CN204011797U - A kind of earthing wire clip - Google Patents
A kind of earthing wire clip Download PDFInfo
- Publication number
- CN204011797U CN204011797U CN201420489637.7U CN201420489637U CN204011797U CN 204011797 U CN204011797 U CN 204011797U CN 201420489637 U CN201420489637 U CN 201420489637U CN 204011797 U CN204011797 U CN 204011797U
- Authority
- CN
- China
- Prior art keywords
- wire clamp
- ground wire
- tube body
- tunnel
- sleeve
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Details Of Audible-Bandwidth Transducers (AREA)
Abstract
一种接地线线夹。本实用新型涉及电力行业变电站、架空输电线路、配电线路和电缆线路地线安装安全防护领域,具体涉及一种接地线线夹。本实用新型的目的是要解决传统的接地线线夹拆除时耗时长以及长时间连续作业严重影响操作人员的体能,为安全操作埋下了隐患的问题。本实用新型的一种接地线线夹,包括接地导线夹体和与绝缘拉杆连接的套筒,接地导线夹体上设置有夹头,套筒由直筒式管体和喇叭筒式管体组成,直筒式管体与喇叭筒式管体的窄口端对接为一体结构,在喇叭筒式管体的管壁上开有通长的第一孔道,在直筒式管体的管壁开有第二孔道,在第二孔道封闭端的一侧垂直于孔道开有转向孔道,转向孔道一端的端部两侧设置有第一定位卡孔和第二定位卡孔。
A ground wire clip. The utility model relates to the field of safety protection for the installation of substations, overhead power transmission lines, power distribution lines and cable lines in the electric power industry, in particular to a ground wire clip. The purpose of the utility model is to solve the problem that it takes a long time to dismantle the traditional grounding wire clamp and the long-term continuous operation seriously affects the physical ability of the operator, and buryes hidden dangers for safe operation. A grounding wire clamp of the utility model comprises a grounding wire clamp body and a sleeve connected with an insulating pull rod, a chuck is arranged on the grounding wire clamp body, and the sleeve is composed of a straight tube body and a horn tube type tube body. The straight tube body and the narrow mouth end of the horn tube body are butted into one structure. There is a long first hole on the tube wall of the horn tube body, and a second channel is opened on the tube wall of the straight tube body. In the tunnel, a turning tunnel is arranged perpendicular to the tunnel on one side of the closed end of the second tunnel, and a first positioning hole and a second positioning hole are arranged on both sides of the end of the turning tunnel.
Description
技术领域technical field
本实用新型涉及电力行业变电站、架空输电线路、配电线路和电缆线路地线安装安全防护领域,具体涉及一种接地线线夹。The utility model relates to the field of safety protection for the installation of substations, overhead power transmission lines, power distribution lines and cable lines in the electric power industry, in particular to a ground wire clip.
背景技术Background technique
传统的接地线线夹与绝缘拉杆连接部分为直通式连接,为保证连接紧密可靠,线夹套筒为直筒式设计,套筒尺寸与绝缘拉杆金属杆尺寸相差无几。虽然这种设计在地线装设过程中确保地线线夹不脱离,不晃动,保证了安全,但在拆除地线时,由于引流线距离地面较高,一般为4-5米,因此在将绝缘拉杆金属杆伸入地线夹连接套筒时,由于绝缘拉杆晃动(三节拉杆正常情况下就晃动,如计算风速晃动更严重)致使绝缘拉杆与地线夹无法联通,拆除一相地线需要2分钟,拆除一组(三相)需要近7分钟。一座220kV变电站大型操作需悬挂10组及以上接地线,仅拆除接地线一项需一个小时左右的时间,影响了供电及时性和可靠性;同时,由于长时间作业严重影响了操作人员的体能,为安全操作埋下了隐患。The connection part of the traditional grounding wire clamp and the insulating tie rod is a straight-through connection. In order to ensure a tight and reliable connection, the sleeve of the wire clamp is designed as a straight cylinder, and the size of the sleeve is almost the same as that of the metal rod of the insulating tie rod. Although this design ensures that the ground wire clamp does not disengage and does not shake during the installation of the ground wire, which ensures safety, but when the ground wire is removed, because the drainage wire is relatively high from the ground, generally 4-5 meters, it will When the metal rod of the insulating tie rod is inserted into the connecting sleeve of the ground wire clamp, the insulating tie rod and the ground wire clamp cannot be connected due to the shaking of the insulating tie rod (the three-section tie rod shakes under normal conditions, and the shaking is more serious if the wind speed is calculated), so it is necessary to remove the ground wire of one phase 2 minutes, it takes nearly 7 minutes to disassemble one group (three phases). The large-scale operation of a 220kV substation needs to hang 10 or more sets of grounding wires, and it takes about an hour to remove the grounding wires alone, which affects the timeliness and reliability of power supply; at the same time, the long-term operation seriously affects the physical fitness of operators. Hidden dangers have been buried for safe operation.
发明内容Contents of the invention
本实用新型的目的是要解决传统的接地线线夹拆除时耗时长以及长时间连续作业严重影响操作人员的体能,为安全操作埋下了隐患的问题,而提供一种接地线线夹。The purpose of the utility model is to solve the problem that the traditional grounding wire clamp takes a long time to dismantle and the long-term continuous operation seriously affects the physical ability of the operator, which buryes hidden dangers for safe operation, and provides a grounding wire clamp.
本实用新型的一种接地线线夹,包括接地导线夹体和与绝缘拉杆连接的套筒,接地导线夹体上设置有夹头,其特征在于套筒由直筒式管体和喇叭筒式管体组成,直筒式管体与喇叭筒式管体的窄口端对接为一体结构,在喇叭筒式管体的管壁上沿喇叭筒式管体轴向方向开有通长的第一孔道,在直筒式管体的管壁上沿直筒式管体轴向方向开有第二孔道,第一孔道与第二孔道相通,在第二孔道封闭端的一侧垂直于第二孔道开有转向孔道,转向孔道的一端与第二孔道相通,转向孔道的另一端的端部两侧设置有第一定位卡孔和第二定位卡孔。A grounding wire clip of the present utility model comprises a grounding wire clip body and a sleeve connected with an insulating pull rod. The straight pipe body and the narrow mouth end of the trumpet pipe body are butt-jointed as an integrated structure. On the pipe wall of the horn pipe body, there is a first channel with a long length along the axial direction of the horn pipe body. On the tube wall of the straight tube body, there is a second hole along the axial direction of the straight tube body, the first hole communicates with the second hole, and there is a turning hole perpendicular to the second hole on the side of the second hole closed end, One end of the steering hole communicates with the second hole, and the other end of the turning hole is provided with a first positioning hole and a second positioning hole on both sides of the end.
本实用新型的有益效果Beneficial effects of the utility model
①在传统地线夹圆形套筒根部安装一个喇叭筒进行限位,增加绝缘拉杆金属杆与地线夹套筒连接的成功率,在拆除接地线时,让绝缘拉杆与地线夹快速连接,绝缘拉杆与地线夹连接的速度提高了600%,原来绝缘拉杆与地线夹连接最快时需要30秒钟,最慢需要2分钟,而加装喇叭套筒后,绝缘拉杆与地线夹连接的时间只有5秒钟,大大提高了工作效率,缩短了拆除地线的时间,节省倒闸操作时间,确保及时供电。① Install a horn at the root of the traditional ground clamp circular sleeve to limit the position, increase the success rate of the connection between the metal rod of the insulating pull rod and the ground clamp sleeve, and quickly connect the insulating pull rod to the ground clamp when the ground wire is removed , the speed of connecting the insulating rod and the ground wire clamp has increased by 600%. It used to take 30 seconds for the fastest connection between the insulating rod and the ground wire clamp, and 2 minutes for the slowest connection. After installing the horn sleeve, the insulation rod and the ground wire The clamp connection time is only 5 seconds, which greatly improves work efficiency, shortens the time for removing the ground wire, saves switching operation time, and ensures timely power supply.
②减小了操作过程中劳动强度,确保运维人员体力充沛。② Reduce the labor intensity during the operation and ensure that the operation and maintenance personnel are physically strong.
③降低了因长时间托举绝缘拉杆造成体力不支导致误触带电设备的可能性。③It reduces the possibility of accidental contact with live equipment due to physical exhaustion caused by lifting the insulating pull rod for a long time.
④在原有的直线操作轨道(转向孔道)端部增加了限位功能,一个在装设地线时对绝缘拉杆限位,一个在拆除地线时对绝缘拉杆限位,避免装设或拆除地线时绝缘拉杆金属杆从地线夹轨道中滑落出来,为操作埋下隐患。④ A limit function is added to the end of the original linear operation track (steering tunnel), one is to limit the insulation rod when the ground wire is installed, and the other is to limit the insulation rod when the ground wire is removed, so as to avoid installation or removal of the ground wire. When connecting wires, the metal rod of the insulating pull rod slides out of the track of the ground wire clamp, burying hidden dangers for the operation.
附图说明Description of drawings
图1为本实用新型的一种接地线线夹的结构示意图;Fig. 1 is the structural representation of a kind of ground wire clamp of the present utility model;
图2为本实用新型的一种接地线线夹的与绝缘拉杆连接的套筒的侧面局部结构示意图;Fig. 2 is a schematic diagram of a side partial structure of a sleeve connected to an insulating pull rod of a ground wire clamp of the present invention;
图3为与实用新型的一种接地线线夹配合使用的绝缘拉杆的结构示意图;其中A为绝缘杆,B为金属杆,B-1为立杆,B-2为定位横杆。Fig. 3 is a structural schematic diagram of an insulating pull rod used in conjunction with a ground wire clamp of the utility model; wherein A is an insulating rod, B is a metal rod, B-1 is a vertical rod, and B-2 is a positioning horizontal rod.
具体实施方式Detailed ways
具体实施方式一:本实施方式的一种接地线线夹,包括接地导线夹体1和与绝缘拉杆连接的套筒2,接地导线夹体1上设置有夹头,其特征在于套筒2由直筒式管体3和喇叭筒式管体4组成,直筒式管体3与喇叭筒式管体4的窄口端对接为一体结构,在喇叭筒式管体4的管壁上沿喇叭筒式管体4轴向方向开有通长的第一孔道4-1,在直筒式管体3的管壁上沿直筒式管体3轴向方向开有第二孔道3-1,第一孔道4-1与第二孔道3-1相通,在第二孔道3-1封闭端的一侧垂直于第二孔道3-1开有转向孔道3-2,转向孔道3-2的一端与第二孔道3-1相通,转向孔道3-2的另一端的端部两侧设置有第一定位卡孔3-4和第二定位卡孔3-5。Specific Embodiment 1: A grounding wire clamp in this embodiment includes a grounding wire clamp body 1 and a sleeve 2 connected to an insulating pull rod. The grounding wire clamp body 1 is provided with a chuck, which is characterized in that the sleeve 2 is made of The straight tube body 3 and the trumpet tube body 4 are composed of the straight tube body 3 and the narrow mouth end of the horn tube body 4 buttted into one structure, and the tube wall of the horn tube body 4 is along the horn type The pipe body 4 is provided with a long first channel 4-1 in the axial direction, and the second channel 3-1 is opened along the axial direction of the straight tube body 3 on the tube wall of the straight tube body 3, and the first channel 4 -1 communicates with the second tunnel 3-1, and there is a turning tunnel 3-2 perpendicular to the second tunnel 3-1 on one side of the closed end of the second tunnel 3-1, and one end of the steering tunnel 3-2 is connected to the second tunnel 3 -1 communicates with each other, and the other end of the steering hole 3-2 is provided with a first positioning hole 3-4 and a second positioning hole 3-5 on both sides of the end.
①在传统地线夹圆形套筒根部安装一个喇叭筒进行限位,增加绝缘拉杆金属杆与地线夹套筒连接的成功率,在拆除接地线时,让绝缘拉杆与地线夹快速连接,绝缘拉杆与地线夹连接的速度提高了600%,原来绝缘拉杆与地线夹连接最快时需要30秒钟,最慢需要2分钟,而加装喇叭套筒后,绝缘拉杆与地线夹连接的时间只有5秒钟,大大提高了工作效率,缩短了拆除地线的时间,节省倒闸操作时间,确保及时供电。① Install a horn at the root of the traditional ground clamp circular sleeve to limit the position, increase the success rate of the connection between the metal rod of the insulating pull rod and the ground clamp sleeve, and quickly connect the insulating pull rod to the ground clamp when the ground wire is removed , the speed of connecting the insulating rod and the ground wire clamp has increased by 600%. It used to take 30 seconds for the fastest connection between the insulating rod and the ground wire clamp, and 2 minutes for the slowest connection. After installing the horn sleeve, the insulation rod and the ground wire The clamp connection time is only 5 seconds, which greatly improves work efficiency, shortens the time for removing the ground wire, saves switching operation time, and ensures timely power supply.
②减小了操作过程中劳动强度,确保运维人员体力充沛。② Reduce the labor intensity during the operation and ensure that the operation and maintenance personnel are physically strong.
③降低了因长时间托举绝缘拉杆造成体力不支导致误触带电设备的可能性。③It reduces the possibility of accidental contact with live equipment due to physical exhaustion caused by lifting the insulating pull rod for a long time.
④在原有的直线操作轨道(转向孔道)端部增加了限位功能,一个在装设地线时对绝缘拉杆限位,一个在拆除地线时对绝缘拉杆限位,避免装设或拆除地线时绝缘拉杆金属杆从地线夹轨道中滑落出来,为操作埋下隐患。④ A limit function is added to the end of the original linear operation track (steering tunnel), one is to limit the insulation rod when the ground wire is installed, and the other is to limit the insulation rod when the ground wire is removed, so as to avoid installation or removal of the ground wire. When connecting wires, the metal rod of the insulating pull rod slides out of the track of the ground wire clamp, burying hidden dangers for the operation.
具体实施方式二:本实施方式与具体实施方式一不同的是:所述的接地导线夹体1与套筒2通过金属压接方式连接,两侧接口用铆钉加固。其他步骤及参数与具体实施方式一相同。Embodiment 2: This embodiment differs from Embodiment 1 in that: the ground wire clamp body 1 and the sleeve 2 are connected by metal crimping, and the interfaces on both sides are reinforced with rivets. Other steps and parameters are the same as those in the first embodiment.
具体实施方式三:本实施方式与具体实施方式一或二不同的是:所述的接地导线夹体1的材质为铸造铝合金。其他步骤及参数与具体实施方式一或二相同。Embodiment 3: This embodiment differs from Embodiment 1 or Embodiment 2 in that: the material of the ground wire clip body 1 is cast aluminum alloy. Other steps and parameters are the same as those in Embodiment 1 or 2.
具体实施方式四:本实施方式与具体实施方式一至三之一不同的是:套筒2的材质为铝合金。其他步骤及参数与具体实施方式一至三之一相同。Embodiment 4: This embodiment differs from Embodiments 1 to 3 in that the sleeve 2 is made of aluminum alloy. Other steps and parameters are the same as those in the first to third specific embodiments.
具体实施方式五:本实施方式与具体实施方式一至四之一不同的是:所述的喇叭筒式管体4的扩口端直径为窄口端直径的1.5~2.5倍。其他步骤及参数与具体实施方式一至四之一相同。Embodiment 5: This embodiment differs from Embodiments 1 to 4 in that: the diameter of the flared end of the horn tube body 4 is 1.5 to 2.5 times the diameter of the narrow end. Other steps and parameters are the same as in one of the specific embodiments 1 to 4.
具体实施方式六:本实施方式与具体实施方式一至五之一不同的是:所述的喇叭筒式管体4的扩口端直径为窄口端直径的2倍。其他步骤及参数与具体实施方式一至五之一相同。Embodiment 6: This embodiment differs from Embodiment 1 to Embodiment 5 in that: the diameter of the flared end of the horn tube body 4 is twice the diameter of the narrow end. Other steps and parameters are the same as one of the specific embodiments 1 to 5.
具体实施方式七:本实施方式与具体实施方式一至六之一不同的是:所述的第一孔道4-1和第二孔道3-1的宽度均大于绝缘拉杆上金属杆立杆的直径。其他步骤及参数与具体实施方式一至六之一相同。Embodiment 7: This embodiment differs from Embodiments 1 to 6 in that the widths of the first tunnel 4-1 and the second tunnel 3-1 are larger than the diameter of the metal pole on the insulating pull rod. Other steps and parameters are the same as one of the specific embodiments 1 to 6.
具体实施方式八:本实施方式与具体实施方式一至七之一不同的是:所述的转向孔道3-2的宽度大于绝缘拉杆上金属杆定位横杆的直径。其他步骤及参数与具体实施方式一至去之一相同。Embodiment 8: This embodiment is different from Embodiment 1 to Embodiment 7 in that: the width of the turning hole 3-2 is larger than the diameter of the metal rod positioning cross bar on the insulating pull rod. The other steps and parameters are the same as those in the specific embodiments 1 to 1.
用以下试验来验证本发明的有益效果Verify beneficial effect of the present invention with following test
试验一、(结合图1、2和3)本试验的一种接地线线夹,包括接地导线夹体1和与绝缘拉杆连接的套筒2,接地导线夹体1上设置有夹头,其特征在于套筒2由直筒式管体3和喇叭筒式管体4组成,直筒式管体3与喇叭筒式管体4的窄口端对接为一体结构,在喇叭筒式管体4的管壁上沿喇叭筒式管体4轴向方向开有通长的第一孔道4-1,在直筒式管体3的管壁上沿直筒式管体3轴向方向开有第二孔道3-1,第一孔道4-1与第二孔道3-1相通,在第二孔道3-1封闭端的一侧垂直于第二孔道3-1开有转向孔道3-2,转向孔道3-2的一端与第二孔道3-1相通,转向孔道3-2的另一端的端部两侧设置有第一定位卡孔3-4和第二定位卡孔3-5。Test 1. (Combined with Figures 1, 2 and 3) A grounding wire clamp for this test includes a grounding wire clamp body 1 and a sleeve 2 connected to an insulating pull rod. The grounding wire clamp body 1 is provided with a chuck, and its It is characterized in that the sleeve 2 is composed of a straight tube body 3 and a trumpet tube body 4, the straight tube body 3 and the narrow mouth end of the horn tube body 4 are butted into one structure, and the tube of the horn tube body 4 On the wall, there is a long first channel 4-1 along the axial direction of the trumpet tube body 4, and on the tube wall of the straight tube body 3, there is a second channel 3-1 along the axial direction of the straight tube body 3. 1. The first channel 4-1 communicates with the second channel 3-1. On one side of the closed end of the second channel 3-1, there is a turning channel 3-2 perpendicular to the second channel 3-1. The turning channel 3-2 One end communicates with the second hole 3-1, and the other end of the turning hole 3-2 is provided with a first positioning hole 3-4 and a second positioning hole 3-5 on both sides of the end.
本试验中接地导线夹1与套筒2通过金属压接方式连接,两侧接口用铆钉加固。In this test, the ground wire clamp 1 and the sleeve 2 are connected by metal crimping, and the interfaces on both sides are reinforced with rivets.
本试验中接地导线夹体1的材质为铸造铝合金。In this test, the material of the ground wire clip body 1 is cast aluminum alloy.
本试验中套筒2的材质为铝合金。In this test, the material of sleeve 2 is aluminum alloy.
本试验中喇叭筒式管体4的扩口端直径为窄口端直径的2倍。In this test, the diameter of the flaring end of the trumpet type pipe body 4 is 2 times of the diameter of the narrow mouth end.
本试验中第一孔道4-1与和第二孔道3-1的宽度均大于绝缘拉杆上金属杆立杆的直径。In this test, the widths of the first tunnel 4-1 and the second tunnel 3-1 are larger than the diameter of the metal rod vertical rod on the insulating pull rod.
本试验中转向孔道3-2的宽度大于绝缘拉杆上金属杆定位横杆的直径。In this test, the width of the turning channel 3-2 is greater than the diameter of the metal rod positioning cross bar on the insulating pull rod.
装设本试验的接地线线夹时绝缘拉杆上的金属杆定位横杆卡在第一定位卡孔3-4中。When installing the ground wire clamp of this test, the metal rod positioning cross bar on the insulating pull rod is stuck in the first positioning hole 3-4.
拆除本试验的接地线线夹时绝缘拉杆上的金属杆定位横杆卡在第二定位卡孔3-5中。When removing the ground wire clamp of this test, the metal rod positioning cross bar on the insulating pull rod is stuck in the second positioning hole 3-5.
结论:在传统地线夹圆形套筒根部安装一个喇叭筒进行限位,增加绝缘拉杆金属杆与地线夹套筒连接的成功率,在拆除接地线时,让绝缘拉杆与地线夹快速连接,绝缘拉杆与地线夹连接的速度提高了600%,原来绝缘拉杆与地线夹连接最快时需要30秒钟,最慢需要2分钟,而加装喇叭套筒后,绝缘拉杆与地线夹连接的时间只有5秒钟,大大提高了工作效率,缩短了拆除地线的时间,节省倒闸操作时间,确保及时供电。减小了操作过程中劳动强度,确保运维人员体力充沛。降低了因长时间托举绝缘拉杆造成体力不支导致误触带电设备的可能性。Conclusion: Install a horn at the root of the circular sleeve of the traditional ground wire clamp to limit the position, increase the success rate of the connection between the metal rod of the insulating pull rod and the sleeve of the ground wire clamp, and make the insulation pull rod and the ground wire clamp quickly when the ground wire is removed. Connection, the connection speed of the insulating rod and the ground clamp has been increased by 600%. It used to take 30 seconds for the fastest connection between the insulating rod and the ground clamp, and 2 minutes for the slowest connection. After installing the horn sleeve, the insulating rod and the ground clamp The connection time of the wire clip is only 5 seconds, which greatly improves the work efficiency, shortens the time for removing the ground wire, saves the switching operation time, and ensures timely power supply. It reduces the labor intensity during the operation and ensures that the operation and maintenance personnel are physically strong. It reduces the possibility of accidentally touching live equipment due to lack of physical strength caused by lifting the insulating pull rod for a long time.
Claims (8)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201420489637.7U CN204011797U (en) | 2014-08-27 | 2014-08-27 | A kind of earthing wire clip |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201420489637.7U CN204011797U (en) | 2014-08-27 | 2014-08-27 | A kind of earthing wire clip |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN204011797U true CN204011797U (en) | 2014-12-10 |
Family
ID=52051748
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201420489637.7U Expired - Fee Related CN204011797U (en) | 2014-08-27 | 2014-08-27 | A kind of earthing wire clip |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN204011797U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104157998A (en) * | 2014-08-27 | 2014-11-19 | 国家电网公司 | Ground lead clip |
-
2014
- 2014-08-27 CN CN201420489637.7U patent/CN204011797U/en not_active Expired - Fee Related
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104157998A (en) * | 2014-08-27 | 2014-11-19 | 国家电网公司 | Ground lead clip |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN204645808U (en) | Bar stepped on by cement pole cable | |
| CN102290647A (en) | Earth wire clip for transformer substation | |
| CN203300837U (en) | Throwing-hanging type ground wire | |
| CN105207123A (en) | Equipotential operation method of tubular bus | |
| CN204333317U (en) | Insulation test grounding ring | |
| CN103746316B (en) | A device and method for live replacement of straight-line corner tower insulator strings | |
| CN208094073U (en) | Distribution network live line work dedicated pin fixing bracket | |
| CN204144790U (en) | Two cross-arm conductor leading supports fixed insulation device | |
| CN203551609U (en) | Telescopic short circuit device | |
| CN203406589U (en) | Concrete pole grounding lead wire protecting apparatus | |
| CN203135307U (en) | Temporary insulating holder for electrically connecting drainage wire | |
| CN104157998A (en) | Ground lead clip | |
| CN201584691U (en) | A special tool for 220KV double-circuit common-tower line entering the high-tension high-voltage strong electric field | |
| CN104134963A (en) | Parallel groove clamp insulation protective cover | |
| CN207150032U (en) | One kind ground wire burn-out proof device | |
| CN202534972U (en) | Over-current clamping device | |
| CN201837646U (en) | Insulated fixing device for lead disconnection position during preventative test of substation primary equipment | |
| CN203589662U (en) | Sectional ground wire connection structure | |
| CN202034104U (en) | Tube type bus | |
| CN202817667U (en) | Wire sheath used for wire of electric transmission line | |
| CN204290220U (en) | A kind of power pipe female joint current diverter | |
| CN203113867U (en) | Straight-line cable T-jointing steel tube rod tower | |
| CN202111347U (en) | 10 kV junction box grounding wire | |
| CN204067610U (en) | Power transmission lines overhauling ground wire articulated device | |
| CN104218493A (en) | Process for electrified replacing of tension-resistant hard tube bus jumper insulator for +/-800kV extra-high-voltage direct-current line |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20141210 Termination date: 20180827 |