CN102646945B CN201210126922.8A CN201210126922A CN102646945B CN 102646945 B CN102646945 B CN 102646945B CN 201210126922 A CN201210126922 A CN 201210126922A CN 102646945 B CN102646945 B CN 102646945B
Authority
CN
China
Prior art keywords
adjustable
screw
tower
tower head
insulator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210126922.8A
Other languages
Chinese (zh)
Other versions
CN102646945A (en
Inventor
张森
伏忠奎
雷宏阳
董政
陈跃新
王雷
袁一文
刘思汗
姜坤汝
赵群
赵宏凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liaoyang Power Supply Co of State Grid Liaoning Electric Power Co Ltd
State Grid Corp of China SGCC
Original Assignee
Liaoyang Power Supply Co of State Grid Liaoning Electric Power Co Ltd
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Liaoyang Power Supply Co of State Grid Liaoning Electric Power Co Ltd, State Grid Corp of China SGCC filed Critical Liaoyang Power Supply Co of State Grid Liaoning Electric Power Co Ltd
Priority to CN201210126922.8A priority Critical patent/CN102646945B/en
Publication of CN102646945A publication Critical patent/CN102646945A/en
Application granted granted Critical
Publication of CN102646945B publication Critical patent/CN102646945B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Electric Cable Installation (AREA)

Abstract

本发明涉及一种500kV带电更换合成绝缘子的方法,它包括以下步骤:①安装二次保护器;②安装可调式吊线钩;③更换绝缘子。④安装第二根可调式吊线钩。本发明500kV带电更换合成绝缘子的方法不受塔型限制、不受绝缘子长度的限制,可以实现带电更换不同型号、长度与原有合成绝缘子相差悬殊或过多的合成绝缘子。可以适应多种绝缘子型号、多种绝缘组合形式,两根丝杠无需同时受力,一根丝杠受力、一根丝杠更换接头,更换接头的丝杠再次受力的同时另一根丝杠调整接头,直至更换完成,提高工作效率。

The invention relates to a method for replacing composite insulators with 500kV electrification, which comprises the following steps: ①installing a secondary protector; ②installing an adjustable suspension hook; ③replacing the insulator. ④Install the second adjustable suspension hook. The method for replacing synthetic insulators at 500kV live in the present invention is not limited by the tower type or the length of the insulators, and can realize live replacement of synthetic insulators of different models and whose lengths are greatly different from or too much of the original synthetic insulators. It can adapt to a variety of insulator models and a variety of insulation combinations. There is no need for two screw screws to be stressed at the same time. One screw is stressed, and the joint is replaced by one screw. When the screw with the joint is replaced, the other screw is stressed again. Adjust the joint with the bar until the replacement is completed, improving work efficiency.

Description

500kV带电更换合成绝缘子的方法The Method of Replacing Composite Insulators at 500kV Live

技术领域 technical field

本发明涉及一种500kV带电更换合成绝缘子的方法。 The invention relates to a method for replacing composite insulators with 500kV electrification.

背景技术 Background technique

由于带电更换500kV合成绝缘子所用提升导线的绝缘拉杆上部的丝杠提升及松降距离有限,传统的500kV输电线路带电更换合成绝缘子的作业如遇不同型号、长度与原有合成绝缘子相差悬殊或过多的情况下大多采用停电处理。 Due to the limited lifting and loosening distance of the lead screw on the upper part of the insulating pull rod used to replace the 500kV composite insulator with live electricity, the operation of replacing the composite insulator with live electricity on the traditional 500kV transmission line will be different from the original composite insulator in case of different models and lengths. In most cases, a power outage is used.

发明内容 Contents of the invention

本发明要解决的技术问题是提供一种500kV带电更换合成绝缘子的方法,该方法可以实现带电更换不同型号、长度与原有合成绝缘子相差悬殊或过多的合成绝缘子。 The technical problem to be solved by the present invention is to provide a method for replacing composite insulators with live charging at 500kV. This method can realize the replacement of composite insulators of different models and lengths that differ greatly from the original composite insulators or have too many.

     为了解决现有技术存在的问题,本发明采用的技术方案是: In order to solve the problems existing in the prior art, the technical solution adopted by the present invention is:

500kV带电更换合成绝缘子的方法,包括以下步骤: The method for replacing composite insulators at 500kV live includes the following steps:

①安装二次保护器:等电位电工沿绝缘软梯进入强电场,将卡扣式二次保护器的挂钩挂在铁塔横担上,将掉线器扣在四分裂导线上; ① Install the secondary protector: The equipotential electrician enters the strong electric field along the insulating ladder, hangs the hook of the buckle-type secondary protector on the cross arm of the iron tower, and buckles the disconnector on the four-split wire;

②安装可调式吊线钩:将塔头丝杠安装在铁塔横担头,将可调式绝缘拉板与可调式吊线钩组装好后,将可调式绝缘拉板与塔头丝杠可靠连接,再由等电位电工将掉线器扣在四分裂导线上; ②Install the adjustable hanging wire hook: install the tower head screw on the iron tower cross arm, after assembling the adjustable insulating pull plate and the adjustable hanging wire hook, connect the adjustable insulating pull plate to the tower head screw reliably, and then The equipotential electrician buckles the dropper on the four-split wire;

③更换绝缘子:旋紧或者旋松塔头丝杠至合适位置,使可调式吊线钩承担四分裂导线的垂直向下的重力,将旧绝缘子取下,再将丝杠旋紧或者旋松至合适位置。 ③Replace the insulator: Tighten or loosen the lead screw at the tower head to a suitable position, make the adjustable suspension hook bear the vertical downward gravity of the four-split conductor, remove the old insulator, and then tighten or loosen the lead screw to a suitable position Location.

④安装第二根可调式吊线钩,将塔头丝杠调至最松或者最紧,然后调节可调式绝缘拉板的长度,使第二根塔头丝杠与第二根绝缘拉板的长度总和与第一根可调式绝缘拉板的长度相同,然后再旋紧或者旋松第二根丝杠,用第二根吊线钩承担四分裂导线的重力,反复交替使用两根塔头丝杠受力,直至与新合成绝缘子长度相同,即安装完成。 ④Install the second adjustable hanging wire hook, adjust the tower head screw to the loosest or tightest, and then adjust the length of the adjustable insulating pull plate so that the length of the second tower head screw and the second insulating pull plate The sum is the same as the length of the first adjustable insulating puller, then tighten or loosen the second lead screw, use the second suspension hook to bear the gravity of the four-split wire, and alternately use the two tower head lead screws repeatedly force until the same length as the new composite insulator, that is, the installation is complete.

本发明所具有的优点与效果是: Advantage and effect that the present invention has are:

本发明500kV带电更换合成绝缘子的方法不受塔型限制、不受绝缘子长度的限制,可以实现带电更换不同型号、长度与原有合成绝缘子相差悬殊或过多的合成绝缘子。可以适应多种绝缘子型号、多种绝缘组合形式,两根丝杠无需同时受力,一根丝杠受力、一根丝杠更换接头,更换接头的丝杠再次受力的同时另一根丝杠调整接头,直至更换完成,提高工作效率。 The method for replacing synthetic insulators at 500kV live in the present invention is not limited by the tower type or the length of the insulators, and can realize the live replacement of synthetic insulators of different models and whose lengths are greatly different from or too much of the original synthetic insulators. It can adapt to a variety of insulator models and a variety of insulation combinations. There is no need for two screw screws to be stressed at the same time. One screw is stressed, and the joint is replaced by one screw. When the screw with the joint is replaced, the other screw is stressed again. Adjust the joint with the bar until the replacement is completed, improving work efficiency.

附图说明 Description of drawings

图1本发明500kV带电更换合成绝缘子的方法中所使用的工具。 Fig. 1 is the tool used in the method for replacing composite insulators with electricity at 500kV according to the present invention.

图中:卡扣式二次保护器1;挂钩11;铁塔横担2;掉线器12;四分裂导线3;塔头丝杠4;可调式绝缘拉板5;可调式吊线钩6;掉线器61;合成绝缘子7。 In the figure: buckle-type secondary protector 1; hook 11; iron tower cross arm 2; wire dropper 12; four-split wire 3; tower head screw 4; adjustable insulating pull plate 5; Wire device 61; Composite insulator 7.

具体实施方式 Detailed ways

下面结合附图对本发明作进一步详述: Below in conjunction with accompanying drawing, the present invention is described in further detail:

如图1所示,本发明500kV带电更换合成绝缘子的方法包括以下步骤: As shown in Fig. 1, the method for replacing the synthetic insulator with 500kV electrification of the present invention comprises the following steps:

①安装二次保护器:等电位电工沿绝缘软梯进入强电场,将卡扣式二次保护器1的挂钩11挂在铁塔横担2上,将掉线器12扣在四分裂导线3上; ① Install the secondary protector: the equipotential electrician enters the strong electric field along the insulating ladder, hangs the hook 11 of the buckle-type secondary protector 1 on the cross arm 2 of the iron tower, and buckles the disconnector 12 on the four-split wire 3;

②安装可调式吊线钩:将塔头丝杠4安装在铁塔横担头,将可调式绝缘拉板5与可调式吊线钩6组装好后,将可调式绝缘拉板5与塔头丝杠4可靠连接,再由等电位电工将掉线器61扣在四分裂导线3上; ②Install the adjustable hanging wire hook: install the tower head screw 4 on the iron tower cross arm, after assembling the adjustable insulating pull plate 5 and the adjustable hanging wire hook 6, install the adjustable insulating pull plate 5 and the tower head screw 4 Reliable connection, and then the equipotential electrician buckles the disconnector 61 on the four-split wire 3;

③更换绝缘子:根据要更换的绝缘子的长度,旋紧或者旋松塔头丝杠至合适位置,使可调式吊线钩承担四分裂导线的垂直向下的重力,将旧绝缘子取下,再将丝杠旋紧或者旋松至合适位置。 ③Replacing the insulator: According to the length of the insulator to be replaced, tighten or loosen the lead screw of the tower head to a suitable position, so that the adjustable suspension hook bears the vertical downward gravity of the four-split conductor, remove the old insulator, and then place the wire Tighten or loosen the lever to the proper position.

④安装第二根可调式吊线钩,将塔头丝杠4调至最松或者最紧,然后调节可调式绝缘拉板5的长度,使第二根塔头丝杠与第二根绝缘拉板的长度总和与第一根可调式绝缘拉板5的长度相同,然后再旋紧或者旋松第二根丝杠,用第二根吊线钩承担四分裂导线3的重力,反复交替使用两根塔头丝杠受力,直至与新合成绝缘子7长度相同,即安装完成。 ④Install the second adjustable suspension hook, adjust the tower head screw 4 to the loosest or tightest, and then adjust the length of the adjustable insulating pull plate 5, so that the second tower head screw and the second insulating pull plate The sum of the lengths is the same as the length of the first adjustable insulating pull plate 5, then tighten or loosen the second lead screw, use the second hanging wire hook to bear the gravity of the four-split wire 3, and use the two towers alternately The leading screw is stressed until it has the same length as the new composite insulator 7, that is, the installation is completed.

下面以要更换的新绝缘子短的情况下为例: The following is an example where the new insulator to be replaced is short:

①安装二次保护器:等电位电工沿绝缘软梯进入强电场,将卡扣式二次保护器1的挂钩11挂在铁塔横担2上,将掉线器12扣在四分裂导线3上,防止操作中导线意外脱落。 ① Install the secondary protector: The equipotential electrician enters the strong electric field along the insulating ladder, hangs the hook 11 of the buckle-type secondary protector 1 on the cross arm 2 of the iron tower, buckles the disconnector 12 on the four-split wire 3, Prevent the wire from accidentally falling off during operation.

②安装可调式吊线钩:将塔头丝杠4安装在铁塔横担头,将可调式绝缘拉板5与可调式吊线钩6组装好后,将可调式绝缘拉板5与塔头丝杠4可靠连接,再由等电位电工将掉线器61扣在四分裂导线3上; ②Install the adjustable hanging wire hook: install the tower head screw 4 on the iron tower cross arm, after assembling the adjustable insulating pull plate 5 and the adjustable hanging wire hook 6, install the adjustable insulating pull plate 5 and the tower head screw 4 Reliable connection, and then the equipotential electrician buckles the disconnector 61 on the four-split wire 3;

③更换绝缘子:旋紧塔头丝杠4至合适位置,使可调式吊线钩6承担四分裂导线3的垂直向下的重力,将旧绝缘子取下,再将塔头丝杠4旋至最紧。 ③Replace the insulator: tighten the tower head screw 4 to a suitable position, make the adjustable suspension hook 6 bear the vertical downward gravity of the four-split wire 3, remove the old insulator, and then screw the tower head screw 4 to the tightest .

④安装第二根可调式吊线钩,将塔头丝杠4调至最松,然后调节可调式绝缘拉板5的长度,使第二根塔头丝杠与第二根绝缘拉板的长度总和与第一根可调式绝缘拉板的长度相同,然后再旋紧第二根塔头丝杠,用第二根吊线钩承担四分裂导线的重力,反复交替使用两根丝杠受力,直至与新合成绝缘子长度相同,即安装完成。 ④Install the second adjustable suspension hook, adjust the tower head screw 4 to the loosest position, and then adjust the length of the adjustable insulating pull plate 5 so that the sum of the lengths of the second tower head screw and the second insulating pull plate The same length as the first adjustable insulating puller, then tighten the second tower head lead screw, use the second hanging wire hook to bear the gravity of the four-split wire, and use the two lead screws alternately to bear the force until it is the same as The new composite insulators have the same length, ie the installation is complete.

Claims (1)

1.500kV带电更换合成绝缘子的方法,其特征在于包括以下步骤: 1. A method for replacing composite insulators with electricity at 500kV, characterized in that it comprises the following steps: ①安装二次保护器:等电位电工沿绝缘软梯进入强电场,将卡扣式二次保护器的挂钩挂在铁塔横担上,将掉线器扣在四分裂导线上; ① Install the secondary protector: The equipotential electrician enters the strong electric field along the insulating ladder, hangs the hook of the buckle-type secondary protector on the cross arm of the iron tower, and buckles the disconnector on the four-split wire; ②安装可调式吊线钩:将两根塔头丝杠安装在铁塔横担头,将两根可调式绝缘拉板分别与两根可调式吊线钩一一对应组装,将可调式绝缘拉板与塔头丝杠可靠连接,再由等电位电工将掉线器扣在四分裂导线上; ②Install the adjustable hanging wire hook: Install the two tower head screws on the iron tower cross arm, assemble the two adjustable insulating pull plates with the two adjustable hanging wire hooks one by one, and connect the adjustable insulating pulling plate to the tower The head screw is reliably connected, and then the equipotential electrician buckles the disconnector on the four-split wire; ③更换绝缘子:旋紧或者旋松第一根塔头丝杠至合适位置,使第一根可调式吊线钩承担四分裂导线的垂直向下的重力,将旧绝缘子取下,再将第一根塔头丝杠旋紧或者旋松至合适位置; ③Replace the insulator: Tighten or loosen the first tower head lead screw to a suitable position, make the first adjustable suspension hook bear the vertical downward gravity of the four-split wire, remove the old insulator, and then place the first Tighten or loosen the tower head screw to a suitable position; ④安装第二根可调式吊线钩,将第二根塔头丝杠调至最松或者最紧,然后调节第二根可调式绝缘拉板的长度,使第二根塔头丝杠与第二根可调式绝缘拉板的长度总和与第一根可调式绝缘拉板的长度相同,然后再旋紧或者旋松第二根塔头丝杠,用第二根吊线钩承担四分裂导线的重力,反复交替使两根塔头丝杠受力,直至与新合成绝缘子长度相同,即安装完成。 ④Install the second adjustable suspension hook, adjust the second tower head screw to the loosest or tightest, and then adjust the length of the second adjustable insulating pull plate so that the second tower head screw is in line with the second The sum of the lengths of the first adjustable insulating pull plate is the same as the length of the first adjustable insulating pull plate, and then tighten or loosen the second tower head screw, and use the second hanging wire hook to bear the gravity of the four split wires, Repeatedly and alternately make the two tower head screws bear force until the length of the new synthetic insulator is the same, that is, the installation is completed.
CN201210126922.8A 2012-04-27 2012-04-27 Method for 500kV live replacement of composite insulators Active CN102646945B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210126922.8A CN102646945B (en) 2012-04-27 2012-04-27 Method for 500kV live replacement of composite insulators

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210126922.8A CN102646945B (en) 2012-04-27 2012-04-27 Method for 500kV live replacement of composite insulators

Publications (2)

Publication Number Publication Date
CN102646945A CN102646945A (en) 2012-08-22
CN102646945B true CN102646945B (en) 2015-04-22

Family

ID=46659598

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210126922.8A Active CN102646945B (en) 2012-04-27 2012-04-27 Method for 500kV live replacement of composite insulators

Country Status (1)

Country Link
CN (1) CN102646945B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104113007A (en) * 2013-04-22 2014-10-22 江苏省电力公司常州供电公司 Operation method for replacing strain insulator of 35kV overhead distribution line in live state
CN104113011B (en) * 2014-07-08 2017-01-11 国家电网公司 Single-string-insulator maintenance device
CN105162028A (en) * 2015-07-17 2015-12-16 国网辽宁省电力有限公司辽阳供电公司 Method for replacing linear insulator of 220kV steel pipe tower in live working state
CN105743013B (en) * 2016-03-28 2017-09-15 中国南方电网有限责任公司超高压输电公司南宁局 The method of charged for replacement ± 500kV AC line anchor support insulator chains
CN110011217B (en) * 2019-03-21 2023-12-12 中国南方电网有限责任公司超高压输电公司百色局 Device for replacing jumper insulator string of 500 kilovolt power transmission line and application method thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN85204196U (en) * 1985-09-28 1986-06-11 鞍山电业局 Clamps for change straight-line whole serial insulators on live wire work
JP2005012866A (en) * 2003-06-16 2005-01-13 Sumiden Asahi Industries Ltd Jumper
CN201937206U (en) * 2010-12-07 2011-08-17 江西省电力公司超高压分公司 Universal tool for electrically replacing 500kV strain insulator string
CN202094541U (en) * 2011-06-15 2011-12-28 辽宁省电力有限公司营口供电公司 Adjustable four-bundle conductor lifting device

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN85204196U (en) * 1985-09-28 1986-06-11 鞍山电业局 Clamps for change straight-line whole serial insulators on live wire work
JP2005012866A (en) * 2003-06-16 2005-01-13 Sumiden Asahi Industries Ltd Jumper
CN201937206U (en) * 2010-12-07 2011-08-17 江西省电力公司超高压分公司 Universal tool for electrically replacing 500kV strain insulator string
CN202094541U (en) * 2011-06-15 2011-12-28 辽宁省电力有限公司营口供电公司 Adjustable four-bundle conductor lifting device

Also Published As

Publication number Publication date
CN102646945A (en) 2012-08-22

Similar Documents

Publication Publication Date Title
CN102646945B (en) Method for 500kV live replacement of composite insulators
EP3196998B1 (en) Process for live replacement of tension hard-tube bus-bar jumper insulator of +/- 800kv ultra-high-voltage dc transmission line
CN204103316U (en) For the charged insulation eagle's beak pliers action bars disconnected of isolated circuit breaker
CN104505766B (en) The instrument and method of a kind of charged for replacement transformer station 500kV strain insulator strings
CN205195145U (en) Support is changed to insulator
CN204645808U (en) Bar stepped on by cement pole cable
CN107104387A (en) One kind can second lift wire insulation cross-arm and lifting wire method
CN204885990U (en) Lifting device for connecting plate of transmission line
CN101546894A (en) Method for replacing 220KV steel pipe tower composite insulator electrifiedly
CN103887735A (en) Linear charged wire lifting device of electric transmission line
CN203787855U (en) A straight-line electrified wire lifting device for transmission lines
CN104242813A (en) Power supply structure for direct-current transmission line on-line monitoring device
CN205429192U (en) Novel low pressure earth connection device
CN203895633U (en) Short circuit grounding wire suitable for box transformer substation and electricity distribution room
CN204144800U (en) The special cross-arm card of a kind of ZML type tower
CN202422954U (en) 10KV incoming bridge grounding conductor terminal for transformer
CN201674161U (en) SZ type double-circuit straight line tower live replacement suspension insulator suspension wire fixture assembly
CN204046514U (en) A kind of power supply architecture for DC power transmission line on-Line Monitor Device
CN201312079Y (en) Clamping apparatus for live line replacement of suspended insulator in middle of 500KV untypical tangent tower via splicing method
CN204858403U (en) A temporary hanging point fixing device for live replacement of V-shaped insulators on transmission lines
CN204030448U (en) A kind of electrified fastening pin type insulator nut tool
CN202550391U (en) High-voltage power maintenance implement
CN104218493B (en) ± 800kV UHVDC Transmission Lines live-line replacing strain hard tube mother's wire jumper insulator technique
CN203352055U (en) Electric pole grounding downlead lifting apparatus
CN202868079U (en) Current transformer pole clip for high-voltage transmission line

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: STATE ELECTRIC NET CROP.

Effective date: 20120926

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20120926

Address after: 111000 Liaoyang City, Liaoning province Taizihe District South Street No. 81

Applicant after: Liaoning Electric Power Co., Ltd. Liaoyang Power Supply Company

Applicant after: State Grid Corporation of China

Address before: 111000 No. 81, south suburb street, Liaoning, Liaoyang

Applicant before: Liaoning Electric Power Co., Ltd. Liaoyang Power Supply Company

C14 Grant of patent or utility model
GR01 Patent grant