Prior art keywords
engineering
module
information
data
design
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012100498836A
Other languages
Chinese (zh)
Inventor
丁广鑫
刘开俊
吴平
盛大凯
易建山
刘薇
曲辉
吴志力
李东亮
姜欣
韩文军
李显鑫
曹伟炜
周学文
卢飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Economic and Technological Research Institute
Original Assignee
State Grid Economic and Technological Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Economic and Technological Research Institute filed Critical State Grid Economic and Technological Research Institute
Priority to CN2012100498836A priority Critical patent/CN102663826A/en
Publication of CN102663826A publication Critical patent/CN102663826A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention relates to a power transmission project design review method assisted by a grid holographic digital map system, comprising the following steps: (1) a grid holographic digital map system, which includes a massive geographic information service distribution module, a general data service engine module, a three-dimensional engineering information construction module, a three-dimensional model and spatial data dynamic scheduling module, a multi-source thematic data superposition module, a simulation multimedia playing module and an engineering design review unit, is set; (2) project site environment simulation information completed by the three-dimensional engineering information construction module is acquired through the engineering design review unit; (3) the simulation multimedia playing module browses preliminary design of the grid project; (4) engineering hotspot information is viewed by location finding; (5) the multi-source thematic data superposition module displays design line constraint information; (6) the three-dimensional model and spatial data dynamic scheduling module simulates and displays the design line; and (7) information of line display area is labeled and areas of particular concern is recorded, making it easy to review images and topographical condition near a tower of particular concern.

Description

The method of the auxiliary project of transmitting and converting electricity design review of the holographic Digital Map System of electrical network
Technical field
The present invention relates to a kind of electricity power engineering design field, particularly assist the method for project of transmitting and converting electricity design review about the holographic Digital Map System of a kind of electrical network based on multiple thematic data and project data.
Background technology
Current, the traditional evaluation mode of the many employings of electricity power engineering preliminary design review work.Usually represent the engineering design data with two-dimensional approach, lack three-dimensional digital and express, make that evaluation is not directly perceived, be difficult to realize that the engineering actual environment reproduces, this has directly influenced the efficient and the quality of evaluation.Therefore; Be necessary further to improve the level of informatization in electrical network design review field, particularly aspect the engineering design data represents, need badly through the visualization of 3 d technology; Realize that the engineering actual environment reproduces; Make things convenient for the evaluation expert to the deciphering of engineering and carry out evaluation better, and then shorten the time of evaluation, make evaluation meticulousr, true, accurate.
Summary of the invention
To the problems referred to above, the purpose of this invention is to provide and a kind ofly integrate that engineering preliminary project three-dimensional represents, the method for the auxiliary project of transmitting and converting electricity design review of the holographic Digital Map System of electrical network of multi-source thematic information, multimedia.
For realizing above-mentioned purpose; The present invention takes following technical scheme: the method for the auxiliary project of transmitting and converting electricity design review of the holographic Digital Map System of a kind of electrical network; It may further comprise the steps: (1) is provided with the holographic Digital Map System of an electrical network, and it comprises that magnanimity geographic information services release module, conventional data service-Engine module, engineering three-dimensional information make up module, three-dimensional model and spatial data dynamic dispatching module, multi-source thematic data laminating module, simulation multimedia playing module and engineering design evaluation unit; Various data messages in said magnanimity geographic information services release module and the conventional data service-Engine module invokes server; Supply said engineering three-dimensional information to make up module, three-dimensional model and spatial data dynamic dispatching module, multi-source thematic data laminating module and simulation multimedia playing module and call processing; Result is sent to said engineering design evaluation unit, is met the data message that auxiliary project of transmitting and converting electricity design review needs; (2) make up module through engineering design evaluation unit acquisition by the engineering three-dimensional information and accomplish engineering site environmental simulation information, realize engineering corridor topography and geomorphology displaying completely; (3) obtain to browse the general status of electricity power engineering primary design through engineering design evaluation unit, integrate, realize the broadcast introduction of engineering overall information with three-dimensional scenic by simulating multimedia playing module; (4) confirm on the topography and geomorphology that step (2) makes up, to check the engineering hot information by said step (3), check emphasis scissors crossing location; Also can check the scissors crossing situation of given line repeatedly according to the evaluation needs; (5) Search and Orientation to the zone passage engineering design evaluation unit line project that obtains to show by multi-source thematic data laminating module cross over ice formation, dirty district, earthquake region, protected location, soil erosion district and respectively dodge the information in zone; (6) Search and Orientation to the zone can also evaluate the unit through engineering design and obtain designed lines to be carried out grand, microcosmic and show by three-dimensional model and spatial data dynamic dispatching module so that the some position of the every basic shaft tower of browse queries and peripheral site environment thereof; (7) carry out information labeling in the circuit display area, carry out record, near convenient image, the topographic features of paying close attention to of shaft tower of checking again paying close attention to the area.
In the said step (1), said magnanimity geographic information services release module is used to provide the service of mass spatial information network, and it comprises network map service, network element service and tile service.
In the said step (1), said conventional data service-Engine module is used to provide the three-dimensional modeling data of transformer station, shaft tower, insulator chain, self-defined thematic map data, multimedia file data.
In the said step (1); Said engineering design evaluation unit comprises evaluation application module and evaluation controller; Said evaluation application module is according to the review result of the data message structure project of transmitting and converting electricity design demand that receives, and said evaluation application module is by said its work of evaluation controller control.
Said evaluation application module is used for engineering corridor topography and geomorphology displaying completely, engineering information is play, checks the engineering hot information, checks thematic map, checked the engineering electronic record.
The present invention is owing to take above technical scheme; It has the following advantages: 1, the present invention constitutes owing to the holographic Digital Map System of electrical network makes up module, three-dimensional model and spatial data dynamic dispatching module, multi-source thematic data laminating module, simulation multimedia playing module and engineering design evaluation unit by magnanimity geographic information services release module, conventional data service-Engine module, engineering three-dimensional information; Method based on the auxiliary power transformation engineering design review of the holographic Digital Map System of electrical network can combine the multi-source thematic information; The three-dimensional scenic that structure and model engineering are on-the-spot is realized the three-dimensional of engineering preliminary project is represented.2, therefore the present invention can simulate multimedia owing to adopt the simulation multimedia playing module, represents engineering primary design general status.3, therefore the present invention can carry out the three-dimensional range of line project and power transformation engineering owing to adopt the engineering three-dimensional information to make up module and three-dimensional model and spatial data dynamic dispatching module, carries out cross-domain, the important three-dimensional of dodging the zone of emphasis intersection and checks.4, therefore the present invention can utilize the stack of multi-source thematic data owing to adopt multi-source thematic data laminating module, in system, represents thematic informations such as ice formation, dirty district, represents and rationality that the analysis circuit engineering is passed through, dodged, and the control engineering body is invested.5, the present invention checks owing to carrying out the electronic engineering archives, through checking the electronic record of each evaluation engineering, grasps the comprehensive data of engineering design plan (EDP).The present invention can extensively use in power domain.
Description of drawings
Fig. 1 is an overall flow synoptic diagram of the present invention;
Fig. 2 is the holographic Digital Map System structural representation of electrical network of the present invention.
Embodiment
The present invention provides a kind of and integrates that engineering preliminary project three-dimensional represents, the method for the auxiliary project of transmitting and converting electricity design review of the holographic Digital Map System of electrical network of multi-source thematic information, multimedia, has broken through the evaluation mode of traditional project of transmitting and converting electricity primary design two-dimensional static.Below in conjunction with accompanying drawing and embodiment the present invention is carried out detailed description.
As shown in Figure 1, the method for the auxiliary project of transmitting and converting electricity design review of the holographic Digital Map System of electrical network of the present invention may further comprise the steps:
1) as shown in Figure 2; The holographic Digital Map System of one electrical network is set, and it comprises that magnanimity geographic information services release module 1, conventional data service-Engine module 2, engineering three-dimensional information make up module 3, three-dimensional model and spatial data dynamic dispatching module 4, multi-source thematic data laminating module 5, simulation multimedia playing module 6 and engineering design evaluation unit 7.Magnanimity geographic information services release module 1 is used for calling various data messages in the prior art server with conventional data service-Engine module 2; Supply the engineering three-dimensional information to make up module 3, three-dimensional model and spatial data dynamic dispatching module 4, multi-source thematic data laminating module 5 and simulation multimedia playing module 6 and call processing; Result after the processing is sent to engineering design evaluation unit 7, is met the various data messages that auxiliary project of transmitting and converting electricity design review needs.
2) reviewer makes up module 3 through 7 acquisitions of engineering design evaluation unit by the engineering three-dimensional information and accomplishes engineering site environmental simulation information, realizes engineering corridor topography and geomorphology displaying completely.Make the reviewer can check information such as the topographic relief, scissors crossing, independent strain section of line project like this, and check information such as transformer station's total arrangement, equipment details through the three-dimensional model of transformer station.
3) reviewer obtains to browse the general status of electricity power engineering primary design by simulating multimedia playing module 6 through engineering design evaluation unit 7, realizes the broadcast of engineering information.So just integrated three-dimensional scenic and design data information effectively,, introduced the overall information of line project vividly with the mode of picture, literal, audio frequency combination automatic roaming.
4) by step 2) the basis on integrating step 3) the topography and geomorphology three-dimensional information that obtains; Can confirm the information that needs emphasis to check, carry out the engineering hot information and check, find the hot spot region; Check scissors crossing information, to show the leap rationality of preliminary project.Also can check the scissors crossing situation of given line repeatedly according to the evaluation needs.
5) in zone that Search and Orientation arrives; The reviewer obtains to cross over information such as ice formation, dirty district, earthquake region, protected location, soil erosion district by the line project that multi-source thematic data laminating module 5 is showed through engineering design evaluation unit 7, makes the evaluation expert can estimate engineering body cost rationality.
6) in zone that Search and Orientation arrives; The reviewer can also evaluate unit 7 through engineering design and obtain to carry out grand, microcosmic by three-dimensional model and 4 pairs of designed lines of spatial data dynamic dispatching module and show, so that the some position of the every basic shaft tower of browse queries and peripheral site environment thereof efficiently.
7) in the circuit display area, the reviewer can also carry out information labeling, and interpolation can be ground the path, the reason of relocating and mark, carries out record to paying close attention to the area.Certainly, the reviewer also can check situation such as near the shaft tower of paying close attention to image, landform according to the evaluation needs again.
Above-mentioned steps 1) in; Magnanimity geographic information services release module 1 mainly provides the service of mass spatial information network; Magnanimity geographic information services release module 1 mainly comprises WMS (Web Map Service; The network map service), WFS (Web Feature Service, network element service) and tile service.Network map service utilization has the data creating map of geospatial location information; The network element service is a geographic element online service standard based on Web service, and it has defined three operations: obtain service ability, key element type feature description and obtain object; The tile service is used to provide the service of tile data set, and comprising provides image and landform.
Above-mentioned steps 1) in, conventional data service-Engine module 2 can provide data such as the three-dimensional modeling data of transformer station, shaft tower, insulator chain, self-defined thematic map data, multimedia file.
Above-mentioned steps 1) in; It mainly is that the line project route scheme in the engineering preliminary project, power transformation engineering three-dimensional scenic are arranged, main scissors crossing, mainly dodged data such as zone, high-resolution satellite image, high resolving power aviation image, digital elevation model and integrate and organize that the engineering three-dimensional information makes up module 3; Simulation makes up and the engineering site three-dimensional scenic, reflects engineering primary design situation from macroscopic view to microcosmic comprehensively.
Above-mentioned steps 1) in, three-dimensional model and spatial data dynamic dispatching module 4 mainly are meant under the situation of big data quantity level, adopt the method for dynamic cutting and Real-Time Scheduling, and the smoothness that ensures 3 D rendering experiences for the user with efficient with comfortable three-dimensional.
Above-mentioned steps 1) in; Multi-source thematic data laminating module 5 mainly is meant on the basis that the engineering three-dimensional information makes up; Thematic datas such as stack ice formation, dirty district, water system, road, frozen soil, seismic intensity band, soil utilization, the soil erosion fully reflect the edge-restraint condition that the electricity power engineering designing institute relates to.
Above-mentioned steps 1) in, simulation multimedia playing module 6 mainly is meant under three-dimensional scenic, utilizes the fusion of technology such as video, audio frequency, and the main contents that the engineering primary design is reported represent with the form that multimedia and Three-Dimensional Dynamic picture combine.It has effectively integrated three-dimensional scenic and design data information, combines the mode of automatic three-dimensional range with picture, literal, audio frequency, introduces the primary design information of line project vividly.Simulation multimedia playing module 6 is mainly used in the outline of project information of introducing, engineering pictorial information, the broadcast of engineering audio-frequency information, and combines the engineering three-dimensional information to make up the roaming displaying that module is carried out the engineering geography information.
Above-mentioned steps 1) in; Engineering design evaluation unit 7 comprises evaluation application module 71 and an evaluation controller 72; Evaluation application module 71 is according to the review result of the various data messages structure project of transmitting and converting electricity design demand that receive, and evaluation application module 71 is by 72 its work of control of evaluation controller.Wherein, evaluation application module 71 comprises engineering completely the corridor topography and geomorphology is showed, engineering information is play, checks the engineering hot information, checks thematic map, checks application function such as engineering electronic record.
In sum, the present invention utilizes magnanimity geographic information services release module 1, conventional data service-Engine module 2, engineering three-dimensional information to make up three-dimensional scenic and edge-restraint condition that module 3, three-dimensional model and spatial data dynamic dispatching module 4, multi-source thematic data laminating module 5, simulation multimedia playing module 6 and engineering design evaluation unit 7 make up the engineering preliminary project; Utilize the simulation multimedia, play through engineering information and represent engineering primary design general status, for reviewer's overall project profile of grasping on the macroscopic view provides auxiliary; Through the abundant engineering design evaluation unit 7 of constructing function; Broken through the evaluation mode of traditional project of transmitting and converting electricity primary design two-dimensional static; Provide a kind of and integrated that engineering preliminary project three-dimensional represents, the auxiliary evaluation method of multi-source thematic information, multimedia; Make the reviewer can three-dimensional check the design data of the project of transmitting and converting electricity that the electrical network designer provides intuitively; And combine the electronic engineering archives to check evaluation is made in the design of correlation engineering, for design review work has brought brand-new technology means and experience effect.Wherein, the electronic engineering archives check to be the electronic record that the user can check each evaluation engineering, and purpose is to represent the detailed historical data of engineering to the design review personnel, for auxiliary evaluation provides omnibearing support.Comprising that the all-work electronic record is checked with single engineering electronic record checks.
Above-mentioned each embodiment only is used to explain the present invention; The structure of each parts and connected mode all can change to some extent; On the basis of technical scheme of the present invention; All improvement and equivalents of the connection and the structure of individual component being carried out according to the principle of the invention all should not got rid of outside protection scope of the present invention.

Claims (6)

1. the method for the auxiliary project of transmitting and converting electricity design review of the holographic Digital Map System of an electrical network, it may further comprise the steps:
(1) the holographic Digital Map System of an electrical network is set, it comprises that magnanimity geographic information services release module, conventional data service-Engine module, engineering three-dimensional information make up module, three-dimensional model and spatial data dynamic dispatching module, multi-source thematic data laminating module, simulation multimedia playing module and engineering design evaluation unit; Various data messages in said magnanimity geographic information services release module and the conventional data service-Engine module invokes server; Supply said engineering three-dimensional information to make up module, three-dimensional model and spatial data dynamic dispatching module, multi-source thematic data laminating module and simulation multimedia playing module and call processing; Result is sent to said engineering design evaluation unit, is met the data message that auxiliary project of transmitting and converting electricity design review needs;
(2) make up module through engineering design evaluation unit acquisition by the engineering three-dimensional information and accomplish engineering site environmental simulation information, realize engineering corridor topography and geomorphology displaying completely;
(3) obtain to browse the general status of electricity power engineering primary design through engineering design evaluation unit, integrate, realize the broadcast introduction of engineering overall information with three-dimensional scenic by simulating multimedia playing module;
(4) confirm on the topography and geomorphology that step (2) makes up, to check the engineering hot information by said step (3), check emphasis scissors crossing location; Also can check the scissors crossing situation of given line repeatedly according to the evaluation needs;
(5) Search and Orientation to the zone passage engineering design evaluation unit line project that obtains to show by multi-source thematic data laminating module cross over ice formation, dirty district, earthquake region, protected location, soil erosion district and respectively dodge the information in zone;
(6) Search and Orientation to the zone can also evaluate the unit through engineering design and obtain designed lines to be carried out grand, microcosmic and show by three-dimensional model and spatial data dynamic dispatching module so that the some position of the every basic shaft tower of browse queries and peripheral site environment thereof;
(7) carry out information labeling in the circuit display area, carry out record, near convenient image, the topographic features of paying close attention to of shaft tower of checking again paying close attention to the area.
2. the method for the auxiliary project of transmitting and converting electricity design review of the holographic Digital Map System of electrical network as claimed in claim 1; It is characterized in that: in the said step (1); Said magnanimity geographic information services release module is used to provide the service of mass spatial information network, and it comprises network map service, network element service and tile service.
3. the method for the auxiliary project of transmitting and converting electricity design review of the holographic Digital Map System of electrical network as claimed in claim 1; It is characterized in that: in the said step (1), said conventional data service-Engine module is used to provide the three-dimensional modeling data of transformer station, shaft tower, insulator chain, self-defined thematic map data, multimedia file data.
4. the method for the auxiliary project of transmitting and converting electricity design review of the holographic Digital Map System of electrical network as claimed in claim 2; It is characterized in that: in the said step (1), said conventional data service-Engine module is used to provide the three-dimensional modeling data of transformer station, shaft tower, insulator chain, self-defined thematic map data, multimedia file data.
5. like the method for claim 1 or the auxiliary project of transmitting and converting electricity design review of the holographic Digital Map Systems of 2 or 3 or 4 described electrical networks; It is characterized in that: in the said step (1); Said engineering design evaluation unit comprises evaluation application module and evaluation controller; Said evaluation application module is according to the review result of the data message structure project of transmitting and converting electricity design demand that receives, and said evaluation application module is by said its work of evaluation controller control.
6. the method for the auxiliary project of transmitting and converting electricity design review of the holographic Digital Map System of electrical network as claimed in claim 5 is characterized in that: said evaluation application module is used for engineering corridor topography and geomorphology displaying completely, engineering information is play, checks the engineering hot information, checks thematic map, checked the engineering electronic record.
CN2012100498836A 2012-02-29 2012-02-29 Power transmission project design review method assisted by grid holographic digital map system Pending CN102663826A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012100498836A CN102663826A (en) 2012-02-29 2012-02-29 Power transmission project design review method assisted by grid holographic digital map system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012100498836A CN102663826A (en) 2012-02-29 2012-02-29 Power transmission project design review method assisted by grid holographic digital map system

Publications (1)

Publication Number Publication Date
CN102663826A true CN102663826A (en) 2012-09-12

Family

ID=46773302

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012100498836A Pending CN102663826A (en) 2012-02-29 2012-02-29 Power transmission project design review method assisted by grid holographic digital map system

Country Status (1)

Country Link
CN (1) CN102663826A (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103000076A (en) * 2012-11-23 2013-03-27 山东电力集团公司 Aerial phone map displaying method meeting power distribution real-time monitoring
CN103065040A (en) * 2012-12-14 2013-04-24 福建省电力有限公司 Computer construction method of medium-voltage distribution network power supply framework
CN103399973A (en) * 2013-06-20 2013-11-20 广东电网公司电力科学研究院 Device and method for automatically comparing power grid pollution area maps
CN104657563A (en) * 2015-03-10 2015-05-27 阳光电源股份有限公司 Intelligent design platform and intelligent design method of photovoltaic power station
CN107730218A (en) * 2017-11-20 2018-02-23 广东电网有限责任公司电网规划研究中心 A kind of power transformation result of design display platform operation system
CN110427675A (en) * 2019-07-23 2019-11-08 江西博微新技术有限公司 A kind of data detection method for three dimensional design evaluation
CN111401862A (en) * 2020-04-26 2020-07-10 国网江苏省电力有限公司 Method and system for power grid engineering three-dimensional design review
CN113792436A (en) * 2021-09-17 2021-12-14 国网福建省电力有限公司 Power transmission and transformation project design review system and method based on GIM model
CN115166211A (en) * 2022-09-08 2022-10-11 北京江河惠远科技有限公司 Automatic calculation method and system for all-terrain soil erosion modulus of power transmission line

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101908232A (en) * 2010-07-30 2010-12-08 重庆埃默科技有限责任公司 Interactive scene simulation system and scene virtual simulation method
CN101944204A (en) * 2010-09-10 2011-01-12 北京恒华伟业科技股份有限公司 Geographic information system applied to power system and method for improving display efficiency thereof

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101908232A (en) * 2010-07-30 2010-12-08 重庆埃默科技有限责任公司 Interactive scene simulation system and scene virtual simulation method
CN101944204A (en) * 2010-09-10 2011-01-12 北京恒华伟业科技股份有限公司 Geographic information system applied to power system and method for improving display efficiency thereof

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103000076A (en) * 2012-11-23 2013-03-27 山东电力集团公司 Aerial phone map displaying method meeting power distribution real-time monitoring
CN103065040B (en) * 2012-12-14 2016-01-20 福建省电力有限公司 The computing machine construction method of middle voltage distribution networks construction for electricity
CN103065040A (en) * 2012-12-14 2013-04-24 福建省电力有限公司 Computer construction method of medium-voltage distribution network power supply framework
CN103399973A (en) * 2013-06-20 2013-11-20 广东电网公司电力科学研究院 Device and method for automatically comparing power grid pollution area maps
CN103399973B (en) * 2013-06-20 2015-06-10 广东电网公司电力科学研究院 Device and method for automatically comparing power grid pollution area maps
CN104657563B (en) * 2015-03-10 2017-08-25 阳光电源股份有限公司 The intelligentized design platform and its intellectualized design method of a kind of photovoltaic plant
CN104657563A (en) * 2015-03-10 2015-05-27 阳光电源股份有限公司 Intelligent design platform and intelligent design method of photovoltaic power station
CN107730218A (en) * 2017-11-20 2018-02-23 广东电网有限责任公司电网规划研究中心 A kind of power transformation result of design display platform operation system
CN110427675A (en) * 2019-07-23 2019-11-08 江西博微新技术有限公司 A kind of data detection method for three dimensional design evaluation
CN110427675B (en) * 2019-07-23 2023-01-03 江西博微新技术有限公司 Data detection method for three-dimensional design review
CN111401862A (en) * 2020-04-26 2020-07-10 国网江苏省电力有限公司 Method and system for power grid engineering three-dimensional design review
CN111401862B (en) * 2020-04-26 2022-09-02 国网江苏省电力有限公司 Method and system for power grid engineering three-dimensional design review
CN113792436A (en) * 2021-09-17 2021-12-14 国网福建省电力有限公司 Power transmission and transformation project design review system and method based on GIM model
CN115166211A (en) * 2022-09-08 2022-10-11 北京江河惠远科技有限公司 Automatic calculation method and system for all-terrain soil erosion modulus of power transmission line

Similar Documents

Publication Publication Date Title
CN102663826A (en) Power transmission project design review method assisted by grid holographic digital map system
CN102509330B (en) Application of virtual three-dimensional system of transformer substation on the basis of electric power geographic information system (GIS)
CN106802993B (en) A kind of operation of the electric network swim under three-dimensional scenic shows method
CN109214653A (en) B, C class region medium voltage network planning and designing platform based on three-dimensional live
CN102760255B (en) Underground electric network data management and Electric Power Network Planning system and management method
CN105938613A (en) BIM (building information modeling) and VR (virtual reality)-based smart city pipeline network integrated platform, management method thereof and construction method
CN103810753A (en) Method for visually showing power grid dispatching businesses
CN103093008A (en) System and method for power transmission and transformation project three-dimensional-aided preliminary design
CN104537573A (en) Power grid operation information panoramic visualized display system
CN104166892A (en) Engineering management and control method and system based on three-dimensional design system
CN104077667A (en) Digital campus integrated application system based on two-dimensional and three-dimensional integration
CN104899922A (en) Three-dimensional holographic generation method for intelligent power grid visualization application
CN104951994A (en) GIS-based comprehensive display method and system of distribution network production special topic view
CN105069100A (en) Power network geographic information system (GIS) based mobile terminal collaborative plotting method
CN103064895A (en) Communication source management system computer generating method based on Geographic Information System (GIS)
CN111540046B (en) Virtual reality-based power transmission channel simulation method
CN206021354U (en) One kind is based on BIM and VR smart cities pipeline coordination platform
Ajwaliya et al. Web-GIS based application for utility management system
CN105808662A (en) Three-dimensional virtual technology-based power grid facility layout planning result visualization method
CN105553114B (en) Four-dimensional digital sand table system and power monitoring method
CN102419911A (en) Newspaper report commanding and dispatching management system based on GIS (Geographic information system)
CN105868209A (en) Method and system capable of combining power information and geographic information of smart power grid
CN107169791A (en) Preview marketing system and method before a kind of travel agency's row
Alausa et al. Leveraging Geospatial Technology for Enhanced Utility Management: A Case Study in Electrical Distribution Power Systems
CN103513617A (en) Electronic display screen and large loudspeaker control system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20120912