOGY CO LTD
Priority to CN201210189333.4A priority Critical patent/CN102701462B/en
Publication of CN102701462A publication Critical patent/CN102701462A/en
Application granted granted Critical
Publication of CN102701462B publication Critical patent/CN102701462B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention provides a multi-element ecological balance biological remediation method. The multi-element ecological balance biological remediation method comprises the following steps of: (1) investigating and surveying a water body: investigating and surveying the distribution of plants, animals and microbes in the water body and the current situation of water quality, analyzing and confirming the condition of water quality and bottom mud; (2) seperation and combination: separating, screening, combining and domesticating indigenous microorganisms in an engineering river section; (3) arranging biological membrane grids at an engineering starting point, i.e. a river mouth; (4) respectively dropping the microorganisms which are combined and domesticated at the step (2) at the side of a river bank and the river mouth of a branch; (5) adjusting the throwing amount of the additional microorganisms or adjusting proportions; (6) laying out manual waterweeds at the river bottom and aquatic plants on a water surface, and stocking aquatic animals; (7) keeping living beings and the microorganisms in the water body relatively balance; and (8) monitoring and analyzing the condition of the water body, adjusting the throwing amount and proportion of the microorganisms, and maintaining the water quality of the remedied water body. The multi-element ecological balance biological remediation method has the advantages that the impact resistance load-bearing capacity is strong, the processing effect is stable, the economic performance is good, secondary pollution is avoided, and the multi-element ecological balance is maintained.

Description

Multi-element ecology balance biological renovation method
Technical field
The present invention relates to a kind of multi-element ecology balance biological renovation method.
Background technology
Water pollution problem has become one of most important restraining factors of China's socio-economic development, has caused the great attention of country and local government.Tenth Five-Year Plan Period, country has taked a series of measures with local at aspects such as policy, rules, engineering, science and technology and education, and the trend of containment water environment degradation has been brought into play vital role.The enforcement of country's major scientific and technological project " water pollution control technology and improvement engineering " has also advantageously promoted the comprehensive scientific and technological supporting capacity of China's water pollution control and improvement; But water pollution control will be long-term, a complicated and arduous systems engineering with administering; Water pollution control is resolved far away with the key technology of administering; The capability of independent innovation of water pollution control enterprise is weak; The device product manufacture level is on the low side, quality remains to be improved comprehensively, and still obviously not enough with the technical support that improvement planning is worked out, engineering project is implemented and operation is supervised to water pollution control, water pollutes serious day by day development trend and do not obtain fundamental reversal as yet.
Summary of the invention
For making water pollution obtain the improvement of essence, the present invention aims to provide a kind ofly has that capacity of resisting impact load is strong, treatment effect stable, economic performance is good, the multi-element ecology balance biological renovation method of non-secondary pollution.
The present invention is a kind of structure of water ecology repair system, is a kind of structure of system ensemble engineering, comprises the steps:
1. investigate water body: distribution and water quality present situation to the intravital plant of water, animal, mikrobe are investigated, analysis confirmation water quality and bed mud situation;
2. separate compatibility: to indigenous microorganism separation, screening, compatibility, the domestication in the engineering section;
3. the microbial film grid are installed in river mouth, engineering starting point place;
4. throw respectively in limit, riverbank and river mouth, tributary and spill through 2. compatibility acclimated microorganism of step;
5. mikrobe injected volume or adjustment proportioning are appended in debugging;
6. arrange artificial pasture and water in the river bed, arrange waterplant, put hydrocoles in a suitable place to breed at the water surface;
7. the biology and the mikrobe relative equilibrium that keep water body;
8. monitoring analysis water body situation is adjusted mikrobe injected volume and proportioning, keeps the water quality of being repaired.
If the water pollution in river has point-source pollution, then step 2. and step carry out steps A between 3.: at small-sized sewage draining exit place, the row's of layout mouthful Biological Pretreatment device is controlled the influence of exogenous point-source pollution to the engineering section; Sprout and with blowdown water drainage canal mouth place, miniature organism film grid are set, reduce the impact of sewage to the engineering section.
Said waterplant is preferably native species and right non-hibernating eggs.
Said microbial film canopy is provided with artificial pasture and water and the two-layer microbial film that is positioned at said artificial pasture and water both sides.
A said row mouthful Biological Pretreatment device comprises a framework; Connect fishing net in the upper end of said framework, four ends of said framework be weight, connection carrier between four ends of said framework; Four ends at said framework are covered with one deck outer net, and said carrier is positioned within the said outer net.
Multi-element ecology balance biological renovation method of the present invention is at first investigated the distribution that water body is understood water body implants, animal, mikrobe, then through breadboard rejecting, separation; Screening; After then the native country microbial strains of inoculating microbe and screening being carried out composite domestication, the throwing of carrying out river water body with the bacterial classification behind the compatibility is then spilt, and debugs and adjust injected volume and proportioning; Result according to investigation further arranges artificial water, waterplant again and puts hydrocoles in a suitable place to breed at last; Thereby set up the water body species diversity gradually, construction multi-element ecology balance biosystem, the 26S Proteasome Structure and Function of the realization ecosystem; Make it to reach benign balance of nature, thereby make water pollution obtain the improvement of essence.
Description of drawings
Fig. 1 is microbial film grid structure iron;
Fig. 2 is row's mouthful Biological Pretreatment structure drawing of device;
Fig. 3 is miniature organism film grid structure iron;
Fig. 4 is the mounting structure figure of pleuston, chinampa plant and water peanut.
Embodiment
For a better understanding of the present invention, come further detailed explanation through the embodiment that Foshan City's salt step is gushed greatly below, but be not qualification of the present invention.
Project profile:
The Foshan City salt step is gushed the central zone that the engineering section is positioned at Nanhai District Dali Town, the Foshan City salt step greatly, is to keep an ancient river of broad to gush at present, basic 80% section dirt, and the upper reaches is cut dirt and is carried out, and does not cut the dirty sewage that belongs to.It is that the road is close in the sea that the salt step is gushed the east side greatly, and the west side is toad Long Lu, is roughly south-north direction, and flower ground water channel is gone into through salt step ship lock in the southern side, river course, and the north side is divided into two tributaries, is respectively the imperial sand boil and the west of a river and gushes greatly.Engineering segment length 1.23km, wide 30-40m, the about 40000m of water surface area 2, belong to the heavily contaminated water body.In engineering section salt step gushes greatly, in two months, can accomplish and cut a dirt and receive pipe basically, present sewage network has along the river been laid completion, is carrying out the UNICOM of main pipe.The dragon sand boil and the west of a river are gushed greatly and are not cut dirt, are the main exogenous pollution of engineering section after cutting dirty the completion.
Gush the shove situation of territory water pollution of river greatly, embodiment of the present invention to Foshan City's salt step:
Step 1 investigation water body: distribution and water quality present situation to the intravital plant of water, animal, mikrobe are investigated, analysis confirmation water quality and bed mud situation.
Water quality present situation (data are from the monitoring station, and all the other are tested oneself for sampling):
Figure BSA00000732460900031
Detection shows: 1,2# point water sample and mud appearance are sample detecting August 24 (at the incoming tide) in 2011, and the 3# point is (during ebb tide) sample detecting on September 5th, 2011, and water body totally belongs to bad V class water, and wherein, N, P occupy high.Belong to the heavily contaminated black and odorous water, and the top layer bed mud is black smelly, is colloidal substance.
Salt step is gushed the river territory water pollution analysis of causes of shoving greatly, comprising investigation to water body implants, animal, mikrobe:
1. endogenous pollutes
For a long time, the sewage etc. of periphery constantly enters in the river course, the pollution that brings of tributary, the upper reaches in addition; Make organic contamination, N, P constantly to bed mud deposition, cause the nutrient enrichment in the bed mud, again through with the exchange of overlying water; Discharge pollution to water body, the endogenous that forms the river course pollutes.
2. pollute in the basin
The big water burst body in the imperial sand boil at the upper reaches and the west of a river is black smelly, does not cut dirt along the river as yet.Through morning and evening tides, the pollution at the upper reaches is brought in salt step gushes greatly, during dam site investigation, river surface spreads all over greasy dirt, causes great pollution to impact to the engineering section, is after cutting dirt in the engineering section, the source of pollution of primarily facing.
3. point-source pollution
Salt step gushes greatly to be in and cuts a dirt and receive the pipe critical stage, and at present a large amount of blowdowns get into the engineering sections, and through dam site investigation, basic condition is following:
(1) many small-sized rainwater row mouths are arranged along the river, the resident in roadside and all kinds of shop are more in addition, often have sewage to pass through rain water channel on ordinary days and get into the river course.
During dam site investigation, the sewage draining exit of the dirty mixed flow of this part rain is accomplished the dirty shunting of rain basically, but because house steward is illogical, still in line at present river course.
(2) during dam site investigation, finding along the river has the serious blowdown in 2 places, and the more small-sized sewage draining exit in 3 places is just having sewage discharge, and is bigger to the influence of engineering section.
(3) blowdown water drainage canal in toad dragon North Road side has a sprout and village; Be close to the South Road side in the sea two blowdown water drainage canals in the village are arranged; Being close to the north side, North Road in the sea has a blowdown water drainage canal in the village, is the main point source contact scar in the present engineering section, even after blowdown water drainage canal cuts dirt; The rainy day water yield is big, and rain sewage still can get into the engineering section through overflow.
4. ecological chain break---hard shore protection
The river course bank is the hard shore protection, has blocked the holocoenotic contact of terrestiral ecosystem and water, causes biological chain break.
5. biological chain break---lack waterplant
Substantially anhydrous living plant in the water body lacks the output pathway of nutritive salt, and a day thermal conductance causes the water body blue-green algae and multiplies, and presents eutrophication.
6. the water body organic contamination that causes of along the river greening
The river course is littoral have been improved the degree of viewing and admiring of surrounding enviroment, but has gone into simultaneously after autumn all over planting greening, and litter gets into water body, causes the organic contamination of water body.
Step 2 is separated compatibility: to indigenous microorganism separation, screening, compatibility, the domestication in the engineering section.
Behind main bacterium separation through salt step being gushed indigenous microorganism in the bed mud greatly, screening, the purifying; With the beautiful compound compatibility of YL active bio-compounding agent (being called for short the YL agent) of building the production of Environmental Biotechnology ltd in Shanghai; The pathways metabolism of domestication and improvement mikrobe and its electron acceptor(EA) of change make YL agent (YL agent-H 15For general organic pollution aquifer is handled microbial inoculum, YL-K 40The organic pollution aquifer of attaching most importance to is handled microbial inoculum) can adapt to the water pollution characteristic in the engineering section, become eventual degradation type industry microbial inoculum, and it is strong to have tolerance, the characteristics that decomposition efficiency is high have following characteristics:
Heatproof :-5-90 ℃
Withstand voltage :≤3 normal atmosphere
Anti-pH:4-9
Degradation property: the eventual degradation type, resolve into gas, H with organic pollutant 2O, grey matter.
Step 3: the microbial film grid are installed in river mouth, engineering starting point place.
The intersection in the river mouth, tributary (gush greatly in the imperial sand boil and the west of a river) is provided with the microbial film grid, and the come water outer to the engineering section carries out pre-treatment, reduces the influence of basin to engineering section water quality;
At engineering starting point place, the microbial film grid by the old gate in river mouth, are installed by the intersection that gush greatly in the imperial sand boil and the west of a river, microbial film grid inoculation YL agent-K 40, when the inside and outside water body of engineering section is exchanged,, reduce of the pollution of external water system to the engineering section all through microbial film grid filtration, purification.
Microbial film grid 2 covers are set altogether, the long 10m of device expectation ±, wide 2.5m, the high 2.5m of microbial film ±, the high about 2.0m of artificial pasture and water.
Referring to microbial film grid structure iron shown in Figure 1; The microbial film grid are made up of two portions, and the one, the two-layer microbial film 1, two of both sides is positioned at the artificial pasture and water 2 of intermediary; Biomembranous top is float 11 fixedly; Make the top be affixed on the water surface, and whole microbial film use the collar 12 to be installed in the fixed round steel stake 13, can make the height unmanaged flexibility of microbial film with water level; Artificial pasture and water 2 sink to the bottom floating, and the top is fixing by the ball float that is tied 21, and height is with the automatic up-down adjustment of change of level.
Step 4: at small-sized sewage draining exit place, the row's of layout mouthful Biological Pretreatment device is controlled the influence of exogenous point-source pollution to the engineering section; Sprout and with blowdown water drainage canal mouth place, miniature organism film grid are set, reduce the impact of sewage to the engineering section.
Wherein row's mouthful Biological Pretreatment device is installed as follows:
Row's mouth Biological Pretreatment structure drawing of device referring to shown in Figure 2 comprises a framework 31, connects fishing net 32 in the upper end of framework 3, four ends of framework be weight 33, between four ends of framework, be connected with carrier 34 in order to inoculation YL agent.Four ends at framework are covered with one deck outer net (not shown), and said carrier 34 is positioned within the outer net.
At 5 sewage draining exit places, the row's of installation mouthful Biological Pretreatment device 5 covers are strengthened the pre-treatment to row's mouthful water outlet, cut down the pollution substance that gets into engineering section water body.
The discharge of sewage to sprout, blowdown water drainage canal is big, and the characteristic that pollution index is high at 1 sprout of engineering section, 4 blowdown water drainage canal mouth places, is installed miniature organism film grid, makes pollutants in sewage be able to degraded, SS sedimentation, improves.
Referring to miniature organism film grid shown in Figure 3; Roughly the same with the integral part of the microbial film grid of step 3; Different is shape and the position relation that is positioned at the intermediary second section, and its shape is substantially half cylinder shape, and the bottom surface is bottom framework (not shown); End face is connected with water surface ribbon 42 and ball float (not shown), and whole microbial film grid are fixing through spud pile 44.It is relative with the semicircular opening of microbial film grid that river mouth 45 is gone in blowdown.The race diameter 6m of semicolumn; Inner ring diameter 3m; The high 2.5m of microbial film ±, the high 2.0m of artificial pasture and water ± (just adjusting) according to the each point riverbed, the biomembranous height of device both sides is by ribbon 42 controls; The height of artificial pasture and water is by ball float 43 controls, all can be with the water level difference of current up-down adjustment.
Step 5 is thrown respectively in limit, riverbank and river mouth, tributary and is spilt through 2. compatibility acclimated microorganism of step;
According to engineering section water quality situation, utilize YL agent-K 40Cut down the pollution that littoral small-sized blowdown brings, impel the heavily contaminated degraded in the limit bed mud that pulls in to shore; In going in place, river mouth (gush greatly in the imperial sand boil and the west of a river) the 50m scope of each tributary, inoculation YL agent-K 40, strengthen the degraded of pollutent;
The tributary estuarine organism is strengthened:
The ramuscule that gushes greatly in imperial sand boil, the west of a river with toad dragon North Road side flows in the river mouth 50m scope, inoculates special-purpose YL agent-K 40, strengthen the degraded of going into engineering section place pollution substance, reduce the basin and pollute, throwing and spilling density is 8m 2/ kg.
Dragon sand boil width is inoculated special-purpose YL agent-K approximately in 15m 4094kg.
The west of a river is gushed width greatly in 20m, inoculates special-purpose YL agent-K approximately 40125kg.
The sprout width is inoculated special-purpose YL agent-K approximately in 10m 4063kg.
Along the river the limit is biological reinforced:
Gush the bank greatly along the salt step, more rainwater row mouth is arranged, be organized in the scope of riverbank 5m, inoculate special-purpose YL agent-K 40, strengthen with rainwater bring into Ha Noi or through the stormwater channel discharging the degraded of organic contamination, reduce the pollution that enters the engineering section and impact.It is 20m that density is spread in throwing 2/ kg needs 615kg YL agent-K altogether approximately 40
Along the river inoculum density 15m in each 5m scope of both sides 2/ kg, all the other sections 8m 2/ kg amounts to the special-purpose YL agent-H of inoculation 154283kg.Microbial inoculum is thrown and is spilt evenly, and river bed, sloping bank carry out simultaneously.
Step 6: mikrobe injected volume or adjustment proportioning are appended in debugging.
This step is debugged and is appended biological injected volume or adjustment proportioning according to engineering section water quality situation, reaches and utilizes YL agent-K 40Cut down the pollution that littoral small-sized blowdown brings, utilize YL agent-H 15Rebuild detritus food chain, for the biocenological structure in upper strata lays the foundation.
YL agent-H wherein 15The injected volume of debugging fully starts population advantage and the physical features mineralization rate of the pioneer population of bottom-dwelling chain building.
Step 7 is arranged artificial pasture and water in the river bed, arrange waterplant at the water surface, puts hydrocoles in a suitable place to breed.
Arrange artificial pasture and water in the river bed, quicken the degraded of overlying water organic contamination;
Because engineering section water quality is relatively poor, under existing condition of water quality, do not reach submerged plant survival requirement.
Inoculation YL agent-H is arranged in establishment 15Artificial pasture and water, highly the establishment for 1.2m ±.It can increase contact surface circle of microbial inoculum and overlying water, through collision, impels the sedimentation of SS in the overlying water, accelerates purification of water quality speed, for the intervention of waterplant provides condition.The fraction of coverage that artificial pasture and water are arranged in the ballow, river bed is 8%, then estimates to install artificial pasture and water 3200m 2, 3840m 3
Frame size: 3 * 2.5 (m 2), adopt angle steel weldering system, install 427 altogether.Ground net on each framework is fixed with nylon rope, and artificial pasture and water are adopted the ball float come-up, and ball float is fixed on the fishing net with rope, and filler is fixed on the fishing net.
Arrange waterplant at the water surface, select native species and right non-hibernating eggs, strengthen landscape effect, improve food chain;
The mounting structure figure of pleuston, chinampa plant and water peanut is referring to shown in Figure 4:
The stable breeding of pleuston 51
Plantation pleuston (Herba Eichhorniae) because it has strong reproductive ability and strong soil pick-up ability, carries out the stable breeding pleuston; Area coverage plantation pleuston according to about 10%~11% is employed in bank 54 fixed modes, at a distance from 10m; The floating frame of stable breeding of a semi-circular diameter 10m is installed; 110 of floating frames are installed, and each 55 of both sides amount to stable breeding pleuston 4310m 2
Plantation chinampa plant 52
Along the river both sides, but the chinampa of following water-level lifting is installed in establishment, enriches the ecological element of water body, and the enhanced biological chain accelerates that the water pollution material decomposes and output.
Along the river the layout of bank both sides length direction is fixedly installed between the half-turn at adjacent two Herba Eichhorniae, and separation is installed 1 chinampa, the every long 10m in chinampa, wide 1.0m at a distance from a 10m neutral gear (adjacent two Herba Eichhorniae are the space of half-turn fixedly).54 chinampas are installed altogether, and the total area is 540m 2At the fixing water peanut 53 of the periphery on chinampa, improve and pollute output rate, and stiff chinampa is incorporated nature, improve the degree of viewing and admiring of integral body.Estimate water peanut plantation 800m 2
The chinampa plant selects for use the waterplant that detergent power is strong, degree of viewing and admiring is high to arrange in pairs or groups, like calamus, parasol grass, aquatic Canna generalis Bailey, wilson iris, floral leaf cattail, Spiked Loosestrife, Scirpus tabernaemontani, power is colored etc. again.
On the basis of water quality improving situation, in the section, put the hydrocoles of some amount in a suitable place to breed, the food and extend chain enriches aquatic attitude structure.
Suitably put fish, spiral shell and loach in a suitable place to breed, the food and extend chain is accelerated flowing of energy and material, and transition early is how natural river course.
The selection fish is silver carp, bighead, is this soil species, and breeding density is 50m 2/ kg amounts to and puts fish 800kg in a suitable place to breed.
Select screw and loach (indigenous species or right non-hibernating eggs), per kilogram screw control water surface area 100m 2, per kilogram loach control water surface area 200m 2, estimate screw 400kg, loach 200kg.
Step 8: the biology and the mikrobe relative equilibrium that keep water body.
According to the growing state behind the water plant planting, carry out maintenance, clear up, reseed; Surviving the winter season the dead withered body of cleaning waterplant; Keep the good growth of waterplant, hydrocoles in the water body, keep the biology and the mikrobe relative equilibrium of water body.
Step 9: monitoring analysis water body situation, adjustment mikrobe injected volume and proportioning keep the water quality of being repaired.
Generally speaking, remedy in right amount after 2 years and throw in the YL agent, mend the throwing amount and be 10% of injected volume first ±.
Result after the embodiment of the present invention:
Implement after 12 months:
Water-quality guideline: CODcr :≤30mg/l ammonia nitrogen :≤4.0mg/l
Total phosphorus :≤0.8mg/l BOD5 :≤15mg/l
Perhaps the clearance behind each item index weighting control point velocity of variation reaches:
CODcr:10% ± ammonia nitrogen: 50% ±
Total phosphorus: 30% ± BOD5:10% ±
Sampling is 3 times in 10 days, and above index all reaches more than 80%.
Judge with artificial directly range estimation of third-party spot sampling and sense organ whether water body is black smelly.
The bed mud color reaches: beige (PANTONE (Pan is logical) international colour atla look number (C face) 412c/433c/440c/447c)
Implement after 24 months:
Water-quality guideline: CODcr :≤30mg/l ammonia nitrogen :≤4.0mg/l
Total phosphorus :≤0.8mg/l BOD5 :≤15mg/l
Perhaps the clearance behind each item index weighting control point velocity of variation reaches:
CODcr:10% ± ammonia nitrogen: 50% ±
Total phosphorus: 30% ± BOD5:10% ±
Sampling is 4 times in 15 days, and above index all reaches more than 80%.
Judge with artificial directly range estimation of third-party spot sampling and sense organ whether water body is black smelly.
The bed mud color reaches: terra brown (PANTONE (Pan is logical) international colour atla look number (C face) 412c/432c/433c/438c/439c/440c/445c/446c/447c)
Weighting clearance method of calculation:
Figure BSA00000732460900091
Annotate: consider that the engineering section gushes the aquaporin that changes with imperial sand boil greatly as the west of a river, will change primary water about 2~3 days, therefore vertical and horizontal contrast dual indexes be set, choose one or the other of these two.
The result: water body does not have black smelly, and the bed mud color reaches terra brown.
Supplementary notes can realize multi-element ecology equilibrium principle of the present invention and engineering long term maintenance regulation effect principle below.
The multi-element ecology equilibrium principle:
1, the organic contamination principle is decomposed in the YL agent
A, YL agent are inoculated in immobilization on the carrier, and water body is dropped in on-the-spot flexibility domestication back, and rapid subsidence is in substrate, and are adsorbed on bulkhead wall, suspended substance, artificial pasture and water, the waterplant.Because the extracellular microbial exoenzyme, it is in the contact interface secure adhesion, difficult drop-off, and in the environment that is fit to own growth, set up the nest of oneself, rapid fissiparity.
B, YL agent have suppressed the growth of spoilage organism simultaneously with the organic substance in the form water of decomposition of metabolism and thoroughly degraded altogether (producing gas, water and inorganic salt) with the form of dominant group, and drive the improvement of overlying water water quality.
C, macromolecular organic pollutant can't directly be absorbed as nutrition source by mikrobe, need under the effect of the extracellular enzyme of microorganism secretion, be decomposed into small organic molecule, could be absorbed in the body by mikrobe; Under the intravital intracellular enzyme effect of mikrobe, small organic molecule is metabolised to water, gas and inorganic salt, excretes, and reaches the purpose of degraded organic contamination.
2, denitrogenation dephosphorizing
Denitrogenation dephosphorizing mainly passes through two aspects, and the one, through action of microorganisms, be nitrogen etc. with nitrogen transformation, discharge water body; The 2nd, make up the approach that nutrition is exported through ecosystem plant, take N, P out of water body.
The a action of microorganisms
The YL agent is set up detritus food chain in bed mud after throwing in like engineering section bed mud, reverse the corruption reaction in the original bed mud.And the black smelly immanent cause in generation river course, upwards water body release pollutent that corrupt just reaction brings and odorous gas ammonia, H 2S etc., simultaneously strong in activity, under the effect of the YL agent that efficient is high, to greatest extent nitric nitrogen is converted into nitrogen, take water body out of.
B nutrition output pathway makes up
Degraded through endogenous in bacteria agent, artificial pasture and water, the reinforcement engineering section pollutes improves the impact of extraneous contamination to the engineering section in conjunction with microbial film grid and row's mouthful Biological Pretreatment device.After above two parts's engineering measure is implemented, on the basis of water correction, get involved waterplant and animal, make up the biologic chain and the food chain of water body, make water body self-energy material cycle, and take N, P out of water body through the harvesting of waterplant.
2, engineering long term maintenance regulation effect principle:
The a microbial population:
The growth of the microbial population of bottom, river course inoculation or extinction are that the amount according to organic pollutant in bed mud and the water body decides; After improvement; Each item pollution concentration reduces; Microbial numbers will be withered away to a certain extent, reaches certain microbial biomass at last and can decompose amount of contamination and the balance that gets into pollution of river quantity; And after external strong pollution gets into water body, microbial numbers can increase along with organic increase again (after superpower pollution gets into, the river course is caused crushing ballistic, black smelly etc. like river course moment, need carry out microbial inoculum mend throw in).Simply, be exactly that mikrobe has how much eat nutrition, the mikrobe of how many respective numbers is just arranged, be a dynamic multi-element ecology balance.
The b extraneous contamination:
Guaranteeing the engineering section after enforcement, do not have great destructive pollution to impact, is to ensure the long-acting stable key of engineering achievement.
Keeping of the c ecosystem:
Through artificial maintenance, keep the good growth of waterplant, hydrocoles in the water body, ensure the normal operation of microbial film grid, row's mouthful Biological Pretreatment device, be to keep the long-acting stable important factor of water body.
China orientated the environment industry as strategic new industry in 2010; Nanhai District is with development environment service sector accumulation area; The South Sea proposes the integrated city of strategy, drop osmanthus and sets up process, and new industry is set up in big gravitational attraction, like service areas such as new-energy automobile, bio-pharmaceuticals, LED industry and high-tech finance; The energy-conserving and environment-protective industry is listed in first of the national strategy property new industry, and it will be a major contribution engineering to the life production environment of following Nanhai District that Nanhai District can have been renovated black-odor river.There is 259 rivers to gush to face the test of black smelly environment at the South Sea, and this present invention and embodiment will be to having comprehensive directive significance future.Will settle comprehensively and build up breeding experiment base, mikrobe regulation black-odor river south at the South Sea.Popularize in an all-round way and use, improve people's livelihood health level, improve Urban Water Environment, improve the ecological environment; The project prospect is very grave long-range, and is favorable to the people egoistic, and environmental improvement will bring great riches to increase to the South Sea; The people's welfare index increases in the urbanization, and real estate value increases, and comprises that environment brings production, life to start an undertaking well; Purchase of property aspect wealth increases, and is healthy GDP growth, and powerful sustainability is arranged.

Claims (5)

1. a multi-element ecology balance biological renovation method is characterized in that: comprise the steps:
1. investigate water body: distribution and water quality present situation to the intravital plant of water, animal, mikrobe are investigated, analysis confirmation water quality and bed mud situation;
2. separate compatibility: to indigenous microorganism separation, screening, compatibility, the domestication in the engineering section;
3. the microbial film grid are installed in river mouth, engineering starting point place;
4. throw respectively in limit, riverbank and river mouth, tributary and spill through 2. compatibility acclimated microorganism of step;
5. mikrobe injected volume or adjustment proportioning are appended in debugging;
6. arrange artificial pasture and water in the river bed, arrange waterplant, put hydrocoles in a suitable place to breed at the water surface;
7. the biology and the mikrobe relative equilibrium that keep water body;
8. monitoring analysis water body situation is adjusted mikrobe injected volume and proportioning, keeps the water quality of being repaired.
2. multi-element ecology balance biological renovation method as claimed in claim 1; It is characterized in that: step 3. and step carry out steps A between 4.: the row's of layout mouthful Biological Pretreatment device at small-sized sewage draining exit place, in the tributary and blowdown water drainage canal mouth said microbial film grid are installed.
3. according to claim 1 or claim 2 multi-element ecology balance biological renovation method, it is characterized in that: said waterplant is selected native species and right non-hibernating eggs for use.
4. according to claim 1 or claim 2 multi-element ecology balance biological renovation method, it is characterized in that: said microbial film grid are provided with artificial pasture and water and the two-layer microbial film that is positioned at said artificial pasture and water both sides.
5. multi-element ecology balance biological renovation method as claimed in claim 2; It is characterized in that: a said row mouthful Biological Pretreatment device comprises a framework; Connect fishing net in the upper end of said framework, four ends of said framework be weight, connection carrier between four ends of said framework; Four ends at said framework are covered with one deck outer net, and said carrier is positioned within the said outer net.
CN201210189333.4A 2012-06-11 2012-06-11 Multi-element ecological balance biological remediation method Active CN102701462B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210189333.4A CN102701462B (en) 2012-06-11 2012-06-11 Multi-element ecological balance biological remediation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210189333.4A CN102701462B (en) 2012-06-11 2012-06-11 Multi-element ecological balance biological remediation method

Publications (2)

Publication Number Publication Date
CN102701462A true CN102701462A (en) 2012-10-03
CN102701462B CN102701462B (en) 2014-02-26

Family

ID=46894602

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210189333.4A Active CN102701462B (en) 2012-06-11 2012-06-11 Multi-element ecological balance biological remediation method

Country Status (1)

Country Link
CN (1) CN102701462B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106673220A (en) * 2016-12-22 2017-05-17 北京桑德环境工程有限公司 In-situ treatment method for improving quality of water environment
CN107162209A (en) * 2017-05-22 2017-09-15 浙江阿凡柯达环保科技有限公司 A kind of biological dredging method of polluted water body in-situ
CN107226585A (en) * 2017-06-29 2017-10-03 山东毅康科技股份有限公司 A kind of artificial river water body ecological restoring method in city
CN110104793A (en) * 2019-05-10 2019-08-09 陈师楚 The primary flora of a kind of pair of sludge carries out the method for administering sewage that preferably spreads cultivation
CN111847778A (en) * 2020-07-15 2020-10-30 北京天诚众合科技发展有限公司 Method for treating and maintaining landscape water body and pool
CN112028257A (en) * 2020-07-27 2020-12-04 江苏若焱环境设计有限公司 Preliminary sewage purification facility of drain
CN116238176A (en) * 2023-05-11 2023-06-09 枣庄市永益新材料科技股份有限公司 Artificial quartz stone plate raw material configuration control system

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101555088A (en) * 2009-05-15 2009-10-14 李华林 Method for treating black-odor rivers and lakes with microbiological preparations
CN102010071A (en) * 2010-10-29 2011-04-13 上海优博环境工程有限公司 Combined high-efficiency river water quality purification process
CN102050523A (en) * 2010-12-29 2011-05-11 赵亚勋 Method for treatment and in-situ ecological restoration of black and stink riverway by using microorganism
CN102259984A (en) * 2011-05-04 2011-11-30 南开大学 Method for remedying reclaimed water landscape river polluted water body by oxygen-enriching biological technology and application thereof

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101555088A (en) * 2009-05-15 2009-10-14 李华林 Method for treating black-odor rivers and lakes with microbiological preparations
CN102010071A (en) * 2010-10-29 2011-04-13 上海优博环境工程有限公司 Combined high-efficiency river water quality purification process
CN102050523A (en) * 2010-12-29 2011-05-11 赵亚勋 Method for treatment and in-situ ecological restoration of black and stink riverway by using microorganism
CN102259984A (en) * 2011-05-04 2011-11-30 南开大学 Method for remedying reclaimed water landscape river polluted water body by oxygen-enriching biological technology and application thereof

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106673220A (en) * 2016-12-22 2017-05-17 北京桑德环境工程有限公司 In-situ treatment method for improving quality of water environment
CN106673220B (en) * 2016-12-22 2019-01-22 北京桑德环境工程有限公司 One kind improving in-situ treatment method for quality of water environment
CN107162209A (en) * 2017-05-22 2017-09-15 浙江阿凡柯达环保科技有限公司 A kind of biological dredging method of polluted water body in-situ
CN107226585A (en) * 2017-06-29 2017-10-03 山东毅康科技股份有限公司 A kind of artificial river water body ecological restoring method in city
CN110104793A (en) * 2019-05-10 2019-08-09 陈师楚 The primary flora of a kind of pair of sludge carries out the method for administering sewage that preferably spreads cultivation
CN111847778A (en) * 2020-07-15 2020-10-30 北京天诚众合科技发展有限公司 Method for treating and maintaining landscape water body and pool
CN112028257A (en) * 2020-07-27 2020-12-04 江苏若焱环境设计有限公司 Preliminary sewage purification facility of drain
CN116238176A (en) * 2023-05-11 2023-06-09 枣庄市永益新材料科技股份有限公司 Artificial quartz stone plate raw material configuration control system

Also Published As

Publication number Publication date
CN102701462B (en) 2014-02-26

Similar Documents

Publication Publication Date Title
CN102701462B (en) Multi-element ecological balance biological remediation method
AU2020103451A4 (en) Method for landscape water body regulation and ecological purification of urban and peripheral high-water-table coal mining subsidence areas
CN106186343B (en) A kind of comprehensive processing method to urban river
CN100378272C (en) Stereo in-situ ecological urban water system repairing process
CN201406359Y (en) Treatment device for black odor river
CN101575145B (en) Riverway water quality purification and ecosystem restoration adjustable wetland technology
CN102874934A (en) Technology for direct in-situ treatment and ecological restoration of polluted water body
CN103960113B (en) The multi-layer classification cultivation of full-automatic batch production pond
CN102134140B (en) Fore-reservoir system driven by natural energy in lake outlet regions
CN104032706A (en) Method for constructing wetland type river channel
CN103382056B (en) A kind of submerged plant fast run-up group device
CN107311314A (en) A kind of method of black-odor riverway restoration of the ecosystem in situ
CN112340932B (en) Method for improving and treating water quality of rainwater collection type reservoir
CN103993576A (en) Eutrophic river water purifying and non-point source pollution interception system
CN110803771A (en) Ecological buffer system in river lake bank area
CN112939220B (en) Non-point source pollution control system based on clear water flow net
CN102060384A (en) Underwater lawn capable of removing phosphorous and inhibiting algae and construction method thereof
CN107651754B (en) Composite ecological system construction method for restoring eutrophic water body and artificial reef
CN204662553U (en) A kind of cavernous body multifunctional ecological governing system
CN116750886A (en) Low-temperature-domain activated water purification ecological construction method and system for wetland plant bed-trench system
CN108503034A (en) ecological floating island
CN111099748B (en) Method and system for treating and repairing SPEG biological migration small micro water body
CN208561854U (en) Ecological floating island
CN103214094A (en) Fixed type composite layer net supporting floating island
CN114368871A (en) Rural ecological wetland environment protection construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20121003

Assignee: Dongguan Branch of Foshan Yuhuang Ecological Environment Technology Co.,Ltd.

Assignor: FOSHAN CITY YUHUANG ECOLOGICAL ENVIRONMENT SCIENCE AND TECHNOLOGY CO.,LTD.

Contract record no.: X2022440000218

Denomination of invention: Multi ecological balance bioremediation method

Granted publication date: 20140226

License type: Common License

Record date: 20221009

CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: Unit 1101, 11th Floor, Building 8, Zone A, Hantian Science and Technology City, No. 17 Shenhai Road, Guicheng Street, Nanhai District, Foshan City, Guangdong Province, 528244

Patentee after: Yuhuang Ecological Technology Co.,Ltd.

Country or region after: Zhong Guo

Address before: Unit 1101, 11th Floor, Building 8, Zone A, Hantian Science and Technology City, No. 17 Shenhai Road, Guicheng Street, Nanhai District, Foshan City, Guangdong Province, 528244

Patentee before: FOSHAN CITY YUHUANG ECOLOGICAL ENVIRONMENT SCIENCE AND TECHNOLOGY CO.,LTD.

Country or region before: Zhong Guo