CN102644292A - Inclined post pile foundation for overhead transmission line - Google Patents

Inclined post pile foundation for overhead transmission line Download PDF

Info

Publication number
CN102644292A
CN102644292A CN2012100935838A CN201210093583A CN102644292A CN 102644292 A CN102644292 A CN 102644292A CN 2012100935838 A CN2012100935838 A CN 2012100935838A CN 201210093583 A CN201210093583 A CN 201210093583A CN 102644292 A CN102644292 A CN 102644292A
Authority
CN
China
Prior art keywords
foundation
transmission line
pile
concrete pile
angle steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012100935838A
Other languages
Chinese (zh)
Inventor
陶春凤
顾俊颉
梁浩
倪镭
金成生
郑伟华
王怡风
龚泉
徐坤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Shanghai Municipal Electric Power Co
Shanghai Electric Power Design Institute Co Ltd
Original Assignee
Shanghai Municipal Electric Power Co
Shanghai Electric Power Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Municipal Electric Power Co, Shanghai Electric Power Design Institute Co Ltd filed Critical Shanghai Municipal Electric Power Co
Priority to CN2012100935838A priority Critical patent/CN102644292A/en
Publication of CN102644292A publication Critical patent/CN102644292A/en
Pending legal-status Critical Current

Links

Landscapes

  • Foundations (AREA)

Abstract

The invention relates to an inclined post pile foundation for an overhead transmission line. The inclined post pile foundation comprises inserted angle steel, anchoring angle steel, a concrete pile and a foundation step pile, wherein the inserted angle steel and the anchoring angle steel are fixedly arranged on the upper part and the lower part of the concrete pile respectively; an included angle of 10-20 degree is formed between the concrete pile and a vertical direction; and the foundation step pile is arranged at the bottom of the concrete pile, and is connected with the concrete pile by pouring. Compared with the prior art, the obliqueness is consistent with the gradient of an overhead transmission line bracket, so that the stress states of a foundation upright post and a bottom plate are improved greatly, the influence of foundation horizontal force on a foundation bottom plate is reduced to the maximum extent, and the stability of the foundation is enhanced remarkably; and meanwhile, the eccentric bending moment is reduced, so that the size of the controlled foundation bottom plate can be reduced correspondingly, the concrete amount and reinforcement amount of the foundation are reduced, the foundation is stressed reasonably, the anti-dumping stability is enhanced greatly, and the using amount of a foundation material can be saved by about 20 percent.

Description

A kind of batter post formula pile foundation that is used for overhead transmission line
Technical field
The present invention relates to a kind of pile foundation, especially relate to a kind of batter post formula pile foundation that is used for overhead transmission line.
Background technology
Conventional overhead transmission line outlet structure often adopts flush type foot joint form; Promptly stay and establish a rim of a cup at basic top; The herringbone steel pipe column is inserted in the rim of a cup; Adopt the concrete of high one-level label to fill rim of a cup again, fill and carry out at twice, treating that concreting for the second time forms just can carry out follow-up lead after the intensity and hang up work.Say from the construction angle, this method easy construction, the foundation construction required precision is not high, but long in time limit, for reconstruction and extension project, can cause twice power failure process successively.
Summary of the invention
The object of the invention is exactly for the defective that overcomes above-mentioned prior art existence the batter post formula pile foundation that is used for overhead transmission line that a kind of basic principal post gradient is consistent with the transmission line of electricity support gradient, basic stress reasonable, stability against overturning improves greatly to be provided.
The object of the invention can be realized through following technical scheme:
A kind of batter post formula pile foundation that is used for overhead transmission line; This pile foundation comprises inserts angle steel, anchoring angle steel, concrete pile, footing step stake; Described insertion angle steel and anchoring angle steel are fixedly mounted on the top and the bottom of concrete pile respectively; Described concrete pile and vertical direction are 10 °~20 ° angle, and described footing step stake is located at the bottom of concrete pile, are connected with the concrete pile cast.
The top of described concrete pile is connected with the footing of transmission line of electricity support.
Be provided with main muscle in the described concrete pile, hoop is provided with stirrup around the main muscle.
Described footing step stake is a double-layer structure, is provided with step master muscle in the step of upper strata, is provided with on the base plate muscle under the muscle and base plate in lower floor's step.
Be provided with handling reinforcement between the muscle under muscle and the base plate on the described base plate.
The junction of described anchoring angle steel and concrete pile is provided with location-plate.
Compared with prior art, gradient of the present invention is consistent with the transmission line of electricity support gradient, has improved the force-bearing situation of basic column, base plate greatly; Make foundation level power drop to minimum level to the influence of sole plate, the stability on basis is significantly improved, simultaneously; Because eccentric bending moment reduces, in check sole plate size can obtain corresponding reducing, thereby reduces the amount of concrete and the quantity of reinforcement on basis; And basic stress is reasonable, and stability against overturning improves greatly, and the basic material consumption can be practiced thrift about 20%; Simultaneously can reduce land area, have good and economic and reasonability, in addition; Batter post formula pile foundation can reduce base concrete and rolled steel dosage; Accelerating construction progress reduces construction investment, is applicable to the iron tower of power transmission line of place, tower position for normal geological conditions (except the unfavorable geological conditionss such as the pool, dark creek, river course, irrigation canals and ditches).
Description of drawings
Fig. 1 is a structural representation of the present invention;
Fig. 2 is the structural representation of concrete pile.
Among the figure, 1 is that insertion angle steel, 2 is that anchoring angle steel, 3 is that concrete pile, 4 is that location-plate, 5 is that main muscle, 6 is that stirrup, 7 is that footing step stake, 8 is that step master muscle, 9 is that muscle on the base plate, 10 is that muscle under the base plate, 11 is a handling reinforcement.
The specific embodiment
Below in conjunction with accompanying drawing and specific embodiment the present invention is elaborated.
Embodiment
A kind of batter post formula pile foundation that is used for overhead transmission line; Its structure is as shown in Figure 1; This pile foundation comprises inserts angle steel 1, anchoring angle steel 2, concrete pile 3, footing step stake 7; Insert angle steel 1 and anchoring angle steel 2 and be fixedly mounted on the top and the bottom of concrete pile 3 respectively, as shown in Figure 2, thereby make things convenient for the fixing of concrete pile 3 and with being connected of other pile foundation or power transmission tower.Concrete pile 3 is 10 °~20 ° angle with vertical direction, thereby the gradient that guarantees batter post formula pile foundation is consistent with the transmission line of electricity support gradient.Footing step stake 7 is located at the bottom of concrete pile 3, is connected with concrete pile 3 cast.
The top of concrete pile 3 is connected with the footing of transmission line of electricity support, in concrete pile 3, is provided with main muscle 5, and hoop is provided with stirrup 6 around the main muscle 5, and anchoring angle steel 2 is provided with location-plate 4 with the junction of concrete pile 3, and concrete pile 3 is played good positioning action.
Footing step stake 7 is a double-layer structure, is provided with step master muscle 8 in the step of upper strata, is provided with on the base plate muscle 10 under the muscle 9 and base plate in lower floor's step, is being provided with handling reinforcement 11 under muscle on the base plate 9 and the base plate between the muscle 10.
Adopt the batter post basis greatly to improve the force-bearing situation of basic column, base plate, make foundation level power drop to minimum level to the influence of sole plate, the stability on basis is significantly improved.Simultaneously, because eccentric bending moment reduces, in check sole plate size can obtain corresponding reducing, thereby reduces the amount of concrete and the quantity of reinforcement on basis.

Claims (6)

1. batter post formula pile foundation that is used for overhead transmission line; It is characterized in that; This pile foundation comprises inserts angle steel, anchoring angle steel, concrete pile, footing step stake, and described insertion angle steel and anchoring angle steel are fixedly mounted on the top and the bottom of concrete pile respectively, and described concrete pile and vertical direction are 10 °~20 ° angle; Described footing step stake is located at the bottom of concrete pile, is connected with the concrete pile cast.
2. a kind of batter post formula pile foundation that is used for overhead transmission line according to claim 1 is characterized in that the top of described concrete pile is connected with the footing of transmission line of electricity support.
3. a kind of batter post formula pile foundation that is used for overhead transmission line according to claim 1 is characterized in that, is provided with main muscle in the described concrete pile, and hoop is provided with stirrup around the main muscle.
4. a kind of batter post formula pile foundation that is used for overhead transmission line according to claim 1 is characterized in that described footing step stake is a double-layer structure, is provided with step master muscle in the step of upper strata, is provided with on the base plate muscle under the muscle and base plate in lower floor's step.
5. a kind of batter post formula pile foundation that is used for overhead transmission line according to claim 4 is characterized in that, is provided with handling reinforcement between the muscle under muscle and the base plate on the described base plate.
6. a kind of batter post formula pile foundation that is used for overhead transmission line according to claim 1 is characterized in that the junction of described anchoring angle steel and concrete pile is provided with location-plate.
CN2012100935838A 2012-03-31 2012-03-31 Inclined post pile foundation for overhead transmission line Pending CN102644292A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012100935838A CN102644292A (en) 2012-03-31 2012-03-31 Inclined post pile foundation for overhead transmission line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012100935838A CN102644292A (en) 2012-03-31 2012-03-31 Inclined post pile foundation for overhead transmission line

Publications (1)

Publication Number Publication Date
CN102644292A true CN102644292A (en) 2012-08-22

Family

ID=46657355

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012100935838A Pending CN102644292A (en) 2012-03-31 2012-03-31 Inclined post pile foundation for overhead transmission line

Country Status (1)

Country Link
CN (1) CN102644292A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102926398A (en) * 2012-10-10 2013-02-13 青海省电力设计院 Construction method of inclined column type corrosion resistant foundation for power line in salt lake area
CN103343548A (en) * 2013-07-31 2013-10-09 山东电力工程咨询院有限公司 Foundation type for power transmission tower and bearing capacity calculation method for same

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0711861A (en) * 1993-06-25 1995-01-13 Hitachi Cable Ltd Steel-tower foundation hole and forming method thereof
CN101255699A (en) * 2008-01-10 2008-09-03 广东省电力设计研究院 Novel structure inclined inserting digging hole pile foundation
CN201128914Y (en) * 2007-11-26 2008-10-08 上海电力设计院有限公司 Anchoring part for inclined post type iron tower foundation
CN201128915Y (en) * 2007-11-26 2008-10-08 上海电力设计院有限公司 Inclined post type iron tower foundation
CN201254730Y (en) * 2008-08-11 2009-06-10 国网北京电力建设研究院 Reinforcement tower foundation
CN202595758U (en) * 2012-03-31 2012-12-12 上海市电力公司 Batter post foundation structure for overhead transmission line

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0711861A (en) * 1993-06-25 1995-01-13 Hitachi Cable Ltd Steel-tower foundation hole and forming method thereof
CN201128914Y (en) * 2007-11-26 2008-10-08 上海电力设计院有限公司 Anchoring part for inclined post type iron tower foundation
CN201128915Y (en) * 2007-11-26 2008-10-08 上海电力设计院有限公司 Inclined post type iron tower foundation
CN101255699A (en) * 2008-01-10 2008-09-03 广东省电力设计研究院 Novel structure inclined inserting digging hole pile foundation
CN201254730Y (en) * 2008-08-11 2009-06-10 国网北京电力建设研究院 Reinforcement tower foundation
CN202595758U (en) * 2012-03-31 2012-12-12 上海市电力公司 Batter post foundation structure for overhead transmission line

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
山西省电力工业局: "《供电线路(电缆)施工、运行、检修(中级工)》", 31 January 1999, 中国电力出版社 *
鲁先龙等: "输电线路角钢斜插式基础抗拔试验研究", 《电力建设》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102926398A (en) * 2012-10-10 2013-02-13 青海省电力设计院 Construction method of inclined column type corrosion resistant foundation for power line in salt lake area
CN102926398B (en) * 2012-10-10 2016-09-07 青海省电力设计院 A kind of for Salt Lake Area iron tower of power transmission line bolts of inclined column type anti-corrosion foundation construction method
CN103343548A (en) * 2013-07-31 2013-10-09 山东电力工程咨询院有限公司 Foundation type for power transmission tower and bearing capacity calculation method for same
CN103343548B (en) * 2013-07-31 2015-03-11 山东电力工程咨询院有限公司 Foundation type for power transmission tower and bearing capacity calculation method for same

Similar Documents

Publication Publication Date Title
CN201762717U (en) Structure for connecting prestressed pipe pile and cushion cap
CN103225304B (en) A kind of marine foundation supporting structure and construction method thereof
CN202595758U (en) Batter post foundation structure for overhead transmission line
CN204849851U (en) Retaining pile combines anti structure of floating in subway station of anti floating block
CN201762666U (en) Capping construction support
CN104652475A (en) Truss type retaining wall
CN203200771U (en) Connection structure for pile extension top and bearing platform
CN206784392U (en) The horizontal inner supporting body system of deep basal pit assembled combination steel construction
CN205591555U (en) Processing apparatus of basement outer wall
CN102979109A (en) Design method of assembled-type prestressed concrete cylindrical column base
CN104195956A (en) Scaffolding type water area continuous beam cast-in-situ supporting frame and erection method thereof
CN102644292A (en) Inclined post pile foundation for overhead transmission line
CN203626055U (en) Super-high-rise large-section half-embedded type intensive anchor bar steel column base locating support
CN204098059U (en) For the electric power pylon basis of high-strength bolt
CN102535496A (en) Expanded pier structure and forming method thereof
CN206521941U (en) Pull-type single side formwork system in a kind of
CN202689029U (en) Anchor rod foundation of photovoltaic module support
CN205205847U (en) Frame construction of stake cushion cap
CN102134856B (en) Tower crane foundation
CN205742249U (en) A kind of prestressed concrete back cover cushion cap template
CN204876084U (en) Steel column foot crab -bolt fixed bolster
CN211285682U (en) Deepwater cantilever type tower crane foundation structure
CN209162880U (en) A kind of photovoltaic bracket basis for heavy grade landform
CN203145034U (en) Assembled prestress concrete cylindrical column body foundation
CN103866782B (en) The stone bolt eccentric connecting structure of power transmission line iron tower foundation

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: STATE GRID CORPORATION OF CHINA SHANGHAI ELECTRIC

Free format text: FORMER OWNER: SHANGHAI ELECTRIC POWER DESIGN INSTITUTE CO., LTD.

Effective date: 20121214

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20121214

Address after: 200122 Shanghai City, Pudong New Area source deep road, No. 1122

Applicant after: Shanghai Electric Power Corporation

Applicant after: State Grid Corporation of China

Applicant after: Shanghai Electric Power Design Institute Limited

Address before: 200122 Shanghai City, Pudong New Area source deep road, No. 1122

Applicant before: Shanghai Electric Power Corporation

Applicant before: Shanghai Electric Power Design Institute Limited

C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20120822