CN102638515A - ICT technical support design for global value chain network configuration project - Google Patents

ICT technical support design for global value chain network configuration project Download PDF

Info

Publication number
CN102638515A
CN102638515A CN2011103467731A CN201110346773A CN102638515A CN 102638515 A CN102638515 A CN 102638515A CN 2011103467731 A CN2011103467731 A CN 2011103467731A CN 201110346773 A CN201110346773 A CN 201110346773A CN 102638515 A CN102638515 A CN 102638515A
Authority
CN
China
Prior art keywords
network configuration
gvc
gvc network
engineering
resource
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011103467731A
Other languages
Chinese (zh)
Inventor
李宗诚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2011103467731A priority Critical patent/CN102638515A/en
Publication of CN102638515A publication Critical patent/CN102638515A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

An ICT technical support design for the global value chain network configuration project is a new technology which is built on the brand-new basis of logics, the brand-new basis of mathematics and the brand-new basis of science, aims to modify the 'cloud' computing system into a universal 'heaven-earth' computing system, centers on internet users and multi-level global value chain (GVC), is utilized by a principle line of a high-ranking intelligent integrated system (HIIS) evolution process by connecting and harmonizing a cognitive system and a practice system on the basis of the computer auxiliary system and the internet and assisted by building basic models, normal forms, equation systems of network configuration dynamics and game synergetic organization.

Description

The ICT technical support design of GVC network configuration engineering
Technical field
(generic name is " GVC network technology support system [DCN/IIL (VCSE) to this invention 600 patent of invention clusters that to be applicant Li Zongcheng formally submit to State Patent Office through electronic system in September, 2011; ] " in the 596th.
(generic name is " GVC network technology support system [DCN/IIL (VCSE) for this invention and patent of invention cluster; ] " in the 581st, the 582nd, the 583rd, the 584th, the 585th, the 586th, the 587th, the 588th, the 589th, the 590th, the 591st, the 592nd, the 593rd, the 594th, the 595th, the 597th, the 598th, the 599th, the 600th together, constitute patent of invention crowd " GVC network configuration ICT technique support system (ICT-NAM/[GVC]) " jointly.
" GVC network technology support system [DCN/IIL (VCSE) that the applicant proposes to comprise this invention, is made up of 600 patents of invention; ] "; its bulking property target is; with GVC system (GVC) is core; the connection of carrying out based on computer and network thereof with Natural Intelligence and Artificial Intelligence and coordinate the main line as general intelligence integrated system (GIIS) Upgrade process; set up brand-new logical foundations, Fundamentals of Mathematics, scientific basic and brand-new technology basis and engineering foundation; for relative closure, static relatively " resource pool "---system for cloud computing injects soul, intelligence and life, builds global intelligent integral contract network computer architecture (CS/HSN (GII)), and Global Internet is made becomes the technique support system that really has life and ecological holographic joint management character.On this basis; With GVC system (GVC) is core; The connection of carrying out based on computer aided system and the Internet with cognitive system and practice system and coordinate the main line as high-grade intelligent integrated system (HIIS) evolution process is set up based on brand-new theoretical intelligent integrated scientific and technical system (the IIS & IIT of metasystem (MS) science; ); Logistics net, energy net, Network and Finance Network and the knowledge knowledge network of each field all departments combine together with being dispersed in all over the world with the novel Global Internet of life-giving vigor; Carry out the GVC system engineering energetically; Set up the global intelligent integral really have life and ecological holographic joint management character and dynamically converge open network system (DCN/HII (GVC)), thereby build intelligent integrated net, life the Internet and ecological operation net.GVC system engineering technology cluster exploitation total strategy---inventor Li Zong really is referred to as " since the beginning of history " plan through implementing, and " cloud " counting system that flicker is indefinite is transformed into " world " counting system that converges logical all things on earth, connects longitude and latitude.
The main purpose of this invention is through brand-new logical foundations, Fundamentals of Mathematics, scientific basic and brand-new technology basis and engineering foundation, and the ICT network docking technique of engineering is provided for the GVC network configuration.
All related Mathematical Modelings are the really independent foundation of inventor Li Zong basically in this specification, have original innovation.
This invention belongs to that (network technology of NA/GVC) is supported the field towards GVC network configuration, network organization and network management; Be towards GVC and then towards the intelligent integrated technical foundation of GVC network configuration system, people, mechanism and tissue guided into from flicker indefinite " cloud " (counting system) converge the key of " world " (brand-new counting system) of logical all things on earth.
NA/GVC is a kind of solution of GVC system engineering; By means of the brand-new Information technology and the network technology; Importing the service strategy of GVC and operation mode whole is among the inside and outside related system of GVC network configuration of trunk with the information system; It is the just change on the science and technology, but involves GVC organization internal comprehensive integration and the configuration all about the flow process on the cross-region of personnel, fund, logistics, manufacturing and GVC tissue or transnational border related with the outside.  
NA/GVC is physical resources configuration (logistics), human resources configuration (stream of people), fund resource distribution (wealth stream), information resources configuration (information flow) the integrated GVC configuration software to the inside and outside association of GVC network configuration.The DIM analysis that generates the merchant through Rule Design merchant, system integrator, module towards the inside and outside association of GVC network configuration proposes towards the inside and outside related ultimate consumer of GVC network configuration, social governor motion with Li Zongcheng, the SHF of relative analyzes both at home and abroad, describes the vertical related department of the next generation, horizontal related department and value resource planning (VRP) software.It will comprise the inside and outside related user of GVC network configuration/service system framework, use graphical user interface, use open system and make.Except the existing standard function, it also comprises other characteristic, like the adjustment report of the quality of the inside and outside association of GVC network configuration, process enactment configuration and the inside and outside association of GVC network configuration etc.Particularly, thus the basic technology that NA/GVC adopts will be more prone to upgrading will for simultaneously the independence of the inside and outside related user software and hardware of GVC network configuration two aspects.The key of NA/GVC be all users of the inside and outside association of GVC network configuration can cutting its use, thereby have natural ease for use.
Background technology
In recent years, the fusion of ICT industry three macroreticulars and system for cloud computing technology were pushed ahead international and domestic always energetically.Grid attempts to realize the overall sharing of interconnected internet resource, comprises information resources, data resource, computational resource and software resource etc.
But at present, the fusion of ICT industry three macroreticulars just is being absorbed in the dangerous condition of dying young, the novelty wretched insufficiency of cloud computing technology, and the application of cloud computing meets with all restrictions, and the exploitation of cloud computing system meets with heat, cold difficult situation out of trade in the industry.The fast development of the Along with computer technology and the network technology, along with the increase day by day of financial innovation and financial risks, market competition is further aggravated, and the space and the scope of GVC competition further enlarge, and the integrated of global economy also constantly pushed ahead.Twentieth century progressively develops into the configuration thought of how effectively utilizing and disposing whole resource mainly towards the thought of the comprehensive configuration of GVC internal resource the nineties thereupon.Under this situation, Li Zongcheng has at first proposed the notion report of NA/GVC.
The logical set of the remittance of setting up integrated economic multiattribute measure space based on intelligence, based on intelligence the logical operator of the remittance of integrated economic more rules metric matrix, integrated economic multiple-factor becomes the comprehensive remittance of power and is open to the custom and is and based on intelligence on the basis of the remittance pass function of integrated economic multiplicity algebra system based on intelligence, it is platform and the brand-new network system that logistics network, knowledge network and banking network are combined together that the inventor proposes will develop and set up with the information network---" whole world dynamically converge open network "; And then propose to develop and to set up and a kind of cloud computing and grid computing included at interior brand-new counting system---dispose and " world " computation schema of allocation of financial resource towards knowledge resource configuration, physical resources; Again and then to propose to develop and to set up a kind of serve as crucial and brand-new operation system that various cognitive operation and practice are combined together with computer operating system and internet operating system---and " holographic co-operation system " (OS/HSO).
The GVC that the inventor proposes dynamically converges open network system DCN/IIL (VCSE); Be meant with the multimodal value chain system (VCS of multilayer level; From value of the product chain PVC, GVC GVC; To industry value chain IVC, regional value chain RVC; So that national value chain NVC, GVC GVC) be core; Be fused to the major technique support with telecommunications network (MCN), computer network (WWW) and broadcasting and television network (BTN) three macroreticulars, logistics net (MN), ability drift net (EN), information network (IN), Network and Finance Network (FN) and knowledge knowledge network (KN) five macroreticulars are combined together, the global open network system of full field, total system, overall process comprehensive integration business service is provided.
Calculating of the open network and the world thereof and the holographic co-operation (abbreviation OS/HSO of system dynamically converge in the whole world that inventor's proposition will be developed and set up; Operating System of Holo-synergetic Oganization), be a complete complex system.The world is calculated and is intended to through the logistics under the information network support, knowledge, the full open network that converges of finance; The computational entity that a plurality of costs are relatively low is integrated into a complete intelligent integrated system with powerful calculating ability; And, this powerful computing ability is distributed in the terminal use's hand of information network inside and outside by brand-new business models such as information network inside and outside SaaS/HSO, PaaS/HSO, IaaS/HSO, MSP/HSO.
The whole world is dynamically converged open network and is calculated notion to can be regarded as a kind of be platform and logistics network, knowledge network and banking network compiled connect the application model of getting up with the information network.Not only computer-oriented and information network are calculated in the whole world dynamically remittance open network, and towards logistics network, knowledge network and banking network.It is attempted to surmount information calculations and information network and calculates, and information calculations and information network calculating and logistics network, knowledge network and banking network is compiled connect and operation is closely linked, and realization is intelligent integrated.
As the basis of this invention, brand-new logical foundations comprises the logical logic of holographic remittance, the logical logic of the two poles of the earth remittance, the logical logic of the holographic remittance in the two poles of the earth; Brand-new Fundamentals of Mathematics comprise holographic logical mathematics, the logical mathematics of the two poles of the earth remittance, the system's transition analyze mathematics of converging; Brand-new scientific basic comprises resource distribution dynamics, holographic coordination, the system behavio(u)r theory of value, game coordination, the equilibrium economics that liquidates, holographic logical physics and the perforation science (interdisciplinary science and cross-section science)---metasystem science and the intelligent integrated science that are formed by the big comprehensive of a series of brand-new theories of converging; The brand-new technology basis is is core with the value chain system, towards the synergitic brand-new systems technology of holography (cluster); Brand-new engineering foundation is is core with the value chain system, towards the synergitic brand-new system engineering of holography (cluster).
Summary of the invention
(1) for GVC; The inventor is on the brand-new logical foundations of its independent foundation, Fundamentals of Mathematics, scientific basic and brand-new technology basis and engineering foundation; " world " counting system that converges logical all things on earth, connects longitude and latitude for " cloud " counting system that flicker is indefinite is transformed into; Adhere to that with the GVC system be core; With the connection of cognitive system (RS and computer aided system thereof) and practice system (PS and computer aided system thereof) with coordinate main line, set up the dynamical foundation of network configuration engineering design as high-grade intelligent integrated system (HIIS) evolution process.
(1. 1) await developing energetically the NA/GVC of foundation; Be a information integration, and NA/IVC is an information integration towards supply chain planning operation (Planning Operation of Supply Chain) towards GVC planning operation (Planning Operation of Enterprise Vlue Chain).Outside manufacturing, supply and marketing, monetary items function and the various back-up system and the technology of NA/IVC system, NA/GVC combines vertically reaching laterally related product, project and field on the GVC, has following a series of brand-new technology:
The ICT technical support design of the 581st GVC network configuration mechanism
The ICT technical support design of the 582nd GVC network configuration unit
The ICT technical support design of the 583rd GVC network configuration dynamic foundation
The 584th GVC network configuration odds ratio ICT technical support design
The 585th the holographic collaborative ICT technical support design of GVC network configuration
The ICT technical support design of the 586th GVC network configuration production function
The 587th GVC network configuration is worth the ICT technical support design of metering
The ICT technical support design of the 588th GVC network configuration joint management
The 589th GVC network configuration holography balancing technique basis that liquidates
The 590th GVC network configuration holography balanced tabular technology that liquidates
The ICT technical support design of the 591st GVC network configuration main body
The ICT technical support design of the 592nd GVC network configuration load
The ICT technical support design of the 593rd GVC network configuration mode
The ICT technical support design of the 594th GVC network configuration system
The ICT technical support design of the 595th GVC network configuration environment
The ICT technical support design of the 596th GVC network configuration engineering
The ICT technical support basis of the 597th the just system of GVC network configuration
The 598th GVC network configuration intelligent integral system-computed technical foundation
The 599th GVC network configuration intelligent integral operation system technology basis
The 600th GVC network configuration intelligent integral dynamically converges and leads to technical foundation
(1. 2) inventor regards GVC as resource configuration system and process, and sets up network configuration dynamics normal form.
With the lowermost layer of hierarchical chart as evaluation index; We can be according to the relation between environmental factor and the bearing capacity; Set up judgment matrix; Methods such as the maximum characteristic vector method of integrated use sum of squares approach, Saaty, geometric average method, expert's method are determined the relative importance (weight) of this one deck to last layer.Utilize the counting backward technique in the AHP method, can each value of statistical indicant be carried out consistent the standardization, that is: through utilizing formula
Figure 2011103467731100002DEST_PATH_IMAGE002
Solve the nondimensionalization problem between the index, and in the matrix after make changing each element value 0 and l between, and its monotonicity is constant.
(1. 3) all in all, the following basic natural environmental condition of arbitrary GVC network configuration systems face:
In GVC network configuration action scope, all activities are to iThe utilization of kind of resource will receive nature the iBut the restriction of the bearing capacity of kind of resource aspect (but but comprising instantaneous bearing capacity and long-term bearing capacity).
The now following several respects of this basic restriction table:
a. in GVC network configuration action scope, all activities are to iPlant the actual utilization of resource y 1 i Receive nature iKind of resource can the confession amount y * 1 i Restriction, promptly y 1 i y * 1 i
b. in GVC network configuration action scope, all activities are to iPlant the actual converted amount of resource y 2 i Receive nature iPlant the convertible amount of resource y * 2 i Restriction, promptly y 2 i y * 2 i
c. in GVC network configuration action scope, all activities are to iThe reality of planting resource substitutes amount y 3 i Receive nature iPlant the alternative amount of resource y * 3 i Restriction, promptly y 3 i y * 3 i
d. in GVC network configuration action scope, all activities are to iThe actual reproduction amount of the data of kind y 4 i Receive nature iPlant the reproducible amounts of resource y * 4 i Restriction, promptly y 4 i y * 4 i
GVC network configuration system constitutes GVC network configuration natural ecosystems jointly with natural environment on every side.For this type system, we need divide five action scopes to consider GVC network configuration ecological balance condition.
In self-organizing competition action scope, realize aspect certain resource that balance of nature, GVC network configuration system just receive following essential condition constraint:
a1. nature is iPlant the bearing capacity of resource aspect BN i ( t) attenuation rate β i ( t) the time period of being considered [ t 0, t 1] in must be not more than arbitrarily small number ε i , promptly
β i? (? t?)?≤? ε i? , t∈?[? t? 0?,? t? 1?] (?2.?232?)
a2. the GVC network configuration system of self-organizing competition G 1To iPlant the utilization of natural resources DG 1, i ( t) the time period of being considered [ t 0, t 1] in must approach the bearing capacity of nature aspect i kind resource BN i ( t), promptly
| ?DG ?1,? i? (? t?)?–? BN i? (? t?)?|?≤? η i ? β i? (? t?)?≤? ε i? ,? t∈?[? t? 0?,? t? 1?]?(?2.?233?)
Concentrating tissue competition action scope, realize aspect certain resource that balance of nature, GVC network configuration system just should receive following essential condition constraint:
b1. nature is iPlant the bearing capacity of resource aspect BN i ( t) attenuation rate β i ( t) the period of being considered [ t 0, t 1] in must be not more than arbitrarily small number ε i , promptly
β i? (? t?)?≤? ε i? , t∈?[? t? 0?,? t? 1?] (?2.?234?)
b2. concentrate the GVC network configuration system of tissue competition G 2To iPlant the utilization of natural resources DG 2, i ( t) the time period of being considered [ t 0, t 1] in must approach the bearing capacity of nature aspect i kind resource BN i ( t), promptly
| ?DG ?2,? i? (? t?)?–? BN i? (? t?)?|?≤? η i ? β i? (? t?)?≤? ε i? ,? t∈?[? t? 0?,? t? 1?](?2.?235?)
In basic synergy territory, realize aspect certain resource that balance of nature, GVC network configuration system just should receive following essential condition constraint:
c1. nature is iPlant the bearing capacity of resource aspect BN i ( t) attenuation rate β i ( t) the period of being considered [ t 0, t 1] in must be not more than arbitrarily small number ε i , promptly
β i? (? t?)?≤? ε i? , t∈?[? t? 0?,? t? 1?] (?2.?236?)
c2. basic collaborative GVC network configuration system G 3To iPlant the utilization of natural resources DG 3, i ( t) in the time period of being considered
[ t 0, t 1] in must approach nature the iPlant the bearing capacity of resource aspect BN i (t), promptly
| ?DG ?3,? i? (? t?)?–? BN i? (? t?)?|?≤? η i ? β i? (? t?)?≤? ε i? ,? t∈?[? t? 0?,? t? 1?]?(?2.?237?)
In self-organizing cooperation action scope, realize aspect certain resource that balance of nature, GVC network configuration system just should receive following essential condition constraint:
d1. nature is iPlant the bearing capacity of resource aspect BN i ( t) attenuation rate β i ( t) the period of being considered [ t 0, t 1] in must be not more than arbitrarily small number ε i , promptly
β i? (? t?)?≤? ε i? , t∈?[? t? 0?,? t? 1?] ?(?2.?238?)
d2. the GVC network configuration system of self-organizing cooperation G 4To iPlant the utilization of natural resources DG 4, i ( t) in the period of being considered
[ t 0, t 1] in must approach nature the iPlant the bearing capacity of resource aspect BN i ( t), promptly
| ?DG ?4,? i? (? t?)?–? BN i? (? t?)?|?≤? η i ? β i? (? t?)?≤? ε i? ,? t∈?[? t? 0?,? t? 1?](?2.?239?)
Organize the cooperation action scope concentrated, realize aspect certain resource that balance of nature, GVC network configuration system just should receive following essential condition constraint:
e1. nature is iPlant the bearing capacity of resource aspect BN i ( t) attenuation rate β i ( t) the period of being considered [ t 0, t 1] in must be not more than arbitrarily small number ε i , promptly
β i? (? t?)?≤? ε i? , t∈?[? t? 0?,? t? 1?] ?(?2.?240?)
e2. concentrate the GVC network configuration system of tissue cooperation G 5To iPlant the utilization of natural resources DG 5, i ( t) the period of being considered [ t 0, t 1] in must approach nature the iPlant the bearing capacity of resource aspect BN i ( t), promptly
| ?DG ?5,? i? (? t?)?–? BN i? (? t?)?|?≤? η i ? β i? (? t?)?≤? ε i? ,? t∈?[? t? 0?,? t? 1?](?2.?241?)
(1. 4) all in all, the following basic social environmental condition of arbitrary GVC network configuration systems face:
In GVC network configuration action scope, all activities are to iThe utilization of kind of resource will receive society the iBut the restriction of the bearing capacity of kind of resource aspect (but but comprising instantaneous bearing capacity and long-term bearing capacity).
The now following several respects of this basic restriction table:
a. in GVC network configuration action scope, all activities are to iPlant the actual utilization of resource z 1 i Receive in the society iKind of resource can the confession amount z * 1 i Restriction, promptly z 1 i z * 1 i
b. in GVC network configuration action scope, all activities are to iPlant the actual converted amount of resource z 2 i Receive society to the iKind of resource can the confession amount z * 2 i Restriction, promptly z 2 i z * 2 i
c. in GVC network configuration action scope, all activities are to iThe reality of planting resource substitutes amount z 3 i Receive in the society iPlant the alternative amount of resource z * 3 i Restriction, promptly z 3 i z * 3 i
d. in GVC network configuration action scope, all activities are to iPlant the actual reproduction amount of resource z 4 i Receive in the society iPlant the reproducible amounts of resource z * 4 i Restriction, promptly z 4 i z * 4 i
GVC network configuration system constitutes GVC network configuration society ecosystem jointly with social environment on every side.For this type system, we need divide five action scopes to consider social ecological balance condition.
In self-organizing competition action scope, realize the social ecological balance aspect certain resource, GVC network configuration system just should receive following essential condition constraint:
a1. society is the iPlant the bearing capacity of resource aspect BS i ( t) attenuation rate α i ( t) the time period of being considered [ t 0, t 1] in must be not more than arbitrarily small number ε i , promptly
α i? (? t?)?≤? ε i? , t∈?[? t? 0?,? t? 1?] (?2.?242?)
a2. the GVC network configuration system of self-organizing competition G 1To iPlant the utilization of resource DG 1, i ( t) the time period of being considered [ t 0, t 1] in must approach society the iPlant the bearing capacity of resource aspect BS i ( t), promptly
| ?DG ?1,? i? (? t?)?–? BS i? (? t?)?|?≤? η i ? α i? (? t?)?≤? ε i? ,? t∈?[? t? 0?,? t? 1?]?(?2.?243?)
Concentrating tissue competition action scope, realize the social ecological balance aspect certain resource, GVC network configuration system just should receive following essential condition constraint:
b1. society is the iPlant the bearing capacity of resource aspect BS i ( t) attenuation rate α i ( t) the time period of being considered [ t 0, t 1] in must be not more than arbitrarily small number ε i , promptly
α i? (? t?)?≤? ε i? , t∈?[? t? 0?,? t? 1?] (?2.?244?)
b2. concentrate the GVC network configuration system of tissue competition G 2To iPlant the utilization of resource DG 2, i ( t) the period of being considered [ t 0, t 1] in must approach society the iPlant the bearing capacity of resource aspect BS i ( t), promptly
| ?DG ?2,? i? (? t?)?–? BS i? (? t?)?|?≤? η i ? α i? (? t?)?≤? ε i? ,? t∈?[? t? 0?,? t? 1?]?(?2.?245?)
In basic synergy territory, realize aspect certain resource that social practice balance, GVC network configuration system will receive following essential condition constraint:
c1. society is the iPlanting the resource aspect is bearing capacity BS i ( t) attenuation rate α i ( t) the time period of being considered [ t 0, t 1] in must be not more than arbitrarily small number ε i , promptly
α i? (? t?)?≤? ε i? , t∈?[? t? 0?,? t? 1?] (?2.?246?)
c2. basic collaborative GVC network configuration system G 3To iPlant the utilization of resource DG 3, i ( t) the time period of being considered [ t 0, t 1] in must approach society the iPlant the bearing capacity of resource aspect BS i ( t), promptly
| ?DG ?3,? i? (? t?)?–? BS i? (? t?)?|?≤? η i ? α i? (? t?)?≤? ε i? ,? t∈?[? t? 0?,? t? 1?]?(?2.?247?)
In self-organizing cooperation action scope, realize the social ecological balance aspect certain resource, GVC network configuration system just should receive following essential condition constraint:
d1. society is the iPlant the bearing capacity of resource aspect BS i ( t) attenuation rate α i ( t) the time period of being considered [ t 0, t 1] in must be not more than arbitrarily small number ε i , promptly
α i? (? t?)?≤? ε i? , t∈?[? t? 0?,? t? 1?] (?2.?248?)
d2. the GVC network configuration system of self-organizing cooperation G 4To iPlant the utilization of resource DG 4, i ( t) the period of being considered [ t 0, t 1] in must approach society the iPlant the bearing capacity of resource aspect BS i ( t), promptly
| ?DG ?4,? i? (? t?)?–? BS i? (? t?)?|?≤? η i ? α i? (? t?)?≤? ε i? ,? t∈?[? t? 0?,? t? 1?]?(?2.?249?)
Organize the cooperation action scope concentrated, realize the social ecological balance aspect certain resource, GVC network configuration system just should receive following essential condition constraint:
e1. society is the iPlant the bearing capacity of resource aspect BS i ( t) attenuation rate α i ( t) the time period of being considered [ t 0, t 1] in must be not more than arbitrarily small number ε i , promptly
α i? (? t?)?≤? ε i? , t∈?[? t? 0?,? t? 1?] (?2.?250?)
e2. concentrate the GVC network configuration system of tissue cooperation G 5To iPlant the utilization of resource DG 5, i ( t) the time period of being considered [ t 0, t 1] in must approach society the iPlant the bearing capacity of resource aspect BS i ( t), promptly
| ?DG ?5,? i? (? t?)?–? BS i? (? t?)?|?≤? η i ? α i? (? t?)?≤? ε i? ,? t∈?[? t? 0?,? t? 1?](?2.?251?)
(1. 5) for the GVC network configuration, the various factors of integration engineering and condition constitute two basic aspects respectively: GVC network configuration nature bearing capacity and the social bearing capacity of GVC network configuration.Here; GVC network configuration nature bearing capacity is meant that nature is the ability that the operation and development of the Internet provide certain or various resource and condition, and GVC network configuration society bearing capacity is meant the social ability that certain or various resource and condition are provided for the operation and development of the Internet.For the bulking property innovation of the Internet operation, GVC network configuration nature bearing capacity and GVC network configuration society bearing capacity all are the importances of can not ignore.
General rationality requirement according to holographic joint management; We not only should consider, estimate GVC network configuration nature bearing capacity and GVC network configuration society bearing capacity from the scope in a state or an area, and should further consider, estimate GVC network configuration nature bearing capacity and GVC network configuration society bearing capacity from global range.Whole world GVC network configuration nature bearing capacity is not the simple summation of various countries GVC network configuration nature bearing capacity, the simple summation that global GVC network configuration society bearing capacity neither various countries GVC network configuration society bearing capacity.In fact, between the various countries GVC network configuration nature bearing capacity, between the various countries GVC network configuration society bearing capacity and between various countries GVC network configuration nature bearing capacity and the various countries GVC network configuration society bearing capacity, exist conspiracy relation widely.
General rationality requirement according to holographic joint management; We not only should consider, estimate in the past GVC network configuration nature bearing capacity and GVC network configuration society bearing capacity; And natural bearing capacity of the GVC network configuration that should consider, estimate the current period and GVC network configuration society bearing capacity, also should consider, estimate GVC network configuration nature bearing capacity and the GVC network configuration society bearing capacity of period (or over a long time) in the future.No matter GVC network configuration nature bearing capacity or GVC network configuration society bearing capacity are not the simple summations of residue bearing capacity, current bearing capacity and potential bearing capacity.Between residue bearing capacity, current bearing capacity and potential bearing capacity, exist conspiracy relation.
(B1) in the multiple inscape of GVC network configuration nature bearing capacity system, the macrovariable that plays the dominating system effect can be divided into three kinds:
a. the flow of material variable M SE ( t); b. the energy flow variables E SE ( t); c. collaborative variable K SEN ( t).
According to GVC network configuration nature bearing capacity notion, " GVC network configuration nature bearing capacity dynamical equation " as follows:
P ?SEN? (? t?)?=? P ?SEN? [? M ?SE ?(? t?),? E ?SE ?(? t?),? K ?SEN? (? t?)?]
=? F ?SEN? (? X ?SE?1? (? t?),? X ?SE?2? (? t?),?…,? X ?SE?6? (? t?)) (?2.?15.?8?)
In the formula, P SEN ( t)--- tThe GVC network configuration nature bearing capacity exponential quantity in period;
X SE1 ( t)--- tThe bearing capacity of the ground key element index in period;
X SE2 ( t)--- tThe energy bearing capacity key element index in period;
X SE3 ( t)--- tThe waters bearing capacity key element index in period;
X SE4 ( t)--- tThe Forest carrying capacity key element index in period;
X SE5 ( t)--- tThe mineral reserve bearing capacity key element index in period;
X SE6 ( t)--- tThe atmosphere bearing capacity key element index in period;
F SEN ( X SE1 ( t), X SE2 ( t) ..., X SE6 ( t))---about X SE i ( t) nonlinear function.
(B2) in the multiple inscape of GVC network configuration bearing capacity system of society, the macrovariable that plays the dominating system effect can be divided into three kinds:
a. " firmly " variable H SE ( t); b. " soft " variable S SE ( t); c. " working in coordination with " variable K SES ( t).
According to GVC network configuration society bearing capacity notion, " GVC network configuration society bearing capacity dynamical equation " as follows:
P ?SES? (? t?)?=? P ?SES? [? H ?SE ?(? t?),? S ?SE ?(? t?),? K ?SES? (? t?)?]
=? F ?SES? (? Y ?SE?1? (? t?),? Y ?SE?2? (? t?),?…,? Y ?SE?6? (? t?)) (?2.?15.?9?)
In the formula, P SES ( t)--- tThe GVC network configuration society bearing capacity exponential quantity in period;
Y SE1 ( t)--- tThe political bearing capacity key element index in period;
Y SE2 ( t)--- tThe cultural bearing capacity key element index in period;
Y SE3 ( t)--- tThe science bearing capacity key element index in period;
Y SE4 ( t)--- tThe education bearing capacity key element index in period;
Y SE5 ( t)--- tThe defence bearing capacity key element index in period;
Y SE6 ( t)--- tThe diplomatic bearing capacity key element index in period;
F S ( Y SE1 ( t), Y SE2 ( t) ..., Y SE6 ( t))---about Y SE i ( t) nonlinear function.
(B3) GVC network configuration nature bearing capacity and GVC network configuration society bearing capacity interconnect, work in coordination with each other, form " integration engineering bearing capacity ".The integration engineering bearing capacity totally can be regarded as and is made up of a large amount of matter essential factor and spiritual key element, social pattern key element and natural form key element.For the integration engineering bearing capacity, be suitable for the examination method that dynamics and statistics combine.
Formula (2. 15. 8) and (2. 15. 9) are combined, can provide " integration engineering bearing capacity dynamical equation " as follows:
P ?SE? (? t?)?=? P ?SE? [? M ?SE ?(? t?),? E ?SE ?(? t?),? K ?SEN? (? t?),? H ?SE ?(? t?),? S ?SE ?(? t?),? K ?SES? (? t?)?]
=? F ?SE? (? X ?SE?1? (? t?),? X ?SE?2? (? t?),?…,? X ?SE?6? (? t?);? Y ?SE?1? (? t?),? Y ?SE?2? (? t?),?…,? Y ?SE?6? (? t?))
(?2.?15.?10?)
In the formula, P SE ( t)--- tThe integration engineering bearing capacity exponential quantity in period;
F SE ( X SE1 ( t), X SE2 ( t) ..., X SE6 ( t); Y SE1 ( t), Y SE2 ( t) ..., Y SE6 ( t))---about
X SE i ( t) and Y SE i ( t) nonlinear function.
(2) for GVC; The inventor is on the brand-new logical foundations of its independent foundation, Fundamentals of Mathematics, scientific basic and brand-new technology basis and engineering foundation; " world " counting system that converges logical all things on earth, connects longitude and latitude for " cloud " counting system that flicker is indefinite is transformed into; Adhere to that with the GVC system be core; With the connection of cognitive system (RS and computer aided system thereof) and practice system (PS and computer aided system thereof) with coordinate main line, set up the know-why of network configuration engineering design as high-grade intelligent integrated system (HIIS) evolution process.
(2. 1) for the network configuration of GVC, the inventor sets up the main functional modules design of network configuration system.
A funding arrangement module (the resource distribution accounting of the inside and outside association of GVC network configuration, finance configuration)
The resource distribution of the inside and outside association of A1 GVC network configuration is adjusted
The funding arrangement of the inside and outside association of A 2 GVC network configuration
The operation control configuration module (planning and implementation of the inside and outside association of GVC network configuration) of the inside and outside association of B GVC network configuration
The main system operation planning of B1, the inside and outside association of GVC network configuration
The material demand planning of B2, the inside and outside association of GVC network configuration
The ability need planning of B3, the inside and outside association of GVC network configuration
The DIM control of B4, the inside and outside association of GVC network configuration
The manufacturer's standard of B5, the inside and outside association of GVC network configuration
C logistics configuration module (supply and the configuration of the inside and outside association of GVC network configuration)
The distribution configuration of the inside and outside association of C 1 GVC network configuration
Stock's control of the inside and outside association of C 2 GVC network configuration
The logistics arrangement of the inside and outside association of C 3 GVC network configuration
Batch tracking configuration of the inside and outside association of C 4 GVC network configuration
D human resources configuration module
The HRP aid decision of the inside and outside association of D 1 GVC network configuration
The human resources configuration of the inside and outside association of D 2 GVC network configuration
The personal income of the inside and outside association of D 3 GVC network configuration is adjusted
The configuration in man-hour of the inside and outside association of D 4 GVC network configuration
(2. 2) big system of whole GVC network configuration and exist feedback mechanism widely with the interaction of nature one social engineering is shown in Fig. 1.GVC network configuration tissue makes decisions according to certain target (or complex); Import certain people, thing, information; Make the mankind between different departments field, carry out harmonious activity (also having feedback mechanism here), the result exports new people, thing, information.This brings huge motive force on the one hand the existence and the development of society, can cause negative effect to natural engineering on the other hand.Two feedback informations are arranged respectively here; The one, the social base of GVC network configuration main body or system (bearing capacity) compares with the social quality index (desired value) on operation basis; Finding out that deviation that mankind's activity brings is progressively dwindled or the feedback information when widening is given policy-making body, is the feedback factor of GVC network configuration process in this social base; On the other hand; The harmful effect that the people of output, thing, information cause for the nature engineering; Compare with natural quality index (desired value); This information is fed back to decision-making section, and to influence next decision process, the engineering situation is exactly the feedback factor that the GVC network configuration influences the nature engineering here.Wherein social base index (desired value) all is that GVC network configuration tissue is confirmed according to the overall goal of the coordinated development of each different stages of development with engineering situation index (desired value).GVC network configuration tissue is regulated control according to this target utilization feedback mechanism and is not departed from predeterminated target to keep mankind's activity, keeps human history and stablizes sustained and coordinated development.
For the collaborative type GVC network configuration engineering of holography, we need carry out component analysis and evaluation, and then carry out step analysis and evaluation.
As a kind of system of complicacy, holographic collaborative type GVC network configuration engineering has oneself general nature engineering and balance of nature condition and mass society engineering and social ecological balance condition thereof.The effect basis of holographic collaborative type GVC network configuration engineering is GVC network configuration nature bearing capacity and GVC network configuration society bearing capacity.The restriction that holographic collaborative type GVC configuration-system should receive the natural bearing capacity of GVC network configuration receives the restriction of GVC network configuration society bearing capacity again.See that from the process of reproduction holographic collaborative type GVC network configuration engineering comprises: collaborative subsystem engineering, collaborative consumption subsystem engineering, coordinated exchange subsystem engineering and the collaborative assignment subsystem engineering of producing.
GVC network configuration nature bearing capacity and GVC network configuration society bearing capacity constitute constraints to the effect of the Internet operation on the whole.Each item democratic system and each item principle of centrality constitute constraints to the main body of the Internet operation on the whole.To the mankind on the whole, the prime design requirement of the Internet engineering is, impels the operation of the Internet should be tending towards the social the Internet balance of a certain period, is tending towards the ecological the Internet balance of a certain period again; Should constantly keep long-term social the Internet balance, constantly keep long-term ecological the Internet balance again.The design centre of the Internet engineering is for setting up big collaborative the Internet main body reasonable process arrangement, effective policy engineering and sound social security to be provided.
The inventor inquires on the Internet network configuration engineering based on product efficacy structure (EVS [PES]).Based on the network configuration engineering of product efficacy structure, should comprise following several different levels on the Internet:
On the Intranet based on the network configuration engineering of product efficacy structure (EVS [PES])
On the industry the Internet based on the network configuration engineering of product efficacy structure (EVS [PES])
On the national the Internet based on the network configuration engineering of product efficacy structure (EVS [PES])
On the GVC based on the network configuration engineering of product efficacy structure (EVS [PES])
The inventor inquires on the Internet network configuration engineering based on Technological Economy foundation structure (RCS [TKS/EBS]).Based on the network configuration engineering of Technological Economy foundation structure, should comprise following several different levels on the Internet:
On the Intranet based on the network configuration engineering of Technological Economy foundation structure (RCS [TKS/EBS])
On the industry the Internet based on the network configuration engineering of Technological Economy foundation structure (RCS [TKS/EBS])
On the national the Internet based on the network configuration engineering of Technological Economy foundation structure (RCS [TKS/EBS])
On the GVC based on the network configuration engineering of Technological Economy foundation structure (RCS [TKS/EBS])
The inventor inquires on the Internet network configuration engineering based on internal-external conspiracy relation (SOS [ESS/ISS]).Based on the network configuration engineering of internal-external conspiracy relation, should comprise following several different levels on the Internet:
On the Intranet based on the network configuration engineering of internal-external conspiracy relation (SOS [ESS/ISS])
On the industry the Internet based on the network configuration engineering of internal-external conspiracy relation (SOS [ESS/ISS])
On the national the Internet based on the network configuration engineering of internal-external conspiracy relation (SOS [ESS/ISS])
On the GVC based on the network configuration engineering of internal-external conspiracy relation (SOS [ESS/ISS])
(2. 2) inventor considers that the basic cofactor kinetics relation that will work in coordination with type GVC network configuration system is divided into two aspects, that is: the basic motive effect relation and the ecological dynamic effect relation of collaborative type GVC network configuration system.
The factor that constitutes collaborative type GVC network configuration system basic motive effect relation can be divided into two aspects; That is: be based on collaborative configuration effect and the competition configuration load that resource configuration system constitutes on the one hand, be based on collaborative configuration income and competition deployment cost that resource configuration system constitutes on the other hand.With regard to first aspect, the collaborative configuration effect that constitutes based on resource configuration system is not only with respect to collaborative configuration-system resource external load, and with respect to the resource load of collaborative configuration-system inside.The adequate condition that the collaborative type GVC network configuration system of this fundamental relation factor affecting and decision exists and changes.The basic motive factorial analysis constitutes the feasibility analysis field of basic motive effect.With regard to second aspect, relevant with the social necessary effect of collaborative configuration based on the collaborative configuration income that resource configuration system constitutes with collaborative deployment cost, thus relevant with the value of collaborative configuration mechanism.The necessary condition that the collaborative type GVC network configuration system of this fundamental relation factor affecting and decision exists and changes.The basic effect factorial analysis constitutes the efficiency analysis field of basic motive effect.
The factor that constitutes collaborative type GVC network configuration system ecology dynamic effect relation can be divided into two aspects; That is: be based on cooperative surroundings carrying and the competitive environment load that resource configuration system constitutes on the one hand, be based on collaborative ecological income and the ecological cost of competition that resource configuration system constitutes on the other hand.With regard to first aspect, based on the not only outside environmental load of the collaborative configuration effect of resource configuration system formation with respect to joint management, and the environmental load inner with respect to joint management.The adequate condition that the collaborative type GVC network configuration system of this ecological relationship factor affecting and decision exists and changes.The ecological dynamic factorial analysis constitutes the feasibility analysis field of ecological dynamic effect.With regard to second aspect, relevant with the social necessary effect of competition configuration mechanism based on the collaborative ecological income that resource configuration system constitutes with collaborative ecological cost, thus relevant with the value of collaborative configuration mechanism.The necessary condition that the collaborative type GVC network configuration system of this ecological relationship factor affecting and decision exists and changes.The ecological effect factorial analysis constitutes the efficiency analysis field of ecological dynamic effect.
We can regard the collaborative type GVC system of network integration by collaborative type GVC main body (intelligentized self-organizing control system) as S S M , effective object (supply and demand both sides) S S O , general technique basis S S T And basis of property right S S P And environment S S E The complex large system that interconnects, interacts and form, note is done:
S ?S?S =?<?S ?S?M?,?S ?S?O?,?S ?S?T?,?S ?S?P?,?S ?S?E?,?ψ ?S?>, S ?S =?{?S ?S?M?,?S ?S?O?,?S ?S?T?,?S ?S?P?,?S ?S?E?}
Wherein
S S M ---collaborative type GVC main body S S M Can remember work S S M =< s S M , ψ S M >, wherein
s S M Be elementary organization's unit set s SM = s S M1 , s S M2 ,, s S M n ,
ψ S M Structure function for self-organizing control system ψ S M = ψ S M ( X),
XElementary organization's location mode vector for cooperative system X=( x 1, x 2,, x n ),
S S M, i =< s S M, i , S S M i >( i=1,2,, w) be cooperative system S S M =< s S M , ψ S M >Subsystem,
hBe cooperative system< S S M , h>Structure function, S S M = S S M1 , S S M2 ,, S S M w , h= h( S S M ).
Typical case's collaborative type GVC configuration tissue or main body can regard as by
The GVC game tissue of the concentrated cooperation type in outside concentrated cooperation/inside ( S M A1 )
The GVC game tissue of outside dispersion cooperation/inside dispersion cooperation type ( S M A2 )
The GVC game tissue of outside collecting and distributing working in coordination with/inner collecting and distributing collaborative type ( S M B0 )
The GVC game tissue of the outside concentrated competition in concentrated competition/inside type ( S M C1 )
The GVC game tissue of outside dispersion competition/inside dispersion competition type ( S M C2 ) wait the complication system of common formation, can remember work S M tap That is:
S ?M?S?tap ?=?< ?S ?M?tap ,? ψ ?M?S?tap >, S ?M?tap ?=?{ ?S ?M?A?1? ,? S ?M?A?2? ,? S ?M?B?0? ,? S ?M?C?1? ,? S ?M?C?2? }
Wherein, ψ M S tap Be typical joint management structure function.
General collaborative type GVC configuration tissue or main body can regard as by
The GVC game tissue of outside concentrated working in coordination with/inner concentrated collaborative type ( S M B1 )
The GVC game tissue of outside concentrated working in coordination with/collaborative type of inner dispersion ( S M B2 )
The GVC game tissue of outside concentrated working in coordination with/inner collecting and distributing collaborative type ( S M B3 )
Outside disperse collaborative/inner GVC game tissue of concentrating collaborative type ( S M B4 )
Outside disperse collaborative/inner GVC game tissue that disperses collaborative type ( S M B5 )
The GVC game tissue of collaborative/inner collecting and distributing collaborative type that the outside disperses ( S M B6 )
The GVC game tissue of outside collecting and distributing working in coordination with/inner concentrated collaborative type ( S M B7 )
The GVC game tissue of outside collecting and distributing working in coordination with/collaborative type of inner dispersion ( S M B8 )
The GVC game tissue of outside collecting and distributing working in coordination with/inner collecting and distributing collaborative type ( S M B9 )
Deng the common complication system that constitutes, can remember work S M gen That is:
S ?M?S?gen ?=?< ?S ?M?gen ,? ψ ?M?S?gen >
S ?M?gen ?=?{ ?S ?M?B?1? ,? S ?M?B?2? ,? S ?M?B?3? ,? S ?M?B?4? ,? S ?M?B?5? ,? S ?M?B?6? ,? S ?M?B?7? ,? S ?M?B?8? ,? S ?M?B?9? }
Wherein, ψ M S gen Be general joint management structure function.
S SP ---the property right combination foundation S SP Always link together with certain property rights system combination.If each involved party in the collaborative type GVC network configuration system on average has the amount of property right M d, k Many more, it is also just high more that the rights and interests of this system are enjoyed level.Can provide following new function:
Figure 2011103467731100002DEST_PATH_IMAGE004
In the formula RExpression rights and interests function, M d, k Be k( k=1,2,, l) plant the tax power configuration amount that property right makes up, promptly
Figure 2011103467731100002DEST_PATH_IMAGE006
Wherein, C d, k Be k( k=1,2,, l) plant the configuration intensity of property right combination, x k Be k( k=1,2,, l) plant the quantity of property right combination. M d, k Can regard as k( k=1,2,, l) plant the property right amount of property right combination.
S S T ---generalized network configuring technical basis S S T Mainly comprise the generally collaborative basis of thing, network configuration techniques is basic and be that master's information is basic with the network value coefficient signal of extensive stock combination.
General collaborative basic condition S SG Can be divided into material base condition, information basic condition and spiritual basis condition.Further, can the general basis of working in coordination with the type GVC be regarded as mainly and be made up of five types of element of resources, note is done
S ?SG ?={? S ?S?M? ,? S ?S?E? ,? S ?S?I? ,? S ?S?K? ,? S ?S?G? }。
Wherein, all are by the material of collaborative type GVC main body control or utilization S S M And the energy S S E Constitute the material base of practice, all are by the communications facility of collaborative type GVC main body control or utilization S SI Constitute the information basis of collaborative type GVC, the knowledge that all are grasped or utilized by collaborative type GVC main body
S S K And intelligence S S G Constitute the spiritual basis of collaborative type GVC.As the basic basic condition of the technology of collaborative type GVC system core factor from collaborative type GVC.
The network configuration techniques basis S T It is a multi-level complicated dynamic system that comprises multiple factor.In arbitrary collaborative type GVC systematic procedure, always have the integral body of structure function between the technological and various technology and exist and play a role as one.
The technical system of modern collaborative type GVC can be regarded as by applied in the network configuration process
Member (is basic building block with planning index, the market price and seal and contract documents) S W14 ,
Instrument (is basic tool with quota ticket, currency and quota certification and financial product) S W13 ,
Means (is basic means with administrative power, budget power and common interests and individual interest) S W12 ,
Instrument (is underlying instrument with internal regulator, external regulator filter and planning execution device and city's field detector) S W11 ,
Equipment (with plan analogue system, market robot control system(RCS) and vertically connect and the transverse splicing system is a basic equipment) S W10 ,
Facility (with administrative office system and the marketing field basic facilities of doing) S W9 ,
Program (is base program with administrative procedures, transaction program and cooperation program and competition program) S W8 ,
Rule (is primitive rule with plan rules, market rules and cooperative system and competitive system) S W7 ,
Technology (with planned regulation technology, market regulation is technological and leadership skill and Negotiation Skills are basic skills) S W6 ,
Plan (is basic plan with short-term plan, budget layout and planning for a long time and contention scheme) S W5 ,
Method (is basic skills with plan management method, market method for organizing and cooperation method and competing method) S W4 ,
Strategy (is elementary tactics with cooperation policy, competitive strategy and cooperative game and competition game) S W3 ,
Tactics (deepening and share out the work and help one another with specialty is elementary tactic) S W2 ,
Strategy (is basic strategy with collaborative positioning strategy) S W1
Etc. the complexity dynamic system of different levels various factors formation, promptly
S ?T?S =?<? S ?T ,? ψ ?T >?(? S ?T =?{? S ?T?1? ,? S ?T?2? ,?···,? S ?T?14? })。
Here, can be with the network configuration techniques system S T Be divided into 14 levels ( i=1,2,, 14): S T =< s ST , ψ ST >---multi-level multifactor network configuration techniques system, wherein s T Be the elements combination of network configuration techniques system, promptly
{? s ST11? ,? s ST?12? ,?···,? s ST?1? k?1? ,? s ST?21? ,? s ST?22? ,?···,? s ST?2? k?2? ,?···?,? s ST?14?1? ,? s ST?14?2? ,?···,? s ST?14? k?14 ?};
ψ ST Structure function for the network configuration techniques system; ψ ST = ψ ST ( X), XBe network configuration techniques factor of system state vector, promptly
(? x ?11?,? x ?12?,?···,? x ?1? k?1? ,? x ?21?,? x ?22?,?···,? x ?2? k?2? ,?···?,? x ?14?1?,? x ?14?2?,?···,? x ?14? k?14 ?);
Wherein,
< A ST, I j , S ST i j >Be the network configuration techniques system< A ST , ψ ST > iThe level subsystem, i=1,2,, 14; j=0,1,2,, k i
D( h i , S ST i ) be the network configuration techniques system< A ST , ψ ST > iHiberarchy Decomposition;
S ST i Be iThe state vector of level subsystem, promptly ( S STi1 , S STi2 ,, S STik i );
h i Be iThe level subsystem< S ST i , h i >Structure function;
S ST?i ?=?{? S STi1? ,? S STi2? ,?···,? S STik?i }
For collaborative type GVC, the network value signaling mechanism of grouping of commodities is basic information basis S S V In collaborative type GVC, the configuration intensity of various resources mainly shows as the network value coefficient index of grouping of commodities.Collaborative type GVC main body is mainly carried out FEEDBACK CONTROL and adjusting according to the network value coefficient signal of grouping of commodities to relation between market supply and demand.
Can regard the network value coefficient of the complex large system grouping of commodities of collaborative type GVC of modern times as network value coefficient by the member grouping of commodities c 14, the instrument grouping of commodities the network value coefficient c 13, the means grouping of commodities the network value coefficient c 12, the instrument grouping of commodities the network value coefficient c 11, the equipment grouping of commodities the network value coefficient c 10, the facility grouping of commodities the network value coefficient c 9, the program grouping of commodities the network value coefficient c 8, the rule (comprising system) grouping of commodities the network value coefficient c 7, the skill grouping of commodities the network value coefficient c 6, the plan (comprising design) grouping of commodities the network value coefficient c 5, the method grouping of commodities the network value coefficient c 4, policy commercial product combination the network value coefficient c 3, technological commodity combination the network value coefficient c 2, strategic commodity combination the network value coefficient c 1The complexity dynamic system that the network value coefficient that makes up etc. the different levels extensive stock constitutes, promptly
c ?S =?<? c,? ψ> ?(? c=?{ c ?1?,? c 2?,?···,? c 14?})
At this, with the network value coefficient of complex large system grouping of commodities cBe divided into 14 levels ( i=1,2,, 14)
S S O ---effective object, S SO = S I, SO , S II, SO ,, S X, SO ,
Object S SO Be product supply and demand both sides and product.We can expand product concept and be the Generalized Product notion.Forms such as basic product, joint product, single system product, complication system product and complex large system product can be summed up as element of resource, resource node (model), configuration node (model) respectively, organize node (model) and organize node set.In the basic product space, joint product space, single system product space, complication system product space and complex large system product space etc. can set up corresponding quota index system and corresponding value basis.
As the subordinate factor of collaborative type GVC network configuration system, configuration load or configuration object S C Can be divided into typical case's collaborative configuration load or object S C, Sre , general collaborative configuration load or object S C, Col With complete collaborative configuration load or object S C, Soc
Collaborative type GVC configuration load of typical case or object can regard as by
The resource distribution load of the concentrated cooperation type in outside concentrated cooperation/inside ( S C A1 )
The resource distribution load of outside dispersion cooperation/inside dispersion cooperation type ( S C A2 )
The resource distribution load of outside collecting and distributing working in coordination with/inner collecting and distributing collaborative type ( S C B0 )
The resource distribution load of the outside concentrated competition in concentrated competition/inside type ( S C C1 )
The resource distribution load of outside dispersion competition/inside dispersion competition type ( S C C2 )
Deng the common complication system that constitutes, can remember work S C tap That is:
S ?C?S?tap ?=?< ?S ?C?tap ,? ψ ?C?S?tap >
S ?C?tap ?=?{ ?S ?C?A?1? ,? S ?C?A?2? ,? S ?C?B?0? ,? S ?C?C?1? ,? S ?C?C?2? }
Wherein, ψ C S tap Be the collaborative configuration of typical case load structure function.
General synergetic GVC configuration load or object can regard as by
The resource distribution load of outside concentrated working in coordination with/inner concentrated collaborative type ( S C B1 )
The resource distribution load of outside concentrated working in coordination with/collaborative type of inner dispersion ( S C B2 )
The resource distribution load of outside concentrated working in coordination with/inner collecting and distributing collaborative type ( S C B3 )
Outside disperse collaborative/inner resource distribution load of concentrating collaborative type ( S C B4 )
Outside disperse collaborative/inner resource distribution load that disperses collaborative type ( S C B5 )
The resource distribution load of collaborative/inner collecting and distributing collaborative type that the outside disperses ( S C B6 )
The resource distribution load of outside collecting and distributing working in coordination with/inner concentrated collaborative type ( S C B7 )
The resource distribution load of outside collecting and distributing working in coordination with/collaborative type of inner dispersion ( S C B8 )
The resource distribution load of outside collecting and distributing working in coordination with/inner collecting and distributing collaborative type ( S C B9 )
Deng the common complication system that constitutes, can remember work S C gen That is:
S ?C?S?gen ?=?< ?S ?C?gen ,? ψ ?C?S?gen >
S ?C?gen ?=?{ ?S ?C?B?1? ,? S ?C?B?2? ,? S ?C?B?3? ,? S ?C?B?4? ,? S ?C?B?5? ,? S ?C?B?6? ,? S ?C?B?7? ,? S ?C?B?8? ,? S ?C?B?9? }
Wherein, ψ C S gen Be general collaborative configuration load structure function.
S P E ---cooperative surroundings S PE More varied, varied.We can regard as by collaborative production environment working in coordination with type GVC environment S PPE , collaborative consumer environment S PCE , the coordinated exchange environment S PXE , collaborative distribution environments P PDE The system that interconnects, interacts and form, note is done:
S ?P?ES?? =?<? S ?PPE? ,? S ?PCE? ,? S ?PXE? ,? S ?PDE? ,? ψ E ?>,
S ?PE?? =?{ ?S ?PPE? ,? S ?PCE? ,? S ?PXE? ,? S ?PDE? }
ψ P ---the structure function of collaborative type GVC system, ψ P = ψ P ( X)
X---collaborative type GVC factor of system state vector, promptly
(? x ?11?,? x ?12?,?···,? x ?1? h1? ,? x ?21?,? x ?22?,?···,? x ?2? h?2? ,?···?,? x m?1? ,? x m?2? ,?···,? x mhm ?)
< S I j, P , s I j >---collaborative type GVC system< S i, P , ψ P > iThe level subsystem,
i?=?1,?2,?···,? mj?=?0,?1,?2,?···,? k ?i?
D( h i , s i )---collaborative type GVC system< P i , ψ P > iHiberarchy Decomposition
s i ---the iThe state vector of level subsystem, promptly ( s i1 , s i2 ,, s Ik i )
h i ---the iThe level subsystem< s i , h i >Structure function, s i = s i1 , s i2 ,, s Ik i , h i = h i ( g i )
U ?i?j? ——{? e ?i? |? ψ ?P (? e ?i? )?≥? j ?i? }
Min U I j ( ψ)--- ψ P ( X) minimum vector set, j=0,1,2,, k i
P---the state probability vector of collaborative type GVC system, promptly ( P(0), P(1), P(2),, P( k i ))
∧---conjunction means in lattice operation and gets little computing
∨---extract, in lattice operation, mean and get macrooperation
MCBSES---the relevant checks and balances system of multi-level multimode
MIF---monotonic increase discrete function
(2. 3) provide the big system of GVC network configuration carries out Hiberarchy Decomposition by structure and function Mathematical Modeling at present.We can be modeled as this hierarchical set (hierarchical set) of hierarchical structure directed graph (1evel structured diagraphs) [200] [201]
To the big system of GVC network configuration G I After carrying out Hiberarchy Decomposition by structure and function, G I Structurally can represent to become a hierarchical set
(?2.?2?)
The effect of GVC network configuration system generally comprises the effect of GVC network configuration main body, the effect of GVC network configuration object, the effect of GVC network configuration techniques and the effect of GVC network configuration environment.GVC network configuration system behavio(u)r (GFE) is the concentrated expression of GVC network configuration main body effect (MFE), GVC network configuration object effect (QFE), GVC network configuration techniques effect (WFE) and GVC network configuration environment effect (EFE); Furtherly, GVC network configuration system behavio(u)r is comprehensive and comprehensive performance of GVC network configuration main body effect.
The target and the requirement of target and the requirement of the effect of GVC network configuration main body and society and self or high-rise GVC network configuration main body are associated; The effect of GVC network configuration object and the effect of GVC network configuration techniques all are associated with the target and the requirement of GVC network configuration main body; The effect of GVC network configuration environment is associated with the target and the requirement of GVC network configuration system; The target and the requirement of target and the requirement of the effect of GVC network configuration system and society and self or high-rise GVC network configuration main body are associated.
Analytic hierarchy process (AHP) (AHP-Analytic Hierarchy Process) can be used for the GFD process.Theory framework based on GVC network configuration effect; The utilization resulting social desirability of AHP (or requirement of main body self), plan requirement, subitem task characteristic, subitem operation and change require comparatively accurate to the integrated ordered weight of GVC network configuration overall goal; The consistency of judging is remarkable, and can use C.R. (Consistent Ratio) index to verify.Based on this idea, according to the four-stage of GFD process, be general objective with society and total satisfaction of GVC network configuration main body, we can set up total satisfaction and pass stratum's aggregated(particle) structure.
In the GVC network configuration process; The transmission of any signal and information produces hysteresis always, and practical problem quite a few must be by non-linear portrayal, and because the existence of disturbing factor; Some loop is temporary transient interrupts or when connecting again, causes the variation on the hysteresis control system recurring structure.In addition; Because the scale of control; Like multilayer, pass the response of the control system between rank, multiloop, negative feedback, many inputs, many output, be the variation on the big system configurations of control that lag behind of group more than one, and owing to the uncertainty of modeling more; Therefore study organize when lagging behind the interval more more and become the structure and related robust stabilizing problem that non-linear correlation is controlled big system, significant [230]
Consideration becomes the GVC network configuration of non-linear correlation and controls big system when having the many hysteresis of many groups interval, it is represented by w related subsystem:
Figure 2011103467731100002DEST_PATH_IMAGE012
Figure 2011103467731100002DEST_PATH_IMAGE014
Figure 2011103467731100002DEST_PATH_IMAGE016
Figure 2011103467731100002DEST_PATH_IMAGE018
?
Figure 2011103467731100002DEST_PATH_IMAGE022
(?2.?87? a?)
Figure 2011103467731100002DEST_PATH_IMAGE024
Figure 380428DEST_PATH_IMAGE022
(?2.?87? b?)
Here,
xR Ni Be the state of GVC network configuration system,
UR Mi Be the control input of GVC network configuration main body,
YR Fi Be the output of GVC network configuration system,
FR L i Interference for the decision of the senior level outside the GVC network configuration system;
Figure 2011103467731100002DEST_PATH_IMAGE028
Figure 2011103467731100002DEST_PATH_IMAGE030
is the GVC network configuration incidence matrices that is produced by basic GVC network configuration incidence matrices
Figure 2011103467731100002DEST_PATH_IMAGE032
; Be designated as
Figure 2011103467731100002DEST_PATH_IMAGE034
, i.e.
Figure 2011103467731100002DEST_PATH_IMAGE036
or
Figure 2011103467731100002DEST_PATH_IMAGE038
;
The time bending moment battle array A ( r) ( t), A ( s) ( t), B ( d) ( t), C ( h) ( t) be the uncertain matrix of suitable dimension, and excursion satisfies:
Figure 2011103467731100002DEST_PATH_IMAGE040
,
Figure 2011103467731100002DEST_PATH_IMAGE042
Figure 2011103467731100002DEST_PATH_IMAGE044
,
Figure 2011103467731100002DEST_PATH_IMAGE046
(?2.?88?)
Figure 2011103467731100002DEST_PATH_IMAGE048
;
Figure 2011103467731100002DEST_PATH_IMAGE050
; ;
Wherein
Figure 2011103467731100002DEST_PATH_IMAGE056
,
Figure 2011103467731100002DEST_PATH_IMAGE058
Figure 2011103467731100002DEST_PATH_IMAGE060
is the certainty matrix.And have
Figure 2011103467731100002DEST_PATH_IMAGE064
(?2.?89?)
Figure 2011103467731100002DEST_PATH_IMAGE066
Hysteresis non-linearity more than many groups is become related GVC network configuration when interval and control big system (2. 87); If do not consider its perturbations associations and hysteresis disturbance associations and nonlinear terms, then formula (2. 87) turns to the linear time varying control system of no hysteresis non-structure disturbance parameter and does
Figure 2011103467731100002DEST_PATH_IMAGE068
Figure 2011103467731100002DEST_PATH_IMAGE070
(?2.?90?)
To
Figure 2011103467731100002DEST_PATH_IMAGE072
and incidence matrices
Figure 2011103467731100002DEST_PATH_IMAGE074
Figure 2011103467731100002DEST_PATH_IMAGE076
of lagging behind; Become related GVC network configuration when interval to control the null solution of the closed-loop system of big system (2. 87) be asymptotically stable if having many hysteresis non-linearities, become related GVC network configuration when then weighing-appliance has many hysteresis non-linearities interval and control big system relationship robust stabilizing.
(3) for GVC; The inventor is on the brand-new logical foundations of its independent foundation, Fundamentals of Mathematics, scientific basic and brand-new technology basis and engineering foundation; " world " counting system that converges logical all things on earth, connects longitude and latitude for " cloud " counting system that flicker is indefinite is transformed into; Adhere to that with the GVC system be core; Introduce suitable, be used for reflecting respectively general Complex Adaptive Systems basic motive, base load, basic effect, consume basically, the various basic collaborative variablees of inner cooperation and competition and outside cooperation and competition, set up the rationalization evaluation model and the technical scheme of network configuration system engineering.
(3. 1) for the design of new GVC network configuration engineering, should be set up rational standard or interpretational criteria.This reasonability should and can only be established from the overall interests of the mankind.Furthermore; Standard design field as new economics; Big collaborative GVC network configuration engineering and with the interconnecting and interacting of GVC configuration-system; Should both adapt with the Individual of Humanity interests; Group interest with the mankind adapts again, also will adapt with all interests of the mankind; Should adapt with the mankind's immediate interests, the future benefit with the mankind adapts again, also will adapt with the mankind's permanent interests.
The rational principal element that influences engineering design of GVC network configuration and evaluation has: design and evaluation objective A, design and interpretational criteria (index, model, structure) T, the design with the evaluation colony G, design and evaluation model MAnd design and estimator's preference ηIf design is designated as with the reliability of evaluation system R, then
R?=? f?(? A?,? T?, ?G?,? M, η)
To the design and the evaluation of GVC network configuration engineering, should only not regard professional person's thing as, also should there be the representative of various interest groups to participate in.In design and evaluation procedure, design will be brought into play multiple function with evaluation colony, design and evaluation objective as setting; Set up design and evaluation structure; Set up design and assessment indicator system, (qualitatively) design and evaluation index etc. are confirmed in definite design and evaluation index weight.
If rationalize the index composition with reference to ordered series of numbers with the GVC network configuration engineering of estimating with to be designed; GVC network configuration engineering is rationalized the evaluation criterion index and is formed relatively ordered series of numbers of quilt; Then available grey relational grade is represented GVC network configuration engineering and degree of closeness at different levels to be designed and evaluation, and the least squared criterion of utilization expansion is constructed target function and rationalized the grey evaluation model through asking conditional extremum to set up GVC network configuration engineering.
Be provided with mThe item evaluation index nIndividual GVC network configuration engineering factor is formed with reference to ordered series of numbers:
x ?j? =?{? x ?j ?(? i?)?|? i?=?1,?2,…,? m?j?=?1,?2,…,? n?} (?2.?15.?1?)
cLevel GVC network configuration engineering is rationalized evaluation criterion and is formed relatively ordered series of numbers of quilt x h = x h ( i) | h=I, II ..., c i=1,2 ..., m, note x j With x h iThe absolute difference △ of individual index h ( i)=| x j ( i) x h ( i) |, then x j With x h The iThe degree of closeness of individual index is used grey incidence coefficient ζ( x j , x h ) be expressed as [43]
(?2.?15.?4?)
In the formula
Figure 2011103467731100002DEST_PATH_IMAGE080
Be the two-stage lowest difference;
Figure 2011103467731100002DEST_PATH_IMAGE082
Be two-stage maximum difference; ρFor resolution ratio is arranged, span is 0< ρ<1, generally get ρHigher resolution was promptly arranged in=0. 5 o'clock.
If the weight of various evaluation indexes does w i ( i=1,2 ..., m), then there is grey relational grade to do
Figure 2011103467731100002DEST_PATH_IMAGE084
(?2.?15.?5?)
With the least squared criterion in the classical mathematics---square distance and minimum, expand to power square distance and minimum criteria, then rationalize index with GVC network configuration engineering x j With the grade scale index x h Between diversity factor u H j For the Weighted distance of weighing is expressed as
(?2.?15.?6?)
To be designed should being divided into the GVC network configuration engineering of estimating makes u H j Minimum rank.Then there is following GVC network configuration engineering to rationalize the grey evaluation model
Figure 2011103467731100002DEST_PATH_IMAGE088
Figure 2011103467731100002DEST_PATH_IMAGE090
(?2.?15.?7?)
(3. 2) advantage of future scenarios: NA/GVC and problem of enforcement aspect
The advantage of C1 future scenarios: NA/GVC
a. the camera choice property of the inside and outside association of GVC network configuration
In the face of the market of keen competition, the planning of steadily cooperation and network across time and space; GVC is organized in the internationalization running that is full of the exchange rate fluctuation risk; As can not comprise that income design schedule, expenditure design schedule, total design schedule etc. carry out the running of camera choice property, so to the various exchange rate, various countries' customer order, various transaction; Even GVC profit in one's hands, also can because of the fluctuation of the exchange rate or slowly project shrink.Under NA/GVC state, the data message of the inside and outside association of GVC network configuration and data are interlocks and are updated at any time that each stakeholder can grasp instant information at any time.
b. the polynary integration of the inside and outside association of GVC network configuration
Under NA/GVC state, the various information of the inside and outside association of GVC network configuration integrated will provide necessary condition for the scientification of decision-making.NA/GVC gets up the various information integrations of the inside and outside association of GVC network configuration; Be connected like a cork; Just make budget, planning more accurate, control more practicable, also make actual numeral that takes place and the variance analysis between the budget, configuration control is more easy and quick.
c. the multidimensional relevance of the inside and outside association of GVC network configuration
Under NA/GVC state, on the one hand, close association between upstream department and middle reaches department and the lower dept longitudinally; On the other hand, close association between horizontal department of system and cooperation department and the supporting department.This vertical association with laterally related in, core product and project, dominant traffic and project, outside ventures and project, auxiliary products and project and derived product and project combine, and form GVC; And Rule Design merchant, system integrator, module generation merchant, ultimate consumer and social governor motion and domestic and international relative combine, and form benefit community.
d. the holographic concertedness of the inside and outside association of GVC network configuration
Under NA/GVC state; As the market of competition configuration mechanism, as the planning of cooperation configuration mechanism with as the network of coordinating configuration mechanism; Interconnect, cooperatively interact, determine the holographic concertedness in inside and the outside holographic concertedness of GVC jointly.The holographic concertedness in the inside of GVC is mainly reflected on the conspiracy relation between Rule Design merchant, system integrator, the module generation merchant, and the outside holographic concertedness of GVC is mainly reflected on the conspiracy relation between ultimate consumer, social governor motion, the domestic and international relative.
e. the expection adaptability of the inside and outside association of GVC network configuration
The vertical related department subsystem of NA/GVC system, horizontal related department subsystem and project center subsystem; Integrating monetary items accounting, resource distribution accounting, cost-benefit adjusts; Merge with other subsystems again; The synergitic metasystem of this holography is integrated, and the information providing of the inside and outside association of GVC network configuration, helps the GVC project is done prospective analysis and prediction.
Attention problem in C 2 future scenarios: NA/GVC implementation process
a. the demand analysis of the inside and outside association of GVC network configuration, confirm real-world objects
Domestic GVC development is more and more faster, and configuration mode does not catch up with the development in market gradually, so be badly in need of improving configuration with NA/GVC system, often there is the demand risk in this situation.GVC is before preparing to use NA/GVC system; Need carry out demand analysis reasoningly: whether can solve on financial resources GVC and can support whether the enforcement configurations work of NA/GVC makes personnel's quality is enough highly before last NA/GVC, whether need to prepare consulting firm's assistance can determine what is correct thing in order if what system is the current problem that presses for solution most of GVC be; And then doing things right, risk will reduce greatly.
b. the enforcement of the inside and outside association of GVC network configuration is prepared
The GVC tissue utilizes NA/GVC to improve GVC competitiveness, cooperation power and coordination power, still, reaches NA/GVC highway, and " driving license " of being admitted to configuration specification is the most basic assurance.If the configurations of GVC own is lack of standardization, just must carry out the preparation that fights a protracted war, otherwise the implementation cycle is long, GVC and supplier's confidence will get a hard knock, and the stranded risk of project will strengthen; Do not look to NA/GVC to change the configuration mode and delivery flow process of GVC, it is configuration tool and advanced idea, can control it, see GVC tissue and supplier's ability.
c. engineering is worked in coordination with in the holography of stakeholder's fellowship of the inside and outside association of GVC network configuration
Awaiting developing the NA/GVC of foundation, is the collaborative engineering of holography of metasystem property.The stakeholder's fellowship that has only the inside and outside association of GVC network configuration just can make the enforcement of NA/GVC succeed.In fact, the enforcement of NA/GVC is Rule Design merchant, system integrator, module generates the process of carrying out game between merchant, ultimate consumer, social governor motion and the domestic and international relative, is that cooperative game occupies a kind of broad sense equilibrium under the superiority condition.It is high that team is implemented in the initial stage learning enthusiasm to NA/GVC, is one of necessary condition of successful implementation NA/GVC but continue confidence.
d. set up the project configuration system of the inside and outside association of GVC network configuration.
Await developing the NA/GVC project of foundation; It is a GVC configuration-system engineering that has system complexity, holographic concertedness, implements characteristics such as difficulty is quite big, the application cycle is quite long; Therefore, GVC is organized in NA/GVC application process, must be from the angle of system engineering and scientific allocation; Establish and improve engineering project configuration scheme and operating mechanism, guarantee the successful implementation of NA/GVC project.Main contents comprise: work out NA/GVC application target clear and definite, that quantize; Carry out the training education of modern configuration knowledge such as NA/GVC, introduce the information-based consulting of GVC, carry out NA/GVC project demands analysis; Carry out GVC configuration innovation; Carry out the reorganization of delivery flow process, carry out NA/GVC project supervisory system and carry out NA/GVC project appraisal system etc., be implementing important reform and the innovation that NA/GVC regards GVC tissue itself as.
e. strengthen training, deepen the understanding
f. the consulting merchant of the inside and outside association of GVC network configuration, supplier's immediate service
NA/GVC is not a simple configuration tool, but is representing advanced delivery flow process and configuration thought.Its enforcement is a complex engineering, is organically blending of IT technological innovation and configuration innovation.This needs NA/GVC supplier and GVC to make joint efforts for a long time, even needs the participation of third party's professional consultation service provider can realize fully really that NA/GVC uses, and reaches re-set target.
g. the data Back ground Information of the inside and outside association of GVC network configuration perfect
Information is the assurance of normal operation, and data must be accurately.A lot of GVCs are difficult to drop into enough energy in the preparation of basic data, the result is " having imported hurrock, the still rubbish of output at last ".For the system high efficiency operation, data must be accomplished complete, accurate.In order to improve the operational efficiency of system, GVC should carry out reasonable coding to corresponding data, helps the information trace and the inquiry of system like this.The basic operation platform of NA/GVC is exactly to be based upon in the element task of data, for the normal operation after NA/GVC importing is laid a good foundation.
C 3 future scenarios: the pattern of successful implementation NA/GVC
NA/GVC system implementation successfully has two primary conditions, and one is suitable software, and another is effective implementation method.Wherein effective implementation method can reduce the content of ten aspects haply:
The one, the support and the promise of the advanced configuration layer of the inside and outside association of GVC network configuration;
The 2nd, there is one not only to understand configuration but also be proficient in the enforcement of software and seek advice from troop;
The 3rd, the reaffirming and supervising of the inside and outside associated configuration information system of GVC network configuration scope of project;
The 4th, the inside and outside associated configuration information system of the GVC network configuration project team's composition;
The 5th, the degree of going deep into of the inside and outside associated configuration information system of GVC network configuration project work;
The 6th, the inside and outside associated item planning of feasible in detail GVC network configuration;
The 7th, the inside and outside associated item continuation planning of feasible in detail GVC network configuration;
The 8th, the inside and outside associated item of GVC network configuration must have suitable resource;
The 9th, " summary of experience ", the quality configuration assessment of all inside and outside related departments of GVC network configuration;
The tenth, the inside and outside associated item of GVC network configuration from modeling, test, try the conversion configurations that formally puts into operation out.
The GVC tissue is selected software; Whether needn't investigate it is real NA/GVC software; Select software function to distinguish, and will select the software that is suitable for according to the difference of the products characteristics of GVC, system organization mode, operation configuration characteristics by the size of GVC.
Delivery flow process reorganization is that GVC is organized the thinking again of existing process flow operation mode and design again, should follow following basic principle: must serve as to lead to adjust institutional framework, must let the executor that the power of decision-making, the participation that must obtain the policymaker and support are arranged, must select suitable flow process to recombinate, must set up the unobstructed channel of communication, institutional framework must to be the center rather than to be the center with the task with target and output with the target of GVC tissue.
A complete NA/GVC system must be a system that ten minutes is numerous and jumbled; (Rule Design merchant, system integrator, module generate relation configuration RD between the merchant/DIM) to the inner kernel software NA/GVC/DIM of its existing configuration GVC, extend to the outside software NA/GVC/SHF of GVC (ultimate consumer, social governor motion, the RD of the configuration of the relation between the relative both at home and abroad/SHF) in addition; Existingly be configured to the main supply chain that logistics/cash flow is an object, configuration supportive supply chain---configurations such as human resources, device resource, financing are arranged again, and to the support of policy-making supply chain.Any one GVC is organized all can not overnight just can realize the system that this is huge.Each GVC all has characteristics of oneself and the subject matter that will solve, and need confirm to implement target and step based on self actual conditions.
Await developing the NA/GVC of foundation, be not only a kind of software, especially a GVC solution.Therefore; Even same set of software; Its implementation method of different GVCs is also different; For example implement which module? How to carry out the classification training? Which rank of is NA/GVC configured to? Is configuration thin to what degree? With the manual configuration merger time how long? When get rid of manual configuration? How to strengthen the enforcement of NA/GVC planning? These all will be confirmed according to the demand and the configure base of GVC; And formulate practicable target and implementary plan, guarantee the successful implementation of NA/GVC.
It is incremental, a continuous perfecting process that GVC is implemented NA/GVC, has only improving constantly of stakeholder's quality, just can guarantee deepening continuously of system.Can combine stakeholder's economic benefit and action through the chapter system of establishing rules to the GVC stakeholder, stakeholder's enthusiasm can be improved like this, and the consciousness of being familiar with flow process also can be enhanced.
C 4 future scenarios: decision NA/GVC implements the influencing factor of success or failure
a. the stakeholder is to the influence of NA/GVC implementation result.
The stakeholder is the important factors that NA/GVC implements, and these stakeholder comprise that decision of the senior level person, Rule Design merchant, system integrator, module generate merchant, NA/GVC enforcement and user of service, advisory agent etc.
b. organizational factor is to the influence of NA/GVC implementation result.
When the factor of NA/GVC being implemented success or failure was analyzed, we should set about from the organizational factor of the inside and outside association of GVC network configuration.Some organizational factors such as the institutional framework of the inside and outside association of GVC network configuration, size of the organization, organizational environment, tissue delivery flow process all can exert an influence to implementation result and the enforcement degree of NA/GVC more or less.The motivation that different GVC sizes of the organization is implemented for NA/GVC, carry out strategy, adopt the type of NA/GVC, to the modification degree of fundamental system, implement performance etc. and have bigger difference.
What need carry out proof analysis future is, which type of effect institutional framework, tissue play to the adaptability of NA/GVC, size of the organization etc. to NA/GVC result of implementation.But,, perhaps also have some other factor,, make the GVC tissue can't improve the success rate that NA/GVC implements significantly like historical, culture and strategic even company has carried out better controlled to these factors.
c. culture is to the influence of NA/GVC implementation result.
When NA/GVC system developed under different cultural backgrounds, the GVC tissue can embody the different social category, and this social category is difficult to change owing to technical stability, and this has just caused some the incompatibility problems in NA/GVC enforcement.Country origin culture that Here it is is to the influencing factor of NA/GVC.
Need future usefulness case study such as people and proof analysis to explain that international GVC is organized in NA/GVC and receives the influence of national difference in implementing, and study these difference content and influence modes.What need consideration is that six big-differences such as culture/language, configuration mode, government, company policy, supervision, legal requiremnt, internal technology personnel reserved resources, stakeholder's technical ability, geography, time zone all are the factors of the transnational successful implementation NA/GVC of influence.Through the method for positive research, we can analyze the influence to NA/GVC implementation result such as the country source of NA/GVC software, the quality of consulting firm, high-rise support of disposing, user.Implementing NA/GVC is not only new software of exploitation, but a kind of cultural comprehensive change and innovation.
From above research to cultural factor, we can not compare the cultural difference of software development GVC the country one belongs to and software implementation GVC the country one belongs to, and ignore the GVC culture only from country origin culture incision.In fact, the GVC culture also is to influence the extremely important factor that NA/GVC implements, because the acceptance level to NA/GVC is different in different GVC culture.
4, description of drawings
Fig. 1 explanation:
The big system of whole GVC network configuration and with the nature one social engineering interaction exist feedback mechanism widely, shown in Fig. 1.GVC network configuration tissue makes decisions according to certain target (or complex); Import certain people, thing, information; Make the mankind between different departments field, carry out harmonious activity (also having feedback mechanism here), the result exports new people, thing, information.This brings huge motive force on the one hand the existence and the development of society, can cause negative effect to natural engineering on the other hand.Two feedback informations are arranged respectively here; The one, the social base of GVC network configuration main body or system (bearing capacity) compares with the social quality index (desired value) on operation basis; Finding out that deviation that mankind's activity brings is progressively dwindled or the feedback information when widening is given policy-making body, is the feedback factor of GVC network configuration process in this social base; On the other hand; The harmful effect that the people of output, thing, information cause for the nature engineering; Compare with natural quality index (desired value); This information is fed back to decision-making section, and to influence next decision process, the engineering situation is exactly the feedback factor that the GVC network configuration influences the nature engineering here.
Fig. 2 explanation:
For the evaluation of GVC network configuration main body ability integration, a lot of because of factor of evaluation (index), need set up multistage fuzzy level valency model, as shown in Figure 2.If have in certain GVC configuration tissue NThe individual is to be appraised, and is selected mIndividual benchmark people (Utopian GVC network configuration main body), wherein N>> mThis system organization contains KIndividual primary subsystem, the number to be appraised of each subsystem is respectively n 1, n 2..., n i ..., n k , then have
Figure 2011103467731100002DEST_PATH_IMAGE092
If note
Figure 2011103467731100002DEST_PATH_IMAGE094
Then the organization system appraisee is P 1, P 2..., P N1 ..., P N1+1 ..., P N2 ..., P N2+1 ..., P N i ..., P N i+ 1 ..., P N k– 1 , P N k– 1+1 ..., P N k
Fig. 3 explanation:
Based on resource distribution dynamics, holographic coordination and the game coordination principle that the inventor sets up, we can carry out overall merit from entity and value two aspects to the collaborative type GVC network configuration main body that disposes towards GVC respectively.
This overall evaluation system such as Fig. 3.Aspect entity, we can analyze the property of GVC configuration tissue through the GVC network configuration main body ability enhancement degree of measuring.But, the ability of GVC network configuration main body comprises many fuzzy qualitative factors, like independence, decision-making capability, risk holding capacity, harmony, the sense of duty, self-organizing level, operating efficiency or the like.The GVC network configuration main body capacity situation of want science, reasonably evaluating just need quantitatively judge these qualitative factors.
Fig. 4 explanation:
GVC network configuration main body ability evaluation index is more, can be divided into different levels between index, and it passs stratum's aggregated(particle) structure such as Fig. 4.Visible by figure, GVC network configuration main body merit rating problem, relate to a plurality of factors such as decision-making capability, risk tolerance, the coordination ability, assets degree of concern.Quilt comments object (GVC configuration tissue or individual) to have certain ambiguity with respect to these evaluation of indexes (excellent, good, in, poor, bad), needs the utilization fuzzy set theory to study.
5, embodiment
Await developing the NA/GVC system of foundation; Be undoubtedly a kind of advanced person's economic science technical system, a kind of advanced management science and technology system and a kind of advanced person's the system engineering theory and practice, it involves a wide range of knowledge, and throws the National People's Congress; Implementation cycle is long; Difficulty is big, has certain risk, need take scientific methods to guarantee the success of the project implementation.
E 1 GVC network configuration project implementation planning
Actual based on the GVC tissue, confirm that whole project divides two stages to carry out:
First stage, mainly implement the inside and outside association of GVC network configuration system control, sell configuration, receivable configuration, logistics arrangement, deal with configuration, stock's configuration, inventory auditing, product data configurations (containing GVC structural arrangements, Process configuration), expense budget configuration (containing expense disposes), monetary items accounting, PDM data preparation and demand analysis, hardware net environmental structure, GVC network configuration.Cycle is about 12 months.Main the integrated of inside and outside related logistics of GVC network configuration and cash flow, standard, the transparent configurations accomplished.
Second stage is production master program, material demand planning, power balance, workshop project configuration, quality configuration, equipment metering configuration, human resources configuration, solution analysis, the GVC network configuration of the inside and outside association of integrated GVC network configuration.Cycle is about 16 months.Main realize the market with the inside and outside association of GVC network configuration be demand, with vertically and the master ga(u)ge that laterally drives divides core into, be the holographic concertedness enterprise schema of main contents with the input and output of the inside and outside association of GVC network configuration; Be controlled at goods effectively; Compress stock to greatest extent; Improve delivery date, satisfy market demand apace.
The overall goal of E 2 network configuration
a. to implement GVC network configuration project is opportunity, promotes GVC by the transformation to the configuration mode of transparent, collaborative, standard, lean of traditional close, poor efficiency, extensive style configuration mode, the realization of support GVC strategic objective.
b. strengthen the GVC configurations.Set up the inside and outside associated data standard of GVC network configuration and the coding scheme of standard, promote the GVC basis to rectify; Strengthen product design, the technical papers standard configurations of the inside and outside association of GVC network configuration; Dispose by norm when the raw materials consumption of the inside and outside association of refinement GVC network configuration, man-hour, the occupation of capital, table of equipment; GVC standard campaign of the inside and outside association of standard GVC network configuration; Strengthen the customer resources information configuration of the inside and outside association of GVC network configuration; The cost of the inside and outside association of refinement GVC network configuration and price configuration; Strengthen the delivery flow process and the role norm configuration of the inside and outside association of GVC network configuration.
c. improve configuration, decision-making technique.The IRP of the inside and outside association of realization GVC network configuration, the data integration of each subsystem and the database overall situation are shared; Set up the GVC Back ground Information structure of the inside and outside association of GVC network configuration, comprise integrated information network and comprehensive mutual form of unified data; The neat cover stock configuration and the analysis of the inside and outside association of GVC network configuration; The process consuming cost of the inside and outside association of GVC network configuration is adjusted; The inside and outside association of GVC network configuration sell the configuration of risk control and customer resources on credit; Vertically reach the integrated application of the horizontal main system operation planning that drives, material demand planning, order configuration; The real-time cost accounting of the branch product of the inside and outside association of GVC network configuration; Fast Quotation; The profit budget and the breakeven analysis of the inside and outside association of GVC network configuration; Online multidimensional data analysis is supported decision application.
d. with the GVC network configuration is standard, and system improving GVC configuration is supported GVC and carried out phyletic evolution, and the GVC that forms transparent, open, collaborative, standard, lean is cultural.
The implementation content of E 3 network configuration
a. the logistics arrangement of the inside and outside association of GVC network configuration.Rely on brand-new information system support; In time transmit the demand of the inside and outside related production system of GVC network configuration; And through with the information integration of the inside and outside related logistics system of GVC network configuration; Rapidly the inside and outside related demand of producing of GVC network configuration is made fast reaction, guarantee the Qi Taoxing of the inside and outside related production material of GVC network configuration.GVC network configuration system proposes the inside and outside related demand planning of producing of GVC network configuration according to system's operation planning; The inside and outside related production system of GVC network configuration can propose the inside and outside related logistics arrangement planning of GVC network configuration according to the neat cover situation of material planning inquiry raw material and parts; Rely on the inside and outside related information of GVC network configuration of GVC network configuration system integrated, set up the inside and outside affiliated supplier's configuration scheme of perfect GVC network configuration; With the foundation of information such as delivery date of the inside and outside affiliated supplier of GVC network configuration, article quality as supplier evaluation; Arrange the inside and outside affiliated supplier's evaluation result of GVC network configuration share distribution, Payments Policy to combine with logistics; Set up the inside and outside related logistics of GVC network configuration and arrange the information bank of configurations such as cycle, economic lot size, safety inventory, for ensureing that in time material supplies provide foundation.
b. sale, stock and the production system of the inside and outside association of GVC network configuration.System's operation planning is the programmatic document that instructs the inside and outside related activity in production of GVC network configuration.For the enforcement of safeguards system operation planning, Feed stream arrangement planning, cooperation part planning, workshop project planning, the equipment that can produce the inside and outside association of GVC network configuration simultaneously use a series of supporting planning such as planning, moulds of industrial equipment planning.System's operation planning and these planning are guiding principle and purpose relation, and guiding principle is lifted and could be opened by order.
c. the cost configuration of the inside and outside association of GVC network configuration.Production cost to the inside and outside association of GVC network configuration is planned, adjusts, is controlled and disposes; Set up the departmental cost budget method of the inside and outside association of GVC network configuration; And with thing in cost analysis compare; Make progressively department of budget, accurate, provide the data of usefulness for GVC organizational decision making.
d. the inside and outside association of GVC network configuration deal with configuration.The account payable subsystem of the inside and outside association of GVC network configuration mainly disposes the various contact funds that GVC takes place with supplier in running; Help GVC configuration person to grasp the flow direction of fund effectively; Control the outflow of GVC fund through monitoring the payment situation, form the good circulation of circulating fund.The account payable subsystem of the inside and outside association of GVC network configuration is filled in invoice, tax and logistics operational costs usefulness based on logistics arrangement activity, also can directly call the order that logistics arranges subsystem to generate.Invoice amount is shared with the warehouse-in material, can confirm to put in storage material payment situation.Generate the account payable account after invoice is transferred items, payment order and account payable account are settled accounts, and confirm the received payment amount of money and the arrearage amount of money, can handle advance payment simultaneously.In order to grasp following cash flow artificial situation in real time; The system of the inside and outside association of GVC network configuration also provides the rich querying statistical function, and arranges subsystem, the integrated use of account subsystem with the inside and outside related logistics of GVC network configuration.
e. the receivable configuration of the inside and outside association of GVC network configuration.The GVC tissue is through the application to GVC network configuration system, and data shares the interchange of completion data message on network between the monetary items department of the inside and outside association of realization GVC network configuration and sales department; The income design schedule money of the monetary items portion of the inside and outside association of GVC network configuration will serve as according to registering with the invoice for sales of sales department; The income design schedule money of the inside and outside association of GVC network configuration is by collecting toward vostro account.Gathering, the invoice for sales of the inside and outside association of GVC network configuration has according to complying with clear and definite flow process source.The returned money clearing time can be assigned to each account due, make income design schedule age, collect the aging reflection in advance in time, accurately, not only can take in design schedule age, collect aging analysis of accounts in advance, can also carry out the returned money aging analysis of accounts.
6,600 patent of invention common implementing plan brief introductions
Through 30 years freely explore; Independent inventor Li Zongcheng is taught in September, 2011 and formally submits 600 applications for a patent for invention to State Patent Office through the electronic application system, and submits materials such as 600 parts of claims that amount to about 3,600 ten thousand words, specification, accompanying drawing to.
Through 30 years freely explore; Independent inventor Li Zongcheng professor is delivering through international and domestic academic journals and academic conference on more than the 80 piece of paper basis of (not containing the achievement that cooperation is accomplished); Independent recently writing is accomplished eight ones has the academic monumental work (amounting to 3,000 ten thousand words) of substantial connection with these 600 technological inventions declaring, plans in September, 2011 after, to handle successively formally publication matters.
600 technological invention patents that this is declared; Be that inventor Li Zong really explores and a brand new technical cluster that establishes one's own system of foundation through 30 years independence and freedom, its generic name is " GVC network technology support system " [DCN/HII (GVC); ].
Based on great initiative academic research achievement and 600 state-of-the-art technology inventions that a series of independence and freedom are accomplished, inventor Li Zong really proposes a strategy that can be referred to as " since the beginning of history " plan---GVC system engineering technology cluster exploitation total strategy.
The total strategy target of GVC network technology support system can be summed up as following content:
1, aspect technological development basic (front end of ICT industrial chain); With the multimodal GVC system of multilayer level (GVC) is core; The connection of carrying out based on computer and network thereof with Natural Intelligence and Artificial Intelligence and coordinate main line as general intelligence integrated system (IIS) Upgrade process; Set up brand-new logical foundations, Fundamentals of Mathematics, scientific basic and brand-new technology basis and engineering foundation; Be that relative closure, static relatively " resource pool "---system for cloud computing injects soul, intelligence and life; Build global intelligent integral network computer system (CS/HSN (GII)), Global Internet is made becomes the technique support system that really has life and ecological holographic joint management.
2, in the application facet (end of ICT industrial chain) of brand new technical; With the multimodal GVC system of multilayer level (GVC) is core; The connection of carrying out based on computer aided system and the Internet with cognitive system and practice system and coordinate the main line as high-grade intelligent integrated system (HIIS) evolution process is set up based on brand-new theoretical intelligent integrated scientific and technical system (the IIS & IIT of metasystem (MS) science; ); With the novel Global Internet of life-giving vigor be dispersed in all over the world logistics net, energy net, Network and Finance Network and the knowledge knowledge network of each field all departments combine together (DCN); Carry out the GVC system engineering energetically; Set up the global intelligent integral really have life and ecological holographic joint management and dynamically converge open network system (DCN/HII (GVC)), thereby build intelligent integrated net, life the Internet and ecological operation net.
GVC system engineering technology cluster exploitation total strategy---the inventor is referred to as " since the beginning of history " plan through implementing, and " cloud " counting system that flicker is indefinite is transformed into " world " counting system that converges logical all things on earth, connects longitude and latitude.
Revolution is calculated in the world based on cloud computing is changed; System is a core with the multimodal GVC of multilayer level; With modern electronic technology, modern communication technology and present information network technology serves as to support the basis; Logistics network, energy network, information network, banking network and knowledge network are combined closely; Set up efficient, intensive, as to have life (or ecological) the self-organizing character big system of intelligent integrated dynamic remittance open network; Greatly simplify Team Management's (and business administration), division management (and management of industry), district management and national management and whole world management; Effectively reduce team (and enterprise) infrastructure cost, department's (and industry) infrastructure cost, region base facility cost and national basis facility cost and global basis facility cost; Improve team (and enterprise) level of IT application, department's (and industry) level of IT application, area information level and national information level and global IT application level comprehensively; All social tissues and activity thereof are become configuration node and the activity thereof in the global multilayer level multi-mode system effect chain network system; Especially all social economic organizations and activity thereof are become configuration node and the activity thereof in the global multilayer level multi-mode value chain network system, cause more educated, intelligent and networked society, tissue, the individual base attribute that becomes the most at last.

Claims (7)

1. independent claims---the ICT technical support design of GVC network configuration engineering; Be that the applicant is setting up on brand-new logical foundations, Fundamentals of Mathematics, scientific basic and brand-new technology basis and the engineering foundation; " world " counting system that converges logical all things on earth, connects longitude and latitude for " cloud " counting system that flicker is indefinite is transformed into; With Internet user is the center; And then be the center with GVC system (GVC); The connection of carrying out based on computer and network thereof with Natural Intelligence and Artificial Intelligence and coordinate main line as general intelligence integrated system (IIS) Upgrade process, through setting up the new technology that network configuration dynamics basic model and normal form put forward, this right is characterised in that:
A, for the ICT technical support of GVC network configuration engineering, brand-new logical foundations comprises that the holographic logical logic, the two poles of the earth of converging converge that logical logic, the two poles of the earth are holographic converges logical logic; Brand-new Fundamentals of Mathematics comprise holographic logical mathematics, the logical mathematics of the two poles of the earth remittance, the system's transition analyze mathematics of converging; Brand-new scientific basic comprises resource distribution dynamics, holographic coordination, the system behavio(u)r theory of value, game coordination, the equilibrium economics that liquidates, holographic logical physics and the perforation science (interdisciplinary science and cross-section science)---metasystem science and the intelligent integrated science that are formed by the big comprehensive of a series of brand-new theories of converging; The brand-new technology basis is is core with the value chain system, towards the synergitic brand-new systems technology of holography (cluster); Brand-new engineering foundation is is core with the value chain system, towards the synergitic brand-new system engineering of holography (cluster);
B, for the ICT technical support of GVC network configuration engineering; " world " calculating itself is an extremely complicated system; Has very complicated holographic joint management structure; Here; On the one hand, various computers and infrastructure thereof, auxiliary device and the network equipment (comprising server, browser) couple together with holographic joint management pattern (comprising ICC, ICK, ICH, IDC, IDK, IDH, IMC, IMK, IMH, ECC, ECK, ECH, EDC, EDK, EDH, EMC, EMK, EMH) and form the computer interconnected network tissue; On the other hand; Various users and effect chain thereof couple together with holographic joint management pattern (comprising ICC, ICK, ICH, IDC, IDK, IDH, IMC, IMK, IMH, ECC, ECK, ECH, EDC, EDK, EDH, EMC, EMK, EMH) and form natural intelligence socialization tissue, and this natural intelligence socialization tissue and computer interconnected network tissue form " world " counting system CS/HSN (GII) that the inventor censured jointly;
C, for the ICT technical support of GVC network configuration engineering, set up the technical system and the dynamical foundation of network configuration engineering design, and then set up the know-why of network configuration engineering design;
D, for the ICT technical support of GVC network configuration engineering; Introduce suitable, be used for reflecting respectively general Complex Adaptive Systems basic motive, base load, basic effect, consume basically, the various basic collaborative variablees of inner cooperation and competition and outside cooperation and competition, set up the rationalization evaluation model and the technical scheme of network configuration system engineering.
2. dependent claims---for GVC, the 1 described inventor sets up the technical system of network configuration engineering design according to independent claims, and this right is characterised in that:
Await developing energetically the NA/GVC of foundation; Be a information integration, and NA/IVC is an information integration towards supply chain network operation (Netting Operation of Supply Chain) towards GVC network operation (Netting Operation of Enterprise Value Chain); Outside manufacturing, supply and marketing, monetary items function and the various back-up system and the technology of NA/IVC system, NA/GVC combines vertically reaching laterally related product, project and field on the GVC, has following a series of brand-new technology:
The ICT technical support design of the 581st GVC network configuration mechanism
The ICT technical support design of the 582nd GVC network configuration unit
The ICT technical support design of the 583rd GVC network configuration dynamic foundation
The 584th GVC network configuration odds ratio ICT technical support design
The 585th the holographic collaborative ICT technical support design of GVC network configuration
The ICT technical support design of the 586th GVC network configuration production function
The 587th GVC network configuration is worth the ICT technical support design of metering
The ICT technical support design of the 588th GVC network configuration joint management
The 589th GVC network configuration holography balancing technique basis that liquidates
The 590th GVC network configuration holography balanced tabular technology that liquidates
The ICT technical support design of the 591st GVC network configuration main body
The ICT technical support design of the 592nd GVC network configuration load
The ICT technical support design of the 593rd GVC network configuration mode
The ICT technical support design of the 594th GVC network configuration system
The ICT technical support design of the 595th GVC network configuration environment
The ICT technical support design of the 596th GVC network configuration engineering
The ICT technical support basis of the 597th the just system of GVC network configuration
The 598th GVC network configuration intelligent integral system-computed technical foundation
The 599th GVC network configuration intelligent integral operation system technology basis
The 600th GVC network configuration intelligent integral dynamically converges and leads to technical foundation.
3. dependent claims---for GVC, set up the dynamics normal form of network configuration engineering according to the independent claims 1 described inventor, this right is characterised in that:
GVC network configuration system constitutes GVC network configuration natural ecosystems jointly with natural environment on every side; For this type system, we need divide five action scopes to consider GVC network configuration ecological balance condition;
In self-organizing competition action scope, realize aspect certain resource that balance of nature, GVC network configuration system just receive following essential condition constraint:
a1. nature is iPlant the bearing capacity of resource aspect BN i ( t) attenuation rate β i ( t) the time period of being considered [ t 0, t 1] in must be not more than arbitrarily small number ε i , promptly
β i? (? t?)?≤? ε i? , t∈?[? t? 0?,? t? 1?] (?2.?232?)
a2. the GVC network configuration system of self-organizing competition G 1To iPlant the utilization of natural resources DG 1, i ( t) the time period of being considered [ t 0, t 1] in must approach the bearing capacity of nature aspect i kind resource BN i ( t), promptly
| ?DG ?1,? i? (? t?)?–? BN i? (? t?)?|?≤? η i ? β i? (? t?)?≤? ε i? ,? t∈?[? t? 0?,? t? 1?]?(?2.?233?)
Concentrating tissue competition action scope, realize aspect certain resource that balance of nature, GVC network configuration system just should receive following essential condition constraint:
b1. nature is iPlant the bearing capacity of resource aspect BN i ( t) attenuation rate β i ( t) the period of being considered [ t 0, t 1] in must be not more than arbitrarily small number ε i , promptly
β i? (? t?)?≤? ε i? , t∈?[? t? 0?,? t? 1?] (?2.?234?)
b2. concentrate the GVC network configuration system of tissue competition G 2To iPlant the utilization of natural resources DG 2, i ( t) the time period of being considered [ t 0, t 1] in must approach the bearing capacity of nature aspect i kind resource BN i ( t), promptly
| ?DG ?2,? i? (? t?)?–? BN i? (? t?)?|?≤? η i ? β i? (? t?)?≤? ε i? ,? t∈?[? t? 0?,? t? 1?](?2.?235?)
In basic synergy territory, realize aspect certain resource that balance of nature, GVC network configuration system just should receive following essential condition constraint:
c1. nature is iPlant the bearing capacity of resource aspect BN i ( t) attenuation rate β i ( t) the period of being considered [ t 0, t 1] in must be not more than arbitrarily small number ε i , promptly
β i? (? t?)?≤? ε i? , t∈?[? t? 0?,? t? 1?] (?2.?236?)
c2. basic collaborative GVC network configuration system G 3To iPlant the utilization of natural resources DG 3, i ( t) the time period of being considered [ t 0, t 1] in must approach nature the iPlant the bearing capacity of resource aspect BN i (t), promptly
| ?DG ?3,? i? (? t?)?–? BN i? (? t?)?|?≤? η i ? β i? (? t?)?≤? ε i? ,? t∈?[? t? 0?,? t? 1?]?(?2.?237?)
In self-organizing cooperation action scope, realize aspect certain resource that balance of nature, GVC network configuration system just should receive following essential condition constraint:
d1. nature is iPlant the bearing capacity of resource aspect BN i ( t) attenuation rate β i ( t) the period of being considered [ t 0, t 1] in must be not more than arbitrarily small number ε i , promptly
β i? (? t?)?≤? ε i? , t∈?[? t? 0?,? t? 1?] ?(?2.?238?)
d2. the GVC network configuration system of self-organizing cooperation G 4To iPlant the utilization of natural resources DG 4, i ( t) the period of being considered [ t 0, t 1] in must approach nature the iPlant the bearing capacity of resource aspect BN i ( t), promptly
| ?DG ?4,? i? (? t?)?–? BN i? (? t?)?|?≤? η i ? β i? (? t?)?≤? ε i? ,? t∈?[? t? 0?,? t? 1?](?2.?239?)
Organize the cooperation action scope concentrated, realize aspect certain resource that balance of nature, GVC network configuration system just should receive following essential condition constraint:
e1. nature is iPlant the bearing capacity of resource aspect BN i ( t) attenuation rate β i ( t) the period of being considered [ t 0, t 1] in must be not more than arbitrarily small number ε i , promptly
β i? (? t?)?≤? ε i? , t∈?[? t? 0?,? t? 1?] ?(?2.?240?)
e2. concentrate the GVC network configuration system of tissue cooperation G 5To iPlant the utilization of natural resources DG 5, i ( t) the period of being considered [ t 0, t 1] in must approach nature the iPlant the bearing capacity of resource aspect BN i ( t), promptly
| ?DG ?5,? i? (? t?)?–? BN i? (? t?)?|?≤? η i ? β i? (? t?)?≤? ε i? ,? t∈?[? t? 0?,? t? 1?](?2.?241?)
GVC network configuration system constitutes GVC network configuration society ecosystem jointly with social environment on every side; For this type system, we need divide five action scopes to consider social ecological balance condition;
In self-organizing competition action scope, realize the social ecological balance aspect certain resource, GVC network configuration system just should receive following essential condition constraint:
a1. society is the iPlant the bearing capacity of resource aspect BS i ( t) attenuation rate α i ( t) the time period of being considered [ t 0, t 1] in must be not more than arbitrarily small number ε i , promptly
α i? (? t?)?≤? ε i? , t∈?[? t? 0?,? t? 1?] (?2.?242?)
a2. the GVC network configuration system of self-organizing competition G 1To iPlant the utilization of resource DG 1, i ( t) the time period of being considered [ t 0, t 1] in must approach society the iPlant the bearing capacity of resource aspect BS i ( t), promptly
| ?DG ?1,? i? (? t?)?–? BS i? (? t?)?|?≤? η i ? α i? (? t?)?≤? ε i? ,? t∈?[? t? 0?,? t? 1?]?(?2.?243?)
Concentrating tissue competition action scope, realize the social ecological balance aspect certain resource, GVC network configuration system just should receive following essential condition constraint:
b1. society is the iPlant the bearing capacity of resource aspect BS i ( t) attenuation rate α i ( t) the time period of being considered [ t 0, t 1] in must be not more than arbitrarily small number ε i , promptly
α i? (? t?)?≤? ε i? , t∈?[? t? 0?,? t? 1?] (?2.?244?)
b2. concentrate the GVC network configuration system of tissue competition G 2To iPlant the utilization of resource DG 2, i ( t) the period of being considered [ t 0, t 1] in must approach society the iPlant the bearing capacity of resource aspect BS i ( t), promptly
| ?DG ?2,? i? (? t?)?–? BS i? (? t?)?|?≤? η i ? α i? (? t?)?≤? ε i? ,? t∈?[? t? 0?,? t? 1?]?(?2.?245?)
In basic synergy territory, realize aspect certain resource that social practice balance, GVC network configuration system will receive following essential condition constraint:
c1. society is the iPlanting the resource aspect is bearing capacity BS i ( t) attenuation rate α i ( t) the time period of being considered [ t 0, t 1] in must be not more than arbitrarily small number ε i , promptly
α i? (? t?)?≤? ε i? , t∈?[? t? 0?,? t? 1?] (?2.?246?)
c2. basic collaborative GVC network configuration system G 3To iPlant the utilization of resource DG 3, i ( t) the time period of being considered [ t 0, t 1] in must approach society the iPlant the bearing capacity of resource aspect BS i ( t), promptly
| ?DG ?3,? i? (? t?)?–? BS i? (? t?)?|?≤? η i ? α i? (? t?)?≤? ε i? ,? t∈?[? t? 0?,? t? 1?]?(?2.?247?)
In self-organizing cooperation action scope, realize the social ecological balance aspect certain resource, GVC network configuration system just should receive following essential condition constraint:
d1. society is the iPlant the bearing capacity of resource aspect BS i ( t) attenuation rate α i ( t) the time period of being considered [ t 0, t 1] in must be not more than arbitrarily small number ε i , promptly
α i? (? t?)?≤? ε i? , t∈?[? t? 0?,? t? 1?] (?2.?248?)
d2. the GVC network configuration system of self-organizing cooperation G 4To iPlant the utilization of resource DG 4, i ( t) the period of being considered [ t 0, t 1] in must approach society the iPlant the bearing capacity of resource aspect BS i ( t), promptly
| ?DG ?4,? i? (? t?)?–? BS i? (? t?)?|?≤? η i ? α i? (? t?)?≤? ε i? ,? t∈?[? t? 0?,? t? 1?]?(?2.?249?)
Organize the cooperation action scope concentrated, realize the social ecological balance aspect certain resource, GVC network configuration system just should receive following essential condition constraint:
e1. society is the iPlant the bearing capacity of resource aspect BS i ( t) attenuation rate α i ( t) the time period of being considered [ t 0, t 1] in must be not more than arbitrarily small number ε i , promptly
α i? (? t?)?≤? ε i? , t∈?[? t? 0?,? t? 1?] (?2.?250?)
e2. concentrate the GVC network configuration system of tissue cooperation G 5To iPlant the utilization of resource DG 5, i ( t) the time period of being considered [ t 0, t 1] in must approach society the iPlant the bearing capacity of resource aspect BS i ( t), promptly
| ?DG ?5,? i? (? t?)?–? BS i? (? t?)?|?≤? η i ? α i? (? t?)?≤? ε i? ,? t∈?[? t? 0?,? t? 1?]。
4. dependent claims---for the network configuration of GVC, according to the feedback mechanism design that the independent claims 1 described inventor sets up the network configuration engineering, this right is characterised in that:
Inquire on the Internet network configuration engineering according to the independent claims 1 described inventor based on product efficacy structure (EVS [PES]); Based on the network configuration engineering of product efficacy structure, should comprise following several different levels on the Internet:
On the Intranet based on the network configuration engineering of product efficacy structure (EVS [PES])
On the industry the Internet based on the network configuration engineering of product efficacy structure (EVS [PES])
On the national the Internet based on the network configuration engineering of product efficacy structure (EVS [PES])
On the GVC based on the network configuration engineering of product efficacy structure (EVS [PES])
Inquire on the Internet network configuration engineering according to the independent claims 1 described inventor based on Technological Economy foundation structure (RCS [TKS/EBS]); Based on the network configuration engineering of Technological Economy foundation structure, should comprise following several different levels on the Internet:
On the Intranet based on the network configuration engineering of Technological Economy foundation structure (RCS [TKS/EBS])
On the industry the Internet based on the network configuration engineering of Technological Economy foundation structure (RCS [TKS/EBS])
On the national the Internet based on the network configuration engineering of Technological Economy foundation structure (RCS [TKS/EBS])
On the GVC based on the network configuration engineering of Technological Economy foundation structure (RCS [TKS/EBS])
Inquire on the Internet network configuration engineering according to the independent claims 1 described inventor based on internal-external conspiracy relation (SOS [ESS/ISS]); Based on the network configuration engineering of internal-external conspiracy relation, should comprise following several different levels on the Internet:
On the Intranet based on the network configuration engineering of internal-external conspiracy relation (SOS [ESS/ISS])
On the industry the Internet based on the network configuration engineering of internal-external conspiracy relation (SOS [ESS/ISS])
On the national the Internet based on the network configuration engineering of internal-external conspiracy relation (SOS [ESS/ISS])
On the GVC based on the network configuration engineering of internal-external conspiracy relation (SOS [ESS/ISS]).
5. dependent claims---for the network configuration of GVC, set up the Hiberarchy Decomposition model of network configuration engineering according to the independent claims 1 described inventor, this right is characterised in that:
In the GVC network configuration process; The transmission of any signal and information produces hysteresis always, and practical problem quite a few must be by non-linear portrayal, and because the existence of disturbing factor; Some loop is temporary transient interrupts or when connecting again, causes the variation on the hysteresis control system recurring structure; In addition; Because the scale of control; Like multilayer, pass the response of the control system between rank, multiloop, negative-feedback, many inputs, many output; It is the variation on the big system architectures of control that lag behind of group more than more; And because the uncertainty of modeling; Therefore study organize when lagging behind the interval more more and become the structure and related robust stabilizing problem that non-linear correlation is controlled big system, significant;
Consideration becomes the GVC network configuration of non-linear correlation and controls big system when having the many hysteresis of many groups interval, it is represented by w related subsystem:
Figure 2011103467731100001DEST_PATH_RE-DEST_PATH_IMAGE002
Figure 2011103467731100001DEST_PATH_RE-DEST_PATH_IMAGE004
Figure 2011103467731100001DEST_PATH_RE-DEST_PATH_IMAGE006
Figure 2011103467731100001DEST_PATH_RE-DEST_PATH_IMAGE008
Figure 2011103467731100001DEST_PATH_RE-DEST_PATH_IMAGE010
?
Figure 2011103467731100001DEST_PATH_RE-DEST_PATH_IMAGE014
(?2.?87? a?)
Figure 2011103467731100001DEST_PATH_RE-DEST_PATH_IMAGE016
Figure 2011103467731100001DEST_PATH_RE-DEST_PATH_IMAGE018
Figure DEST_PATH_RE-389824DEST_PATH_IMAGE014
(?2.?87? b?)
Here,
xR Ni Be the state of GVC network configuration system,
UR Mi Be the control input of GVC network configuration main body,
YR Fi Be the output of GVC network configuration system,
FR L i Interference for the decision of the senior level outside the GVC network configuration system;
Figure 2011103467731100001DEST_PATH_RE-DEST_PATH_IMAGE020
Figure 2011103467731100001DEST_PATH_RE-DEST_PATH_IMAGE022
is the GVC network configuration incidence matrices that is produced by basic GVC network configuration incidence matrices
Figure 2011103467731100001DEST_PATH_RE-DEST_PATH_IMAGE024
; Be designated as
Figure 2011103467731100001DEST_PATH_RE-DEST_PATH_IMAGE026
, i.e.
Figure 2011103467731100001DEST_PATH_RE-DEST_PATH_IMAGE028
or
Figure 2011103467731100001DEST_PATH_RE-DEST_PATH_IMAGE030
;
The time bending moment battle array A ( r) ( t), A ( s) ( t), B ( d) ( t), C ( h) ( t) be the uncertain matrix of suitable dimension, and excursion satisfies:
Figure 2011103467731100001DEST_PATH_RE-DEST_PATH_IMAGE032
,
Figure 2011103467731100001DEST_PATH_RE-DEST_PATH_IMAGE036
,
Figure 2011103467731100001DEST_PATH_RE-DEST_PATH_IMAGE038
(?2.?88?)
Figure 2011103467731100001DEST_PATH_RE-DEST_PATH_IMAGE040
;
Figure 2011103467731100001DEST_PATH_RE-DEST_PATH_IMAGE042
;
Figure 2011103467731100001DEST_PATH_RE-DEST_PATH_IMAGE044
;
Figure 2011103467731100001DEST_PATH_RE-DEST_PATH_IMAGE046
Wherein
Figure 2011103467731100001DEST_PATH_RE-DEST_PATH_IMAGE048
,
Figure 2011103467731100001DEST_PATH_RE-DEST_PATH_IMAGE050
Figure 2011103467731100001DEST_PATH_RE-DEST_PATH_IMAGE052
is the certainty matrix; And have
Figure 2011103467731100001DEST_PATH_RE-DEST_PATH_IMAGE054
Figure 2011103467731100001DEST_PATH_RE-DEST_PATH_IMAGE056
Figure 2011103467731100001DEST_PATH_RE-DEST_PATH_IMAGE058
6. dependent claims---for GVC, the 1 described inventor sets up the rationalization evaluation model of network configuration system engineering according to independent claims, and this right is characterised in that:
The rational principal element that influences engineering design of GVC network configuration and evaluation has: design and evaluation objective A, design and interpretational criteria (index, model, structure) T, the design with the evaluation colony G, design and evaluation model MAnd design and estimator's preference ηIf design is designated as with the reliability of evaluation system R, then
R?=? f?(? A?,? T?, ?G?,? M, η)
If the weight of various evaluation indexes does w i ( i=1,2 ..., m), then there is grey relational grade to do
Figure 2011103467731100001DEST_PATH_RE-DEST_PATH_IMAGE060
(?2.?15.?5?)
With the least squared criterion in the classical mathematics---square distance and minimum, expand to power square distance and minimum criteria, then rationalize index with GVC network configuration engineering x j With the grade scale index x h Between diversity factor u H j For the Weighted distance of weighing is expressed as
Figure 2011103467731100001DEST_PATH_RE-DEST_PATH_IMAGE062
(?2.?15.?6?)
To be designed should being divided into the GVC network configuration engineering of estimating makes u H j Minimum rank; Then there is following GVC network configuration engineering to rationalize the grey evaluation model
Figure 2011103467731100001DEST_PATH_RE-DEST_PATH_IMAGE064
Figure 2011103467731100001DEST_PATH_RE-DEST_PATH_IMAGE066
7. dependent claims---for GVC, the 1 described inventor sets up the technical scheme of network configuration system engineering according to independent claims, and this right is characterised in that:
Actual based on the GVC tissue, confirm that whole project divides two stages to carry out:
First stage, mainly implement the inside and outside association of GVC network configuration system control, sell configuration, receivable configuration, logistics arrangement, deal with configuration, stock's configuration, inventory auditing, product data configurations (containing GVC structural arrangements, Process configuration), expense budget configuration (containing expense disposes), monetary items accounting, PDM data preparation and demand analysis, hardware net environmental structure, GVC network configuration; Cycle is about 12 months; Main the integrated of inside and outside related logistics of GVC network configuration and cash flow, standard, the transparent configurations accomplished;
Second stage is production master program, material demand planning, power balance, workshop project configuration, quality configuration, equipment metering configuration, human resources configuration, solution analysis, the GVC network configuration of the inside and outside association of integrated GVC network configuration; Cycle is about 16 months; Main realize the market with the inside and outside association of GVC network configuration be demand, with vertically and the master ga(u)ge that laterally drives divides core into, be the holographic concertedness enterprise schema of main contents with the input and output of the inside and outside association of GVC network configuration; Be controlled at goods effectively; Compress stock to greatest extent; Improve delivery date, satisfy market demand apace.
CN2011103467731A 2011-11-05 2011-11-05 ICT technical support design for global value chain network configuration project Pending CN102638515A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011103467731A CN102638515A (en) 2011-11-05 2011-11-05 ICT technical support design for global value chain network configuration project

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011103467731A CN102638515A (en) 2011-11-05 2011-11-05 ICT technical support design for global value chain network configuration project

Publications (1)

Publication Number Publication Date
CN102638515A true CN102638515A (en) 2012-08-15

Family

ID=46622758

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011103467731A Pending CN102638515A (en) 2011-11-05 2011-11-05 ICT technical support design for global value chain network configuration project

Country Status (1)

Country Link
CN (1) CN102638515A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107392424A (en) * 2017-06-14 2017-11-24 中国航空综合技术研究所 A kind of method for establishing quality fluctuation source ISM in manufacture course of products

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107392424A (en) * 2017-06-14 2017-11-24 中国航空综合技术研究所 A kind of method for establishing quality fluctuation source ISM in manufacture course of products

Similar Documents

Publication Publication Date Title
CN102624811A (en) ICT technical support design for providing engineering for enterprise value chain network configuration
CN102638515A (en) ICT technical support design for global value chain network configuration project
CN102655521A (en) Design of ICT (information communication technology) technical support of regional value chain market allocation engineering
CN102624812A (en) ICT technical support design for providing engineering foundation for global value chain market configuration
CN102624814A (en) Information and communication technology (ICT) support design for market allocation engineering of industrial value chain
CN102624904A (en) Design basis for planning configuration unit of internet user terminal
CN102624805A (en) ICT technical support design for providing engineering for internet user terminal market configuration
CN102710708A (en) Information and communication technology (ICT) support design for global value chain planning configuration project
CN102624821A (en) ICT technical support design for providing engineering for regional value chain network configuration
CN102624799A (en) ICT technical support design for providing engineering for regional value chain planning and configuration
CN102780742A (en) Information communication technology (ICT) support design of national value chain market configuration project
CN102710715A (en) Information and communication technology (ICT) support design for industry value chain network configuration project
CN102638558A (en) Information communication technology (ICT) support design for enterprise value chain market configuration engineering
CN102651766A (en) Information communication technology (ICT) technical supporting design for engineering for planning and configuring value chain of enterprise
CN102752353A (en) Information and communication technology (ICT) support design of industrial value chain planning and configuration engineering
CN102752351A (en) Information and communication technology (ICT) support design of national value chain network configuration engineering
CN102624792A (en) ICT technical support design for national value chain planning and configuration environment
CN102638506A (en) ICT technical support design for internet user terminal planning and configuration project
CN102724242A (en) ICT technical support design for coordination configuration engineering of internet user terminal
CN102624854A (en) ICT technical support design for enterprise value chain planning and configuration units
CN102638509A (en) Intelligent integrated system computing technology basis for Internet user terminal planning configuration
CN102739746A (en) Information communication technology (ICT)/technical support design of Internet user terminal coordination configuration environment
CN102761590A (en) ICT (information and communication technology) technical support design for network configuration environment of enterprise value chain
CN102624839A (en) ICT technical support design for providing environment for internet user terminal planning configuration
CN102769656A (en) Information and communications technology (ICT) technical support design of network allocation environment of industrial value chain

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20120815