CN206021354U - One kind is based on BIM and VR smart cities pipeline coordination platform - Google Patents

One kind is based on BIM and VR smart cities pipeline coordination platform Download PDF

Info

Publication number
CN206021354U
CN206021354U CN201620645324.5U CN201620645324U CN206021354U CN 206021354 U CN206021354 U CN 206021354U CN 201620645324 U CN201620645324 U CN 201620645324U CN 206021354 U CN206021354 U CN 206021354U
Authority
CN
China
Prior art keywords
management
bim
monitoring device
control valve
model
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620645324.5U
Other languages
Chinese (zh)
Inventor
张壮飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
XIAMEN RUICHUANG ENERGY SAVING TECHNOLOGY Co.,Ltd.
Original Assignee
Rui Chuang (tangshan) Ecological Building Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Rui Chuang (tangshan) Ecological Building Technology Co Ltd filed Critical Rui Chuang (tangshan) Ecological Building Technology Co Ltd
Priority to CN201620645324.5U priority Critical patent/CN206021354U/en
Application granted granted Critical
Publication of CN206021354U publication Critical patent/CN206021354U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Arrangements For Transmission Of Measured Signals (AREA)
  • Alarm Systems (AREA)

Abstract

This utility model discloses a kind of based on BIM and VR smart cities pipeline coordination platform, including monitoring device, management and control valve, BIM center service platforms and VR interactive display equipment, the monitoring device is deployed in the crucial monitoring position of urban pipe network, management and control valve portion is deployed on the crucial management and control position of urban pipe network, BIM center service platforms are made up of storage server and management and control devices, storage server internal memory contains three-dimensional true City scenarios model data, and three-dimensional true City scenarios model data includes monitoring device model corresponding with monitoring device and management and control valve and management and control valve model;Monitoring device and management and control valve are connected with the storage server and management and control devices of BIM center service platforms respectively;The VR interactive displays equipment is connected with center service platform so as to can carry out information exchange with BIM center service platforms.This utility model realizes the monitoring and management and control to urban pipe network by three-dimensional true City scenarios models coupling VR VR-Platforms, to improve management and control efficiency and promptness, reduces human and material resources cost.

Description

One kind is based on BIM and VR smart cities pipeline coordination platform
Technical field
This utility model is related to urban pipe network monitoring technology field, more particularly to a kind of based on BIM and VR smart cities pipe Net comprehensive platform.
Background technology
City Buried Pipeline is always city " blood vessel " and " nerve ", and underground utilities are related to feedwater, rainwater, sewage, combustion More than the ten kinds of underground utilities such as gas, electric power, street lamp, cable television, industry, define a complicated underground utilities network (That is urban pipe network), traditional two-dimentional way to manage is difficult to the space for accurately, intuitively explicitly descending power pipeline cross arrangement Position relationship.
" digital city "(digital city)It is to be with computer technology, multimedia technology and Mass storage technology Basis, with broadband network as tie, with skills such as remote sensing, global positioning system, GIS-Geographic Information System, remote measurement, emulation-virtuality Art, the three-dimensional description for carrying out multiresolution, multiple dimensioned, multi-space and multiple types to city, i.e., using Information Technology Methods city The full content in the past in city, present situation and future is digitized Virtual Realization on network.Three-dimensional is incorporated in digital city Pipe network, i.e. combining geographic information system(GIS)Technology, database technology and 3-D technology, the space for showing underground utilities directly perceived Level and position, with buried depth, material, shape, trend and work well construction and periphery that emulation mode image represents underground utilities Environment, is very easy to the lookup of the information such as comb, work well occupancy situation, position, is underground electric line resource from now on Plan as a whole to utilize and science layout, pipeline take the work such as examination & approval and provide accurate, directly perceived, efficient reference.
But, current urban pipe network system for the data modeling of monitoring and can only be input into digital city model display, In the integrated management work of urban pipe network, in the design of pipe networks construction stage, need according to pipeline designs parameter(Including absolute altitude, chi Very little, model etc.)Construction and material production are managed, in the operation management stage, need to enter the operation conditions of urban pipe network Row monitoring and management and control in real time, its means is monitored to each pipeline state generally by monitoring device, and passes through management and control Switch carries out on-off control to each pipeline, only cannot realize real-time monitoring and fast reaction management and control at present in the model of digital city Function.
In view of this, the present inventor proposes a kind of based on BIM and VR smart cities pipeline coordination platform.
Utility model content
The purpose of this utility model is to provide one kind based on BIM and VR smart cities pipeline coordination platform, and which passes through three Monitoring and management and control of the true City scenarios models coupling VR VR-Platforms realization to urban pipe network is tieed up, is applying for urban pipe network Work and operation management provide foundation.
To achieve these goals, the technical solution of the utility model is as follows:
One kind is based on BIM and VR smart cities pipeline coordination platform, puts down including monitoring device, management and control valve, BIM center services Platform and VR interactive display equipment, the monitoring device are deployed in the crucial monitoring position of urban pipe network, and management and control valve portion is deployed on city The crucial management and control position of pipe network, BIM center service platforms are made up of storage server and management and control devices, storage server memory storage There are three-dimensional true City scenarios model data, three-dimensional true City scenarios model data to include and monitoring device and management and control valve pair The monitoring device model that answers and management and control valve model;Monitoring device and management and control valve storage service respectively with BIM center service platforms Device and management and control devices connection;The VR interactive displays equipment is connected with center service platform so as to BIM center service platform energy Information exchange is enough carried out.
The monitoring device includes water quality monitoring equipment, tube water level monitoring equipment, gas leakage testing equipment and leakage Pyroelectric monitor equipment.
VR interactive display equipment includes data transmit-receive module, display screen and instruction input module, the instruction input module For a key-press input plate, data transmit-receive module is connected with BIM center service platforms by wirelessly or non-wirelessly network.
After using such scheme, operation principle of the present utility model is:In BIM center service platforms of the present utility model Storage server is managed collectively to three-dimensional true City scenarios model data, the management and control devices in BIM center service platforms Then obtain the Monitoring Data of monitoring device and processed, three-dimensional true City scenarios model data include with monitoring device and Therefore Monitoring Data can be embodied on model, then by the corresponding monitoring device model of management and control valve and management and control valve model Again can be by model data(It is usually some light weighed model data corresponding with model)Set by being sent to VR interactive displays Standby realization visualization, operator check model in VR interactive display equipment, you can know the state of current urban pipe network, then Process instruction is assigned by management and control devices to management and control valve, realize quick response and control to urban pipe network.
Therefore, this utility model combines BIM and VR, and BIM models and digital city are blended in one, is incorporated by VR friendships Mutually presentation device intuitively shows urban pipe network running status and its situation of change, greatly reduce urban pipe network problem investigation when Between and problem response time, reduce the consume of human and material resources, make urban pipe network problem in safety precautionss state, compare Conventional digital city, substantially reduces the generation of urban pipe network problem.
This utility model is described further below in conjunction with the drawings and specific embodiments.
Description of the drawings
Fig. 1 is structural representation of the present utility model.
Specific embodiment
As shown in figure 1, one kind that this utility model is disclosed is based on BIM and VR smart cities pipeline coordination platform, including prison Measurement equipment 1, management and control valve 2, BIM center service platforms 3 and VR interactive displays equipment 4, the monitoring device 1 is deployed in urban pipe network Crucial monitoring position, management and control valve 2 is deployed in the crucial management and control position of urban pipe network, and BIM center service platforms 3 are by storage service Device 31 and management and control devices 32 are constituted, and 31 internal memory of storage server contains three-dimensional true City scenarios model data, three-dimensional true city City's scene model data includes monitoring device model corresponding with monitoring device and management and control valve and management and control valve model;Monitoring device 1 and management and control valve 2 be connected with the storage server 31 and management and control devices 32 of BIM center service platforms respectively;The VR interactive displays Equipment 4 is connected with center service platform 3 so as to can carry out information exchange with BIM center service platforms.
The monitoring device 1 includes water quality monitoring equipment, tube water level monitoring equipment, gas leakage testing equipment and leakage Pyroelectric monitor equipment.
VR interactive displays equipment 4 includes data transmit-receive module, display screen and instruction input module, the instruction input module For a key-press input plate, data transmit-receive module is connected with BIM center service platforms by wirelessly or non-wirelessly network.
After using such scheme, operation principle of the present utility model is:In BIM center service platforms 3 of the present utility model The true City scenarios model data of 31 pairs of three-dimensionals of storage server be managed collectively, the management and control in BIM center service platforms Equipment then obtains the Monitoring Data of monitoring device and is processed, and three-dimensional true City scenarios model data is included and set with monitoring Therefore Monitoring Data can be embodied on model by the standby and corresponding monitoring device model of management and control valve and management and control valve model, Then again can be by model data(It is usually some light weighed model data corresponding with model)Exhibition is interacted by being sent to VR Show that equipment realizes that visualization, operator check model in VR interactive display equipment, you can know the state of current urban pipe network, Then process instruction is assigned by management and control devices to management and control valve, realize quick response and control to urban pipe network.
Therefore, this utility model combines BIM and VR, and BIM models and digital city are blended in one, is incorporated by VR friendships Mutually presentation device intuitively shows urban pipe network running status and its situation of change, greatly reduce urban pipe network problem investigation when Between and problem response time, reduce the consume of human and material resources, make urban pipe network problem in safety precautionss state, compare Conventional digital city, substantially reduces the generation of urban pipe network problem.
Specific embodiment of the utility model is these are only, not the restriction to protection domain of the present utility model.All according to The equivalent variations done by the mentality of designing of this case, each fall within the protection domain of this case.

Claims (3)

1. a kind of based on BIM and VR smart cities pipeline coordination platform, it is characterised in that including monitoring device, management and control valve, BIM Center service platform and VR interactive display equipment, the monitoring device are deployed in the crucial monitoring position of urban pipe network, management and control valve The crucial management and control position of urban pipe network is deployed in, BIM center service platforms are made up of storage server and management and control devices, storage clothes Business device internal memory contains three-dimensional true City scenarios model data, and three-dimensional true City scenarios model data is included and monitoring device With the corresponding monitoring device model of management and control valve and management and control valve model;Monitoring device and management and control valve respectively with BIM center service platforms Storage server and management and control devices connection;The VR interactive displays equipment is connected with center service platform so as to BIM centers Service platform can carry out information exchange.
2. as claimed in claim 1 a kind of based on BIM and VR smart cities pipeline coordination platform, it is characterised in that:The prison Measurement equipment includes water quality monitoring equipment, tube water level monitoring equipment, gas leakage testing equipment and electric leakage monitoring device.
3. as claimed in claim 1 a kind of based on BIM and VR smart cities pipeline coordination platform, it is characterised in that:VR is interacted Presentation device includes data transmit-receive module, display screen and instruction input module, and the instruction input module is a key-press input plate, Data transmit-receive module is connected with BIM center service platforms by wirelessly or non-wirelessly network.
CN201620645324.5U 2016-06-27 2016-06-27 One kind is based on BIM and VR smart cities pipeline coordination platform Active CN206021354U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620645324.5U CN206021354U (en) 2016-06-27 2016-06-27 One kind is based on BIM and VR smart cities pipeline coordination platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620645324.5U CN206021354U (en) 2016-06-27 2016-06-27 One kind is based on BIM and VR smart cities pipeline coordination platform

Publications (1)

Publication Number Publication Date
CN206021354U true CN206021354U (en) 2017-03-15

Family

ID=58242973

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620645324.5U Active CN206021354U (en) 2016-06-27 2016-06-27 One kind is based on BIM and VR smart cities pipeline coordination platform

Country Status (1)

Country Link
CN (1) CN206021354U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107194861A (en) * 2017-07-02 2017-09-22 四川藏区高速公路有限责任公司 A kind of road network operation comprehensive monitoring management platform and method based on 3DGIS+BIM
CN108629037A (en) * 2018-05-11 2018-10-09 河南工业和信息化职业学院 A kind of smart city service platform and its management method
CN109067822A (en) * 2018-06-08 2018-12-21 珠海欧麦斯通信科技有限公司 The real-time mixed reality urban service realization method and system of on-line off-line fusion
CN110820890A (en) * 2019-11-26 2020-02-21 深圳市奥城景观工程设计有限公司 Water-saving landscape rainwater is collected and water recycling system

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107194861A (en) * 2017-07-02 2017-09-22 四川藏区高速公路有限责任公司 A kind of road network operation comprehensive monitoring management platform and method based on 3DGIS+BIM
CN107194861B (en) * 2017-07-02 2020-11-06 四川藏区高速公路有限责任公司 Road network operation comprehensive monitoring management platform and method based on 3DGIS + BIM
CN108629037A (en) * 2018-05-11 2018-10-09 河南工业和信息化职业学院 A kind of smart city service platform and its management method
CN109067822A (en) * 2018-06-08 2018-12-21 珠海欧麦斯通信科技有限公司 The real-time mixed reality urban service realization method and system of on-line off-line fusion
CN110820890A (en) * 2019-11-26 2020-02-21 深圳市奥城景观工程设计有限公司 Water-saving landscape rainwater is collected and water recycling system

Similar Documents

Publication Publication Date Title
CN105938613B (en) Intelligent city pipe network comprehensive platform based on BIM and VR and management method and construction method thereof
Ham et al. Participatory sensing and digital twin city: Updating virtual city models for enhanced risk-informed decision-making
CN103837796B (en) The transmission line malfunction visualization report method of a kind of sing on web and GIS and system
CN206021354U (en) One kind is based on BIM and VR smart cities pipeline coordination platform
CN106595565A (en) BIM-based intelligent monitoring system
CN106710001A (en) Substation inspection robot based centralized monitoring and simulation system and method thereof
CN105447766A (en) Three-dimensional power-grid weather-information panoramic display method based on GIS and system thereof
CN103646091B (en) A kind of generation method and device of grid graph data
CN103810753A (en) Method for visually showing power grid dispatching businesses
CN107292989A (en) High-voltage power transmission inspection system based on 3DGIS technology
CN102509330A (en) Application of virtual three-dimensional system of transformer substation on the basis of electric power geographic information system (GIS)
CN103778566A (en) Heat-engine plant monitoring and measuring method based on three-dimensional visualization demonstration
CN109857819B (en) Global energy geography multimedia interactive display system
CN107544380A (en) One kind is based on virtual reality technology transformer station panorama intelligent tickets system
CN105741340B (en) A kind of transmission line of electricity three-dimensional scenic emulation mode and system for web page display
Chen et al. Data visualization in smart grid and low‐carbon energy systems: A review
CN117977586B (en) Power failure early warning method and device based on three-dimensional digital twin model and electronic equipment
CN103049640A (en) Power grid multi-state and multi-dimensional display control method based on geographic information system
KR20230166545A (en) System, apparatus and method for management of energy source
Liu et al. Integration of Building Information Modelling (BIM) and sensor technology: a review of current developments and future outlooks
CN116826970A (en) Source network charge storage type intelligent park integrated management system based on BIM, GIS and IOT technologies
KR102359512B1 (en) Apparatus for providing integrated information on energy facilities of smart city and method thereof
Gao et al. Research on integrated management platform of smart park based on CIM
CN105868209A (en) Method and system capable of combining power information and geographic information of smart power grid
Moraes et al. Towards a simulator for green smart campus systems

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20200511

Address after: 361006 23 / F, 266 Lujiang Road, Siming District, Xiamen City, Fujian Province

Patentee after: XIAMEN RUICHUANG ENERGY SAVING TECHNOLOGY Co.,Ltd.

Address before: 063000 Hebei Province, Tangshan City Caofeidian Industrial Zone equipment manufacturing park

Patentee before: RUICHUANG (TANGSHAN) ECOLOGICAL BUILDING TECHNOLOGY Co.,Ltd.

TR01 Transfer of patent right