CN102646945A - Method for 500kV live replacement of composite insulators - Google Patents

Method for 500kV live replacement of composite insulators Download PDF

Info

Publication number
CN102646945A
CN102646945A CN2012101269228A CN201210126922A CN102646945A CN 102646945 A CN102646945 A CN 102646945A CN 2012101269228 A CN2012101269228 A CN 2012101269228A CN 201210126922 A CN201210126922 A CN 201210126922A CN 102646945 A CN102646945 A CN 102646945A
Authority
CN
China
Prior art keywords
leading screw
insulator
adjustable
arm
tie
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012101269228A
Other languages
Chinese (zh)
Other versions
CN102646945B (en
Inventor
张森
伏忠奎
雷宏阳
董政
陈跃新
王雷
袁一文
刘思汗
姜坤汝
赵群
赵宏凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
LIAONING ELECTRIC POWER CO Ltd LIAOYANG POWER SUPPLY Co
State Grid Corp of China SGCC
Original Assignee
LIAONING ELECTRIC POWER CO Ltd LIAOYANG POWER SUPPLY Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by LIAONING ELECTRIC POWER CO Ltd LIAOYANG POWER SUPPLY Co filed Critical LIAONING ELECTRIC POWER CO Ltd LIAOYANG POWER SUPPLY Co
Priority to CN201210126922.8A priority Critical patent/CN102646945B/en
Publication of CN102646945A publication Critical patent/CN102646945A/en
Application granted granted Critical
Publication of CN102646945B publication Critical patent/CN102646945B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Electric Cable Installation (AREA)

Abstract

The invention relates to a method for 500kV live replacement of composite insulators, which includes the steps: firstly, mounting a secondary protector; secondly, mounting an adjustable hanging wire hook; thirdly, replacing the insulator; and fourthly, mounting a second adjustable hanging wire hook. The method for 500kV live replacement of the composite insulators is unlimited by a tower type and the length of the insulator, can be used for realizing live replacement of composite insulators of different types, in different lengths and differing greatly or excessively as compared with original composite insulators, and can adapt to various insulator types and various insulator combination modes. Two lead screws do not need to be stressed simultaneously, one lead screw is stressed while the other lead screw is used for replacing a connector, and the lead screw used for replacing the connector is stressed while the other lead screw is used for adjusting the connector until replacement is completed, so that work efficiency is improved.

Description

The method of 500kV charged for replacement synthetic insulator
Technical field
The present invention relates to a kind of method of 500kV charged for replacement synthetic insulator.
Background technology
Because the leading screw on the insulated tension pole top of the used lifting lead of charged for replacement 500kV synthetic insulator promotes and pine to fall distance limited, the operation of traditional 500kV transmission line charged for replacement synthetic insulator differ greatly like different model, length and original synthetic insulator or too much situation under adopt the power failure processing mostly.
Summary of the invention
The technical problem that the present invention will solve provides a kind of method of 500kV charged for replacement synthetic insulator, and this method can realize that charged for replacement different model, length and original synthetic insulator differ greatly or too much synthetic insulator.
In order to solve the problem that prior art exists, the technical scheme that the present invention adopts is:
The method of 500kV charged for replacement synthetic insulator may further comprise the steps:
1. the second protection device is installed: equipotential electrician gets into highfield along insulated flexible ladder, and the hook of buckle-type second protection device is hung on the iron tower cross-arm, and the device that will go offline is buckled on the conductors on quad bundled;
2. adjustable line hanging hook is installed: the tower head leading screw is installed in iron tower cross-arm head; After adjustable insulation arm-tie and adjustable line hanging hook assembled; Adjustable insulation arm-tie reliably is connected with the tower head leading screw, is buckled on the conductors on quad bundled by the equipotential electrician device that will go offline again;
3. change insulator: screw or unscrew the tower head leading screw, make adjustable line hanging hook bear the gravity vertically downward of conductors on quad bundled, old insulator is taken off, again leading screw is screwed or unscrewed to correct position to correct position.
4. second adjustable line hanging hook be installed, the tower head leading screw is transferred to pine or the tightest, the length of regulating adjustable insulation arm-tie then; Make the length of length summation and first adjustable insulation arm-tie of second tower head leading screw and the second insulated arm-tie identical; And then screw or unscrew the second rhizoid thick stick, bear the gravity of conductors on quad bundled with second line hanging hook, it is stressed to be used alternatingly two tower head leading screws repeatedly; Until identical with new synthetic insulator length, i.e. installation.
Advantage and effect that the present invention had are:
The method of 500kV charged for replacement synthetic insulator of the present invention does not receive the tower restriction, does not receive the restriction of insulator length, can realize that charged for replacement different model, length and original synthetic insulator differ greatly or too much synthetic insulator.Can adapt to multiple insulator model, multiple insulation combining form; Two rhizoid thick sticks need not simultaneously stressed, and a rhizoid thick stick is stressed, a rhizoid thick stick is changed joint, another rhizoid thick stick adjustment joint when the leading screw of replacing joint is stressed once more; Accomplish until changing, increase work efficiency.
Description of drawings
Employed instrument in the method for Fig. 1 500kV charged for replacement of the present invention synthetic insulator.
Among the figure: buckle-type second protection device 1; Hook 11; Iron tower cross-arm 2; Device 12 goes offline; Conductors on quad bundled 3; Tower head leading screw 4; Adjustable insulation arm-tie 5; Adjustable line hanging hook 6; Device 61 goes offline; Synthetic insulator 7.
Embodiment
Below in conjunction with accompanying drawing the present invention is made further detailed description:
As shown in Figure 1, the method for 500kV charged for replacement synthetic insulator of the present invention may further comprise the steps:
1. the second protection device is installed: equipotential electrician gets into highfield along insulated flexible ladder, and the hook 11 of buckle-type second protection device 1 is hung on the iron tower cross-arm 2, and the device 12 that will go offline is buckled on the conductors on quad bundled 3;
2. adjustable line hanging hook is installed: tower head leading screw 4 is installed in iron tower cross-arm head; After adjustable insulation arm-tie 5 and adjustable line hanging hook 6 assembled; Adjustable insulation arm-tie 5 reliably is connected with tower head leading screw 4, is buckled on the conductors on quad bundled 3 by the equipotential electrician device 61 that will go offline again;
3. change insulator: according to the length of the insulator that will change; Screw or unscrew the tower head leading screw to correct position; Make adjustable line hanging hook bear the gravity vertically downward of conductors on quad bundled, old insulator is taken off, again leading screw is screwed or unscrewed to correct position.
4. second adjustable line hanging hook be installed, tower head leading screw 4 is transferred to pine or the tightest, the length of regulating adjustable insulation arm-tie 5 then; Make the length of length summation and first adjustable insulation arm-tie 5 of second tower head leading screw and the second insulated arm-tie identical; And then screw or unscrew the second rhizoid thick stick, bear the gravity of conductors on quad bundled 3 with second line hanging hook, it is stressed to be used alternatingly two tower head leading screws repeatedly; Until identical with new synthetic insulator 7 length, i.e. installation.
Below being example under the short situation of the new insulator that will change:
1. the second protection device is installed: equipotential electrician gets into highfield along insulated flexible ladder, and the hook 11 of buckle-type second protection device 1 is hung on the iron tower cross-arm 2, and the device 12 that will go offline is buckled on the conductors on quad bundled 3, prevents lead accidental in the operation.
2. adjustable line hanging hook is installed: tower head leading screw 4 is installed in iron tower cross-arm head; After adjustable insulation arm-tie 5 and adjustable line hanging hook 6 assembled; Adjustable insulation arm-tie 5 reliably is connected with tower head leading screw 4, is buckled on the conductors on quad bundled 3 by the equipotential electrician device 61 that will go offline again;
3. change insulator: the tower head leading screw 4 of screwing makes adjustable line hanging hook 6 bear the gravity vertically downward of conductors on quad bundled 3 to correct position, and old insulator is taken off, and is threaded to tower head leading screw 4 the tightest again.
4. second adjustable line hanging hook be installed, tower head leading screw 4 is transferred to pine, the length of regulating adjustable insulation arm-tie 5 then; Make the length of length summation and first adjustable insulation arm-tie of second tower head leading screw and the second insulated arm-tie identical; And then the second tower head leading screw of screwing, bear the gravity of conductors on quad bundled with second line hanging hook, it is stressed to be used alternatingly two rhizoid thick sticks repeatedly; Until identical with new synthetic insulator length, i.e. installation.

Claims (1)

1.500kV the method for charged for replacement synthetic insulator is characterized in that may further comprise the steps:
1. the second protection device is installed: equipotential electrician gets into highfield along insulated flexible ladder, and the hook of buckle-type second protection device is hung on the iron tower cross-arm, and the device that will go offline is buckled on the conductors on quad bundled;
2. adjustable line hanging hook is installed: the tower head leading screw is installed in iron tower cross-arm head; After adjustable insulation arm-tie and adjustable line hanging hook assembled; Adjustable insulation arm-tie reliably is connected with the tower head leading screw, is buckled on the conductors on quad bundled by the equipotential electrician device that will go offline again;
3. change insulator: screw or unscrew the tower head leading screw, make adjustable line hanging hook bear the gravity vertically downward of conductors on quad bundled, old insulator is taken off, again leading screw is screwed or unscrewed to correct position to correct position;
4. second adjustable line hanging hook be installed, the tower head leading screw is transferred to pine or the tightest, the length of regulating adjustable insulation arm-tie then; Make the length of length summation and first adjustable insulation arm-tie of second tower head leading screw and the second insulated arm-tie identical; And then screw or unscrew the second rhizoid thick stick, bear the gravity of conductors on quad bundled with second line hanging hook, it is stressed to be used alternatingly two tower head leading screws repeatedly; Until identical with new synthetic insulator length, i.e. installation.
CN201210126922.8A 2012-04-27 2012-04-27 Method for 500kV live replacement of composite insulators Active CN102646945B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210126922.8A CN102646945B (en) 2012-04-27 2012-04-27 Method for 500kV live replacement of composite insulators

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210126922.8A CN102646945B (en) 2012-04-27 2012-04-27 Method for 500kV live replacement of composite insulators

Publications (2)

Publication Number Publication Date
CN102646945A true CN102646945A (en) 2012-08-22
CN102646945B CN102646945B (en) 2015-04-22

Family

ID=46659598

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210126922.8A Active CN102646945B (en) 2012-04-27 2012-04-27 Method for 500kV live replacement of composite insulators

Country Status (1)

Country Link
CN (1) CN102646945B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104113007A (en) * 2013-04-22 2014-10-22 江苏省电力公司常州供电公司 Operation method for replacing strain insulator of 35kV overhead distribution line in live state
CN104113011A (en) * 2014-07-08 2014-10-22 国家电网公司 Single-string-insulator maintenance device
CN105162028A (en) * 2015-07-17 2015-12-16 国网辽宁省电力有限公司辽阳供电公司 Method for replacing linear insulator of 220kV steel pipe tower in live working state
CN105743013A (en) * 2016-03-28 2016-07-06 中国南方电网有限责任公司超高压输电公司南宁局 Method for live replacement of +/-500kV DC line strain tower insulator string
CN110011217A (en) * 2019-03-21 2019-07-12 中国南方电网有限责任公司超高压输电公司百色局 500 kV power transmission line jumper insulator string replacing device and using method thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN85204196U (en) * 1985-09-28 1986-06-11 鞍山电业局 Clamps for change straight-line whole serial insulators on live wire work
JP2005012866A (en) * 2003-06-16 2005-01-13 Sumiden Asahi Industries Ltd Jumper
CN201937206U (en) * 2010-12-07 2011-08-17 江西省电力公司超高压分公司 Universal tool for electrically replacing 500kV strain insulator string
CN202094541U (en) * 2011-06-15 2011-12-28 辽宁省电力有限公司营口供电公司 Adjustable four-bundle conductor lifting device

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN85204196U (en) * 1985-09-28 1986-06-11 鞍山电业局 Clamps for change straight-line whole serial insulators on live wire work
JP2005012866A (en) * 2003-06-16 2005-01-13 Sumiden Asahi Industries Ltd Jumper
CN201937206U (en) * 2010-12-07 2011-08-17 江西省电力公司超高压分公司 Universal tool for electrically replacing 500kV strain insulator string
CN202094541U (en) * 2011-06-15 2011-12-28 辽宁省电力有限公司营口供电公司 Adjustable four-bundle conductor lifting device

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104113007A (en) * 2013-04-22 2014-10-22 江苏省电力公司常州供电公司 Operation method for replacing strain insulator of 35kV overhead distribution line in live state
CN104113011A (en) * 2014-07-08 2014-10-22 国家电网公司 Single-string-insulator maintenance device
CN104113011B (en) * 2014-07-08 2017-01-11 国家电网公司 Single-string-insulator maintenance device
CN105162028A (en) * 2015-07-17 2015-12-16 国网辽宁省电力有限公司辽阳供电公司 Method for replacing linear insulator of 220kV steel pipe tower in live working state
CN105743013A (en) * 2016-03-28 2016-07-06 中国南方电网有限责任公司超高压输电公司南宁局 Method for live replacement of +/-500kV DC line strain tower insulator string
CN105743013B (en) * 2016-03-28 2017-09-15 中国南方电网有限责任公司超高压输电公司南宁局 The method of charged for replacement ± 500kV AC line anchor support insulator chains
CN110011217A (en) * 2019-03-21 2019-07-12 中国南方电网有限责任公司超高压输电公司百色局 500 kV power transmission line jumper insulator string replacing device and using method thereof
CN110011217B (en) * 2019-03-21 2023-12-12 中国南方电网有限责任公司超高压输电公司百色局 Device for replacing jumper insulator string of 500 kilovolt power transmission line and application method thereof

Also Published As

Publication number Publication date
CN102646945B (en) 2015-04-22

Similar Documents

Publication Publication Date Title
CN102646945B (en) Method for 500kV live replacement of composite insulators
CN205069242U (en) Polymerization gold silicon pin insulator
CN103887735A (en) Linear charged wire lifting device of electric transmission line
CN203787855U (en) Power transmission line linear charged wire lifting device
CN204516510U (en) A kind of insulator
CN204290154U (en) A kind of replacing insulator under electrified specific purpose tool
CN206022675U (en) Universal shaped cable clamp earth lead
CN203839151U (en) Zinc oxide arrester without jumper
CN204257296U (en) A kind of anti-thunder insulator for overhead transmission line
CN203607248U (en) Complete set of capacitor equipment
CN203312466U (en) Novel waterproof rectilinear jointing clamp
CN204947467U (en) Vertical two elevator
CN203352104U (en) Multifunctional insulating cross arm
CN205429654U (en) Wedge type aluminum alloy high -voltage cable strain insulator tension disk
CN106025918A (en) Adjustable wire-clamping machine
CN205178049U (en) Diversion type meets ground wire device
CN104201602A (en) Charged replacement method for whole string of insulators of ultra-high-voltage transmission line, and hardware fitting thereof
CN203536859U (en) Single hanging self-tightening four-hook clamp
CN203967620U (en) Single insulator string attending device
CN203367610U (en) Novel waterproof T-shaped jointing clamp
CN104201606A (en) Separating clamp for 500KV strain insulator string
CN204155729U (en) The joint of transformer and cable
CN203135312U (en) 500kV line cross arm side end part clamping apparatus
CN104113011B (en) Single-string-insulator maintenance device
CN203377037U (en) High altitude region 330kV AC line duplex strain insulator string

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: STATE ELECTRIC NET CROP.

Effective date: 20120926

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20120926

Address after: 111000 Liaoyang City, Liaoning province Taizihe District South Street No. 81

Applicant after: Liaoning Electric Power Co., Ltd. Liaoyang Power Supply Company

Applicant after: State Grid Corporation of China

Address before: 111000 No. 81, south suburb street, Liaoning, Liaoyang

Applicant before: Liaoning Electric Power Co., Ltd. Liaoyang Power Supply Company

C14 Grant of patent or utility model
GR01 Patent grant