CN102664378B - Strain tower drainage wire bracket and method for stabilizing drainage wire - Google Patents

Strain tower drainage wire bracket and method for stabilizing drainage wire Download PDF

Info

Publication number
CN102664378B
CN102664378B CN201210145728.4A CN201210145728A CN102664378B CN 102664378 B CN102664378 B CN 102664378B CN 201210145728 A CN201210145728 A CN 201210145728A CN 102664378 B CN102664378 B CN 102664378B
Authority
CN
China
Prior art keywords
drainage wire
drainage thread
strain tower
nut
insulator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210145728.4A
Other languages
Chinese (zh)
Other versions
CN102664378A (en
Inventor
姜广敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
LIAONING ELECTRIC POWER Corp PANJIN POWER SUPPLY CORPORATION
State Grid Corp of China SGCC
Original Assignee
LIAONING ELECTRIC POWER Corp PANJIN POWER SUPPLY CORPORATION
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by LIAONING ELECTRIC POWER Corp PANJIN POWER SUPPLY CORPORATION, State Grid Corp of China SGCC filed Critical LIAONING ELECTRIC POWER Corp PANJIN POWER SUPPLY CORPORATION
Priority to CN201210145728.4A priority Critical patent/CN102664378B/en
Publication of CN102664378A publication Critical patent/CN102664378A/en
Application granted granted Critical
Publication of CN102664378B publication Critical patent/CN102664378B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention provides a strain tower drainage wire bracket which is characterized by comprising an inner pipe and an outer pipe which are movably matched in an inserting manner. The inner pipe and the outer pipe are respectively welded with one or more than one U-shaped bolt; a pressing plate and a nut are further matched with the U-shaped bolts; the other end of the inner pipe is welded with a mounting plate; and the other end of the outer pipe is welded with a connecting piece. A method for stabilizing a drainage wire by using the strain tower drainage wire bracket is characterized by comprising the following steps of: fixing the mounting plate at one end of the inner pipe on a cross arm at an electrified side of an insulator hanging bunch; utilizing the U-shaped bolts to fix the drainage wire on the bracket; and finally, mounting the connecting piece of the outer pipe on two connecting plate sag adjusting plates or an extending ring of an electrified part of the front part of an insulator pulling bunch of a strain tower. The strain tower drainage wire bracket is used for fixing the drainage wire so that the problems that the drainage wire swings in a wind environment, the distance between the drainage wire and an iron tower is small and the drainage wire is easy to discharge are solved, and the safe and reliable operation of a line can be guaranteed.

Description

The method of strain tower drainage thread support and stable drainage thread
Technical field
The invention belongs to T & D Technology field, particularly make the device and method that strain tower drainage thread is stable.
Background technology
Original 220KV line midline drainage adopts the mode of hanging string to have two kinds, and one twoly hangs string, and another kind singly hangs string.Strain tower of transmission line drainage thread, particularly singly hangs string drainage thread and swings excessive in strong wind atmosphere, with strain tower apart from little, easily causes line tripping power-off to steel tower electric discharge, causes economic loss to enterprise and society.
Summary of the invention
Swing in strong wind atmosphere to solve strain tower drainage thread, little with the distance of strain tower, cause drainage thread to discharge to strain tower, cause the problem of line tripping power outage, propose following technical scheme.
A kind of strain tower drainage thread support, its special character is that it comprises the movable inner and outer tubes coordinating grafting mutually, inner and outer tubes are respectively welded with the U-bolt of more than 1 or 1, pressing plate and nut is separately had to coordinate with U-bolt, at the other end welded and installed plate of interior pipe, in the other end welded connections of outer tube.
A kind of method using strain tower drainage thread bracket stable drainage thread, its special character the mounting panel of interior pipe one end is fixed on insulator to hang on the cross-arm of ribbon electricity side, again drainage thread is placed in U-bolt along rack surface, cover pressing plate, to screw on nut, drainage thread is stretching, from mounting panel end to outer tunnel end successively fastening nut, insulator to be observed hang string whether naturally droop when tightening the nut on outer tube, when insulator hangs string perpendicular to the nut tightened again during ground on outer tube, finally the connector on outer tube is arranged on strain tower insulator draw the two connecting plate sag adjustment plates at the anterior charged position of string or extend on ring.
Tool of the present invention has the following advantages:
Because strain tower drainage thread support of the present invention is made up of two sleeve pipes that activity coordinates mutually, can stretch, therefore, string can be hung according to insulator when fixing drainage thread and whether adjust perpendicular to ground the degree of depth that interior pipe inserts outer tube, like this, easy for installation, to save time, laborsaving.And because inner and outer pipes is movable connected structure, can stretch, therefore, it is possible to adapt to because of the change of natural conditions, as strong wind, severe cold, heat, swing or the relaxation causing drainage thread such as freezing.Use this strain tower drainage thread support to fix drainage thread, solve drainage thread and swing in strong wind atmosphere, with the problem of steel tower apart from little, easy electric discharge, line security reliability service can be ensured.
Accompanying drawing illustrates:
Fig. 1 is full sectional view, and Fig. 2 is vertical view, and Fig. 3 is partial enlarged drawing A-A, Fig. 4 is strain tower drainage thread support using state schematic diagram.
Embodiment
Embodiment, describes embodiment with reference to the accompanying drawings.
A kind of strain tower drainage thread support, it comprises movable interior pipe 4 and the outer tube 3 coordinating grafting mutually, interior pipe 4 welds two U-bolts 5, outer tube 3 welds 1 U-bolt 5, pressing plate 8 and nut 9 is separately had to coordinate with U-bolt 5, weld the mounting panel 6 it having installing hole 7 at the other end of interior pipe 4, weld the connector 2 with connecting ring 1 at the other end of outer tube 3.Mounting panel 6 adopts length 150 millimeters, wide 40 millimeters, thick 5 millimeters steel plate is made.Interior pipe 46 points of steel pipes are made, 6 meters long; Outward effective 1 inch steel pipe make, 1.2 meters long.The degree of depth that interior pipe 4 inserts outer tube 3 will be determined to resistance to two connecting plates at stretch-draw ribbon electricity position or the distance of prolongation ring 13 perpendicular to cross-arm during ground 11 end according to hanging when insulator string 12, is generally about 0.6 meter.Gap between interior pipe 4 and outer tube 3 is approximately 3 millimeters.In in figure, pipe 4 is large with the gap of outer tube 3, just clear in order to show.Spacing between three bolts 5 is 0.9 meter.
A kind of method using strain tower drainage thread bracket stable drainage thread, it the mounting panel 6 of interior pipe 4 one end is fixed on insulator to hang on the cross-arm 11 of ribbon electricity side, again drainage thread 15 is placed in U-bolt 5 along rack surface, cover pressing plate 8, to screw on nut 9, by stretching for drainage thread 15, from mounting panel 6 end to outer tube 3 end successively fastening nut 9, insulator to be observed when tightening the nut 9 on outer tube 3 and hang no on string 12 naturally drooping, when insulator hangs string 12 perpendicular to ground, determine the length of interior pipe to the two connecting plate sag adjustment plates at resistance to stretch-draw ribbon electricity position or the distance of prolongation ring 13 according to cross-arm 11 one end, if oversize, after reserved 0.6 meter, it is sawed-off, insert afterwards in outer tube 3, the degree of depth inserted in outer tube 3 is 0.6 meter, at this moment the nut 9 on outer tube 3 is tightened again, finally the connector 2 on outer tube 3 is arranged on strain tower insulator to draw on the prolongation ring 13 of string front portion.In figure, sequence number 10 is strain tower, 14 is be not stuck in the drainage thread in U-bolt 5.
Strain tower drainage thread support is used to fix drainage thread, by U-bolt, drainage thread is rack-mount, drainage thread is held up, without radian, thus increase the distance of drainage thread and strain tower closest approach, reach the requirement of safe operation, ensure that line security runs.

Claims (1)

1. one kind uses the method for strain tower drainage thread bracket stable drainage thread, it is characterized in that strain tower drainage thread support comprises the movable inner and outer tubes coordinating grafting mutually, inner and outer tubes are respectively welded with the U-bolt of more than 1 or 1, pressing plate and nut is separately had to coordinate with U-bolt, at the other end welded and installed plate of interior pipe, in the other end welded connections of outer tube, using the mounting panel of first interior pipe one end during this strain tower drainage thread bracket stable drainage thread to be fixed on insulator hangs on the cross-arm of ribbon electricity side, again drainage thread is placed in U-bolt along rack surface, cover pressing plate, to screw on nut, drainage thread is stretching, from mounting panel end to outer tunnel end successively fastening nut, insulator to be observed hang string whether naturally droop when tightening the nut on outer tube, when insulator hangs string perpendicular to the nut tightened again during ground on outer tube, finally the connector on outer tube is arranged on strain tower insulator draw the two connecting plate sag adjustment plates at the anterior charged position of string or extend on ring.
CN201210145728.4A 2012-05-11 2012-05-11 Strain tower drainage wire bracket and method for stabilizing drainage wire Active CN102664378B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210145728.4A CN102664378B (en) 2012-05-11 2012-05-11 Strain tower drainage wire bracket and method for stabilizing drainage wire

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210145728.4A CN102664378B (en) 2012-05-11 2012-05-11 Strain tower drainage wire bracket and method for stabilizing drainage wire

Publications (2)

Publication Number Publication Date
CN102664378A CN102664378A (en) 2012-09-12
CN102664378B true CN102664378B (en) 2015-01-07

Family

ID=46773821

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210145728.4A Active CN102664378B (en) 2012-05-11 2012-05-11 Strain tower drainage wire bracket and method for stabilizing drainage wire

Country Status (1)

Country Link
CN (1) CN102664378B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102931599A (en) * 2012-11-16 2013-02-13 江苏省电力公司徐州供电公司 Sliding type damping connection device for transformer substation
CN113972585A (en) * 2021-10-20 2022-01-25 国网辽宁省电力有限公司盘锦供电公司 Drainage support reinforcement device for live-wire work

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201312097Y (en) * 2008-11-03 2009-09-16 湖南景明电力器材有限责任公司 Two-plate type strain clamp
CN101567528A (en) * 2008-04-22 2009-10-28 上海市电力公司 Method for electrification end-hanging operation at 60-90 degrees of corners on 10 kilovolt lines
CN201408942Y (en) * 2009-05-15 2010-02-17 上海市南电力工程有限公司 Flow inducing connecting device for 10 kV lines
CN202098992U (en) * 2010-09-07 2012-01-04 上海三一科技有限公司 Clamping bracket structure for boom

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101567528A (en) * 2008-04-22 2009-10-28 上海市电力公司 Method for electrification end-hanging operation at 60-90 degrees of corners on 10 kilovolt lines
CN201312097Y (en) * 2008-11-03 2009-09-16 湖南景明电力器材有限责任公司 Two-plate type strain clamp
CN201408942Y (en) * 2009-05-15 2010-02-17 上海市南电力工程有限公司 Flow inducing connecting device for 10 kV lines
CN202098992U (en) * 2010-09-07 2012-01-04 上海三一科技有限公司 Clamping bracket structure for boom

Also Published As

Publication number Publication date
CN102664378A (en) 2012-09-12

Similar Documents

Publication Publication Date Title
CN102664378B (en) Strain tower drainage wire bracket and method for stabilizing drainage wire
CN206673533U (en) A kind of novel high-pressure transmission line of electricity angle pole mounting structure
CN204577646U (en) Extension type ground wire fixing device
CN203871745U (en) Double-hoisting-point rod head fixture for live changing of linear insulator on steel pipe pole of 220kV line
CN103325550B (en) A kind of Transformer Bushing Tap introduction pipe fixing means, structure and fixed support
CN204167694U (en) Switch cubicle secondary line routing device
CN204424843U (en) One prevents stockbridge damper positioning device
CN106285167A (en) Cable support cross-arm is drawn under a kind of shaft tower
CN204333854U (en) Steel tower T connects cable fixture
CN204760900U (en) Insulating spooler
CN202524045U (en) Drainage thread bracket of resisting-tensile tower
CN202840313U (en) Outdoor box body installation structure
CN204651853U (en) A kind of self-skating type space-stop rack for overhead transmission line
CN204651516U (en) The special double end line card of a kind of nuclear bridge
CN207638302U (en) Power transmission line wind insulate spacer device partially
CN204156482U (en) A kind of power circuit is registered one's residence lightning arrester erecting bed
CN202888719U (en) Cross-arm widening type clamping tool
CN104505788A (en) Large-span suspension type tubular bus-bar multiple-hanging-point combined metal fitting and mounting method thereof
CN204706863U (en) Cable clamp sleeve pipe
CN203871746U (en) Rod head fixture used for live change of linear insulator on steel pipe pole of 66kV line
CN205299369U (en) Transmission line prevents mountain fire indicating device night
CN204011797U (en) A kind of earthing wire clip
CN204141051U (en) Assembly type cable bracket
CN204087704U (en) Transformer title nameplate installation fixed support
CN203850789U (en) Insulation enclosed busbar installation structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: STATE ELECTRIC NET CROP.

Effective date: 20121009

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20121009

Address after: 124010 No. 5, main street, Shenyang, Liaoning

Applicant after: Liaoning Electric Power Corporation Panjin Power Supply Corporation

Applicant after: State Grid Corporation of China

Address before: 124010 No. 5, main street, Shenyang, Liaoning

Applicant before: Liaoning Electric Power Corporation Panjin Power Supply Corporation

C53 Correction of patent for invention or patent application
CB02 Change of applicant information

Address after: 124010 Panjin City, Liaoning city street, No. 5

Applicant after: Liaoning Electric Power Corporation Panjin Power Supply Corporation

Applicant after: State Grid Corporation of China

Address before: 124010 No. 5, main street, Shenyang, Liaoning

Applicant before: Liaoning Electric Power Corporation Panjin Power Supply Corporation

Applicant before: State Grid Corporation of China

C14 Grant of patent or utility model
GR01 Patent grant