CN102644230B - 试车场高速环道边坡修整方法 - Google Patents

试车场高速环道边坡修整方法 Download PDF

Info

Publication number
CN102644230B
CN102644230B CN201210132339.8A CN201210132339A CN102644230B CN 102644230 B CN102644230 B CN 102644230B CN 201210132339 A CN201210132339 A CN 201210132339A CN 102644230 B CN102644230 B CN 102644230B
Authority
CN
China
Prior art keywords
curved surface
slope trimming
surface control
control stake
slope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210132339.8A
Other languages
English (en)
Other versions
CN102644230A (zh
Inventor
张杰胜
阮仁义
刘晓东
沈志强
徐海林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Engineering Co Ltd of CTCE Group
Original Assignee
First Engineering Co Ltd of CTCE Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Engineering Co Ltd of CTCE Group filed Critical First Engineering Co Ltd of CTCE Group
Priority to CN201210132339.8A priority Critical patent/CN102644230B/zh
Publication of CN102644230A publication Critical patent/CN102644230A/zh
Application granted granted Critical
Publication of CN102644230B publication Critical patent/CN102644230B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Road Paving Structures (AREA)
  • Road Repair (AREA)

Abstract

本发明公开了试车场高速环道边坡修整方法,其特征是:在试车场高速环道(1)的边坡修整中,在盆腔式路基曲面(2)上沿线路纵向及横向利用全站仪放样并设置曲面控制桩(3),相邻曲面控制桩(3)之间进行挂线,将盆腔式路基曲面(2)分割成若干边坡修整方格网(4),利用施工机械在边坡修整方格网(4)内进行边坡修整粗平,后经人工精平达到设计要求。采用本发明的方法修整的路基成型精度高、实用性强,能够满足试车场高速环道施工精度要求。

Description

试车场高速环道边坡修整方法
技术领域
本发明涉及试车场高速环道边坡修整方法。
背景技术
试车场高速环道曲面施工精度要求高,如何对盆腔式路基进行边坡修整以保证上部曲线面层的精度一直是高速环道曲面施工的控制难点,目前施工中多采取机械刷坡多次修补的方法,控制方法落后、工作量大、路基成型精度低,如何对试车场高速环道边坡进行精确修整保证路基成型精度,目前没有很好地解决这一问题的相关方法的公开报导。
发明内容
本发明的目的是提供一种试车场高速环道边坡修整方法,其路基成型精度高、实用性强,能够满足试车场高速环道施工精度要求。
本发明的技术方案如下:
试车场高速环道边坡修整方法,在试车场高速环道(1)的边坡修整中,在盆腔式路基曲面(2)上沿线路纵向及横向利用全站仪放样并设置曲面控制桩(3),相邻曲面控制桩(3)之间进行挂线,将盆腔式路基曲面(2)分割成若干边坡修整方格网(4),利用施工机械在边坡修整方格网(4)内进行边坡修整粗平,后经人工精平达到设计要求;具体实施步骤如下:
a、曲面控制桩(3)放样及设置,
根据试车场高速环道(1)的曲面设计线形,计算试车场高速环道(1)在线路纵向及线路横向上以弦长代替弧长可能的最大间距,在盆腔式路基曲面(2)上按弦长代替弧长的最大间距确定曲面控制桩(3)的位置,利用全站仪放样曲面控制桩(3)的空间位置并埋设曲面控制桩(3);
b、边坡修整,
在曲面控制桩(3)间挂线,将盆腔式路基曲面(2)分割成若干边坡修整方格网(4),施工机械在边坡修整方格网(4)根据曲面控制桩(3)间的挂线高度,进行边坡修整,修整到位后,由人工边坡修整精平,达到边坡修整的设计位置。
与已有技术相比,本发明有益效果体现在:
1、本方法对盆腔式路基边坡修整进行精确控制,路基成型精度高。
2、采用本方法无需对盆腔式路基边坡进行反复修整,简化了施工工序,节约了工期和成本。
附图说明
图1为本发明的边坡修整平面示意图
图2为图1的I-I剖面图
图中标号,1高速环道,2盆腔式路基,3曲面控制桩,4边坡修整方格网,5坡顶,6外侧边坡。
具体实施方式
参见附图,试车场高速环道边坡修整方法,在试车场高速环道1的边坡修整中,在盆腔式路基曲面2上沿线路纵向及横向利用全站仪放样并设置曲面控制桩3,相邻曲面控制桩3间进行挂线,将盆腔式路基曲面2分割成若干边坡修整方格网4,利用施工机械在边坡修整方格网4内进行边坡修整粗平,后经人工精平达到设计要求,具体步骤操作步骤如下:
a、曲面控制桩3放样及设置,
参见图1、图2,根据试车场高速环道1的曲面设计线形,计算试车场高速环道1在线路纵向及线路横向上以弦长代替弧长可能的最大间距。以弦长代替弧长时正矢值需满足规范规定,在满足规定的情况下计算在纵向及横向上以弦长代替弧长可能的最大间距;
在盆腔式路基曲面2上按弦长代替弧长的最大间距确定曲面控制桩3的位置,如根据计算在纵向及横向上的最大间距为10m、5m,则曲面控制桩3的布置间距不得超过10m、5m,边坡修整方格网4的尺寸规格为10m*5m;
利用全站仪放样曲面控制桩3的空间位置并埋设曲面控制桩3;
b、边坡修整,
参见图1、图2,在曲面控制桩3间挂线,将盆腔式路基曲面2分割成若干边坡修整方格网4,施工机械在边坡修整方格网4根据曲面控制桩3间的挂线高度,进行边坡修整,修整到位后,由人工边坡修整精平,达到边坡修整的设计位置。

Claims (1)

1.试车场高速环道边坡修整方法,其特征是:在试车场高速环道(1)的边坡修整中,在盆腔式路基曲面(2)上沿线路纵向及横向利用全站仪放样并设置曲面控制桩(3),相邻曲面控制桩(3)之间进行挂线,将盆腔式路基曲面(2)分割成若干边坡修整方格网(4),利用施工机械在边坡修整方格网(4)内进行边坡修整粗平,后经人工精平达到设计要求;具体实施步骤如下:
a、曲面控制桩(3)放样及设置,
根据试车场高速环道(1)的曲面设计线形,计算试车场高速环道(1)在线路纵向及线路横向上能够以弦长代替弧长的最大间距,在盆腔式路基曲面(2)上按弦长代替弧长的最大间距确定曲面控制桩(3)的位置,利用全站仪放样曲面控制桩(3)的空间位置并埋设曲面控制桩(3);
b、边坡修整,
在曲面控制桩(3)间挂线,将盆腔式路基曲面(2)分割成若干边坡修整方格网(4),施工机械在边坡修整方格网(4)根据曲面控制桩(3)间的挂线高度,进行边坡修整,修整到位后,由人工边坡修整精平,达到边坡修整的设计位置。
CN201210132339.8A 2012-04-28 2012-04-28 试车场高速环道边坡修整方法 Active CN102644230B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210132339.8A CN102644230B (zh) 2012-04-28 2012-04-28 试车场高速环道边坡修整方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210132339.8A CN102644230B (zh) 2012-04-28 2012-04-28 试车场高速环道边坡修整方法

Publications (2)

Publication Number Publication Date
CN102644230A CN102644230A (zh) 2012-08-22
CN102644230B true CN102644230B (zh) 2014-07-02

Family

ID=46657293

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210132339.8A Active CN102644230B (zh) 2012-04-28 2012-04-28 试车场高速环道边坡修整方法

Country Status (1)

Country Link
CN (1) CN102644230B (zh)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103088745B (zh) * 2012-11-05 2015-12-16 中铁十局集团建筑工程有限公司 双曲面混凝土路面曲度控制装置及方法
CN103410072B (zh) * 2013-08-20 2015-07-15 广东盛瑞土建科技发展有限公司 一种使用泡沫轻质土的环形试车道立体弧面的施工方法
CN108487016B (zh) * 2018-03-05 2021-04-06 中交一公局第五工程有限公司 试验场无规律精准高程混凝土路面施工方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB427682A (en) * 1933-05-15 1935-04-29 Ilva Alti Forni E Acciaierie D Improvements in or relating to road and like paving
CN2359324Y (zh) * 1999-02-09 2000-01-19 毛文忠 多功能养路整型机
CN101748896A (zh) * 2008-12-13 2010-06-23 广西建工集团第五建筑工程有限责任公司 现浇混凝土地面平整度和标高控制装置及用于施工的方法
CN101914890A (zh) * 2010-08-31 2010-12-15 中交第二公路勘察设计研究院有限公司 一种基于机载激光测量的公路改扩建勘测方法
CN102147252A (zh) * 2010-12-30 2011-08-10 中铁三局集团电务工程有限公司 客运专线接触网支柱位置的测定方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB427682A (en) * 1933-05-15 1935-04-29 Ilva Alti Forni E Acciaierie D Improvements in or relating to road and like paving
CN2359324Y (zh) * 1999-02-09 2000-01-19 毛文忠 多功能养路整型机
CN101748896A (zh) * 2008-12-13 2010-06-23 广西建工集团第五建筑工程有限责任公司 现浇混凝土地面平整度和标高控制装置及用于施工的方法
CN101914890A (zh) * 2010-08-31 2010-12-15 中交第二公路勘察设计研究院有限公司 一种基于机载激光测量的公路改扩建勘测方法
CN102147252A (zh) * 2010-12-30 2011-08-10 中铁三局集团电务工程有限公司 客运专线接触网支柱位置的测定方法

Also Published As

Publication number Publication date
CN102644230A (zh) 2012-08-22

Similar Documents

Publication Publication Date Title
CN102505598B (zh) 采用泡沫轻质土换填的软土地基加固施工方法
CN103993560B (zh) 大跨度钢混结合梁步履式顶推施工方法及装置
CN102644230B (zh) 试车场高速环道边坡修整方法
CN103046459B (zh) 一种应用毫米gps摊铺高精度路面的方法
CN105951608A (zh) 一种波形钢腹板预应力混凝土组合梁顶推施工方法
CN202300419U (zh) 超浅埋下穿铁路长管棚隧道支护结构
CN201695341U (zh) 一种箱梁预制台座
CN103821038A (zh) 高速铁路路基上拱修复加固结构
CN102031757B (zh) 一种顶进框架桥的底板导向层的施工方法
CN107063213B (zh) 一种适用于黄土地质隧道的地表监测点及布设装置及方法
CN203024955U (zh) 可调多功能流通试验槽平台
CN108589434B (zh) 一种路基底部膨胀土复合桩基的抗隆起设计方法
CN206428538U (zh) 海砂路基结构
CN203654194U (zh) 桥梁快速施工结构
CN207143627U (zh) 全预制装配式整体道路结构
CN114386137B (zh) 基于倾斜摄影技术的道路地形曲面优化设计方法
CN205557348U (zh) 混凝土梁面可调式拉毛装置
CN205044180U (zh) 3d光固化树脂液面快速流平装置
CN105839487B (zh) 一种采用凸型刮尺控制混凝土面负高程的施工方法
CN203593976U (zh) 钢桁梁拖拉法架设用滑移系统
CN203654193U (zh) 一种桥梁快速施工结构
CN103696370B (zh) 一种桥梁快速施工工法及结构
CN103362037B (zh) 考虑地基土体支承作用的桩板结构解析计算方法
CN208792056U (zh) 路基高桩板
CN205399107U (zh) 一种控制基标

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant