CN202865804U - Structure for preventing supporting articulation brackets from generating bevel angle cracks when installing arc-shaped gate - Google Patents

Structure for preventing supporting articulation brackets from generating bevel angle cracks when installing arc-shaped gate Download PDF

Info

Publication number
CN202865804U
CN202865804U CN 201220525703 CN201220525703U CN202865804U CN 202865804 U CN202865804 U CN 202865804U CN 201220525703 CN201220525703 CN 201220525703 CN 201220525703 U CN201220525703 U CN 201220525703U CN 202865804 U CN202865804 U CN 202865804U
Authority
CN
China
Prior art keywords
steel plate
hinge bracket
installing
buried
arc
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201220525703
Other languages
Chinese (zh)
Inventor
符晓
汤暘
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hydrochina East China Engineering Corp
Original Assignee
Hydrochina East China Engineering Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hydrochina East China Engineering Corp filed Critical Hydrochina East China Engineering Corp
Priority to CN 201220525703 priority Critical patent/CN202865804U/en
Application granted granted Critical
Publication of CN202865804U publication Critical patent/CN202865804U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

The utility model relates to a structure for preventing supporting articulation brackets from generating bevel angle cracks when installing an arc-shaped gate, and aims to provide the structure for preventing the supporting articulation brackets from generating the bevel angle cracks when installing the arc-shaped gate in order to strengthen rigidity of concrete on the opposite-angle portions of a first-stage pre-buried steel plate of the supporting articulation brackets of the arc-shaped gate. The technical scheme is that the structure for preventing the supporting articulation brackets from generating the bevel angle cracks when installing the arc-shaped gate comprises the supporting articulation brackets connected on gate piers at two sides, wherein the arc-shaped gates are supported on the supporting articulation brackets, the first-stage pre-buried steel plate and foundation bolts are pre-buried on the supporting articulation brackets and are connected, a second-stage steel plate is welded on the first-stage pre-buried steel plate, and metal construction is arranged on the lower portion of the second-stage steel plate and is welded and fixed with the first-stage pre-buried steel plate and the second-stage pre-buried steel plate. The structure for preventing the supporting articulation brackets from generating the bevel angle cracks when installing the arc-shaped gate is characterized in that cracking-limiting steel plate is pre-buried on the opposite-angle positions of the first-stage pre-buried steel plate, wherein two sides of the cracking-limiting steel plate are welded with rebar, and the rebar is also pre-buried inside the concrete of the supporting articulation brackets. The structure for preventing the supporting articulation brackets from generating the bevel angle cracks when installing the arc-shaped gate is applied to hydraulic and hydroelectric engineering and the like.

Description

A kind of Segment gate that prevents props up the structure in hinge bracket generation crack, oblique angle when installing
Technical field
The utility model relates to a kind of Segment gate that prevents and props up the structure in hinge bracket generation crack, oblique angle when installing.Be applicable to Hydraulic and Hydro-Power Engineering etc.
Background technology
In Hydraulic and Hydro-Power Engineering, for the larger discharge orifice of head, Service gate generally adopts Segment gate, and Segment gate supports on a hinge bracket.Prop up the hinge bracket by embedding anchor bolts first phase steel plate, Segment gate is installed by the second stage of steel plate and first phase pre-embedded steel slab and is welded, and is hinged by stone bolt and radial gate support on the second stage of steel plate again.If the total water pressure of Segment gate is larger, a hinge bracket size and first phase pre-embedded steel slab size are also larger, and pre-embedded steel slab is subjected to concrete constraint corresponding also large.In the radial gate support hinge installation process, second phase steel plate and member thereof and a hinge bracket first phase pre-embedded steel slab weld together, owing to causing first phase pre-embedded steel slab temperature to raise during welding, the distortion of first phase pre-embedded steel slab is retrained by surrounding concrete, can produce larger stress, cause the stressed variation of concrete Shallow crack to occur, the crack generally occurs in four diagonal positions of first phase pre-embedded steel slab, extends with the miter angle direction, and particularly two diagonal positions of side more are prone to the crack near water.
Summary of the invention
The technical problems to be solved in the utility model is: for the problem of above-mentioned existence, provide a kind of Segment gate that prevents simple in structure, easy construction to prop up the structure in hinge bracket generation crack, oblique angle when installing, to strengthen position, radial gate support hinge bracket first phase pre-embedded steel slab diagonal angle concrete rigidity.
The technical scheme that the utility model adopts is: a kind of Segment gate that prevents props up the structure in hinge bracket generation crack, oblique angle when installing, comprise a hinge bracket that is connected on the gate pier of both sides, Segment gate supports on a hinge bracket, pre-buried first phase pre-embedded steel slab links to each other with stone bolt and both on the bracket cutting with scissors corresponding to propping up of Segment gate installation position, first phase pre-embedded steel slab surface and a hinge bracket flush, the second stage of steel plate of welding on the first phase pre-embedded steel slab, second phase steel plate bottom is provided with the hardware of fixing with first phase pre-embedded steel slab and the second stage of Plate Welding, it is characterized in that: the pre-buried limit in position, described first phase pre-embedded steel slab diagonal angle is split steel plate, this limit is split steel plate both sides welded reinforcement, and reinforcing bar is embedded in the concrete of hinge bracket section equally in advance.
Described limit is split steel plate and is rectangular in shape, two length of side 15cm, and thick 10mm, length of embedment is 20cm.
Described bar diameter 8mm, long 30cm, spacing 5cm, an end and limit are split Plate Welding, are embedded in advance in the concrete of hinge bracket.
The beneficial effects of the utility model are: the utility model can improve the arc door and prop up the concrete rigidity in hinge bracket position, first phase pre-embedded steel slab diagonal angle.
In the utility model between first phase pre-embedded steel slab and the second stage of steel plate weld seam welding carry out in certain sequence, and every weld seam weld interval 15min, temperature does not continue to raise when guaranteeing the pre-embedded steel slab welding, avoids producing the crack because the Plate Welding variations in temperature causes position, first phase pre-embedded steel slab diagonal angle to prop up the hinge bracket in the Segment gate installation process.
Description of drawings
Fig. 1 is structural representation of the present utility model.
Fig. 2 is sectional view of the present utility model.
The specific embodiment
As shown in Figure 1 and Figure 2, the present embodiment is that a kind of Segment gate that prevents props up the structure in hinge bracket generation crack, oblique angle when installing, be provided with a hinge bracket 2 at both sides gate pier 1, Segment gate supports on a hinge bracket 2, at pre-buried first phase pre-embedded steel slab 3 and the stone bolt 8 on the hinge bracket 2 that prop up corresponding to the Segment gate installation position, both link to each other, first phase pre-embedded steel slab 3 surfaces and a hinge bracket flush.In this example at position, first phase pre-embedded steel slab 3 diagonal angle pre-buried perpendicular type limit split steel plate 4, the perpendicular type limit is split steel plate 4 thick 10mm, two length of side 15cm, the dark 20cm of Transducers Embedded in Concrete.The perpendicular type limit is split two reinforcing bars 5 of steel plate 4 both sides welding, reinforcing bar 5 diameter 8mm, long 30cm, spacing 5cm.At the second stage of steel plate 6 of first phase pre-embedded steel slab 3 welding, stone bolt and radial gate support are hinged on the second stage of steel plate 6.Second phase steel plate 6 bottoms are provided with hardware 7, and this hardware and first phase pre-embedded steel slab 3 and the second stage of steel plate 6 are welded and fixed.
The concrete construction method of the present embodiment is as follows:
1, carry out first phase pre-embedded steel slab 3, limit split steel plate 4, reinforcing bar 5 and a hinge bracket reinforcing bar prefabricated, install;
2, cast hinge bracket 2 concrete;
3, carry out the second stage of steel plate 6 and hardware 7 welding, whole and first phase pre-embedded steel slab 3 is located, is welded again, as shown in Figure 1, the weld seam welding sequence is weld seam a → weld seam b → weld seam c → weld seam d → weld seam e → weld seam f → weld seam g → weld seam h, every weld seam weld interval 15min guarantees that steel billet temperature does not continue to raise.
Certainly, above-mentioned explanation is not limitation of the utility model, and the utility model also is not limited to above-mentioned giving an example; those skilled in the art; in scope of the present utility model, the variation of making, change and add or replace, all should belong to protection domain of the present utility model.

Claims (3)

1. one kind prevents that Segment gate from propping up the hinge bracket and producing the structure in crack, oblique angle when installing, comprise a hinge bracket (2) that is connected on the both sides gate pier (1), Segment gate supports on a hinge bracket (2), link to each other with stone bolt (8) and both at the upper pre-buried first phase pre-embedded steel slab (3) of a hinge bracket (2) corresponding to the Segment gate installation position, first phase pre-embedded steel slab (3) surface and hinge bracket (a 2) flush, the upper welding of first phase pre-embedded steel slab (3) the second stage of steel plate (6), second phase steel plate (6) bottom is provided with the hardware (7) that is welded and fixed with first phase pre-embedded steel slab (3) and the second stage of steel plate (6), it is characterized in that: the pre-buried limit in described first phase pre-embedded steel slab (3) position, diagonal angle is split steel plate (4), this limit is split steel plate (4) both sides welded reinforcements (5), and reinforcing bar (5) is embedded in the concrete of hinge bracket (2) equally in advance.
2. the Segment gate that prevents according to claim 1 props up the structure in hinge bracket generation crack, oblique angle when installing, and it is characterized in that: described limit is split steel plate (4) and is rectangular in shape, two length of side 15cm, and thick 10mm, length of embedment is 20cm.
3. the Segment gate that prevents according to claim 1 props up the structure in hinge bracket generation crack, oblique angle when installing, it is characterized in that: described reinforcing bar (5) diameter 8mm, long 30cm, spacing 5cm, one end and limit are split steel plate (4) welding, are embedded in advance in the concrete of hinge bracket (2).
CN 201220525703 2012-10-15 2012-10-15 Structure for preventing supporting articulation brackets from generating bevel angle cracks when installing arc-shaped gate Expired - Lifetime CN202865804U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220525703 CN202865804U (en) 2012-10-15 2012-10-15 Structure for preventing supporting articulation brackets from generating bevel angle cracks when installing arc-shaped gate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220525703 CN202865804U (en) 2012-10-15 2012-10-15 Structure for preventing supporting articulation brackets from generating bevel angle cracks when installing arc-shaped gate

Publications (1)

Publication Number Publication Date
CN202865804U true CN202865804U (en) 2013-04-10

Family

ID=48032535

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220525703 Expired - Lifetime CN202865804U (en) 2012-10-15 2012-10-15 Structure for preventing supporting articulation brackets from generating bevel angle cracks when installing arc-shaped gate

Country Status (1)

Country Link
CN (1) CN202865804U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103469771A (en) * 2013-09-26 2013-12-25 江苏省水利机械制造有限公司 Segmented mounting method for large-sized goggles gate
CN104099907A (en) * 2014-07-17 2014-10-15 黄河勘测规划设计有限公司 Construction method for articulated gate shoe of pull rod of fan-shaped reinforcing steel bar penetrating arc door of gate pier
CN106223271A (en) * 2016-07-27 2016-12-14 中国葛洲坝集团第工程有限公司 Radial gate support hinge installation of embedded parts method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103469771A (en) * 2013-09-26 2013-12-25 江苏省水利机械制造有限公司 Segmented mounting method for large-sized goggles gate
CN103469771B (en) * 2013-09-26 2015-09-30 江苏省水利机械制造有限公司 Large-scale goggles-shaped gate burst mounting method
CN104099907A (en) * 2014-07-17 2014-10-15 黄河勘测规划设计有限公司 Construction method for articulated gate shoe of pull rod of fan-shaped reinforcing steel bar penetrating arc door of gate pier
CN104099907B (en) * 2014-07-17 2016-01-27 黄河勘测规划设计有限公司 The construction method that arc door pull bar props up free bearing worn by the fan-shaped reinforcing bar of gate pier
CN106223271A (en) * 2016-07-27 2016-12-14 中国葛洲坝集团第工程有限公司 Radial gate support hinge installation of embedded parts method

Similar Documents

Publication Publication Date Title
CN111395351B (en) Assembled supporting structure of foundation pit and supporting construction method
KR100837608B1 (en) J.K Bracket Method
CN101255697A (en) Method for integrally applying prestress to truss-type inner support of deep foundation pit
CN202865804U (en) Structure for preventing supporting articulation brackets from generating bevel angle cracks when installing arc-shaped gate
KR20120096605A (en) Bracket support type downward construction system and method
CN105040594A (en) Variable cross-section box girder bridge closure segment construction method
CN102277835A (en) Method for constructing single-column bent cap by adopting hoop and A-frame composite system
CN109281408B (en) Comprehensive pipe gallery embedded part and fixing method thereof
CN210658698U (en) Connector of semi-prefabricated reinforced concrete column node unit and beam column
CN203546583U (en) Box-inside horizontal reinforcing device of concrete box-cross-section multi-beam bridge
CN109654295B (en) Temporary thrust block for elbow access point, construction method and design method thereof
JP2017172295A (en) Reinforcement structure and reinforcement method of existing steel sheet pile wall
CN102444408B (en) Secondary lining split mounting type blocking head device for metro underground excavation tunnel
KR101384087B1 (en) Rahmen bridge construction method using support tendon apparatus and construction method therewith
CN104060531A (en) Boltless comb plate expansion device
CN101260671B (en) Deep pit trussed-beam type inner support prestressed force applying method
CN102704490B (en) Assembled waist rail
JP2017172296A (en) Reinforcement structure and reinforcement method of existing steel sheet pile wall
CN113136946B (en) Self-supporting assembly type seawater sea sand concrete frame structure and construction method
KR20090083106A (en) Method of the bridge construction which connects the steel pipe pile of abutment substituion and the precast girder with a fixation
CN210507799U (en) Connector of semi-prefabricated section steel concrete column-section steel concrete beam node unit and section steel concrete beam
CN212506152U (en) Transverse three-support-arm radial gate
JP2007321450A (en) Installation structure of lining pc slab and its pc slab
CN202602228U (en) Closed type cable pit
CN105480842A (en) Post-cast equipment supporting beam and construction method thereof

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20130410

CX01 Expiry of patent term