CN102660938A - Support structure of hydraulic hoist for open-top type arc gate - Google Patents

Support structure of hydraulic hoist for open-top type arc gate Download PDF

Info

Publication number
CN102660938A
CN102660938A CN201210165818XA CN201210165818A CN102660938A CN 102660938 A CN102660938 A CN 102660938A CN 201210165818X A CN201210165818X A CN 201210165818XA CN 201210165818 A CN201210165818 A CN 201210165818A CN 102660938 A CN102660938 A CN 102660938A
Authority
CN
China
Prior art keywords
downstream
concrete layer
stage concrete
backing plate
upstream side
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201210165818XA
Other languages
Chinese (zh)
Other versions
CN102660938B (en
Inventor
行少阜
陈丽晔
杨光
陈霞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yellow River Engineering Consulting Co Ltd
Original Assignee
Yellow River Engineering Consulting Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yellow River Engineering Consulting Co Ltd filed Critical Yellow River Engineering Consulting Co Ltd
Priority to CN201210165818.XA priority Critical patent/CN102660938B/en
Publication of CN102660938A publication Critical patent/CN102660938A/en
Application granted granted Critical
Publication of CN102660938B publication Critical patent/CN102660938B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Barrages (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a support structure of a hydraulic hoist for an open-top type arc gate, comprising concrete corbels arranged at an upstream side and a downward side on the sidewall of a gate pier, wherein support steel beams are arranged on the top surfaces of the concrete corbels at the upstream side and the downward side, and hydraulic cylinder hinge shafts are arranged on the support steel beams close to downstream ends; a plurality of embedded insertion ribs and embedded anchoring bolts are vertically arranged in a first-stage concrete layer and a second-stage concrete layer of the concrete corbels at the upstream side and the downward side, and the plurality of embedded insertion ribs are welded and fixed with an adjusted cushion plate at the upstream side before the second-stage concrete layer is cast; and grooves are arranged on the upper surface of a cushion plate at the downward side, shear-resistant cushion blocks higher than the groove openings of the grooves are installed in the grooves, connection plates are welded on the lower surfaces of the downward ends of the support steel beams, lower open grooves adaptive to the shear-resistant cushion blocks in shape are arranged on the lower surfaces of the connection plates, and the downstream ends of the support steel beams are clipped to the shear-resistant cushion blocks via the lower open grooves. The support structure disclosed by the invention has the advantage of reducing the deformation of a hinge seat of the hydraulic hoist and the adverse influence on the hoisting process of the arc gate caused by the deflection of the hinge seat.

Description

The braced structures of extended-top type arc door hydraulic hoist
Technical field
The present invention relates to be applied to the extended-top type arc door hydraulic hoist in the Hydraulic and Hydro-Power Engineering, especially relate to the braced structures of extended-top type arc door hydraulic hoist.
Background technology
In Hydraulic and Hydro-Power Engineering, for satisfying the dam flood-discharge requirement, the wide and height of extended-top type Segment gate port size than many >=1.Therefore, the two suspension centre hydraulic hoists that adopt two hydraulic cylinders to form are controlled the opening and closing of Segment gate more.Conventional extended-top type arc door hydraulic hoist arrange supporting form adopt with two hydraulic cylinders following hang head respectively with gate on two suspension centres is connected, the upper hoisting head of two hydraulic cylinders hangs on respectively and is embedded in the interior hydraulic cylinder of both sides gate pier and props up on the free bearing.Though the layout supporting form of this hydraulic hoist can adapt to the hydraulic hoist design feature and the installation specification of conventional hoisting capacity capacity; (then there is following drawback in hoisting capacity>2500kN): at first but for the large hydraulic headstock gear; The physical dimension of large hydraulic headstock gear hydraulic cylinder is bigger; Two hydraulic cylinders prop up free bearing, and to stretch out the gate pier sidewall respectively longer; The deadweight and the Qi Menli that add hydraulic cylinder are bigger, and the part distortion that overhangs that causes hydraulic cylinder to prop up free bearing causes amount of deflection to increase, and causes hydraulic cylinder to prop up free bearing virtual center value deviation theory central value; Secondly; There is the installation accuracy requirement at the hinge center that two hydraulic cylinders of extended-top type Segment gate hydraulic hoist prop up free bearing; Because two hydraulic cylinders prop up free bearing and are embedded in respectively in the gate pier of both sides; Can't carry out the secondary adjustment to the deviation that its hinge center occurs after the concrete pouring; A hinge centre-height difference that causes two hydraulic cylinders to prop up free bearing is difficult to guarantee to satisfy at ± 0.5mm and is no more than ± 2mm (" manufacturing installation of Hydraulic and Hydro-Power Engineering headstock gear and standards of acceptance " be the regulation of 7.4.2 (SL381-2007)) with the distance of actual lifting center line with interior, cross central line, causes adverse effect to the even running and the twin-tub Synchronization Control of extended-top type arc door hydraulic hoist.Simultaneously; Since hydraulic cylinder prop up free bearing overhang the part increase; Certainly will to increase hydraulic cylinder and prop up the pre-buried length of free bearing in gate pier; Therefore gate pier need have enough width adequate hydraulic cylinders to prop up the structure needs of free bearing, and this has just limited the orifice number and the gate port size of dam flood-discharge building, and the increasing of gate pier thickness has also increased the engineering quantity and the cost of hydraulic structure.
Summary of the invention
The object of the invention is to provide that a kind of installation accuracy is high, the braced structures of the extended-top type arc door hydraulic hoist of long service life.
For realizing above-mentioned purpose, the present invention takes following technical proposals:
The braced structures of extended-top type arc door hydraulic hoist according to the invention comprises the upstream and downstream side concrete bracket that is arranged on the gate pier sidewall; Side concrete bracket end face is provided with the support girder steel in said upstream and downstream, on said support girder steel, is provided with hydraulic cylinder near downstream and props up hinge;
Said upstream side concrete bracket is made up of fist stage concrete layer and second stage concrete layer from bottom to top; In upstream side concrete bracket one, second stage concrete layer, be vertically installed with many pre-buried joint bars and pre-buried anchor bolt; Said pre-buried anchor bolt passes the upstream side backing plate that is embedded in the second stage concrete laminar surface and extends outside the second stage concrete layer and support the girder steel upstream extremity and be connected through hold-down nut; The pre-buried anchor bolt that is positioned at below the upstream side backing plate is provided with adjusting nut, and said many pre-buried joint bars are fixed with the welding of adjusted upstream side backing plate before the cast of second stage concrete layer;
Said downstream concrete bracket is made up of fist stage concrete layer and second stage concrete layer from bottom to top; In downstream concrete bracket one, second stage concrete layer, be vertically installed with many pre-buried joint bars and pre-buried anchor bolt, said pre-buried anchor bolt passes the downstream backing plate that is embedded in the second stage concrete laminar surface and extends outside the second stage concrete layer and through hold-down nut and be connected with the downstream backing plate; The pre-buried anchor bolt that is positioned at below the backing plate of downstream is provided with adjusting nut; The backing plate upper surface offers groove in said downstream; In said groove, be mounted with the shearing resistance cushion block that exceeds the groove notch; Be welded with junction plate at support girder steel downstream soffit; Offer the down-open recess that adapts with said shearing resistance cushion block shape at said junction plate soffit, support the girder steel downstream and snap onto on the shearing resistance cushion block through said down-open recess, said many pre-buried joint bars and the welding of downstream backing plate are fixing before the cast of second stage concrete layer.
The invention has the advantages that reducing hydraulic hoist props up free bearing distortion and amount of deflection thereof to the adverse effect of Segment gate opening-closing process, is convenient to install and adjust two hydraulic cylinders more and props up the free bearing positional precision to satisfy the service requirement of twin-tub synchronous opening/closing Segment gate.
Description of drawings
Fig. 1 is a structural representation of the present invention.
Fig. 2 is the A portion structure for amplifying sketch map of Fig. 1.
Fig. 3 is the B portion structure for amplifying sketch map of Fig. 1.
Fig. 4 is that the present invention is arranged in the structural representation on the gate pier.
The specific embodiment
Shown in Fig. 1-4, the braced structures of extended-top type arc door hydraulic hoist according to the invention comprises the upstream and downstream side concrete bracket 2,3 that is arranged on gate pier 1 sidewall; Side concrete bracket 2,3 end faces are provided with and support girder steel 4 in said upstream and downstream, on said support girder steel 4, are provided with hydraulic cylinder near downstream and prop up hinge 21;
Said upstream side concrete bracket 2 is made up of fist stage concrete layer 5 and second stage concrete layer 6 from bottom to top; In upstream side concrete bracket 2 one, second stage concrete layer 5,6, be vertically installed with many pre-buried joint bars 7 and pre-buried anchor bolt 8; Said pre-buried anchor bolt 8 passes the upstream side backing plates 9 that are embedded in second stage concrete layer 6 surface and extends outside the second stage concrete layer 6 and support girder steel 4 upstream extremities and be connected through hold-down nut 10; Be positioned at upstream side backing plate 9 following pre-buried anchor bolts 8 and be provided with adjusting nut 11; Be used for before 6 cast of second stage concrete layer, adjusting upstream side backing plate 9 levelnesss and guaranteeing that the actual elevation and the theoretical elevation that support girder steel 4 installed surfaces match, said many pre-buried joint bars 7 are fixed with adjusted upstream side backing plate 9 welding;
Said downstream concrete bracket 3 is made up of fist stage concrete layer 12 and second stage concrete layer 13 from bottom to top; In downstream concrete bracket 3 one, second stage concrete layer 12,13, be vertically installed with many pre-buried joint bars 14 and pre-buried anchor bolt 15, said pre-buried anchor bolt 15 passes the downstream backing plates 16 that are embedded in second stage concrete layer 13 surface and extends outside the second stage concrete layer 13 and through hold-down nut 17 and be connected with downstream backing plate 16; Be positioned at downstream backing plate 16 following pre-buried anchor bolts 15 and be provided with adjusting nut 18; Be used for before 13 cast of second stage concrete layer, adjusting downstream backing plate 16 levelnesss and guaranteeing that the actual elevation and the theoretical elevation that support girder steel 4 installed surfaces match, said many pre-buried joint bars 14 are fixed with adjusted upstream side backing plate 16 welding; Backing plate 16 upper surfaces offer groove in said downstream; In said groove, be mounted with the shearing resistance cushion block 19 that exceeds the groove notch; Downstream soffit supporting girder steel 4 is welded with junction plate 20; Offer the down-open recess that adapts with said shearing resistance cushion block 19 shapes at said junction plate 20 soffits, support girder steel 4 downstream and snap onto on the shearing resistance cushion block 19 through said down-open recess.

Claims (1)

1. the braced structures of an extended-top type arc door hydraulic hoist comprises the upstream and downstream side concrete brackets (2,3) that are arranged on gate pier (1) sidewall; It is characterized in that: be provided with at said upstream and downstream side concrete brackets (2,3) end face and support girder steel (4), upward being provided with hydraulic cylinder near downstream props up hinge (21) at said support girder steel (4);
Said upstream side concrete bracket (2) is made up of fist stage concrete layer (5) and second stage concrete layer (6) from bottom to top; In upstream side concrete bracket (2), second stage concrete layer (5,6), be vertically installed with many pre-buried joint bars (7) and pre-buried anchor bolt (8); Said pre-buried anchor bolt (8) passes the upstream side backing plate (9) that is embedded in second stage concrete layer (6) surface and extends outside the second stage concrete layer (6) and support girder steel (4) upstream extremity and be connected through hold-down nut (10); Be positioned at the following pre-buried anchor bolt (8) of upstream side backing plate (9) and be provided with adjusting nut (11), said pre-buried joint bar (7) and upstream side backing plate (9) welding are fixing;
Said downstream concrete bracket (3) is made up of fist stage concrete layer (12) and second stage concrete layer (13) from bottom to top; In downstream concrete bracket (3), second stage concrete layer (12,13), be vertically installed with many pre-buried joint bars (14) and pre-buried anchor bolt (15), said pre-buried anchor bolt (15) passes the downstream backing plate (16) that is embedded in second stage concrete layer (13) surface and extends outside the second stage concrete layer (13) and be connected with downstream backing plate (16) through hold-down nut (17); Be positioned at the following pre-buried anchor bolt (15) of downstream backing plate (16) and be provided with adjusting nut (18); Backing plate (16) upper surface offers groove in said downstream; In said groove, be mounted with the shearing resistance cushion block (19) that exceeds the groove notch; Downstream soffit supporting girder steel (4) is welded with junction plate (20); Offer the down-open recess that adapts with said shearing resistance cushion block (19) shape at said junction plate (20) soffit; Support girder steel (4) downstream and snap onto on the shearing resistance cushion block (19) through said down-open recess, said pre-buried joint bar (14) and downstream backing plate (16) welding are fixing.
CN201210165818.XA 2012-05-25 2012-05-25 Support structure of hydraulic hoist for open-top type arc gate Active CN102660938B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210165818.XA CN102660938B (en) 2012-05-25 2012-05-25 Support structure of hydraulic hoist for open-top type arc gate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210165818.XA CN102660938B (en) 2012-05-25 2012-05-25 Support structure of hydraulic hoist for open-top type arc gate

Publications (2)

Publication Number Publication Date
CN102660938A true CN102660938A (en) 2012-09-12
CN102660938B CN102660938B (en) 2014-04-16

Family

ID=46770507

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210165818.XA Active CN102660938B (en) 2012-05-25 2012-05-25 Support structure of hydraulic hoist for open-top type arc gate

Country Status (1)

Country Link
CN (1) CN102660938B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114182694B (en) * 2021-12-27 2022-10-04 黄河水利委员会黄河水利科学研究院 Gate beam reinforcing and supporting device

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2913453Y (en) * 2006-06-30 2007-06-20 北京中水科海利工程技术有限公司 Gate frusta corbel pre-tensioned nondestructive reinforcing structure
KR20100077514A (en) * 2008-12-29 2010-07-08 주식회사 포스코플랜텍 Radial gate opening and shutting apparatus for floodgate
CN102322044A (en) * 2011-06-21 2012-01-18 中国葛洲坝集团股份有限公司 Method for mounting down-the-hole type arc gate embedded parts and water seals
CN102418329A (en) * 2011-08-24 2012-04-18 中国水利水电第五工程局有限公司 Rapid installation method for large-scale hydraulic radial gate
CN202577246U (en) * 2012-05-25 2012-12-05 黄河勘测规划设计有限公司 Support structure for open top type arc door hydraulic hoist

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2913453Y (en) * 2006-06-30 2007-06-20 北京中水科海利工程技术有限公司 Gate frusta corbel pre-tensioned nondestructive reinforcing structure
KR20100077514A (en) * 2008-12-29 2010-07-08 주식회사 포스코플랜텍 Radial gate opening and shutting apparatus for floodgate
CN102322044A (en) * 2011-06-21 2012-01-18 中国葛洲坝集团股份有限公司 Method for mounting down-the-hole type arc gate embedded parts and water seals
CN102418329A (en) * 2011-08-24 2012-04-18 中国水利水电第五工程局有限公司 Rapid installation method for large-scale hydraulic radial gate
CN202577246U (en) * 2012-05-25 2012-12-05 黄河勘测规划设计有限公司 Support structure for open top type arc door hydraulic hoist

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
梁献,张明: "百色水利枢纽溢流坝表孔弧形闸门设计", 《广西水利水电》 *

Also Published As

Publication number Publication date
CN102660938B (en) 2014-04-16

Similar Documents

Publication Publication Date Title
CN202577246U (en) Support structure for open top type arc door hydraulic hoist
CN105908629B (en) Downlink movable mould frame and its application method for combined highway and metro section highway box beam
CN105538484B (en) It is a kind of to be used to prevent U-shaped beam mould and the U-shaped beam preparation method for putting that tension stress destroys
CN203546583U (en) Box-inside horizontal reinforcing device of concrete box-cross-section multi-beam bridge
CN102677638B (en) Disposing and supporting method for top-exposed arc-door hydraulic hoist
CN102660938B (en) Support structure of hydraulic hoist for open-top type arc gate
CN210657970U (en) Adjusting device of bridge beam supports
CN205669313U (en) A kind of Universal adjustable hangs template system
CN112049148A (en) Construction method of high-fill super-thick weighing concrete retaining wall
CN209958213U (en) Bent cap construction support of column pier
CN111441251A (en) Construction method for folding steel box girder striding over existing steel girder
CN105863261A (en) Universally-adjustable suspension formwork system
CN105297643A (en) Method for replacing support of hollow slab type bridge
CN202865804U (en) Structure for preventing supporting articulation brackets from generating bevel angle cracks when installing arc-shaped gate
CN105480842B (en) Equipment support beam and its construction method are poured after one kind
CN211341746U (en) Novel cast-in-place slab band of assembled frame construction hangs mould device
CN110598250B (en) Method and system for optimizing bending moment distribution of continuous rigid frame bridge
CN203807946U (en) Track beam erecting device
CN102182320A (en) Method for mounting steel reinforced concrete steel skeleton of large metallurgical industry factory building
CN208718360U (en) A kind of cast-in-place linkage section mould plate supporting device of tool-type concrete folding plate
KR101121725B1 (en) Construction method for psc girder and slab with precast deck and bridge construction method using the same
CN207512618U (en) A kind of bridge construction bracing means
CN202185973U (en) Device for assisting dismounting and installing T beam formwork
CN211571215U (en) Basement recess pouring device
CN104532743A (en) Tower girder fixed-connection mechanism, corresponding cable-stayed bridge and building method of cable-stayed bridge

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 450003 Jinshui Road 109, Zhengzhou City, Henan Province

Patentee after: Yellow River Survey Planning and Design Research Institute Co., Ltd.

Address before: 450003 Jinshui Road 109, Zhengzhou City, Henan Province

Patentee before: Yellow River Engineering Consulting Co., Ltd.