CN104505788A - Large-span suspension type tubular bus-bar multiple-hanging-point combined metal fitting and mounting method thereof - Google Patents

Large-span suspension type tubular bus-bar multiple-hanging-point combined metal fitting and mounting method thereof Download PDF

Info

Publication number
CN104505788A
CN104505788A CN201510000680.1A CN201510000680A CN104505788A CN 104505788 A CN104505788 A CN 104505788A CN 201510000680 A CN201510000680 A CN 201510000680A CN 104505788 A CN104505788 A CN 104505788A
Authority
CN
China
Prior art keywords
hanging
tubular bus
yoke plate
suspension
bus
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510000680.1A
Other languages
Chinese (zh)
Other versions
CN104505788B (en
Inventor
周锦平
童仕忠
尹建明
吕续国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HUBEI XINGHE NEW MATERIAL CO Ltd
Original Assignee
HUBEI XINGHE NEW MATERIAL CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HUBEI XINGHE NEW MATERIAL CO Ltd filed Critical HUBEI XINGHE NEW MATERIAL CO Ltd
Priority to CN201510000680.1A priority Critical patent/CN104505788B/en
Publication of CN104505788A publication Critical patent/CN104505788A/en
Application granted granted Critical
Publication of CN104505788B publication Critical patent/CN104505788B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a large-span suspension type tubular bus-bar multiple-hanging-point combined metal fitting and a mounting method thereof. The large-span suspension type tubular bus-bar multiple-hanging-point combined metal fitting is characterized by comprising suspension metal fittings, a connecting plate, an adjustable drawbar and a grading ring. The mounting method of the large-span suspension type tubular bus-bar multiple-hanging-point combined metal fitting comprises that both ends of a tubular bus-bar 1 are provided with the suspension metal fittings 2 on two or more points; the two suspension points at each end are connected through the corresponding connecting plate 5, the corresponding drawbar 3 and the like; the connecting positions of each connecting plate 5 are under grading shielding through the corresponding grading ring 4; the two outermost suspension fittings at both ends are connected with a tower through the connecting plates 5 and insulating substrings 6;by means of the mounting manner with the combined fittings and the multiple suspension points, installation of a large-span suspension type tubular bus-bar can be achieved and the cost can be saved.

Description

A kind of large span hanging tubular bus many hanging points combination hardware fitting and mounting means thereof
Technical field
The present invention relates to power transmission and transformation field, be specifically related to a kind of large span hanging tubular bus many hanging points mounting means and combination hardware fitting.
Background technology
Transformer substation tubular busbar brace type and suspension type are installed, pipe bus hanging formula installs the quantity that can greatly reduce pillar, the vibrations of anti-gentle breeze and antiseismic ability strong, and eliminate because the female amount of deflection reason of pipe causes the fault of Insulator detection to occur, hanging tubular bus is applied in the installation of transformer substation pipe bus more and more widely, but it is all 2 suspension types that traditional suspension type is installed, because the spacing of two hanging points is larger, add that centre must increase and draw lower gold utensil, particularly 750kv and above super, ultra high voltage power transformation engineering pipe bus span is increasing, cause pipe bus amount of deflection larger, not only affect the attractive in appearance of transformer station, but also affect the safe operation of transformer station.
Summary of the invention
The object of the present invention is to provide a kind of novel hanging tubular bus assorted golden tool and mounting means thereof of many hanging points structure, its implementation is as follows:
Described combination hardware fitting comprises at least four suspension gold utensils (2) be arranged on tube type bus (1), at least four yoke plates (5) be connected with suspension gold utensil (2), at least two pull bars (3) and at least four grading rings (4).
Described yoke plate and Equalized voltage ring construction various.
Described pull bar is compensation linkage, and pull bar two ends have a latch closure respectively.
During installation, the two ends of pipe bus (1) take two or more to hang gold utensil (2) respectively, often holding between two hanging points adopts the gold utensil such as yoke plate (5), pull bar (3) to connect, the junction of each yoke plate 5 adopts grading ring (4) all to press shielding, and edge substring 6 is connected with the yoke plate of outermost end and pylon 7 respectively.
Beneficial effect of the present invention is: the size of hanging tubular bus installation horizontal span is the most critical factor of the amount of deflection determining pipe mother, change the length that horizontal span must increase insulator string (6), the height of pylon (7) just must be increased like this when meeting electrical insulation properties, construction cost will certainly be increased like this, the present invention adopts many hanging points to suspend in midair, the distance of second hanging point and first hanging point is regulated by compensation linkage (3), the pulling force of insulator string (6) to be extended to second hanging point, quite shorten the female horizontal span of pipe, greatly can reduce the amount of deflection of pipe mother, and do not increase mounting cost, install simple, flexible adjustment, convenient.
Accompanying drawing explanation
Fig. 1: pipe bus Multi-point hung type installation diagram
Fig. 2: compensation linkage
Fig. 3: yoke plate
Fig. 4: grading ring
In figure: 1 is tube type bus; 2 for hanging gold utensil; 3 is pull bar; 4 is grading ring; 5 is yoke plate; 6 is insulator string; 7 is steel tower.
Embodiment
Fig. 2 is pull bar, two ends are lead screw, screw rod one end is latch closure, be hollow steel pole in the middle of pull bar, steel pole two ends are nut structure, and nut and lead screw are just coincide, simultaneously, the internal diameter of hollow structure part is greater than the external diameter of lead screw, when needing adjusting yoke length, just twists steel pole or lead screw with spanner.
Fig. 3 is the structure chart of yoke plate, and yoke plate structure is multiple, and plate has aperture, and yoke plate is connected with pull bar with insulator string, hangs the position of gold utensil on pipe bus adopt different yoke plates according to many hanging points.
Fig. 4 is the structure chart of grading ring, and the structure of grading ring is multiple, installs needs according to pipe bus, can adopt the grading ring of corresponding construction at different hanging points.
Mounting means is shown in Fig. 1, the two ends of pipe bus 1 take hang gold utensil 2 respectively at 2, yoke plate one end that outer end hangs on gold utensil is connected with pull bar, the other end is connected with insulator string, the other end of insulator string is connected with pylon, and the other end of pull bar is connected with the yoke plate on the suspension gold utensil of middle hanging point, and grading ring is arranged on yoke plate, suspension gold utensil and yoke plate are covered the object reaching and all press, and adjustment pull bar length is to optimum state.
Often holding between two hanging points adopts the gold utensil such as yoke plate 5, pull bar 3 to connect, distance between adjustable two hanging points of pull bar, the junction of each yoke plate 5 adopts grading ring 4 all to press shielding, occur to reduce corona, some suspended fixing Method compare are taked with traditional pipe bus two ends, in the length situation not increasing insulator string 6, greatly reduce pipe bus amount of deflection.
The foregoing is only embodiments of the invention; not thereby scope of patent protection of the present invention is limited; every utilize specification of the present invention and accompanying drawing content thereof to do equivalent structure or equivalence transformation; or direct or indirect other association areas used beyond the present invention, all can be considered in scope of patent protection of the present invention.

Claims (4)

1. large span hanging tubular bus many hanging points combination hardware fitting, it is characterized in that: described combination hardware fitting comprises at least four suspension gold utensils (2) be arranged on tube type bus (1), at least four with suspension gold utensil (2) and the yoke plate (5) be connected with insulator string 6, at least two pull bars (3) and at least four grading rings (4).
2. a kind of large span hanging tubular bus many hanging points combination hardware fitting according to claim 1, is characterized in that: described yoke plate and Equalized voltage ring construction various.
3. a kind of large span hanging tubular bus many hanging points combination hardware fitting according to claim 1, is characterized in that: described pull bar is compensation linkage.
4. the mounting means of a kind of large span hanging tubular bus many hanging points combination hardware fitting according to claim 1, it is characterized in that: during installation, the two ends of pipe bus 1 take two or more to hang gold utensil 2 respectively, the gold utensil such as yoke plate 5, pull bar 3 is adopted to connect between each hanging point, the junction of each yoke plate 5 adopts grading ring 4 all to press shielding, and edge substring 6 is connected with the yoke plate of outermost end and pylon 7 respectively.
CN201510000680.1A 2015-01-04 2015-01-04 A kind of more hanging point combination hardware fittings of large span hanging tubular bus and its mounting means Active CN104505788B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510000680.1A CN104505788B (en) 2015-01-04 2015-01-04 A kind of more hanging point combination hardware fittings of large span hanging tubular bus and its mounting means

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510000680.1A CN104505788B (en) 2015-01-04 2015-01-04 A kind of more hanging point combination hardware fittings of large span hanging tubular bus and its mounting means

Publications (2)

Publication Number Publication Date
CN104505788A true CN104505788A (en) 2015-04-08
CN104505788B CN104505788B (en) 2018-07-24

Family

ID=52947518

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510000680.1A Active CN104505788B (en) 2015-01-04 2015-01-04 A kind of more hanging point combination hardware fittings of large span hanging tubular bus and its mounting means

Country Status (1)

Country Link
CN (1) CN104505788B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112320650A (en) * 2020-11-18 2021-02-05 青海送变电工程有限公司 Method for hoisting ultra-long tubular bus of cable-stayed insulator string
CN114759510A (en) * 2022-04-13 2022-07-15 辽宁锦兴电力金具科技股份有限公司 Tubular bus deflection adjusting hardware fitting

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101335443A (en) * 2008-07-25 2008-12-31 南京线路器材厂 Horizontal direction force regulating apparatus for hard bus jump wire with diagonal tie
CN201594720U (en) * 2010-01-28 2010-09-29 四川电力设计咨询有限责任公司 Suspension tubular busbar mounting structure
CN202308976U (en) * 2011-08-22 2012-07-04 中国电力工程顾问集团华东电力设计院 Jumper structure of direct-current line of vertical type strain tower
CN202474755U (en) * 2011-12-08 2012-10-03 中国电力工程顾问集团公司 720/50 conducting wire jumper wire structure of extra-high voltage DC line
CN103296623A (en) * 2013-05-31 2013-09-11 国家电网公司 Tube busbar suspension fitting for converter station valve hall

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101335443A (en) * 2008-07-25 2008-12-31 南京线路器材厂 Horizontal direction force regulating apparatus for hard bus jump wire with diagonal tie
CN201594720U (en) * 2010-01-28 2010-09-29 四川电力设计咨询有限责任公司 Suspension tubular busbar mounting structure
CN202308976U (en) * 2011-08-22 2012-07-04 中国电力工程顾问集团华东电力设计院 Jumper structure of direct-current line of vertical type strain tower
CN202474755U (en) * 2011-12-08 2012-10-03 中国电力工程顾问集团公司 720/50 conducting wire jumper wire structure of extra-high voltage DC line
CN103296623A (en) * 2013-05-31 2013-09-11 国家电网公司 Tube busbar suspension fitting for converter station valve hall

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
黄进铭: ""500kV配电装置悬吊式管母线技术的应用"", 《企业科技与发展》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112320650A (en) * 2020-11-18 2021-02-05 青海送变电工程有限公司 Method for hoisting ultra-long tubular bus of cable-stayed insulator string
CN114759510A (en) * 2022-04-13 2022-07-15 辽宁锦兴电力金具科技股份有限公司 Tubular bus deflection adjusting hardware fitting
CN114759510B (en) * 2022-04-13 2024-02-02 辽宁锦兴电力金具科技股份有限公司 Tube bus deflection adjusting hardware fitting

Also Published As

Publication number Publication date
CN104505788B (en) 2018-07-24

Similar Documents

Publication Publication Date Title
CN203932341U (en) High and low pressure busbar grounding device
CN208112103U (en) A kind of drainage thread ground connection cross-arm
CN206673533U (en) A kind of novel high-pressure transmission line of electricity angle pole mounting structure
CN204046062U (en) The unsettled fixed support instrument of a kind of power transmission line overhead ground wire
CN104505788A (en) Large-span suspension type tubular bus-bar multiple-hanging-point combined metal fitting and mounting method thereof
CN203707716U (en) Multilayer laying support for aluminum alloy cable in shaft well
CN208142787U (en) Aluminium alloy aerial insulated cable fixes device
CN203871745U (en) Double-hoisting-point rod head fixture for live changing of linear insulator on steel pipe pole of 220kV line
CN203747299U (en) Mountable and dismountable dual-purpose airfoil-profile clamping device
CN202711874U (en) Suspended hard jumper insulator string for +/- 500kV double-circuit transmission lines on same tower
CN201256272Y (en) Six break cage type rigid jumper wire device for ultrahigh voltage transmission line
CN206640265U (en) The important device across the double protections of region duplex of aerial condutor
CN202633839U (en) Special tool for erecting carbon fiber wire
CN205304128U (en) Tower crane cable fixed bolster
CN210110444U (en) Grading ring suitable for multi-size insulator sleeve
CN204349394U (en) A kind of protection rope for conductor cross arm connecting device
CN203760992U (en) Double spring end part vibration reducing type spacing rod
CN209056891U (en) A kind of combination hardware fitting
CN103762519B (en) A kind of dual-purpose wing type clamp apparatus of self-mountable & dismountuble
CN203574335U (en) Jumper system of strain tower
CN202917856U (en) Sliding type damping connection device for transformer substation
CN205212379U (en) Big leap cage rigidity of extra -high voltage eight becomes six wire jumper clusters
CN103311863A (en) Bolt type adjusting elbow
CN212137221U (en) Insulating type drainage wire fixing hardware fitting for weather-resistant angle steel tower of power transmission line
CN218335256U (en) Novel anti-abrasion type interphase spacer

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant