CN102663950A CN2012100974476A CN201210097447A CN102663950A CN 102663950 A CN102663950 A CN 102663950A CN 2012100974476 A CN2012100974476 A CN 2012100974476A CN 201210097447 A CN201210097447 A CN 201210097447A CN 102663950 A CN102663950 A CN 102663950A
Authority
CN
China
Prior art keywords
model
prefabricated
standard module
prefabricated standard
scale
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012100974476A
Other languages
Chinese (zh)
Inventor
陈旭光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hohai University HHU
Original Assignee
Hohai University HHU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hohai University HHU filed Critical Hohai University HHU
Priority to CN2012100974476A priority Critical patent/CN102663950A/en
Publication of CN102663950A publication Critical patent/CN102663950A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)

Abstract

The invention discloses a manufacture method of a large-scale geomechanical model. The method comprises the following steps of: (1) pressing prefabricated standard modules; (2) numbering the pressed prefabricated standard modules respectively and making a design drawing with standard modules being assembled into a model; (3) according to the design drawing, employing a caking agent in order to build the standard modules into a shape; (4) introducing a measuring line on a measuring element out of a model body and to connected with measurement equipment. According to a geomechanical model prefabricated standard module building forming method, the production process of a large-scale true three-dimensional mechanical model is improved, serious stratification of enclosing rocks and a deviation phenomenon of pre-buried measurement element caused by stratification molding in a present geomechanical model manufacture process are overcome, and the manufacture quality of the model is improved. The method has the advantages of high efficiency, being fast and economic, simple operation of equipment, uniform model entity, capability of scaled standardized production and the like, and the high quality operation of a three-dimensional mechanical model experiment is effectively ensured.

Description

A kind of method for making of large-scale geomechanics model
Technical field
The present invention relates to a kind of method for making of large-scale geomechanics model, specifically is to adopt prefabricated standard module to build the method for moulding by laying bricks or stones.
Background technology
Along with the fast development of traffic capital construction and greatly developing of subterranean resource exploitation, underground structure is used widely at water power, traffic, resource, energy field, and the construction safety of underground excavation engineering also receives more and more the concern and attention simultaneously.Along with the increasing of underground works buried depth and the raising of project scale; Engineering geological condition and the hydrogeological condition of planning to build underground works zone rock mass are also complicated day by day; Be the large-scale underground engineering construction excavation of effective evaluation stability of surrounding rock; Need to rely on model experiment to carry out the A+E of underground rock cavern stability, with the mechanical characteristics and the deformation failure rule of the buried surrounding rock of chamber of effective announcement.
Because the model bulky, layering making usually both at home and abroad at present promptly adopts layering casting method or tamper compacting method that it is made.Classic method causes occurring a series of shortcomings: during with layering casting method analogue formation; Analog material is sealed in the model support, and inner jointing compound is difficult to volatilization, makes the material layer upper surface of building reach intensity index; And its inside is moist, weak; The adjacent two layers layers of material influences the whole mechanics parameter of model, finally makes model body not meet designing requirement; And the compacting method is difficult to guarantee that each different parts is stressed evenly equal, therefore has a strong impact on the homogeneity of model body and the authenticity of parameter.In addition; During the top and bottom process analogue formation, the model bottom still receives the superpressure effect in the cover material material compacting process on it and further compression under the situation that reaches strength criterion; Cause material parameter increase, element burial place deviation to occur, influenced the accuracy of model measurement data.Therefore, need a kind of manufacture craft of exploitation badly and reach the measuring sensor method for embedding that adapts with it to large-scale geomechanics model.
The present Research of domestic relevant large-scale three dimensional model production method is following at present:
(1) " Sichuan University's journal " the 3rd phase of calendar year 2001 has been introduced a kind of arch dam model method for making.This method adopts punching block to build moulding, and jointing compound is difficult to volatilization, can't guarantee the consistance on integrally-built homogeneity of model and the mechanical property.
(2) " hydropower journal " the 1st phase in 2004 has been introduced a kind of power station chamber model production method.This method adopts builds moulding, and jointing compound is difficult to volatilization, can't guarantee the consistance on integrally-built homogeneity of model and the mechanical property.
(3) " rock mechanics and engineering journal " the 9th phase in 2006 has been introduced a kind of bifurcated tunnel model method for making, and this method adopts the hand compaction moulding, can't guarantee the consistance on integrally-built homogeneity of model and the mechanical property.
(4) application number is that 200810056625.4 Chinese patent has been introduced a kind of model production method that hits real merit compound action function reverse control principle.This method adopts ramming device compacting, and material places in the model body, and jointing compound is difficult to volatilization, causes lamination to produce, and can't guarantee the homogeneity of model body and the consistance on the mechanical property.
(5) application number is that the Chinese patent of 201010503227.X has been introduced the air-dry model production method of a kind of compaction in layers.This method adopts large-area minute laminate molding type, causes size effect; And material places in the model body, and jointing compound is difficult to volatilization, causes lamination, can't guarantee the homogeneity of model body and the consistance on the mechanical property; Be embedded in following measuring sensor, in continuing pressing process, cause squinting, make the measuring point distortion of design, influenced the accuracy of model measurement data.
Summary of the invention
The objective of the invention is for overcoming the deficiency of above-mentioned prior art, a kind of geomechanics model method for making that a kind of even structure and mechanics parameter adhere to specification, constructing operation is easy is provided.
For realizing above-mentioned purpose, the present invention adopts following technical proposals:
A kind of method for making of large-scale geomechanics model is characterized in that: step is:
The first step, suppress prefabricated standard module:
1) cast material of weighing is laid in the mould; The Prefabricated block material weight is ; Wherein: γ designs unit weight for model body, and is respectively prefabricated standard module and model body width;
Figure 334755DEST_PATH_IMAGE003
is respectively prefabricated standard module and model body length;
Figure 279577DEST_PATH_IMAGE004
is respectively prefabricated standard module and model body height; N is the number of prefabricated standard module;
2) be placed to vent stem and by the moulding of design pressure compression module at design attitude;
3) the Prefabricated block maintenance that will suppress is to design strength;
4) take out into vent stem, install and measure element;
Second step, the prefabricated standard module of compression moulding numbered respectively and make by standard module be assembled into the Model Design drawing;
The 3rd the step, adopt cementing agent to build prefabricated standard module by laying bricks or stones moulding successively according to design drawing;
The 4th step, the slotted line on the measuring sensor is drawn model body, and link to each other with measuring equipment.
The weight of said prefabricated standard module is not more than 20Kg.
Triaxial apparatus is adopted in the application of force source of said compaction model, and said compaction force and analog material test specimen mechanics parameter test press power are consistent, and have guaranteed that the intensity of Prefabricated block is identical with design strength.For guaranteeing that model body mechanics parameter (like elastic modulus , compressive strength , tensile strength , Poisson ratio
Figure 576325DEST_PATH_IMAGE008
etc.) reaches design load; Promptly equate with cast material laboratory mechanics parameter test value; Compacting stress in the compacting stress in Prefabricated block when compacting and the laboratory during compacting standard specimen equates, so the Prefabricated block press power is Prefabricated block cross-sectional area
Figure 2012100974476100002DEST_PATH_IMAGE009
(
Figure 59259DEST_PATH_IMAGE010
is that laboratory standard material test specimen is suppressed stress in the formula).
Said compacting tool set is the steel casing that rigid plate constitutes.
Said cementing agent is and the analog material test specimen is made identical solvent, has guaranteed that prefabricated section is consistent with mechanical property between the adhesive surface.
The present invention has following technical advantage:
(1) the even compacting of small blocks has guaranteed the homogeneity of model body, has eliminated the size effect influence, and the model mechanics parameter is met design requirement;
(2) making of small blocks has solved the solvent that compacting causes because model body paves and has been difficult to volatilization, and the shortcoming that mold strength is difficult to be shaped has been eliminated lamination, has guaranteed that effectively the mechanics parameter of model body reaches the Intensity Design value;
Use when (3) block is piled up with the proportioning material and make the jointing compound gluing,, guarantee the consistance of cast material on mechanical property preferably so seam properties is identical with the model block;
Through presetting operations such as burying the hole underground, guaranteed burying underground smoothly of measuring sensor when (4) burying element underground.In the master die block, bury element underground, guaranteed that deviation does not accurately take place the installation position of measuring sensor, it is measured accurately, and the protection measuring sensor is without prejudice;
(5) but module standardization large-scale production, this method is easy to operate, efficient, quick; Can be widely used in field underground works geomechanics models such as water power, traffic, the energy, mine and make, have wide range of applications.
Description of drawings
Fig. 1 is the modelling process flow diagram.
Fig. 2 is the prefabricated standard module compacting of the present invention figure.
Among the figure, 1. compacting tool set, 2. Prefabricated block 3. becomes vent stem.
Embodiment
Below in conjunction with accompanying drawing and embodiment the present invention is further specified.
Like Fig. 1, shown in 2,
A kind of method for making of large-scale geomechanics model, step is:
1) the match ratio its preparing materials of confirming by experiment also is laid in the material of weighing in the compacting tool set 1.The prefabricated module 2 material weight (formula:
Figure 2012100974476100002DEST_PATH_IMAGE011
as a model body design density).For guaranteeing easy construction, the definite of said prefabricated standard module 2 numbers
Figure 327834DEST_PATH_IMAGE012
needs to guarantee that Prefabricated block weight
Figure 315382DEST_PATH_IMAGE001
is not more than 20Kg.The Prefabricated block squarely; Its length and width and high size are about 20cm; It is square to consider that the model body size of drawing up is generally the 1m left and right sides, so need Prefabricated block 2 total amounts
Figure 2012100974476100002DEST_PATH_IMAGE013
of compacting to be about the 100-200 piece.
2) material is inserted compacting tool set 1 to divide the shop even, is placed to vent stem 3 to make the component positioning hole at design attitude.Said one-tenth vent stem 3 is buried the round bar of measuring sensor for somewhat larger in diameter underground in plan, inserts so that become vent stem to extract the enough measuring sensors of reserving the back of groove of burying underground; Compacting tool set 1 is placed on the pressing machine, carry out compacting by the design pressure value, the compacting stress when suppressing standard specimen in the compacting stress during Prefabricated block 2 compacting and the laboratory equates.
3) Prefabricated block 2 suppressed of maintenance.With the Prefabricated block of having suppressed 2 dismountings, adopt hair-dryer to quicken the air-dry of the intact model of compacting, the alcohol equal solvent in the cast material is effectively volatilized, make mold strength up to standard.
4) take out into vent stem 3, by designed elevation measuring sensor is placed and bury underground in the hole, the space between hole wall and the measuring sensor adopts proportioning identical but alcohol content is higher, and promptly wet analog material is with measured hole landfill and compacting gently;
5)---circulation of maintenance---is buried element underground---compacting Prefabricated block is until the compacting of accomplishing all Prefabricated blocks to carry out next compacting Prefabricated block 2;
6) Prefabricated block 2 of compression moulding is numbered respectively, and with the order of building by laying bricks or stones of each Prefabricated block, as the module 2 that is positioned at sustained height is put order and each layer module 2 and is built order by laying bricks or stones and be made into design drawing;
7) Prefabricated block 2 is built by laying bricks or stones according to design drawing successively, adopt cementing agent bonded and precast piece 2 in the building process, build completion by laying bricks or stones until The model;
8) slotted line on the measuring sensor is drawn model body, and link to each other with measuring equipment outside the model body.
Said Prefabricated block 2 quantity, size are confirmed by the volume of the model body of drawing up.Said prefabricated standard module is of a size of
Figure 352739DEST_PATH_IMAGE014
(
Figure 476553DEST_PATH_IMAGE012
is prefabricated calibrated bolck number) of the volume of the model body of drawing up; I.e.
Figure 2012100974476100002DEST_PATH_IMAGE015
;
Figure 636270DEST_PATH_IMAGE016
,
Figure 2012100974476100002DEST_PATH_IMAGE017
.(in the formula: is respectively prefabricated calibrated bolck and model body width; is respectively prefabricated calibrated bolck and model body length;
Figure 9111DEST_PATH_IMAGE004
is respectively prefabricated calibrated bolck and model body height; N is the number of prefabricated calibrated bolck).Said Prefabricated block material weight is
Figure 198784DEST_PATH_IMAGE001
(in the formula: γ designs unit weight for model body).The number of standard modules prefabricated
Figure 911656DEST_PATH_IMAGE012
to determine the need to ensure prefabricated modules 2 Weight
Figure 540083DEST_PATH_IMAGE001
no more than 20Kg.Model body is divided into some parts of calibrated bolcks 2 models, each standard module 2 number consecutively.
Triaxial apparatus is adopted in the application of force source of said compaction model, and said compaction force is identical with analog material test specimen mechanics parameter test press power, has guaranteed that the intensity and the design strength of Prefabricated block 2 is consistent.For guaranteeing that model body mechanics parameter (like elastic modulus , compressive strength
Figure 15375DEST_PATH_IMAGE006
, tensile strength , Poisson ratio
Figure 834613DEST_PATH_IMAGE008
etc.) reaches design load; Promptly equate with cast material laboratory mechanics parameter test value; Compacting stress in the compacting stress in Prefabricated block when compacting and the laboratory during compacting standard specimen equates, so the Prefabricated block press power is Prefabricated block cross-sectional area
Figure 538258DEST_PATH_IMAGE009
(
Figure 335312DEST_PATH_IMAGE010
is that laboratory standard material test specimen is suppressed stress in the formula).
The steel casing that said compacting tool set 1 constitutes for rigid plate.
Said cementing agent is and the analog material test specimen is made identical solvent, like alcoholic solution, the paraffin solution of rosin, has guaranteed that Prefabricated block 2 is consistent with mechanical property between the adhesive surface.

Claims (3)

1. the method for making of a large-scale geomechanics model is characterized in that:
Step is:
The first step, suppress prefabricated standard module:
1) cast material of weighing is laid in the mould; The Prefabricated block material weight is
Figure 2012100974476100001DEST_PATH_IMAGE001
; Wherein: γ designs unit weight for model body, and
Figure 415154DEST_PATH_IMAGE002
is respectively prefabricated standard module and model body width; is respectively prefabricated standard module and model body length; is respectively prefabricated standard module and model body height; N is the number of prefabricated standard module;
2) design attitude at cast material is placed to vent stem, and by the moulding of design pressure compression module;
3) the Prefabricated block maintenance that will suppress is to design strength;
4) take out into vent stem, install and measure element;
Second step, the prefabricated standard module of compression moulding numbered respectively and make by standard module be assembled into the Model Design drawing;
The 3rd the step, adopt cementing agent to build prefabricated standard module by laying bricks or stones moulding successively according to design drawing;
The 4th step, the slotted line on the measuring sensor is drawn model body, and link to each other with measuring equipment.
2. the method for making of large-scale geomechanics model according to claim 1, it is characterized in that: the weight of said prefabricated standard module is not more than 20Kg.
3. the method for making of large-scale geomechanics model according to claim 1 and 2 is characterized in that: said cementing agent is for identical with the solvent of analog material test specimen manufacturing process.
CN2012100974476A 2012-04-06 2012-04-06 Manufacture method of large-scale geomechanical model Pending CN102663950A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012100974476A CN102663950A (en) 2012-04-06 2012-04-06 Manufacture method of large-scale geomechanical model

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012100974476A CN102663950A (en) 2012-04-06 2012-04-06 Manufacture method of large-scale geomechanical model

Publications (1)

Publication Number Publication Date
CN102663950A true CN102663950A (en) 2012-09-12

Family

ID=46773422

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012100974476A Pending CN102663950A (en) 2012-04-06 2012-04-06 Manufacture method of large-scale geomechanical model

Country Status (1)

Country Link
CN (1) CN102663950A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104424840A (en) * 2013-08-30 2015-03-18 中国石油天然气股份有限公司 Method for manufacturing seismic physical model

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101221709A (en) * 2008-01-23 2008-07-16 清华大学 Geomechanics model production method based on compacting work recombination action function reverse control principle
CN101950504A (en) * 2010-10-11 2011-01-19 山东大学 Geomechanics model layering compaction air drying manufacturing and grooving embedding tester method

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101221709A (en) * 2008-01-23 2008-07-16 清华大学 Geomechanics model production method based on compacting work recombination action function reverse control principle
CN101950504A (en) * 2010-10-11 2011-01-19 山东大学 Geomechanics model layering compaction air drying manufacturing and grooving embedding tester method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
沈泰: "地质力学模型试验技术的进展", 《长江科学院院报》 *
王汉鹏等: "地质力学模型试验过程中关键技术研究", 《实验科学与技术》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104424840A (en) * 2013-08-30 2015-03-18 中国石油天然气股份有限公司 Method for manufacturing seismic physical model

Similar Documents

Publication Publication Date Title
CN105158039B (en) One kind is used for Flow In Jointed Rock Masses test simulation crack production method
CN103616287B (en) A kind of tunnel excavation indoor model test device
CN101832140B (en) Testing method of water pressure distribution law of subsea tunnel lining
CN103954511B (en) A kind of Fracture Networks rock shearing-seepage flow coupling experiment method
CN102289980B (en) Method for preparing preset cracks in hydrofracture simulation specimen
Zhang et al. Large-scale geo-mechanical model tests for the stability assessment of deep underground complex under true-triaxial stress
Zhang et al. True three-dimensional geomechanical model tests for stability analysis of surrounding rock during the excavation of a deep underground laboratory
CN103915030B (en) The underground works driving model test apparatus of the scalable function of a kind of tool
CN110470522B (en) Method for prefabricating fracture network rock mass samples with different water saturation degrees
CN111622277B (en) Test device and test method for simulating influence of pile end cavities on bearing performance of pile foundation
CN110805076B (en) Test device and method for simulating reinforcement of passive area of foundation pit
CN104614242A (en) Excavation and surrounding rock stress and strain monitoring model testing device for rock-soil chamber under complicated conditions, and method thereof
CN108643247A (en) Soft clay area rectangle foundation pit bottom soil body reinforced model testing device and test method
CN109826633A (en) Device and method for simulating shield machine to penetrate existing shield tunnel downwards
CN102445398A (en) Simulation testing method of soft rock and hard soil mechanical characteristics
CN103115821B (en) The in-situ test system of lane side obturation load-carrying properties and method of testing thereof
CN111965327B (en) Plane model test device and method for stratum subsidence rule of thick surface soil and thin bedrock mining
CN102967687B (en) Indoor fracturing grouting experiment system under bidirectional anisobaric condition
CN114002411B (en) Dynamic monitoring system and method for water inflow of coal seam taking coal seam as main aquifer
CN105756106A (en) Centrifugal experiment model test system for simulating vertical load transmission mechanism of composite foundation
CN111537431B (en) Liquid CO2Phase change fracturing effect similar simulation experiment device and experiment method
CN102663950A (en) Manufacture method of large-scale geomechanical model
CN109100307B (en) Experimental device and system for monitoring and simulating deformation of reservoir rock
CN101950504B (en) Geomechanics model layering compaction air drying manufacturing and grooving embedding tester method
CN103234724A (en) Shaping method for experimental grotto of earthquake simulated vibration platform model

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication