CN102638506A - ICT technical support design for internet user terminal planning and configuration project - Google Patents

ICT technical support design for internet user terminal planning and configuration project Download PDF

Info

Publication number
CN102638506A
CN102638506A CN201110342211XA CN201110342211A CN102638506A CN 102638506 A CN102638506 A CN 102638506A CN 201110342211X A CN201110342211X A CN 201110342211XA CN 201110342211 A CN201110342211 A CN 201110342211A CN 102638506 A CN102638506 A CN 102638506A
Authority
CN
China
Prior art keywords
internet user
configuration
planning
internet
zongcheng
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201110342211XA
Other languages
Chinese (zh)
Inventor
李宗诚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201110342211XA priority Critical patent/CN102638506A/en
Publication of CN102638506A publication Critical patent/CN102638506A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

An ICT technical support design for the internet user terminal planning and configuration project is the 256th item of the 600-invention patent cluster (generically named as 'value chain system engineering network technology assistance system (DCN/IIL (VC) Li Zongcheng, 2011) submitted to the State Intellectual Property Office by an applicant Li Zongcheng through the electronic system in September, 2011. The ICT technical support design for the internet user terminal planning and configuration project is a new technology which is built on the brand-new basis of logics, the brand-new basis of mathematics and the brand-new basis of science, aims to modify the 'cloud' computing system into a universal 'heaven-earth' computing system, centralizes in internet users and multi-level global value chain (GVC), is utilized by a principle line of a high-ranking intelligent integrated system (HIIS) evolution process by connecting and harmonizing a cognitive system and a practice system on the basis of the computer auxiliary system and the internet and assisted by building basic models, normal forms, equation systems of network configuration dynamics and holo-synergetic organization.

Description

The ICT technical support design of Internet user terminal planning allocation project
Technical field
(generic name is " GVC network technology support system [DCN/IIL (VCSE) to this invention 600 patent of invention clusters that to be applicant Li Zongcheng formally submit to State Patent Office through electronic system in September, 2011; ] " in the 256th.
(generic name is " GVC network technology support system [DCN/IIL (VCSE) for this invention and patent of invention cluster; ] " in the 241st, the 242nd, the 243rd, the 244th, the 245th, the 246th, the 247th, the 248th, the 249th, the 250th, the 251st, the 252nd, the 253rd, the 254th, the 255th, the 257th, the 258th, the 259th, the 260th, together, constitute patent of invention crowd " Internet user terminal planning configuration ICT technique support system (ICT-PAM/[UEC]) " jointly.
" GVC network technology support system [DCN/IIL (VCSE) that the applicant proposes to comprise this invention, is made up of 600 patents of invention; ] "; its bulking property target is; be the center with Internet user; and then be the center with GVC system (GVC); the connection of carrying out based on computer and network thereof with Natural Intelligence and Artificial Intelligence and coordinate the main line as general intelligence integrated system (GIIS) Upgrade process, sets up brand-new logical foundations, Fundamentals of Mathematics, scientific basic and brand-new technology basis and engineering foundation, for relative closure, static relatively " resource pool "---system for cloud computing injects soul, intelligence and life; build global intelligent integral contract network computer architecture (CS/HSN (GII)), Global Internet is made becomes the technique support system that really has life and ecological holographic joint management character.On this basis; The connection of carrying out based on computer aided system and the Internet with cognitive system and practice system and coordinate the main line as high-grade intelligent integrated system (HIIS) evolution process is set up based on brand-new theoretical intelligent integrated scientific and technical system (the IIS & IIT of metasystem (MS) science; ); Logistics net, energy net, Network and Finance Network and the knowledge knowledge network of each field all departments combine together with being dispersed in all over the world with the novel Global Internet of life-giving vigor; Carry out the GVC system engineering energetically; Set up the global intelligent integral really have life and ecological holographic joint management character and dynamically converge open network system (DCN/HII (GVC)), thereby build intelligent integrated net, life the Internet and ecological operation net.GVC system engineering technology cluster exploitation total strategy---inventor Li Zong really is referred to as " since the beginning of history " plan through implementing, and " cloud " counting system that flicker is indefinite is transformed into " world " counting system that converges logical all things on earth, connects longitude and latitude.
The main purpose of this invention is through brand-new logical foundations, Fundamentals of Mathematics, scientific basic and brand-new technology basis and engineering foundation, and the ICT network docking technique of engineering is provided for the planning configuration of Internet user terminal.
All related Mathematical Modelings are the really independent foundation of inventor Li Zong in this specification, have original innovation property.
This invention belongs to planning configuration, planning organization and the planning management field (PA/UEC) at Internet user terminal; Be towards the Internet user terminal and then towards resource distribution, organization and management technical foundation that the Internet user plans configuration-system, guide people, mechanism and tissue into key that " world " (brand-new counting system) of all things on earth led in remittance from flicker indefinite " cloud " (counting system).
PA/UEC is a kind of solution of Internet user's system engineering; By means of the brand-new Information technology and the network technology; Importing Internet user's service strategy and operation mode whole is that the Internet user of trunk plans among the inside and outside related system of configuration with the information system; It is the just change on the science and technology, but involves Internet user's organization internal comprehensive integration and the configuration all about the flow process on the cross-region of personnel, fund, logistics, manufacturing and Internet user tissue or transnational border related with the outside.  
PA/UEC is physical resources configuration (logistics), human resources configuration (stream of people), fund resource distribution (wealth stream), information resources configuration (information flow) integrated Internet user's configuration software of planning the inside and outside association of configuration to the Internet user.Generating the DIM analysis of discussing through Rule Design merchant, system integrator, the module of planning the inside and outside association of configuration towards the Internet user proposes to plan the inside and outside related ultimate consumer of configuration, social governor motion, the SHF analysis of relative both at home and abroad, description vertical related department of future generation, horizontal related department and value resource planning (VRP) software towards the Internet user with Li Zongcheng.It will comprise the Internet user and plan configuration inside and outside related user/service system framework, use graphical user interface, use open system and make.Except the existing standard function, it also comprises other characteristic, plans that like the Internet user quality, process enactment configuration and the Internet user of the inside and outside association of configuration plan the adjustment report of the inside and outside association of configuration etc.Particularly, thus the basic technology that PA/UEC adopts will plan that to the Internet user independence of the inside and outside related user software and hardware of configuration two aspects is more prone to upgrading simultaneously.The key of PA/UEC be the Internet user plan all users of the inside and outside association of configuration can cutting its use, thereby have natural ease for use.
Background technology
PA/UEC can be a kind of instrument that configuration person solves Internet user's organization configurations problem.The Internet user plans that the department of the inside and outside association of configuration does not treat as management itself with PA/UEC; Before PA/UEC implements, must analyze the Internet user in earnest and plan the inside and outside associated configurations problem of configuration; Seek solution route, and do not rely on PA/UEC solve problem excessively.What correctly is familiar with PA/UEC and is and what is not; Will, PA/UEC the serious analysis Internet user plan the inside and outside problem that exists in the configuration that is associated in of configuration before implementing; Understand the effect of PA/UEC to addressing these problems; The abundant plan and the practicable program of utilizing PA/UEC to address these problems provides the basis for PA/UEC gives full play to efficient carefully.
In recent years, the fusion of ICT industry three macroreticulars and system for cloud computing technology were pushed ahead international and domestic always energetically.Grid attempts to realize the overall sharing of interconnected internet resource, comprises information resources, data resource, computational resource and software resource etc.Therefore, can regard grid as a high performance network computer, it is wideer than general network machine bandwidth, computational speed sooner, intelligent more, more can effectively utilize various resources [20]-[24]Grid adopts the international uniform standard, and this can provide unified port service with regard to meaning it for the object of various different hardware types, different operating system, make people convenient and swift just as water, electricity consumption with grid.The Open Grid Service structure OGSA (Open Grid Services Architecture) that is proposed by WorldNet's lattice theory altar is the most influential mesh architecture, and it changes the application of grid over to commercial field from scientific domain.
But at present, the fusion of ICT industry three macroreticulars just is being absorbed in the dangerous condition of dying young, the novelty wretched insufficiency of cloud computing technology, and the application of cloud computing meets with all restrictions, and the exploitation of cloud computing system meets with heat, cold difficult situation out of trade in the industry.The fast development of the Along with computer technology and the network technology, along with the increase day by day of financial innovation and financial risks, market competition is further aggravated, and the space and the scope of Internet user's competition further enlarge, and the integrated of global economy also constantly pushed ahead.Twentieth century progressively develops into the configuration thought of how effectively utilizing and disposing whole resource mainly towards the thought of the comprehensive configuration of Internet user's internal resource the nineties thereupon.Under this situation, Li Zongcheng has at first proposed the notion report of NA/UEC.
The logical set of the remittance of setting up integrated economic multiattribute measure space based on intelligence, based on intelligence the logical operator of the remittance of integrated economic more rules metric matrix, integrated economic multiple-factor becomes the comprehensive remittance of power and is open to the custom and is and based on intelligence on the basis of the remittance pass function of integrated economic multiplicity algebra system based on intelligence, it is platform and the brand-new network system that logistics network, knowledge network and banking network are combined together that the inventor proposes will develop and set up with the information network---" whole world dynamically converge open network "; And then propose to develop and to set up and a kind of cloud computing and grid computing included at interior brand-new counting system---dispose and " world " computation schema of allocation of financial resource towards knowledge resource configuration, physical resources; Again and then to propose to develop and to set up a kind of serve as crucial and brand-new operation system that various cognitive operation and practice are combined together with computer operating system and internet operating system---and " holographic co-operation system " (OS/HSO).
Calculating of the open network and the world thereof and the holographic co-operation (abbreviation OS/HSO of system dynamically converge in the whole world that inventor's proposition will be developed and set up; Operating System of Holo-synergetic Oganization), be a complete complex system.The world is calculated and is intended to through the logistics under the information network support, knowledge, the full open network that converges of finance; The computational entity that a plurality of costs are relatively low is integrated into a complete intelligent integrated system with powerful calculating ability; And, this powerful computing ability is distributed in the terminal use's hand of information network inside and outside by brand-new business models such as information network inside and outside SaaS/HSO, PaaS/HSO, IaaS/HSO, MSP/HSO.
The whole world is dynamically converged open network and is calculated notion to can be regarded as a kind of be platform and logistics network, knowledge network and banking network compiled connect the application model of getting up with the information network.Not only computer-oriented and information network are calculated in the whole world dynamically remittance open network, and towards logistics network, knowledge network and banking network.It is attempted to surmount information calculations and information network and calculates, and information calculations and information network calculating and logistics network, knowledge network and banking network is compiled connect and operation is closely linked, and realization is intelligent integrated.
The GVC that the inventor proposes dynamically converges open network system DCN/IIL (VCSE); Be meant with the multimodal value chain system (VCS of multilayer level; From value of the product chain PVC, enterprise value chain EVC; To industry value chain IVC, regional value chain RVC; So that national value chain NVC, GVC GVC) be core; Be fused to the major technique support with telecommunications network (MCN), computer network (WWW) and broadcasting and television network (BTN) three macroreticulars, logistics net (MN), ability drift net (EN), information network (IN), Network and Finance Network (FN) and knowledge knowledge network (KN) five macroreticulars are combined together, the global open network system of the comprehensive integration business service of full field, total system, overall process is provided.
Summary of the invention
(1) for the Internet user terminal; The inventor is on the brand-new logical foundations of its independent foundation, Fundamentals of Mathematics, scientific basic and brand-new technology basis and engineering foundation; " world " counting system that converges logical all things on earth, connects longitude and latitude for " cloud " counting system that flicker is indefinite is transformed into; Adhere to that with the GVC system be core; With the connection of cognitive system (RS and computer aided system thereof) and practice system (PS and computer aided system thereof) with coordinate main line, set up the dynamical foundation of planning allocation project design as high-grade intelligent integrated system (HIIS) evolution process.
(1. 1) await developing energetically the PA/UEC of foundation; Be a information integration, and PA/IVC is an information integration towards supply chain planning operation (Planning Operation of Supply Chain) towards Internet user's effect chain planning operation (Planning Operation of User Efficiency Chain).Outside manufacturing, supply and marketing, monetary items function and the various back-up system and the technology of PA/IVC system; PA/UEC combines vertically reaching laterally related product, project and field on Internet user's effect chain, has following a series of brand-new technology:
The 241st Internet user terminal planning configuration mechanism design basis
The 242nd Internet user terminal planning dispensing unit design basis
The ICT technical support design of the 243rd Internet user terminal planning configuration dynamic foundation
The ICT technical support design of the 244th Internet user terminal planning configuration odds ratio
The 245th the holographic collaborative ICT technical support design of Internet user terminal planning configuration
The ICT technical support design of the 246th the integrated function of Internet user terminal planning configuration
The 247th Internet user terminal planning configuration is worth the ICT technical support design of metering
The ICT technical support design of the 248th Internet user terminal planning configuration joint management
The 249th the holographic butt joint of Internet user terminal planning configuration balancing technique basis
The 250th the balanced tabular technology of the holographic butt joint of Internet user terminal planning configuration
The ICT technical support design of the 251st Internet user terminal planning disposal subject
The ICT technical support design of the 252nd Internet user terminal planning configuration load
The ICT technical support design of the 253rd Internet user terminal planning configuration mode
The ICT technical support design of the 254th Internet user terminal planning configuration-system
The ICT technical support design of the 255th Internet user terminal planning configuration surroundings
The ICT technical support design of the 256th Internet user terminal planning allocation project
The ICT technical support basis of the 257th the Internet user terminal just system of planning configuration
The 258th Internet user terminal planning configuration intelligent integral system-computed technical foundation
The 259th Internet user terminal planning configuration intelligent integral operation system technology basis
The 260th Internet user terminal planning configuration intelligent integral dynamically converges and leads to technical foundation
(1. 2) inventor regards the Internet user terminal as resource configuration system and process, and sets up network configuration dynamics normal form.
With the lowermost layer of hierarchical chart as evaluation index; We can be according to the relation between environmental factor and the bearing capacity; Set up judgment matrix; Methods such as the maximum characteristic vector method of integrated use sum of squares approach, Saaty, geometric average method, expert's method are determined the relative importance (weight) of this one deck to last layer.Utilize the counting backward technique in the AHP method, can each value of statistical indicant be carried out consistent the standardization, that is: through utilizing formula
Figure 201110342211X100002DEST_PATH_IMAGE002
Solve the nondimensionalization problem between the index, and in the matrix after make changing each element value 0 and l between, and its monotonicity is constant.
(1. 3) all in all, arbitrary Internet user plans that configuration-system faces following basic natural environmental condition:
Plan the configuration action scope the Internet user, all activities are to iThe utilization of kind of resource will receive nature the iBut the restriction of the bearing capacity of kind of resource aspect (but but comprising instantaneous bearing capacity and long-term bearing capacity).
The now following several respects of this basic restriction table:
a. plan the configuration action scope the Internet user, all activities are to iPlant the actual utilization of resource y 1 i Receive nature iKind of resource can the confession amount y * 1 i Restriction, promptly y 1 i y * 1 i
b. plan the configuration action scope the Internet user, all activities are to iPlant the actual converted amount of resource y 2 i Receive nature iPlant the convertible amount of resource y * 2 i Restriction, promptly y 2 i y * 2 i
c. plan the configuration action scope the Internet user, all activities are to iThe reality of planting resource substitutes amount y 3 i Receive nature iPlant the alternative amount of resource y * 3 i Restriction, promptly y 3 i y * 3 i
d. plan the configuration action scope the Internet user, all activities are to iThe actual reproduction amount of the data of kind y 4 i Receive nature iPlant the reproducible amounts of resource y * 4 i Restriction, promptly y 4 i y * 4 i
The Internet user plans that configuration-system and natural environment on every side constitute the Internet user jointly and plan the configuration natural ecosystems.For this type system, we need divide five action scopes to consider that the Internet user plans configuration ecological balance condition.
In self-organizing competition action scope, realize aspect certain resource that balance of nature, Internet user plan that configuration-system just receives following essential condition and retrains:
a1. nature is iPlant the bearing capacity of resource aspect BN i ( t) attenuation rate β i ( t) the time period of being considered [ t 0, t 1] in must be not more than arbitrarily small number ε i , promptly
β i? (? t?)?≤? ε i? , t∈?[? t? 0?,? t? 1?] (?2.?232?)
a2. the Internet user of self-organizing competition plans configuration-system G 1To iPlant the utilization of natural resources DG 1, i ( t) the time period of being considered [ t 0, t 1] in must approach the bearing capacity of nature aspect i kind resource BN i ( t), promptly
| ?DG ?1,? i? (? t?)?–? BN i? (? t?)?|?≤? η i ? β i? (? t?)?≤? ε i? ,? t∈?[? t? 0?,? t? 1?]?(?2.?233?)
Concentrating tissue competition action scope, realize aspect certain resource that balance of nature, Internet user plan that configuration-system just should receive following essential condition and retrain:
b1. nature is iPlant the bearing capacity of resource aspect BN i ( t) attenuation rate β i ( t) the period of being considered [ t 0, t 1] in must be not more than arbitrarily small number ε i , promptly
β i? (? t?)?≤? ε i? , t∈?[? t? 0?,? t? 1?] (?2.?234?)
b2. concentrate the Internet user of tissue competition to plan configuration-system G 2To iPlant the utilization of natural resources DG 2, i ( t) the time period of being considered [ t 0, t 1] in must approach the bearing capacity of nature aspect i kind resource BN i ( t), promptly
| ?DG ?2,? i? (? t?)?–? BN i? (? t?)?|?≤? η i ? β i? (? t?)?≤? ε i? ,? t∈?[? t? 0?,? t? 1?](?2.?235?)
In basic synergy territory, realize aspect certain resource that balance of nature, Internet user plan that configuration-system just should receive following essential condition and retrain:
c1. nature is iPlant the bearing capacity of resource aspect BN i ( t) attenuation rate β i ( t) the period of being considered [ t 0, t 1] in must be not more than arbitrarily small number ε i , promptly
β i? (? t?)?≤? ε i? , t∈?[? t? 0?,? t? 1?] (?2.?236?)
c2. basic collaborative Internet user plans configuration-system G 3To iPlant the utilization of natural resources DG 3, i ( t) in the time period of being considered
[ t 0, t 1] in must approach nature the iPlant the bearing capacity of resource aspect BN i (t), promptly
| ?DG ?3,? i? (? t?)?–? BN i? (? t?)?|?≤? η i ? β i? (? t?)?≤? ε i? ,? t∈?[? t? 0?,? t? 1?]?(?2.?237?)
In self-organizing cooperation action scope, realize aspect certain resource that balance of nature, Internet user plan that configuration-system just should receive the constraint of following essential condition:
d1. nature is iPlant the bearing capacity of resource aspect BN i ( t) attenuation rate β i ( t) the period of being considered [ t 0, t 1] in must be not more than arbitrarily small number ε i , promptly
β i? (? t?)?≤? ε i? , t∈?[? t? 0?,? t? 1?] ?(?2.?238?)
d2. the Internet user of self-organizing cooperation plans configuration-system G 4To iPlant the utilization of natural resources DG 4, i ( t) in the period of being considered
[ t 0, t 1] in must approach nature the iPlant the bearing capacity of resource aspect BN i ( t), promptly
| ?DG ?4,? i? (? t?)?–? BN i? (? t?)?|?≤? η i ? β i? (? t?)?≤? ε i? ,? t∈?[? t? 0?,? t? 1?](?2.?239?)
Organize the cooperation action scope concentrating, realize aspect certain resource that balance of nature, Internet user plan that configuration-system just should receive following essential condition and retrain:
e1. nature is iPlant the bearing capacity of resource aspect BN i ( t) attenuation rate β i ( t) the period of being considered [ t 0, t 1] in must be not more than arbitrarily small number ε i , promptly
β i? (? t?)?≤? ε i? , t∈?[? t? 0?,? t? 1?] ?(?2.?240?)
e2. concentrate the Internet user of tissue cooperation to plan configuration-system G 5To iPlant the utilization of natural resources DG 5, i ( t) the period of being considered [ t 0, t 1] in must approach nature the iPlant the bearing capacity of resource aspect BN i ( t), promptly
| ?DG ?5,? i? (? t?)?–? BN i? (? t?)?|?≤? η i ? β i? (? t?)?≤? ε i? ,? t∈?[? t? 0?,? t? 1?](?2.?241?)
(1. 4) all in all, arbitrary Internet user plans that configuration-system faces following basic social environmental condition:
Plan the configuration action scope the Internet user, all activities are to iThe utilization of kind of resource will receive society the iBut the restriction of the bearing capacity of kind of resource aspect (but but comprising instantaneous bearing capacity and long-term bearing capacity).
The now following several respects of this basic restriction table:
a. plan the configuration action scope the Internet user, all activities are to iPlant the actual utilization of resource z 1 i Receive in the society iKind of resource can the confession amount z * 1 i Restriction, promptly z 1 i z * 1 i
b. plan the configuration action scope the Internet user, all activities are to iPlant the actual converted amount of resource z 2 i Receive society to the iKind of resource can the confession amount z * 2 i Restriction, promptly z 2 i z * 2 i
c. plan the configuration action scope the Internet user, all activities are to iThe reality of planting resource substitutes amount z 3 i Receive in the society iPlant the alternative amount of resource z * 3 i Restriction, promptly z 3 i z * 3 i
d. plan the configuration action scope the Internet user, all activities are to iPlant the actual reproduction amount of resource z 4 i Receive in the society iPlant the reproducible amounts of resource z * 4 i Restriction, promptly z 4 i z * 4 i
The Internet user plans that configuration-system and social environment on every side constitute the Internet user jointly and plan the social ecosystem of configuration.For this type system, we need divide five action scopes to consider social ecological balance condition.
In self-organizing competition action scope, realize aspect certain resource that the social ecological balance, Internet user plan that configuration-system just should receive following essential condition and retrain:
a1. society is the iPlant the bearing capacity of resource aspect BS i ( t) attenuation rate α i ( t) the time period of being considered [ t 0, t 1] in must be not more than arbitrarily small number ε i , promptly
α i? (? t?)?≤? ε i? , t∈?[? t? 0?,? t? 1?] (?2.?242?)
a2. the Internet user of self-organizing competition plans configuration-system G 1To iPlant the utilization of resource DG 1, i ( t) the time period of being considered [ t 0, t 1] in must approach society the iPlant the bearing capacity of resource aspect BS i ( t), promptly
| ?DG ?1,? i? (? t?)?–? BS i? (? t?)?|?≤? η i ? α i? (? t?)?≤? ε i? ,? t∈?[? t? 0?,? t? 1?]?(?2.?243?)
Concentrating tissue competition action scope, realize aspect certain resource that the social ecological balance, Internet user plan that configuration-system just should receive following essential condition and retrain:
b1. society is the iPlant the bearing capacity of resource aspect BS i ( t) attenuation rate α i ( t) the time period of being considered [ t 0, t 1] in must be not more than arbitrarily small number ε i , promptly
α i? (? t?)?≤? ε i? , t∈?[? t? 0?,? t? 1?] (?2.?244?)
b2. concentrate the Internet user of tissue competition to plan configuration-system G 2To iPlant the utilization of resource DG 2, i ( t) the period of being considered [ t 0, t 1] in must approach society the iPlant the bearing capacity of resource aspect BS i ( t), promptly
| ?DG ?2,? i? (? t?)?–? BS i? (? t?)?|?≤? η i ? α i? (? t?)?≤? ε i? ,? t∈?[? t? 0?,? t? 1?]?(?2.?245?)
In basic synergy territory, realize aspect certain resource that social practice balance, Internet user plan that configuration-system will receive following essential condition and retrain:
c1. society is the iPlanting the resource aspect is bearing capacity BS i ( t) attenuation rate α i ( t) the time period of being considered [ t 0, t 1] in must be not more than arbitrarily small number ε i , promptly
α i? (? t?)?≤? ε i? , t∈?[? t? 0?,? t? 1?] (?2.?246?)
c2. basic collaborative Internet user plans configuration-system G 3To iPlant the utilization of resource DG 3, i ( t) the time period of being considered [ t 0, t 1] in must approach society the iPlant the bearing capacity of resource aspect BS i ( t), promptly
| ?DG ?3,? i? (? t?)?–? BS i? (? t?)?|?≤? η i ? α i? (? t?)?≤? ε i? ,? t∈?[? t? 0?,? t? 1?]?(?2.?247?)
In self-organizing cooperation action scope, realize aspect certain resource that the social ecological balance, Internet user plan that configuration-system just should receive the constraint of following essential condition:
d1. society is the iPlant the bearing capacity of resource aspect BS i ( t) attenuation rate α i ( t) the time period of being considered [ t 0, t 1] in must be not more than arbitrarily small number ε i , promptly
α i? (? t?)?≤? ε i? , t∈?[? t? 0?,? t? 1?] (?2.?248?)
d2. the Internet user of self-organizing cooperation plans configuration-system G 4To iPlant the utilization of resource DG 4, i ( t) the period of being considered [ t 0, t 1] in must approach society the iPlant the bearing capacity of resource aspect BS i ( t), promptly
| ?DG ?4,? i? (? t?)?–? BS i? (? t?)?|?≤? η i ? α i? (? t?)?≤? ε i? ,? t∈?[? t? 0?,? t? 1?]?(?2.?249?)
Organize the cooperation action scope concentrating, realize aspect certain resource that the social ecological balance, Internet user plan that configuration-system just should receive following essential condition and retrain:
e1. society is the iPlant the bearing capacity of resource aspect BS i ( t) attenuation rate α i ( t) the time period of being considered [ t 0, t 1] in must be not more than arbitrarily small number ε i , promptly
α i? (? t?)?≤? ε i? , t∈?[? t? 0?,? t? 1?] (?2.?250?)
e2. concentrate the Internet user of tissue cooperation to plan configuration-system G 5To iPlant the utilization of resource DG 5, i ( t) the time period of being considered [ t 0, t 1] in must approach society the iPlant the bearing capacity of resource aspect BS i ( t), promptly
| ?DG ?5,? i? (? t?)?–? BS i? (? t?)?|?≤? η i ? α i? (? t?)?≤? ε i? ,? t∈?[? t? 0?,? t? 1?](?2.?251?)
(2) for the Internet user terminal; The inventor is on the brand-new logical foundations of its independent foundation, Fundamentals of Mathematics, scientific basic and brand-new technology basis and engineering foundation; " world " counting system that converges logical all things on earth, connects longitude and latitude for " cloud " counting system that flicker is indefinite is transformed into; Adhere to that with the GVC system be core; With the connection of cognitive system (RS and computer aided system thereof) and practice system (PS and computer aided system thereof) with coordinate main line, set up the know-why of planning allocation project design as high-grade intelligent integrated system (HIIS) evolution process.
(2. 1) whole Internet user plans the big system of configuration and exists feedback mechanism widely with the interaction of nature one social engineering, shown in Fig. 1.The Internet user plans that the configuration tissue makes decisions according to certain target (or complex); Import certain people, thing, information; Make the mankind between different departments field, carry out harmonious activity (also having feedback mechanism here), the result exports new people, thing, information.This brings huge motive force on the one hand the existence and the development of society, can cause negative effect to natural engineering on the other hand.Two feedback informations are arranged respectively here; The one, the Internet user plans that the social base (bearing capacity) of disposal subject or system and the basic social quality index (desired value) of operation compare; Finding out that deviation that mankind's activity brings is progressively dwindled or the feedback information when widening is given policy-making body, is the feedback factor that the Internet user plans layoutprocedure in this social base; On the other hand; The harmful effect that the people of output, thing, information cause for the nature engineering; Compare with natural quality index (desired value); This information is fed back to decision-making section, and to influence next decision process, the engineering situation is exactly the feedback factor that the Internet user plans configuration affects nature engineering here.Wherein social base index (desired value) all is that the Internet user plans that the configuration tissue is definite according to the overall goal of the coordinated development of each different stages of development with engineering situation index (desired value).The Internet user plans that the configuration tissue uses feedback mechanism to regulate control according to this target and do not depart from predeterminated target to keep mankind's activity, keep human history and stablize sustained and coordinated development.
Plan allocation project for holographic synergetic Internet user, we need carry out component analysis and evaluation, and then carry out step analysis and evaluation.
As a kind of system of complicacy, holographic collaborative type Internet user plans that allocation project has oneself general nature engineering and balance of nature condition and mass society engineering and social ecological balance condition thereof.Holographic collaborative type Internet user plans that the effect basis of allocation project is IU planning configuration nature bearing capacity and the social bearing capacity of IU planning configuration.The restriction that holographic synergetic Internet user terminal configuration system should be subjected to IU planning configuration nature bearing capacity is subjected to the restriction that social bearing capacity is disposed in IU planning again.See that from the process of reproduction holographic collaborative type Internet user plans that allocation project comprises: collaborative subsystem engineering, collaborative consumption subsystem engineering, coordinated exchange subsystem engineering and the collaborative assignment subsystem engineering of producing.
IU planning configuration nature bearing capacity and the social bearing capacity of IU planning configuration constitute constraints to the effect of the Internet operation on the whole.Each item democratic system and each item principle of centrality constitute constraints to the main body of the Internet operation on the whole.To the mankind on the whole, the prime design requirement of the Internet engineering is, impels the operation of the Internet should be tending towards the social the Internet balance of a certain period, is tending towards the ecological the Internet balance of a certain period again; Should constantly keep long-term social the Internet balance, constantly keep long-term ecological the Internet balance again.The design centre of the Internet engineering is for setting up big collaborative the Internet main body reasonable process arrangement, effective policy engineering and sound social security to be provided.
The inventor inquires on the Internet planning allocation project based on product efficacy structure (EVS [PES]).Based on the planning allocation project of product efficacy structure, should comprise following several different levels on the Internet:
On the Intranet based on the planning allocation project of product efficacy structure (EVS [PES])
On the industry the Internet based on the planning allocation project of product efficacy structure (EVS [PES])
On the national the Internet based on the planning allocation project of product efficacy structure (EVS [PES])
On the Internet user terminal based on the planning allocation project of product efficacy structure (EVS [PES])
The inventor inquires on the Internet planning allocation project based on Technological Economy foundation structure (RCS [TKS/EBS]).Based on the planning allocation project of Technological Economy foundation structure, should comprise following several different levels on the Internet:
On the Intranet based on the planning allocation project of Technological Economy foundation structure (RCS [TKS/EBS])
On the industry the Internet based on the planning allocation project of Technological Economy foundation structure (RCS [TKS/EBS])
On the national the Internet based on the planning allocation project of Technological Economy foundation structure (RCS [TKS/EBS])
On the Internet user terminal based on the planning allocation project of Technological Economy foundation structure (RCS [TKS/EBS])
The inventor inquires on the Internet planning allocation project based on internal-external conspiracy relation (SOS [ESS/ISS]).Based on the planning allocation project of internal-external conspiracy relation, should comprise following several different levels on the Internet:
On the Intranet based on the planning allocation project of internal-external conspiracy relation (SOS [ESS/ISS])
On the industry the Internet based on the planning allocation project of internal-external conspiracy relation (SOS [ESS/ISS])
On the national the Internet based on the planning allocation project of internal-external conspiracy relation (SOS [ESS/ISS])
On the Internet user terminal based on the planning allocation project of internal-external conspiracy relation (SOS [ESS/ISS])
General collaborative type Internet user plans that allocation project comprises following nine types collaborative configuration-system engineering:
(A1) Internet user of outside concentrated working in coordination with/inner concentrated collaborative type plans allocation project (as the combination of administrative configuration-system engineering, budget configuration-system engineering, congenial configuration-system engineering, the configuration-system engineering of deriving etc.);
(A2) Internet user of outside concentrated working in coordination with/collaborative type of inner dispersion plans allocation project (as the combination of administrative configuration-system engineering, budget configuration-system engineering, congenial configuration-system engineering, the configuration-system engineering of deriving etc.);
(A3) Internet user of outside concentrated working in coordination with/inner collecting and distributing collaborative type plans allocation project (as the combination of administrative configuration-system engineering, budget configuration-system engineering, congenial configuration-system engineering, the configuration-system engineering of deriving etc.);
(A4) outsidely disperse collaborative/inner Internet user who concentrates collaborative type to plan allocation project (as administrative configuration-system engineering, budget configuration-system engineering, the combination of speculating configuration-system engineering, the configuration-system engineering of deriving etc.);
(A5) outsidely disperse collaborative/inner Internet user who disperses collaborative type to plan allocation project (as administrative configuration-system engineering, budget configuration-system engineering, the combination of speculating configuration-system engineering, the configuration-system engineering of deriving etc.);
(A6) outside disperses the Internet user of collaborative/inner collecting and distributing collaborative type to plan allocation project (as the combination of administrative configuration-system engineering, budget configuration-system engineering, congenial configuration-system engineering, the configuration-system engineering of deriving etc.);
(A7) outside collecting and distributing collaborative/the inner Internet user who concentrates collaborative type plans allocation project (as administrative configuration-system engineering, budget configuration-system engineering, the combination of speculating configuration-system engineering, the configuration-system engineering of deriving etc.);
(A8) outside collecting and distributing collaborative/the inner Internet user who disperses collaborative type plans allocation project (as administrative configuration-system engineering, budget configuration-system engineering, the combination of speculating configuration-system engineering, the configuration-system engineering of deriving etc.);
(A9) Internet user of outside collecting and distributing working in coordination with/inner collecting and distributing collaborative type plans allocation project (as the combination of administrative configuration-system engineering, budget configuration-system engineering, congenial configuration-system engineering, the configuration-system engineering of deriving etc.).
(2. 2) provide IU user at present and plan that the big system of configuration carries out the Mathematical Modeling of Hiberarchy Decomposition by structure and function.We can be modeled as this hierarchical set (hierarchical set) of hierarchical structure directed graph (1evel structured diagraphs) [200] [201]
IU user is planned the big system of configuration G I After carrying out Hiberarchy Decomposition by structure and function, G I Structurally can represent to become a hierarchical set
Figure 201110342211X100002DEST_PATH_IMAGE004
(?2.?2?)
IU user plans the effect that effect that the effect of configuration-system generally comprises IU user and plan disposal subject, effect that IU user plans configuration object, effect that IU user plans configuring technical and IU user plan configuration surroundings.IU user plans that configuration-system effect (GFE) is that IU user plans that disposal subject effect (MFE), IU user plan that configuration object effect (QFE), IU user plan that configuring technical effect (WFE) and IU user plan the concentrated expression of configuration surroundings effect (EFE); Furtherly, IU user plans that the configuration-system effect is comprehensive and comprehensive performance that IU user plans the disposal subject effect.
The target of the effect that IU user plans disposal subject and society and requirement and self or high-rise IU user plan that the target of disposal subject and requirement are associated; IU user plans that the effect of configuration object and the effect that IU user plans configuring technical all plan that with IU user the target of disposal subject and requirement are associated; IU user plans that the effect of configuration surroundings plans that with IU user the target of configuration-system and requirement are associated; The target of the effect that IU user plans configuration-system and society and requirement and self or high-rise IU user plan that the target of disposal subject and requirement are associated.
Analytic hierarchy process (AHP) (AHP-Analytic Hierarchy Process) can be used for the GFD process.Plan the theory framework of configuration effect based on IU user; The utilization resulting social desirability of AHP (or requirement of main body self), plan requirement, subitem task characteristic, subitem operation and change require IU user is planned that the integrated ordered weight of configuration overall goal is comparatively accurate; The consistency of judging is remarkable, and can use C.R. (Consistent Ratio) index to verify.Based on this idea, according to the four-stage of GFD process, plan that with society and IU user total satisfaction of disposal subject is a general objective, we can set up total satisfaction and pass stratum's aggregated(particle) structure.
Plan in the layoutprocedure IU user; The transmission of any signal and information produces hysteresis always, and practical problem quite a few must be by non-linear portrayal, and because the existence of disturbing factor; Some loop is temporary transient interrupts or when connecting again, causes the variation on the hysteresis control system recurring structure.In addition; Because the scale of control; Like multilayer, pass the response of the control system between rank, multiloop, negative feedback, many inputs, many output, be the variation on the big system configurations of control that lag behind of group more than one, and owing to the uncertainty of modeling more; Therefore study organize when lagging behind the interval more more and become the structure and related robust stabilizing problem that non-linear correlation is controlled big system, significant [230]
Consideration becomes non-linear correlation when having the many hysteresis of many groups interval IU user plans the big system of configuration control, and it is represented by the individual related subsystem of w:
Figure 201110342211X100002DEST_PATH_IMAGE006
Figure 201110342211X100002DEST_PATH_IMAGE008
Figure 201110342211X100002DEST_PATH_IMAGE012
?
Figure 201110342211X100002DEST_PATH_IMAGE016
Figure 201110342211X100002DEST_PATH_IMAGE018
(?2.?87? a?)
Figure 789127DEST_PATH_IMAGE018
(?2.?87? b?)
Here,
xR Ni For IU user plans the state of configuration-system,
UR Mi For IU user plans the control input of disposal subject,
YR Fi For IU user plans the output of configuration-system,
FR L i Plan the interference of the decision of the senior level that configuration-system is outer for IU user;
Figure 201110342211X100002DEST_PATH_IMAGE026
plans that by basic I U user the IU user that configuration association matrix
Figure 201110342211X100002DEST_PATH_IMAGE028
produces plans the configuration association matrix; Be designated as
Figure 201110342211X100002DEST_PATH_IMAGE030
, i.e.
Figure 201110342211X100002DEST_PATH_IMAGE032
or ;
The time bending moment battle array A ( r) ( t), A ( s) ( t), B ( d) ( t), C ( h) ( t) be the uncertain matrix of suitable dimension, and excursion satisfies:
Figure 201110342211X100002DEST_PATH_IMAGE036
,
Figure 201110342211X100002DEST_PATH_IMAGE038
Figure 201110342211X100002DEST_PATH_IMAGE040
,
Figure 201110342211X100002DEST_PATH_IMAGE042
(?2.?88?)
;
Figure 201110342211X100002DEST_PATH_IMAGE046
;
Figure 201110342211X100002DEST_PATH_IMAGE048
;
Figure 201110342211X100002DEST_PATH_IMAGE050
Wherein ,
Figure 201110342211X100002DEST_PATH_IMAGE054
Figure 201110342211X100002DEST_PATH_IMAGE056
is the certainty matrix.And have
Figure 201110342211X100002DEST_PATH_IMAGE060
(?2.?89?)
Figure 201110342211X100002DEST_PATH_IMAGE062
Hysteresis non-linearity more than many groups is become related IU user when interval and plan the big system of configuration control (2. 87); If do not consider its perturbations associations and hysteresis disturbance associations and nonlinear terms, then formula (2. 87) turns to the linear time varying control system of no hysteresis non-structure disturbance parameter and does
Figure 201110342211X100002DEST_PATH_IMAGE064
Figure 201110342211X100002DEST_PATH_IMAGE066
(?2.?90?)
To
Figure 201110342211X100002DEST_PATH_IMAGE068
and incidence matrices
Figure 201110342211X100002DEST_PATH_IMAGE070
of lagging behind; To become the null solution that related IU user plans the closed-loop system of the big system of configuration control (2. 87) when interval be asymptotically stable if having many hysteresis non-linearities, becomes related IU user when then weighing-appliance has many hysteresis non-linearities interval and plan the big system relationship robust stabilizing of configuration control.
(2. 3) for collaborative type and holographic collaborative type Internet user terminal configuration, and the various factors of integration engineering and condition constitute two basic aspect: IU planning configuration nature bearing capacities respectively and plan with IU and dispose social bearing capacity.Here; IU planning configuration nature bearing capacity is meant that nature is the ability that the operation and development of the Internet provide certain or various resource and condition, and the social bearing capacity of IU planning configuration is meant the social ability that certain or various resource and condition are provided for the operation and development of the Internet.For the bulking property innovation of the Internet operation, IU planning configuration nature bearing capacity and the social bearing capacity of IU planning configuration all are the importances of can not ignore.
General rationality requirement according to holographic joint management; We not only should consider, estimate IU planning configuration nature bearing capacity and the social bearing capacity of IU planning configuration from the scope in a state or an area, and should further consider, estimate IU planning configuration nature bearing capacity and the social bearing capacity of IU planning configuration from global range.It is not the simple summation that various countries IU plans configuration nature bearing capacity that the nature bearing capacity is disposed in whole world IU planning, and the social bearing capacity of global IU planning configuration neither be planned the simple summation that disposes social bearing capacity by various countries IU.In fact, between various countries IU planning configuration nature bearing capacity, between the social bearing capacity of various countries IU planning configuration and between various countries IU planning configuration nature bearing capacity and the social bearing capacity of various countries IU planning configuration, exist conspiracy relation widely.
General rationality requirement according to holographic joint management; We not only should consider, estimate in the past IU planning configuration nature bearing capacity and the social bearing capacity of IU planning configuration; And should consider, estimate IU planning configuration nature bearing capacity and the social bearing capacity of IU planning configuration of current period, also should consider, estimate in the future the IU planning configuration nature bearing capacity of period (or over a long time) and plan with IU and dispose social bearing capacity.No matter IU planning configuration nature bearing capacity or the social bearing capacity of IU planning configuration are not the simple summations of residue bearing capacity, current bearing capacity and potential bearing capacity.Between residue bearing capacity, current bearing capacity and potential bearing capacity, exist conspiracy relation.
(B1) in the multiple inscape of IU planning configuration nature bearing capacity system, the macrovariable that plays the dominating system effect can be divided into three kinds:
a. the flow of material variable M SE ( t); b. the energy flow variables E SE ( t); c. collaborative variable K SEN ( t).
Based on IU planning configuration nature bearing capacity notion, " IU planning configuration nature bearing capacity dynamical equation " as follows:
P ?SEN? (? t?)?=? P ?SEN? [? M ?SE ?(? t?),? E ?SE ?(? t?),? K ?SEN? (? t?)?]
=? F ?SEN? (? X ?SE?1? (? t?),? X ?SE?2? (? t?),?…,? X ?SE?6? (? t?)) (?2.?15.?8?)
In the formula, P SEN ( t)--- tThe IU planning configuration nature bearing capacity exponential quantity in period;
X SE1 ( t)--- tThe bearing capacity of the ground key element index in period;
X SE2 ( t)--- tThe energy bearing capacity key element index in period;
X SE3 ( t)--- tThe waters bearing capacity key element index in period;
X SE4 ( t)--- tThe Forest carrying capacity key element index in period;
X SE5 ( t)--- tThe mineral reserve bearing capacity key element index in period;
X SE6 ( t)--- tThe atmosphere bearing capacity key element index in period;
F SEN ( X SE1 ( t), X SE2 ( t) ..., X SE6 ( t))---about X SE i ( t) nonlinear function.
(B2) in the multiple inscape of the IU planning social bearing capacity system of configuration, the macrovariable that plays the dominating system effect can be divided into three kinds:
a. " firmly " variable H SE ( t); b. " soft " variable S SE ( t); c. " working in coordination with " variable K SES ( t).
Based on the social bearing capacity notion of IU planning configuration, " the social bearing capacity dynamical equation of IU planning configuration " as follows:
P ?SES? (? t?)?=? P ?SES? [? H ?SE ?(? t?),? S ?SE ?(? t?),? K ?SES? (? t?)?]
=? F ?SES? (? Y ?SE?1? (? t?),? Y ?SE?2? (? t?),?…,? Y ?SE?6? (? t?)) (?2.?15.?9?)
In the formula, P SES ( t)--- tThe social bearing capacity exponential quantity of IU planning configuration in period;
Y SE1 ( t)--- tThe political bearing capacity key element index in period;
Y SE2 ( t)--- tThe cultural bearing capacity key element index in period;
Y SE3 ( t)--- tThe science bearing capacity key element index in period;
Y SE4 ( t)--- tThe education bearing capacity key element index in period;
Y SE5 ( t)--- tThe defence bearing capacity key element index in period;
Y SE6 ( t)--- tThe diplomatic bearing capacity key element index in period;
F S ( Y SE1 ( t), Y SE2 ( t) ..., Y SE6 ( t))---about Y SE i ( t) nonlinear function.
(B3) IU planning configuration nature bearing capacity and the social bearing capacity of IU planning configuration interconnect, work in coordination with each other, form " integration engineering bearing capacity ".The integration engineering bearing capacity totally can be regarded as and is made up of a large amount of matter essential factor and spiritual key element, social pattern key element and natural form key element.For the integration engineering bearing capacity, be suitable for the examination method that dynamics and statistics combine.
Formula (2. 15. 8) and (2. 15. 9) are combined, can provide " integration engineering bearing capacity dynamical equation " as follows:
P ?SE? (? t?)?=? P ?SE? [? M ?SE ?(? t?),? E ?SE ?(? t?),? K ?SEN? (? t?),? H ?SE ?(? t?),? S ?SE ?(? t?),? K ?SES? (? t?)?]
=? F ?SE? (? X ?SE?1? (? t?),? X ?SE?2? (? t?),?…,? X ?SE?6? (? t?);? Y ?SE?1? (? t?),? Y ?SE?2? (? t?),?…,? Y ?SE?6? (? t?))
(?2.?15.?10?)
In the formula, P SE ( t)--- tThe integration engineering bearing capacity exponential quantity in period;
F SE ( X SE1 ( t), X SE2 ( t) ..., X SE6 ( t); Y SE1 ( t), Y SE2 ( t) ..., Y SE6 ( t))---about
X SE i ( t) and Y SE i ( t) nonlinear function.
(3) for the Internet user terminal; The inventor is on the brand-new logical foundations of its independent foundation, Fundamentals of Mathematics, scientific basic and brand-new technology basis and engineering foundation; " world " counting system that converges logical all things on earth, connects longitude and latitude for " cloud " counting system that flicker is indefinite is transformed into; Adhere to that with the GVC system be core; Introduce suitable, be used for reflecting respectively general Complex Adaptive Systems basic motive, base load, basic effect, consume basically, the various basic collaborative variablees of inner cooperation and competition and outside cooperation and competition, set up the rationalization evaluation model and the technical scheme of allocation project.
(3. 1) for the design that new Internet user plans allocation project, should be set up rational standard or interpretational criteria.This reasonability should and can only be established from the overall interests of the mankind.Furthermore; Standard design field as new economics; Big collaborative Internet user plan allocation project and with the interconnecting and interacting of Internet user's terminal configuration system; Should both adapt with the Individual of Humanity interests, the group interest with the mankind adapts again, also will adapt with all interests of the mankind; Should adapt with the mankind's immediate interests, the future benefit with the mankind adapts again, also will adapt with the mankind's permanent interests.
Influence the Internet user and plan that allocation project design and the rational principal element of estimating have: design and evaluation objective A, design and interpretational criteria (index, model, structure) T, the design with the evaluation colony G, design and evaluation model MAnd design and estimator's preference ηIf design is designated as with the reliability of evaluation system R, then
R?=? f?(? A?,? T?, ?G?,? M, η)
The Internet user is planned the design and the evaluation of allocation project, should only not regard professional person's thing as, also should have the representative of various interest groups to participate in.In design and evaluation procedure, design will be brought into play multiple function with evaluation colony, design and evaluation objective as setting; Set up design and evaluation structure; Set up design and assessment indicator system, (qualitatively) design and evaluation index etc. are confirmed in definite design and evaluation index weight.
If plan that with the Internet user who estimates allocation project rationalizes index and forms with reference to ordered series of numbers with to be designed; The Internet user plans that allocation project rationalizes the evaluation criterion index and forms relatively ordered series of numbers of quilt; Then available grey relational grade representes that the Internet user with evaluation to be designed plans allocation project and degree of closeness at different levels, and the least squared criterion of utilization expansion is constructed target function and planned that through asking conditional extremum to set up the Internet user allocation project rationalizes the grey evaluation model.
Be provided with mThe item evaluation index nIndividual Internet user plans that the allocation project factor forms with reference to ordered series of numbers:
x ?j? =?{? x ?j ?(? i?)?|? i?=?1,?2,…,? m?j?=?1,?2,…,? n?} (?2.?15.?1?)
cThe level Internet user plans that allocation project rationalizes evaluation criterion and forms relatively ordered series of numbers of quilt
x ?h? =?{? x ?h ?(? i?)?|? h?=?I,?II,…,? c?i?=?1,?2,…,? m?} (?2.?15.?2?)
Note x j With x h iThe absolute difference of individual index
h? ( ?i?)?=?|? x ?j ?(? i?) x ?h ?(? i?)?| (?2.?15.?3?)
Then x j With x h The iThe degree of closeness of individual index is used grey incidence coefficient ζ( x j , x h ) be expressed as [43]
Figure 201110342211X100002DEST_PATH_IMAGE074
(?2.?15.?4?)
In the formula
Figure 201110342211X100002DEST_PATH_IMAGE076
Be the two-stage lowest difference;
Figure 201110342211X100002DEST_PATH_IMAGE078
Be two-stage maximum difference; ρFor resolution ratio is arranged, span is 0< ρ<1, generally get ρHigher resolution was promptly arranged in=0. 5 o'clock.
If the weight of various evaluation indexes does w i ( i=1,2 ..., m), then there is grey relational grade to do
Figure 201110342211X100002DEST_PATH_IMAGE080
(?2.?15.?5?)
With the least squared criterion in the classical mathematics---square distance and minimum, expand to power square distance and minimum criteria, then plan that with the Internet user allocation project rationalizes index x j With the grade scale index x h Between diversity factor u H j For the Weighted distance of weighing is expressed as
Figure 201110342211X100002DEST_PATH_IMAGE082
(?2.?15.?6?)
To be designed and the Internet user who estimates plan that allocation project should be divided into to be made u H j Minimum rank.Then there is following Internet user to plan that allocation project rationalizes the grey evaluation model
Figure 201110342211X100002DEST_PATH_IMAGE084
(?2.?15.?7?)
(3. 2) advantage of future scenarios: PA/UEC and problem of enforcement aspect
The advantage of C1 future scenarios: PA/UEC
a. the Internet user plans the camera choice property of the inside and outside association of configuration
In the face of the market of keen competition, the planning of steadily cooperation and network across time and space; The Internet user is organized in the internationalization running that is full of the exchange rate fluctuation risk; As can not comprise that income design schedule, expenditure design schedule, total design schedule etc. carry out the running of camera choice property, so to the various exchange rate, various countries' customer order, various transaction; Even Internet user's profit in one's hands, also can because of the fluctuation of the exchange rate or slowly project shrink.Under PA/UEC state, the Internet user plans that the data message of the inside and outside association of configuration and data are interlocks and are updated at any time that each stakeholder can grasp instant information at any time.
b. the Internet user plans the polynary integration of the inside and outside association of configuration
Under PA/UEC state, the Internet user plans various information integrated of the inside and outside association of configuration, will necessary condition be provided for the scientification of decision-making.PA/UEC plans the Internet user the various information integrations of the inside and outside association of configuration; Be connected like a cork; Just make budget, planning more accurate, control more practicable, also make actual numeral that takes place and the variance analysis between the budget, configuration control is more easy and quick.
c. the Internet user plans the multidimensional relevance of the inside and outside association of configuration
Under PA/UEC state, on the one hand, close association between upstream department and middle reaches department and the lower dept longitudinally; On the other hand, close association between horizontal department of system and cooperation department and the supporting department.This vertical association with laterally related in, core product and project, dominant traffic and project, outside ventures and project, auxiliary products and project and derived product and project combine, and form Internet user's effect chain; And Rule Design merchant, system integrator, module generation merchant, ultimate consumer and social governor motion and domestic and international relative combine, and form benefit community.
d. the Internet user plans the holographic concertedness of the inside and outside association of configuration
Under PA/UEC state; As the market of competition configuration mechanism, as the planning of cooperation configuration mechanism with as the network of coordinating configuration mechanism; Interconnect, cooperatively interact, determine the holographic concertedness in inside and the outside holographic concertedness of Internet user's effect chain jointly.The holographic concertedness in the inside of Internet user's effect chain is mainly reflected on the conspiracy relation between Rule Design merchant, system integrator, the module generation merchant, and the outside holographic concertedness of Internet user's effect chain is mainly reflected on the conspiracy relation between ultimate consumer, social governor motion, the domestic and international relative.
e. the Internet user plans the expection adaptability of the inside and outside association of configuration
The vertical related department subsystem of PA/UEC system, horizontal related department subsystem and project center subsystem; Integrating monetary items accounting, resource distribution accounting, cost-benefit adjusts; Merge with other subsystems again; The synergitic metasystem of this holography is integrated, and the Internet user plans the information providing of the inside and outside association of configuration, helps Internet user's project is done prospective analysis and prediction.
Attention problem in C 2 future scenarios: PA/UEC implementation process
a. the Internet user plans the demand analysis of the inside and outside association of configuration, confirms real-world objects
Domestic Internet user's development is more and more faster, and configuration mode does not catch up with the development in market gradually, so be badly in need of improving configuration with PA/UEC system, often there is the demand risk in this situation.The Internet user is before preparing Using P A/UEC system; Need carry out demand analysis reasoningly: whether can solve on financial resources Internet user and can support whether the enforcement configurations work of PA/UEC makes personnel's quality is enough highly before last PA/UEC, whether need to prepare consulting firm's assistance can determine what is correct thing in order if what system is the current problem that presses for solution most of Internet user be; And then doing things right, risk will reduce greatly.
b. the Internet user plans the enforcement preparation of the inside and outside association of configuration
Internet user's tissue utilizes PA/UEC to improve Internet user's competitiveness, cooperation power and coordination power, still, reaches PA/UEC highway, and " driving license " of being admitted to configuration specification is the most basic assurance.If the configurations of Internet user own is lack of standardization, just must carry out the preparation that fights a protracted war, otherwise the implementation cycle is long, Internet user and supplier's confidence will get a hard knock, and the stranded risk of project will strengthen; Do not look to PA/UEC to change Internet user's configuration mode and delivery flow process, it is configuration tool and advanced idea, can control it, see that the Internet user organizes the ability with supplier.
c. the Internet user plans the collaborative engineering of holography of stakeholder's fellowship of the inside and outside association of configuration
Awaiting developing the PA/UEC of foundation, is the collaborative engineering of holography of metasystem property.Have only the Internet user to plan stakeholder's fellowship of the inside and outside association of configuration, the enforcement of PA/UEC is succeedd.In fact, the enforcement of PA/UEC is Rule Design merchant, system integrator, module generates the process of carrying out game between merchant, ultimate consumer, social governor motion and the domestic and international relative, is that cooperative game occupies a kind of broad sense equilibrium under the superiority condition.It is high that team is implemented in the initial stage learning enthusiasm to PA/UEC, is one of necessary condition of successful implementation PA/UEC but continue confidence.
d. set up the project configuration system that the Internet user plans the inside and outside association of configuration.
Await developing the PA/UEC project of foundation; It is Internet user's configuration-system engineering that has system complexity, holographic concertedness, implements characteristics such as difficulty is quite big, the application cycle is quite long; Therefore, the Internet user is organized in PA/UEC application process, must be from the angle of system engineering and scientific allocation; Establish and improve engineering project configuration scheme and operating mechanism, guarantee the successful implementation of PA/UEC project.Main contents comprise: work out PA/UEC application target clear and definite, that quantize; Carry out the training education of modern configuration knowledge such as PA/UEC, introduce the information-based consulting of Internet user, carry out PA/UEC project demands analysis; Carry out the Internet user and dispose innovation; Carry out the reorganization of delivery flow process, carry out PA/UEC project supervisory system and carry out PA/UEC project appraisal system etc., be implementing important reform and the innovation that PA/UEC regards Internet user's tissue itself as.
e. strengthen training, deepen the understanding
Training is the key factor of successful implementation PA/UEC system.The main purpose of PA/UEC project training is change thought, deepens the understanding.The implementation phase that the thought disunity must not getting into.In order to increase people to the understanding of PA/UEC relevant knowledge and standard configuration personnel's behavior; Will through training make configuration personnel at different levels not only clear and definite what be PA/UEC; Which its enforcement will bring change to the Internet user, and implement clearly how the personnel in each post adapt to new working method behind PA/UEC.Training preferably adopts the mode of giving lessons with on-site training to carry out, and the content of aspects such as PA/UEC theory, PA/UEC software system function, use operation, data acquisition is carried out the training of different levels.
f. the Internet user plans consulting merchant, supplier's immediate service of the inside and outside association of configuration
PA/UEC is not a simple configuration tool, but is representing advanced delivery flow process and configuration thought.Its enforcement is a complex engineering, is organically blending of IT technological innovation and configuration innovation.This needs PA/UEC supplier and Internet user to make joint efforts for a long time, even needs the participation of third party's professional consultation service provider can realize fully really that PA/UEC uses, and reaches re-set target.
g. the Internet user plans data Back ground Information perfect of the inside and outside association of configuration
Information is the assurance of normal operation, and data must be accurately.A lot of Internet users are difficult to drop into enough energy in the preparation of basic data, the result is " having imported hurrock, the still rubbish of output at last ".For the system high efficiency operation, data must be accomplished complete, accurate.In order to improve the operational efficiency of system, the Internet user should carry out reasonable coding to corresponding data, helps the information trace and the inquiry of system like this.The basic operation platform of PA/UEC is exactly to be based upon in the element task of data, for the normal operation after PA/UEC importing is laid a good foundation.
C 3 future scenarios: the pattern of successful implementation PA/UEC
PA/UEC system implementation successfully has two primary conditions, and one is suitable software, and another is effective implementation method.Wherein effective implementation method can reduce the content of ten aspects haply:
The one, the Internet user plans the support and the promise of the advanced configuration layer of the inside and outside association of configuration;
The 2nd, there is one not only to understand configuration but also be proficient in the enforcement of software and seek advice from troop;
The 3rd, the Internet user plans reaffirming and supervising of the inside and outside associated configuration information system scope of project of configuration;
The 4th, the Internet user plans the inside and outside associated configuration information system project team's of configuration composition;
The 5th, the Internet user plans the degree of going deep into of the inside and outside associated configuration information system project work of configuration;
The 6th, feasible Internet user plans the inside and outside associated item planning of configuration in detail;
The 7th, feasible Internet user plans the inside and outside associated item continuation planning of configuration in detail;
The 8th, the Internet user plans that the inside and outside associated item of configuration must have suitable resource;
The 9th, " summary of experience ", all Internet users plan the quality configuration assessment of the inside and outside related department of configuration;
The tenth, the Internet user plan the configuration inside and outside associated item from modeling, test, try the conversion configurations that formally puts into operation out.
The Internet user organizes selection software; Whether needn't investigate it is real PA/UEC software; Select software function to distinguish, and will select the software that is suitable for according to the difference of Internet user's products characteristics, system organization mode, operation configuration characteristics by Internet user's size.
Delivery flow process reorganization is that the Internet user is organized the thinking again of existing process flow operation mode and design again, should follow following basic principle: must serve as that guiding is adjusted institutional framework, must let the executor that the power of decision-making, the participation that must obtain the policymaker and support are arranged, must be selected suitable flow process to recombinate, must set up the unobstructed channel of communication, institutional framework must to be the center rather than to be the center with the task with target and output with the target of Internet user's tissue.
A complete PA/UEC system must be a system that ten minutes is numerous and jumbled; (Rule Design merchant, system integrator, module generate relation configuration RD between the merchant/DIM) to the inner kernel software PA/UEC/DIM of its existing configuring internet user, extend to the outside software PA/UEC/SHF of Internet user (ultimate consumer, social governor motion, the RD of the configuration of the relation between the relative both at home and abroad/SHF) in addition; Existingly be configured to the main supply chain that logistics/cash flow is an object, configuration supportive supply chain---configurations such as human resources, device resource, financing are arranged again, and to the support of policy-making supply chain.Any one Internet user organizes can not overnight just can realize the system that this is huge.Each Internet user has characteristics of oneself and the subject matter that will solve, and need confirm to implement target and step based on self actual conditions.
Await developing the PA/UEC of foundation, be not only a kind of software, especially Internet user's solution.Therefore; Even same set of software; Its implementation method of different Internet users is also different; For example implement which module? How to carry out the classification training? Which rank of is PA/UEC configured to? Is configuration thin to what degree? With the manual configuration merger time how long? When get rid of manual configuration? How to strengthen the enforcement of PA/UEC planning? These all will be confirmed according to Internet user's demand and configure base; And formulate practicable target and implementary plan, guarantee the successful implementation of PA/UEC.
It is incremental, a continuous perfecting process that the Internet user implements PA/UEC, has only improving constantly of stakeholder's quality, just can guarantee deepening continuously of system.Can combine stakeholder's economic benefit and action through the chapter system of establishing rules to the Internet user stakeholder, stakeholder's enthusiasm can be improved like this, and the consciousness of being familiar with flow process also can be enhanced.
C 4 future scenarios: decision PA/UEC implements the influencing factor of success or failure
a. the stakeholder is to the influence of PA/UEC implementation result.
The stakeholder is the important factors that PA/UEC implements, and these stakeholder comprise that decision of the senior level person, Rule Design merchant, system integrator, module generate merchant, PA/UEC enforcement and user of service, advisory agent etc.
b. organizational factor is to the influence of PA/UEC implementation result.
When the factor of PA/UEC being implemented success or failure was analyzed, we should plan that the organizational factor of the inside and outside association of configuration sets about from the Internet user.The Internet user plans that some organizational factors such as institutional framework, size of the organization, organizational environment, the tissue delivery flow process of the inside and outside association of configuration all can exert an influence to implementation result and the enforcement degree of PA/UEC more or less.The motivation that different Internet user's sizes of the organization is implemented for PA/UEC, carry out strategy, adopt the type of PA/UEC, to the modification degree of fundamental system, implement performance etc. and have bigger difference.
What need carry out proof analysis future is, which type of effect institutional framework, tissue play to the adaptability of PA/UEC, size of the organization etc. to PA/UEC result of implementation.But,, perhaps also have some other factor,, make the Internet user organize and to improve the success rate that PA/UEC implements significantly like historical, culture and strategic even company has carried out better controlled to these factors.
c. culture is to the influence of PA/UEC implementation result.
When PA/UEC system developed under different cultural backgrounds, the Internet user organized and can embody the different social category, and this social category is difficult to change owing to technical stability, and this has just caused some the incompatibility problems in PA/UEC enforcement.Country origin culture that Here it is is to the influencing factor of PA/UEC.
Need future usefulness case study such as people and proof analysis explanation Internet user group in PA/UEC implements, to receive the influence of national difference, and study these difference content and influence modes.What need consideration is that six big-differences such as culture/language, configuration mode, government, company policy, supervision, legal requiremnt, internal technology personnel reserved resources, stakeholder's technical ability, geography, time zone all are the factors of the transnational successful implementation PA/UEC of influence.Through the method for positive research, we can analyze the influence to PA/UEC implementation result such as the country source of PA/UEC software, the quality of consulting firm, high-rise support of disposing, user.Implementing PA/UEC is not only new software of exploitation, but a kind of cultural comprehensive change and innovation.
From above research to cultural factor, we can not compare the cultural difference of software development Internet user the country one belongs to and software implementation Internet user the country one belongs to, and ignore Internet user's culture only from country origin culture incision.In fact, Internet user's culture also is to influence the extremely important factor that PA/UEC implements, because the acceptance level to PA/UEC is different in different Internet user's culture.
4, description of drawings
Fig. 1 explanation:
Whole Internet user plan the configuration big system and with the nature one social engineering interaction exist feedback mechanism widely, shown in Fig. 1.The Internet user plans that the configuration tissue makes decisions according to certain target (or complex); Import certain people, thing, information; Make the mankind between different departments field, carry out harmonious activity (also having feedback mechanism here), the result exports new people, thing, information.This brings huge motive force on the one hand the existence and the development of society, can cause negative effect to natural engineering on the other hand.Two feedback informations are arranged respectively here; The one, the Internet user plans that the social base (bearing capacity) of disposal subject or system and the basic social quality index (desired value) of operation compare; Finding out that deviation that mankind's activity brings is progressively dwindled or the feedback information when widening is given policy-making body, is the feedback factor that the Internet user plans layoutprocedure in this social base; On the other hand; The harmful effect that the people of output, thing, information cause for the nature engineering; Compare with natural quality index (desired value); This information is fed back to decision-making section, and to influence next decision process, the engineering situation is exactly the feedback factor that the Internet user plans configuration affects nature engineering here.
Fig. 2 explanation:
For the Internet user plans the evaluation of disposal subject ability integration, a lot of because of factor of evaluation (index), need set up multistage fuzzy level valency model, as shown in Figure 2.
If have in certain Internet user's terminal configuration tissue NThe individual is to be appraised, and is selected mIndividual benchmark people (Utopian Internet user plans disposal subject), wherein N>> mThis system organization contains KIndividual primary subsystem, the number to be appraised of each subsystem is respectively n 1, n 2..., n i ..., n k , then have
Figure 201110342211X100002DEST_PATH_IMAGE088
If note
Figure 201110342211X100002DEST_PATH_IMAGE090
Then the organization system appraisee is P 1, P 2..., P N1 ..., P N1+1 ..., P N2 ..., P N2+1 ..., P N i ..., P N i+ 1 ..., P N k– 1 , P N k– 1+1 ..., P N k
Fig. 3 explanation:
Based on resource distribution dynamics, holographic coordination and the game coordination principle that the inventor sets up, we can plan that to the collaborative type Internet user towards Internet user's terminal configuration disposal subject carries out overall merit from entity and value two aspects respectively.
This overall evaluation system such as Fig. 3.Aspect entity, we can plan that disposal subject ability enhancement degree analyzes the property of Internet user's terminal configuration tissue through the Internet user who measures.But, the Internet user plans that the ability of disposal subject comprises many fuzzy qualitative factors, like independence, decision-making capability, risk holding capacity, harmony, the sense of duty, self-organizing level, operating efficiency or the like.Want the Internet user of science, reasonably evaluation to plan the disposal subject capacity situation, just need quantitatively judge these qualitative factors.
Fig. 4 explanation:
The Internet user plans that disposal subject ability evaluation index is more, can be divided into different levels between index, and it passs stratum's aggregated(particle) structure such as Fig. 4.Visible by figure, the Internet user plan disposal subject merit rating problem, relate to a plurality of factors such as decision-making capability, risk tolerance, the coordination ability, assets degree of concern.Quilt comments object (Internet user's terminal configuration tissue or individual) to have certain ambiguity with respect to these evaluation of indexes (excellent, good, in, poor, bad), needs the utilization fuzzy set theory to study.
5, embodiment (600 patent of invention common implementing plan brief introductions)
Await developing the PA/UEC system of foundation, an Internet user plans the huge system engineering of disposing inside and outside association beyond doubt.For PA/UEC; Certainly need to drop into great amount of manpower and material resources and financial resources; But what is more important; Need brand-new economic science technical system and brand-new management science technical system, need exploitation and set up the integrated operating system of Internet user's terminal intelligent and the dynamic open network that converges.PA/UEC is a kind of advanced person's economic science technical system, a kind of advanced management science and technology system and a kind of advanced person's the system engineering theory and practice; It involves a wide range of knowledge; Throw the National People's Congress, the implementation cycle is long, and difficulty is big; There is certain risk, need takes scientific methods to guarantee the success of the project implementation.
(5. 1) future scenarios: the enforcement of Internet user's effect chain planning configuration
C 1 conceptual design
The software company that is determined should send the strongest configuration and technical specialist, gos deep into Internet user's organization internal and outside related projects link, according to the demand analysis in early stage; The research Internet user plans all departments and the relevant departments' delivery flow process and the problem demanding prompt solution of the inside and outside association of configuration; Propose detailed embodiment, plan that according to the Internet user enforcement logic of the inside and outside association of configuration confirms to implement step by step planning, propose technical standard and digital coding standard that the Internet user plans the inside and outside association of configuration on this basis; Implement step by step; Key breakthrough progressively launch, and relevant manager with the Internet user is fully linked up; The back both sides' affirmation of signing that reaches an agreement is with this foundation as the project implementation and examination.
C 2 organizations set up
Establishment is that group leader, Internet user plan that each leader of functional department of the inside and outside association of configuration is Internet user's effect chain planning configuration Project Leading Group of member with Rule Design merchant's policymaker, and responsible project is totally planned; The Internet user plans resource allocation, interagency coordination and the decision-making of the inside and outside association of configuration; The Internet user plans the project recruitment evaluation and the project configuration examination of the inside and outside association of configuration; Internet user's effect chain planning configuration that foundation is director with the information-based leader of authorities advances office; Plan the flow process backbone of all departments and the project manager of software company of the inside and outside association of configuration and implement the group that the engineer forms by computer professional, Internet user, be responsible for promoting comprehensively of project; Be responsible to define overall plan, and the goal task in clear and definite each stage, director, deadline; Concrete organizing and implementing, the scheduling of the project of being responsible for; Be responsible for the arrangement and the typing of organization foundation data, organize configuration consulting, delivery flow definition, system testing, end user's training, the system acceptance of project simultaneously, and submit progress report to the Project Leading Group by the stage.Submit decision recommendation to and for the risk that possibly the occur solution of advising for significant problem, make the Internet user plan that the related work of the inside and outside associated item of configuration fulfills.
C 3 strengthens project organization configuration
Internet user's effect chain planning configuration is included Internet user's tissue class configuration innovation item in and is configured, and confirms that the Internet user plans phase targets, implementary plan, the rewards and punishments measure of the inside and outside association of configuration, formulates effective appraisal standards.
Be organized as main body with the Internet user and confirm standard process; Formulate the operational procedure that the Internet user plans the inside and outside association of configuration; And to the stakeholder carry out repeatedly, targetedly the training; Carry out the qualifying examination of Internet user's effect chain planning configuration operation after training finishes, with this as foundation on duty.
Carry out Internet user's effect chain planning configuration week work regular meeting and monthly work briefing system of issue.The Internet user plans that each group of the inside and outside association of configuration circulates a notice of performance, asks a question in regular meeting; Solve by leading group is on-the-spot; And arrange the task of next stage; One month system performance is issued on company's internal network with the form of Internet user's effect chain planning configuration bulletin, and be furnished with suitable praise and criticize content, laggard to urge on.
C 4 Internet user's effect chains planning configuration project implementary plan
According to overall planning, implement step by step, benefit drives, the principle of key breakthrough, confirms target stage by stage, plans the target making planning of the inside and outside association of configuration by the Internet user.From easy to difficult, application from low to high focuses on actual effects.All the time adhere to being undertaken by planning tissue, training, data preparation, test, perfect, dry run, the step of formally reaching the standard grade.
The Internet user organizes and confirms first implementing procedure comparison standard, less the advancing, sell, deposit and the monetary items system of difficulty; Treat that the Internet user plans modules such as implementing production module and relevant with it equipment, metering, quality behind the system stability of the inside and outside association of configuration, implements modules such as occurrences in human life, decision-making at last again.
Organize reality based on the Internet user, confirm that whole project divides two stages to carry out:
In first stage, mainly implement system control that the Internet user plans the inside and outside association of configuration, sell configuration, receivable configuration, logistics arrangement, deal with configuration, stock's configuration, inventory auditing, product data configurations (containing Internet user's structural arrangements, Process configuration), expense budget configuration (containing the expense configuration), monetary items are adjusted, PDM data preparation and demand analysis, hardware net environmental structure, Internet user's effect chain are planned and disposed.Cycle is about 12 months.The main Internet user of completion plans and disposes the integrated of inside and outside related logistics and cash flow, standard, transparent configurations.
Second stage is production master program, material demand planning, power balance, workshop project configuration, quality configuration, equipment metering configuration, human resources configuration, solution analysis, the Internet user's effect chain planning configuration that integrated Internet user plans the inside and outside association of configuration.Cycle is about 16 months.Main realize with the Internet user plan the market of the inside and outside association of configuration be demand, with vertically and the master ga(u)ge that laterally drives divide core into, plan that with the Internet user input and output of the inside and outside association of configuration are the holographic concertedness enterprise schema of main contents; Be controlled at goods effectively; Compress stock to greatest extent; Improve delivery date, satisfy market demand apace.
The overall goal of C 5 planning configurations
a. to implement Internet user's effect chain planning configuration project is opportunity; Promote the Internet user by the transformation of traditional close, poor efficiency, extensive style configuration mode, the realization of support Internet user strategic objective to the configuration mode of transparent, collaborative, standard, lean.
b. strengthen Internet user's configurations.The Internet user who sets up standard plans inside and outside associated data standard of configuration and coding scheme, promotes the Internet user basis to rectify; Strengthen product design, technical papers standard configurations that the Internet user plans the inside and outside association of configuration; The refinement Internet user disposes when planning raw materials consumption, man-hour, the occupation of capital, the table of equipment of the inside and outside association of configuration by norm; Standard Internet user plans Internet user's standard campaign of the inside and outside association of configuration; Strengthen the customer resources information configuration that the Internet user plans the inside and outside association of configuration; The refinement Internet user plans the cost and the price configuration of the inside and outside association of configuration; Strengthen delivery flow process and role norm configuration that the Internet user plans the inside and outside association of configuration.
c. improve configuration, decision-making technique.Realize that the Internet user plans that the IRP of the inside and outside association of configuration, the data integration and the database overall situation of each subsystem share; Set up Internet user's Back ground Information structure that the Internet user plans the inside and outside association of configuration, comprise integrated information network and comprehensive mutual form of unified data; The Internet user plans the neat cover stock configuration of the inside and outside association of configuration and analyzes; The Internet user plans the process consuming cost accounting of the inside and outside association of configuration; What the Internet user planned the inside and outside association of configuration sells the configuration of risk control and customer resources on credit; Vertically reach the integrated application of the horizontal main system operation planning that drives, material demand planning, order configuration; The Internet user plans the real-time cost accounting of the branch product of the inside and outside association of configuration; Fast Quotation; The Internet user plans the profit budget and the breakeven analysis of the inside and outside association of configuration; Online multidimensional data analysis is supported decision application.
d. be configured to standard with Internet user's effect chain planning, system improving Internet user configuration is supported the Internet user and is carried out phyletic evolution, and the Internet user who forms transparent, open, collaborative, standard, lean is cultural.
The implementation content of C 6 planning configurations
a. the Internet user plans the logistics arrangement of the inside and outside association of configuration.Rely on brand-new information system support; In time transmit the demand that the Internet user plans the inside and outside related production system of configuration; And through planning the information integration of disposing inside and outside related logistics system with the Internet user; Rapidly the Internet user is planned that disposing inside and outside related demand of producing makes fast reaction, guarantees that the Internet user plans the Qi Taoxing of the inside and outside related production material of configuration.Internet user's effect chain planning configuration-system proposes the Internet user and plans the inside and outside related demand planning of producing of configuration according to system's operation planning; The Internet user plans that the inside and outside related production system of configuration can propose the Internet user and plan the inside and outside related logistics arrangement planning of configuration according to the neat cover situation of material planning inquiry raw material and parts; Rely on the Internet user of Internet user's effect chain planning configuration-system to plan that the inside and outside related information of configuration is integrated, set up perfect Internet user and plan the inside and outside affiliated supplier's configuration scheme of configuration; The Internet user is planned the foundation of the inside and outside affiliated supplier's of configuration information such as delivery date, article quality as supplier evaluation; Plan that the inside and outside affiliated supplier's evaluation result of configuration combines with the distribution of logistics arrangement share, Payments Policy to the Internet user; Set up the information bank that the Internet user plans configurations such as inside and outside related logistics arrangement cycle of configuration, economic lot size, safety inventory, for ensureing that in time material supplies provide foundation.
b. the Internet user plans sale, stock and the production system of the inside and outside association of configuration.System's operation planning is to instruct the Internet user to plan the programmatic document of the inside and outside related activity in production of configuration.For the enforcement of safeguards system operation planning, can produce the Internet user simultaneously and plan that the Feed stream arrangement planning, cooperation part planning, workshop project planning, the equipment that dispose inside and outside association use a series of supporting planning such as planning, moulds of industrial equipment planning.System's operation planning and these planning are guiding principle and purpose relation, and guiding principle is lifted and could be opened by order.
c. the Internet user plans the cost configuration of the inside and outside association of configuration.To the Internet user plan the configuration inside and outside association production cost plan, adjust, control and dispose; Set up the departmental cost budget method that the Internet user plans the inside and outside association of configuration; And with thing in cost analysis compare; Make progressively department of budget, accurate, provide the data of usefulness for Internet user organizational decision making.
d. the Internet user plans the configuration of dealing with of the inside and outside association of configuration.The Internet user plans the various contact funds that the main configuring internet user of account payable subsystem of the inside and outside association of configuration is taken place with supplier in running; Help Internet user configuration person to grasp the flow direction of fund effectively; Control the outflow of Internet user's fund through monitoring the payment situation, form the good circulation of circulating fund.The account payable subsystem that the Internet user plans the inside and outside association of configuration is filled in invoice, tax and logistics operational costs usefulness based on logistics arrangement activity, also can directly call the order that logistics arranges subsystem to generate.Invoice amount is shared with the warehouse-in material, can confirm to put in storage material payment situation.Generate the account payable account after invoice is transferred items, payment order and account payable account are settled accounts, and confirm the received payment amount of money and the arrearage amount of money, can handle advance payment simultaneously.Organize following cash flow artificial situation in order to grasp the Internet user in real time; The Internet user plans that the system of the inside and outside association of configuration also provides the rich querying statistical function, and plans the inside and outside related logistics arrangement of configuration subsystem, the integrated use of account subsystem with the Internet user.
e. the Internet user plans the receivable configuration of the inside and outside association of configuration.Internet user tissue is through the application to Internet user's effect chain planning configuration-system, realizes that the Internet user plans sharing of data between monetary items department and the sales department of the inside and outside association of configuration, accomplishes the interchange of data message on network; The Internet user plans that the income design schedule money of the monetary items portion of the inside and outside association of configuration will serve as according to registering with the invoice for sales of sales department; The Internet user plans that the income design schedule money of the inside and outside association of configuration is by collecting toward vostro account.The Internet user plans that gathering, the invoice for sales of the inside and outside association of configuration have according to complying with clear and definite flow process source.The returned money clearing time can be assigned to each account due, make income design schedule age, collect the aging reflection in advance in time, accurately, not only can take in design schedule age, collect aging analysis of accounts in advance, can also carry out the returned money aging analysis of accounts.
(5. 2) following sight is summed up
The first, the not still brand-new expansion and the innovation of collocation method of enforcement of Internet user's effect chain planning configuration-system, organizational innovation, consciousness innovation and the mechanism innovation that all stakeholder participate in is a synergitic huge system engineering of holography especially.Applying under the technological and brand-new management science technology of brand-new economic science; In modern times on information technology and the integrated operating system of Internet user's terminal intelligent and the dynamic remittance open network basis; Internet user's effect chain planning configuring technical PA/UEC is guidance with the holographic coordinated management thought of metasystem science; With Internet user's effect chain market configuring technical MA/UEC and Internet user's effect chain network configuring technical NA/UEC, formation remedies each other, the relation of phase trans-substitution.Therefore, will do one's best on the implementation, plan that with the Internet user configuration inside and outside related demand and configuration level are directly related, not all Internet user is fit to.
The second, the enforcement of Internet user's effect chain planning configuration-system is that the Internet user plans the inside and outside related engineering of integrating of configuration, must the Internet user plan the policymaker's fellowship that disposes inside and outside association, could continue to promote down; Want strictness follow " long-term plan, implement step by step, benefit drives, key breakthrough " principle, carry out the planning that the Internet user plans the inside and outside association of configuration, have levels, in steps, target arranged, advance in proper order by the stage, can not be anxious for success; Strong organizational structures are arranged, clear and definite objectives, everyone has responsibility, guarantees project success.
The 3rd, the technical risk of Internet user's effect chain planning configuration project is little, and main concentration of risk is planned the inside and outside associated configurations aspect of configuration the Internet user.All Internet users plan that the software of the inside and outside association of configuration all is based on role's the definition and the standard of flow process.Therefore, be not only the technological change that the Internet user plans the inside and outside association of configuration, and be that the Internet user plans configuration inside and outside associated configurations innovation, Thought Innovation and system innovation.Internet user's effect chain planning configuration-system involves a wide range of knowledge, and not only will drop into a large amount of man power and materials, also relates to Internet user's organization, a series of major transformations such as configuration system, method of work and configure base.Say in a sense, informatization be exactly to the Internet user plan the inside and outside association of configuration human, financial, and material resources power resource and Internet user plan once big innovation and the change that the production, supply and sales link of the inside and outside association of configuration is carried out at information processing, working method, configuration mechanism and aspects such as people's idea, custom.
The 4th, Internet user's effect chain planning configuration-system is implemented, and the Internet user plans that the data of the inside and outside association of configuration are crucial.Three fens Internet users plan the software of the inside and outside association of configuration; Seven fens Internet users plan the data of the inside and outside association of configuration; Accomplish " three-arrive-place ": the Internet user plans that the data of the inside and outside association of configuration put in place; The Internet user plans that the training of the inside and outside association of configuration puts in place, and the Internet user plans that the examination of the inside and outside association of configuration puts in place; " guarantee for one ": guarantee that the Internet user plans that the new-old system of the inside and outside association of configuration steadily is connected.
(5. 3) 600 patent of invention common implementing plan brief introductions
Through 30 years freely explore; Independent inventor Li Zongcheng is taught in September, 2011 and formally submits 600 applications for a patent for invention to State Patent Office through the electronic application system, and submits materials such as 600 parts of claims that amount to about 3,600 ten thousand words, specification, accompanying drawing to.
Through 30 years freely explore; Independent inventor Li Zongcheng professor is delivering through international and domestic academic journals and academic conference on more than the 80 piece of paper basis of (not comprising the achievement that cooperation is accomplished); Independent recently writing is accomplished eight ones has the academic monumental work (amounting to 3,000 ten thousand words) of substantial connection with these 600 technological inventions declaring, plans in September, 2011 after, to handle successively formally publication matters.
600 technological invention patents that this is declared; Be that inventor Li Zong really explores and a brand new technical cluster that establishes one's own system of foundation through 30 years independence and freedom, its generic name is " GVC network technology support system " [DCN/HII (GVC); ].
Based on a series of academic research new results and the invention of 600 state-of-the-art technologies, inventor Li Zong has really set up a series of being used for and has unifiedly described, analyzes, explained that global intelligent integral network calculations system (can be referred to as " world " counting system) and GVC dynamically converge resource distribution dynamics RDD model, network configuration dynamics NDD model, intelligent integrated synergetics IIS model and holographic coordination HOS model and the game coordination GOS model of open network system (DCN/HII (GVC)).
After digital technology, network technology and Intel Virtualization Technology, bring intelligent integral technology (IIT) and holographic joint management technology (HST) to the mankind based on the GVC network technology support system of 600 state-of-the-art technology inventions.
Based on a series of academic research new results and 600 state-of-the-art technology inventions, inventor Li Zong really proposes a strategy that can be referred to as " since the beginning of history " plan---GVC system engineering technology cluster exploitation total strategy.
As the applicant of 600 patents of invention, the whole world that the sincere proposition of inventor Li Zong will be developed and set up is dynamically converged open network and is calculated, but visualization abbreviate " world calculating " (Heaven-Earth Computing) as.Through providing information resources to obtain the network of physical resources, knowledge resource and financial resources, can be described as " world ".At this, " my god " the representative information network, represent virtually, represent digital virtual world; " " represent, knowledge, financial three macroreticulars, represent hypostazation, representing real world.Be platform and with the information network, can be described as and converge logical net the brand-new network system that logistics network, knowledge network and banking network combine together.
Some are not only in " world " can self and the virtual computational resource of management, and be various can self and the entity operation resource of management; It is not only some large server clusters that comprise calculation server, storage server, broadband resource etc., and is various industry value chain and the industry clusters that comprise supply system, production system, service system, marketing system etc.It is that logistics net, knowledge knowledge network and Network and Finance Network connect the brand-new system of leading to of converging.
The world is calculated and not only all computational resources is put together, and realizes management automatically by the information network in house software, need not artificial participation; And all entity operation resource put together, and realize management automatically by the information network external software, less or need not artificial participation.It is loaded down with trivial details details worry that this feasible supplier of application need not, and can be absorbed in the business of oneself more, helps innovating and reducing cost.Analogy saying with visualization; This not only cans be compared to the pattern that has turned to power plant's centrally connected power supply from ancient separate unit generator mode, and cans be compared to the intelligent integrated holographic joint management pattern that turns to region-wide power supply, scheduling, control and use from the pattern of power plant's centrally connected power supply.Maximum difference is that it is to transmit through the logistics under the information network support, knowledge, the full open network that converges of finance.  
The total strategy target of GVC network technology support system can be summed up as following content:
Level I, aspect technological development basic (front end of ICT industrial chain); From being that the center turns to that (EC/IU) is the center with Internet user terminal effect chain with Internet user; The connection of carrying out based on computer and network thereof with Natural Intelligence and Artificial Intelligence and coordinate main line as general intelligence integrated system (IIS) Upgrade process; Set up brand-new logical foundations, Fundamentals of Mathematics, scientific basic and brand-new technology basis and engineering foundation; Be that relative closure, static relatively " resource pool "---system for cloud computing injects soul, intelligence and life; Build global intelligent integral network computer system (CS/HSN (GII)), Global Internet is made becomes the technique support system that really has life and ecological holographic joint management.
Level II, in the application facet (end of ICT industrial chain) of brand new technical; From (EC/IU) is that to turn to the multimodal GVC system of multilayer level (GVC) be the center at the center with Internet user terminal effect chain; The connection of carrying out based on computer aided system and the Internet with cognitive system and practice system and coordinate the main line as high-grade intelligent integrated system (HIIS) evolution process is set up based on brand-new theoretical intelligent integrated scientific and technical system (the IIS & IIT of metasystem (MS) science; ); With the novel Global Internet of life-giving vigor be dispersed in all over the world logistics net, energy net, Network and Finance Network and the knowledge knowledge network of each field all departments combine together (DCN); Carry out the GVC system engineering energetically; Set up the global intelligent integral really have life and ecological holographic joint management and dynamically converge open network system (DCN/HII (GVC)), thereby build intelligent integrated net, life the Internet and ecological operation net.
GVC system engineering technology cluster exploitation total strategy---the inventor is referred to as " since the beginning of history " plan through implementing, and " cloud " counting system that flicker is indefinite is transformed into " world " counting system that converges logical all things on earth, connects longitude and latitude.
As the applicant of 600 patents of invention, the whole world that the inventor proposes to develop and to set up is dynamically converged open network and is calculated, but visualization abbreviate " world calculating " (Heaven-Earth Computing) as.Through providing information resources to obtain the network of physical resources, knowledge resource and financial resources, can be described as " world ".At this, " my god " the representative information network, represent virtually, represent digital virtual world; " " represent, knowledge, financial three macroreticulars, represent hypostazation, representing real world.Be platform and with the information network, can be described as and converge logical net the brand-new network system that logistics network, knowledge network and banking network combine together.
Some are not only in " world " can self and the virtual computational resource of management, and be various can self and the entity operation resource of management; It is not only some large server clusters that comprise calculation server, storage server, broadband resource etc., and is various industry value chain and the industry clusters that comprise supply system, production system, service system, marketing system etc.It is through information network (the Internet) logistics net, knowledge knowledge network and Network and Finance Network to be connect brand-new scientific system, technical system and the Engineering System that remittance is led to.
The world is calculated and not only all computational resources is put together, and realizes management automatically by the information network in house software, need not artificial participation; And all entity operation resource put together, and realize management automatically by the information network external software, less or need not artificial participation.It is loaded down with trivial details details worry that this feasible supplier of application need not, and can be absorbed in the business of oneself more, helps innovating and reducing cost.Analogy saying with visualization; This not only cans be compared to the pattern that has turned to power plant's centrally connected power supply from ancient separate unit generator mode, and cans be compared to the intelligent integrated holographic joint management pattern that turns to region-wide power supply, scheduling, control and use from the pattern of power plant's centrally connected power supply.Maximum difference is that it is to transmit through the logistics under the information network support, knowledge, the full open network that converges of finance.  
Payment and the use pattern that is meant information network inside and outside infrastructure calculated in the narrow sense world; Be to be the center with the multi-field multimodal value chain of multilayer level; (CS/HSN (GII)) is the major technique support with global intelligent integral network computer system; Be prone to extended mode with need-based,, obtain required resource through logistics network, knowledge network and the banking network that combines together.Resource in " world " is can infinite expanding In the view of the user, obtains at any time, uses as required, and expansion is at any time paid on time.This specific character just uses water power equally to use information network inside and outside infrastructure as us.
Payment and the use pattern that is meant the service of information network inside and outside calculated in the broad sense world; Be to be the center with the multi-field multimodal value chain of multilayer level; (CS/HSN (GII)) is the major technique support with global intelligent integral network computer system; Be prone to extended mode with need-based,, obtain required service through logistics network, knowledge network and the banking network that combines together.This service can be that technology and the software of information network inside and outside, the logical net that converges are relevant, also can be any other service, and it has unique effects such as ultra-large, virtual, reliable and secure; " world calculating " books version is also a lot, has all introduced characteristic and the function that calculate in the world from theory and practice.
The world calculate (Heaven-Earth Computing) must be holographic cooperating type (HSO, Li Zongcheng).It neither be distributed neither centralized.It is not only cloud computing (cloud computing), grid computing (Grid Computing), Distributed Calculation (Distributed Computing), parallel computation (Parallel Computing), effectiveness and calculates (Utility Computing), the network storage (Network Storage Technologies), virtual (Virtualization), load balancing computer technologies such as (Load Balance) product that development is merged with information network technique, and be through computer technology and information network technique further fusion and development and with logistics net, knowledge knowledge network and the Network and Finance Network intelligent integrated result of realization that is closely linked.
And then say it; Calculate in the world is the major tuneup and the development of the various computing techniques in information network inside and outside, or perhaps statistical technique system, accounting technique system, measurement technology system under computer science and technology and information network technique support in the round Realization in entity activity field.Calculate in the world is the result that virtual (Virtualization), cloud computing (cloud computing), effectiveness are calculated (Utility Computing), IaaS (infrastructure is promptly served), PaaS (platform is promptly served), the mixing evolution of SaaS notions such as (software are promptly served) and risen on the one hand; The result who be that hypostazation (Substantiation), measuring science technology, fundamental accounting and technology, Accounting System, resource distribution kinematic analysis, resource distribution effect analysis, the credit of game coordination are analysed on the other hand, IaaS/HSO (information network inside and outside infrastructure is promptly served), PaaS/HSO (information network inside and outside platform is promptly served), SaaS/HSO notions such as (information network inside and outside software are promptly served) mixes evolution and rise to.
The world is calculated and is intended to through the logistics under the information network support, knowledge, the full open network that converges of finance; The computational entity that a plurality of costs are relatively low is integrated into a complete intelligent integrated system with powerful calculating ability; And, this powerful computing ability is distributed in the terminal use's hand of information network inside and outside by brand-new business models such as information network inside and outside SaaS/HSO, PaaS/HSO, IaaS/HSO, MSP/HSO.
The core concept that calculate in the world is exactly through improving constantly the disposal ability in " world "; And then the processing that reduces information network inside and outside user terminal is born; Finally make information network inside and outside user terminal be simplified to a simple input-output equipment, and can enjoy the powerful computing ability in " world " as required!
When using world calculating; We can also provide the storage of the other a kind of world to be used as that it is auxiliary, such as, the Win Stor high in the clouds storage of China is transformed into world storage; It is the basis with information network inside and outside user; With information network inside and outside storage tool is guiding, and powerful data security feature is provided, and the world is calculated come into the market.The storage of the so-called world is the basis with the logistics under the information network support, knowledge, the full open network that converges of finance exactly, and cross-domain/route realizes that data are omnipresent, need not to download, need not to install and can directly move, and realizes world computing architecture.  
In information service industry the inside, we can be divided into three parts: first part is a service of information network, comprises infrastructure service, the value-added service of telecommunications, the service of Web TV.Second is the service of information technology, comprises the service of software, the service of outsourcing.Also having one is the service of the information content.We can see that this is the big class of whole information service and the state of industry.But we should not see, because the characteristic that merges has appearred in the transition of development of technology and industry, new industry characteristics and characteristics have occurred between the class, and this is the variation that takes place in the information service industry overall situation.We can see, the fusion of the information technology and the communication technology on the platform of the Internet is typically the IMS service very much.Also having a new characteristic is the Sashup technology, can the ability of two nets and user's data well polymerization get up.
Generally speaking, the world is calculated and can be regarded as COMPUTER CALCULATION and information network and calculate with the metering of entity operational system, can take into account that to adjust the complete operation flow that combines technological.Calculate through the world; We might couple together the high-performance computer that is dispersed in various places with express network; And then with the custom-designed various middleware softwares in information network inside and outside; Metering, accounting and the Accounting System in the entity activity field that is dispersed in various places organically are bonded together,, and it is assigned on the suitable node moves with the various man-machine interfaces that comprise the Web interface computation requests that the various users in network inside and outside propose of receiving information.World computing technique system can improve the service quality and the utilance of information network inside and outside resource greatly; Avoid the information network inside and outside to stride node simultaneously and divide inefficiencies and the complexity that application program is brought, can be issued to the practicability requirement of information network inside and outside in present condition.
The target of the integrated collaborative master-plan of intelligence; Be according to the greatly collaborative overall performance requirement of integrated tissue one self-organizing of intelligence; And intelligent integrated entity is implemented collaborative overall concrete social economy one natural ecological environment; Overall middle personnel positions rationally is set and tentatively confirms the body tasks requirement, guarantee to make up on the whole the intelligent integrated big cooperative system framework of a comprehensive benefit optimization, and the detailed design that concerns for main body one effective object lays the first stone.
" intelligent integrated entity one general technique one effective object " function is distributed, and is the basis of the integrated collaborative master-plan of whole intelligence.The function of intelligence integrated entity-general technique-effective object is distributed combines intelligent integrated entity, general technique and effective object three aspects through this tie of function; And formed intelligent integrated key element (subsystem) the function relations of distribution in collaborative overall, confirmed the particular location at intelligent integrated entity one general technique interface, general technique one effective object interface.Integrated collaborative overall main body one general technique one an effective object function interface form of concrete intelligence mainly receives the influence of two aspect factors: the one, and the integrated collaborative overall functional character of intelligence; The 2nd, this overall residing natural, ecological one socio-ecological environment.In numerous possible intelligent integrated functionality interface forms, always there are one or more to be more suitable in the integrated collaborative overall actual conditions of a certain concrete intelligence, the system that can guarantee satisfies performance requirement, satisfies and implement environment requirement.

Claims (7)

1. independent claims---the ICT technical support design of Internet user terminal planning allocation project; Be that the inventor is at the brand-new logical foundations (Li Zongcheng of its independent foundation; 2011), Fundamentals of Mathematics (Li Zongcheng, 2011), scientific basic (Li Zongcheng, 2011) and brand-new technology basis (Li Zongcheng; 2011) and engineering foundation (Li Zongcheng; 2011) on, " world " counting system that converges logical all things on earth, connects longitude and latitude for " cloud " counting system that flicker is indefinite is transformed into is the center with Internet user; And then be the center with GVC system (GVC); The connection of carrying out based on computer and network thereof with Natural Intelligence and Artificial Intelligence and coordinate main line as general intelligence integrated system (IIS) Upgrade process, through setting up the new technology that network configuration dynamics basic model and normal form put forward, this right is characterised in that:
A, for the holographic butt joint of Internet user terminal planning configuration balancing technique, brand-new logical foundations comprises that the holographic logical logic (Li Zongcheng, 2011), the two poles of the earth of converging converge that logical logic (Li Zongcheng, 2011), the two poles of the earth are holographic converges logical logic (Li Zongcheng, 2011); Brand-new Fundamentals of Mathematics comprise holographic logical mathematics (Li Zongcheng, 2011), the logical mathematics (Li Zongcheng, 2011) of the two poles of the earth remittance, the system's transition analyze mathematics (Li Zongcheng, 2011) of converging; Brand-new scientific basic comprises resource distribution dynamics (Li Zongcheng; 2011), holographic coordination (Li Zongcheng, 2011), the system behavio(u)r theory of value (Li Zongcheng, 2011), game coordination (Li Zongcheng; 2011), the equilibrium economics (Li Zongcheng that liquidates; 2011), holographic logical physics (Li Zongcheng, 2011) and perforation science (interdisciplinary science and cross-section science)---the metasystem science (Li Zongcheng that forms by the big comprehensive of a series of brand-new theories of converging; 2011) and intelligent integrated science (Li Zongcheng, 2011); The brand-new technology basis is is core with the value chain system, towards the synergitic brand-new systems technology of holography (cluster); Brand-new engineering foundation is is core with the value chain system, towards the synergitic brand-new system engineering of holography (cluster);
B, for the holographic butt joint of Internet user terminal planning configuration balancing technique; " world " calculating itself is an extremely complicated system; Has very complicated holographic joint management structure; Here; On the one hand, various computers and infrastructure thereof, auxiliary device and the network equipment (comprising server, browser) couple together with holographic joint management pattern (comprising ICC, ICK, ICH, IDC, IDK, IDH, IMC, IMK, IMH, ECC, ECK, ECH, EDC, EDK, EDH, EMC, EMK, EMH) and form the computer interconnected network tissue; On the other hand; Various users and effect chain thereof couple together with holographic joint management pattern (comprising ICC, ICK, ICH, IDC, IDK, IDH, IMC, IMK, IMH, ECC, ECK, ECH, EDC, EDK, EDH, EMC, EMK, EMH) and form natural intelligence socialization tissue, and this natural intelligence socialization tissue and computer interconnected network tissue form according to independent claims 1 described " world " counting system CS/HSN (GII) that 1 described the present invention is censured according to independent claims jointly;
C, for the holographic butt joint of Internet user terminal planning configuration balancing technique, set up the technical system and the dynamical foundation of the design of planning allocation project, and then set up the know-why of planning allocation project design;
D, for the holographic butt joint of Internet user terminal planning configuration balancing technique; Introduce suitable, be used for reflecting respectively general Complex Adaptive Systems basic motive, base load, basic effect, consume basically, the various basic collaborative variablees of inner cooperation and competition and outside cooperation and competition, set up the rationalization evaluation model and the technical scheme of allocation project.
2. dependent claims---for the Internet user terminal, 1 described the present invention sets up the technical system of planning allocation project design according to independent claims, and this right is characterised in that:
Await developing energetically the PA/UEC of foundation; Be a information integration, and PA/IVC is an information integration towards supply chain planning operation (Planning Operation of Supply Chain) towards Internet user's effect chain planning operation (Planning Operation of User Efficiency Chain); Outside manufacturing, supply and marketing, monetary items function and the various back-up system and the technology of PA/IVC system; PA/UEC combines vertically reaching laterally related product, project and field on Internet user's effect chain, has following a series of brand-new technology:
Internet user's effect chain planning configuration-system analytical technology---MS (OP [UEC]) analytical technology (Li Zongcheng, 2011)
Internet user's effect chain planning configuration elementary cell analytical technology---BM/RD [UEC] analytical technology (Li Zongcheng, 2011)
Internet user's effect chain planning configuration dynamical system analytical technology---DS/RD [UEC] analytical technology (Li Zongcheng, 2011)
Internet user's effect chain planning configuration-system dynamic effect comparative advantage analysis technology
---CA/SDE [UEC] analytical technology (Li Zongcheng, 2011)
Technology (I) is analysed in the credit of Internet user's effect chain planning configuration game coordination
---GOS [UEC] analytical technology (Li Zongcheng, 2011)
Internet user's effect chain planning configuration production function analytical technology---PF [UEC] analytical technology (Li Zongcheng, 2011)
Internet user's effect chain planning configuration-system effect value analysis technology---FV [UEC] analytical technology (Li Zongcheng, 2011)
The equilibrium economics analytical technology that liquidates is disposed in the planning of Internet user's effect chain
---effect chain and financing chain are to impulsive motion (V – F [UEC]) analytical technology (Li Zongcheng, 2011)
Internet user's effect chain planning configuration whole network balanced table analysis technology that liquidates
---NA/V – F (DC [UEC]) technology (Li Zongcheng, 2011)
Technology (II) is analysed in the credit of Internet user's effect chain planning configuration game coordination
---GOS (DC [UEC]) analyzes normal form (Li Zongcheng, 2011)
Internet user's effect chain planning disposal subject analytical design technique---IIM [UEC] analytical design technique (Li Zongcheng, 2011)
Internet user's effect chain planning configuration load analytical design technique---IIC [UEC] analytical design technique (Li Zongcheng, 2011)
Internet user's effect chain planning configuration mode analytical design technique---IIW [UEC] analytical design technique (Li Zongcheng, 2011)
Internet user's effect chain planning configuration-system analytical design technique---IIS [UEC] analytical design technique (Li Zongcheng, 2011)
Internet user's effect chain planning configuration surroundings analytical design technique---IIE [UEC] analytical design technique (Li Zongcheng, 2011)
Internet user's effect chain planning configuration-system project analysis designing technique
---IISE [UEC] analytical design technique (Li Zongcheng, 2011)
Internet user's effect chain planning configuration social justice system engineering technology---SFS [UEC] analytical technology (Li Zongcheng, 2011)
The intelligent integrated world of Internet user's effect chain planning configuration computation schema---GIICM [UEC] (Li Zongcheng, 2011)
Internet user's effect chain planning configuration intelligence integrated brand-new operating system---GIIOS [UEC] (Li Zongcheng, 2011)
Internet user's effect chain planning configuration intelligence integrated dynamic remittance open network---GIIN [UEC] technical system (Li Zongcheng, 2011).
3. dependent claims is for the Internet user terminal, and 1 described the present invention sets up the dynamics normal form of planning allocation project according to independent claims, and this right is characterised in that:
The Internet user plans that configuration-system and natural environment on every side constitute Internet user terminal planning configuration natural ecosystems jointly; For this type system, we need divide five action scopes to consider Internet user terminal planning configuration ecological balance condition;
In self-organizing competition action scope, realize aspect certain resource that balance of nature, Internet user plan that configuration-system just receives following essential condition and retrains:
a1. nature is iPlant the bearing capacity of resource aspect BN i ( t) attenuation rate β i ( t) the time period of being considered [ t 0, t 1] in must be not more than arbitrarily small number ε i , promptly
β i? (? t?)?≤? ε i? , t∈?[? t? 0?,? t? 1?] (?2.?232?)
a2. the Internet user of self-organizing competition plans configuration-system G 1To iPlant the utilization of natural resources DG 1, i ( t) the time period of being considered [ t 0, t 1] in must approach the bearing capacity of nature aspect i kind resource BN i ( t), promptly
| ?DG ?1,? i? (? t?)?–? BN i? (? t?)?|?≤? η i ? β i? (? t?)?≤? ε i? ,? t∈?[? t? 0?,? t? 1?]?(?2.?233?)
Concentrating tissue competition action scope, realize aspect certain resource that balance of nature, Internet user plan that configuration-system just should receive following essential condition and retrain:
b1. nature is iPlant the bearing capacity of resource aspect BN i ( t) attenuation rate β i ( t) the period of being considered [ t 0, t 1] in must be not more than arbitrarily small number ε i , promptly
β i? (? t?)?≤? ε i? , t∈?[? t? 0?,? t? 1?] (?2.?234?)
b2. concentrate the Internet user of tissue competition to plan configuration-system G 2To iPlant the utilization of natural resources DG 2, i ( t) the time period of being considered [ t 0, t 1] in must approach the bearing capacity of nature aspect i kind resource BN i ( t), promptly
| ?DG ?2,? i? (? t?)?–? BN i? (? t?)?|?≤? η i ? β i? (? t?)?≤? ε i? ,? t∈?[? t? 0?,? t? 1?](?2.?235?)
In basic synergy territory, realize aspect certain resource that balance of nature, Internet user plan that configuration-system just should receive following essential condition and retrain:
c1. nature is iPlant the bearing capacity of resource aspect BN i ( t) attenuation rate β i ( t) the period of being considered [ t 0, t 1] in must be not more than arbitrarily small number ε i , promptly
β i? (? t?)?≤? ε i? , t∈?[? t? 0?,? t? 1?] (?2.?236?)
c2. basic collaborative Internet user plans configuration-system G 3To iPlant the utilization of natural resources DG 3, i ( t) the time period of being considered [ t 0, t 1] in must approach nature the iPlant the bearing capacity of resource aspect BN i (t), promptly
| ?DG ?3,? i? (? t?)?–? BN i? (? t?)?|?≤? η i ? β i? (? t?)?≤? ε i? ,? t∈?[? t? 0?,? t? 1?]?(?2.?237?)
In self-organizing cooperation action scope, realize aspect certain resource that balance of nature, Internet user plan that configuration-system just should receive the constraint of following essential condition:
d1. nature is iPlant the bearing capacity of resource aspect BN i ( t) attenuation rate β i ( t) the period of being considered [ t 0, t 1] in must be not more than arbitrarily small number ε i , promptly
β i? (? t?)?≤? ε i? , t∈?[? t? 0?,? t? 1?] ?(?2.?238?)
d2. the Internet user of self-organizing cooperation plans configuration-system G 4To iPlant the utilization of natural resources DG 4, i ( t) the period of being considered [ t 0, t 1] in must approach nature the iPlant the bearing capacity of resource aspect BN i ( t), promptly
| ?DG ?4,? i? (? t?)?–? BN i? (? t?)?|?≤? η i ? β i? (? t?)?≤? ε i? ,? t∈?[? t? 0?,? t? 1?](?2.?239?)
Organize the cooperation action scope concentrating, realize aspect certain resource that balance of nature, Internet user plan that configuration-system just should receive following essential condition and retrain:
e1. nature is iPlant the bearing capacity of resource aspect BN i ( t) attenuation rate β i ( t) the period of being considered [ t 0, t 1] in must be not more than arbitrarily small number ε i , promptly
β i? (? t?)?≤? ε i? , t∈?[? t? 0?,? t? 1?] ?(?2.?240?)
e2. concentrate the Internet user of tissue cooperation to plan configuration-system G 5To iPlant the utilization of natural resources DG 5, i ( t) the period of being considered [ t 0, t 1] in must approach nature the iPlant the bearing capacity of resource aspect BN i ( t), promptly
| ?DG ?5,? i? (? t?)?–? BN i? (? t?)?|?≤? η i ? β i? (? t?)?≤? ε i? ,? t∈?[? t? 0?,? t? 1?](?2.?241?)
The Internet user plans that configuration-system and social environment on every side constitute the social ecosystem of Internet user terminal planning configuration jointly; For this type system, we need divide five action scopes to consider social ecological balance condition;
In self-organizing competition action scope, realize aspect certain resource that the social ecological balance, Internet user plan that configuration-system just should receive following essential condition and retrain:
a1. society is the iPlant the bearing capacity of resource aspect BS i ( t) attenuation rate α i ( t) the time period of being considered [ t 0, t 1] in must be not more than arbitrarily small number ε i , promptly
α i? (? t?)?≤? ε i? , t∈?[? t? 0?,? t? 1?] (?2.?242?)
a2. the Internet user of self-organizing competition plans configuration-system G 1To iPlant the utilization of resource DG 1, i ( t) the time period of being considered [ t 0, t 1] in must approach society the iPlant the bearing capacity of resource aspect BS i ( t), promptly
| ?DG ?1,? i? (? t?)?–? BS i? (? t?)?|?≤? η i ? α i? (? t?)?≤? ε i? ,? t∈?[? t? 0?,? t? 1?]?(?2.?243?)
Concentrating tissue competition action scope, realize aspect certain resource that the social ecological balance, Internet user plan that configuration-system just should receive following essential condition and retrain:
b1. society is the iPlant the bearing capacity of resource aspect BS i ( t) attenuation rate α i ( t) the time period of being considered [ t 0, t 1] in must be not more than arbitrarily small number ε i , promptly
α i? (? t?)?≤? ε i? , t∈?[? t? 0?,? t? 1?] (?2.?244?)
b2. concentrate the Internet user of tissue competition to plan configuration-system G 2To iPlant the utilization of resource DG 2, i ( t) the period of being considered [ t 0, t 1] in must approach society the iPlant the bearing capacity of resource aspect BS i ( t), promptly
| ?DG ?2,? i? (? t?)?–? BS i? (? t?)?|?≤? η i ? α i? (? t?)?≤? ε i? ,? t∈?[? t? 0?,? t? 1?]?(?2.?245?)
In basic synergy territory, realize aspect certain resource that social practice balance, Internet user plan that configuration-system will receive following essential condition and retrain:
c1. society is the iPlanting the resource aspect is bearing capacity BS i ( t) attenuation rate α i ( t) the time period of being considered [ t 0, t 1] in must be not more than arbitrarily small number ε i , promptly
α i? (? t?)?≤? ε i? , t∈?[? t? 0?,? t? 1?] (?2.?246?)
c2. basic collaborative Internet user plans configuration-system G 3To iPlant the utilization of resource DG 3, i ( t) the time period of being considered [ t 0, t 1] in must approach society the iPlant the bearing capacity of resource aspect BS i ( t), promptly
| ?DG ?3,? i? (? t?)?–? BS i? (? t?)?|?≤? η i ? α i? (? t?)?≤? ε i? ,? t∈?[? t? 0?,? t? 1?]?(?2.?247?)
In self-organizing cooperation action scope, realize aspect certain resource that the social ecological balance, Internet user plan that configuration-system just should receive the constraint of following essential condition:
d1. society is the iPlant the bearing capacity of resource aspect BS i ( t) attenuation rate α i ( t) the time period of being considered [ t 0, t 1] in must be not more than arbitrarily small number ε i , promptly
α i? (? t?)?≤? ε i? , t∈?[? t? 0?,? t? 1?] (?2.?248?)
d2. the Internet user of self-organizing cooperation plans configuration-system G 4To iPlant the utilization of resource DG 4, i ( t) the period of being considered [ t 0, t 1] in must approach society the iPlant the bearing capacity of resource aspect BS i ( t), promptly
| ?DG ?4,? i? (? t?)?–? BS i? (? t?)?|?≤? η i ? α i? (? t?)?≤? ε i? ,? t∈?[? t? 0?,? t? 1?]?(?2.?249?)
Organize the cooperation action scope concentrating, realize aspect certain resource that the social ecological balance, Internet user plan that configuration-system just should receive following essential condition and retrain:
e1. society is the iPlant the bearing capacity of resource aspect BS i ( t) attenuation rate α i ( t) the time period of being considered [ t 0, t 1] in must be not more than arbitrarily small number ε i , promptly
α i? (? t?)?≤? ε i? , t∈?[? t? 0?,? t? 1?] (?2.?250?)
e2. concentrate the Internet user of tissue cooperation to plan configuration-system G 5To iPlant the utilization of resource DG 5, i ( t) the time period of being considered [ t 0, t 1] in must approach society the iPlant the bearing capacity of resource aspect BS i ( t), promptly
| ?DG ?5,? i? (? t?)?–? BS i? (? t?)?|?≤? η i ? α i? (? t?)?≤? ε i? ,? t∈?[? t? 0?,? t? 1?]。
4. dependent claims---for the planning configuration at Internet user terminal, 1 described the present invention sets up the feedback mechanism design of planning allocation project according to independent claims, and this right is characterised in that:
1 described the present invention inquires on the Internet planning allocation project based on product efficacy structure (EVS [PES]) according to independent claims; Based on the planning allocation project of product efficacy structure, should comprise following several different levels on the Internet:
On the Intranet based on the planning allocation project of product efficacy structure (EVS [PES])
On the industry the Internet based on the planning allocation project of product efficacy structure (EVS [PES])
On the national the Internet based on the planning allocation project of product efficacy structure (EVS [PES])
On the Internet user terminal based on the planning allocation project of product efficacy structure (EVS [PES])
1 described the present invention inquires on the Internet planning allocation project based on Technological Economy foundation structure (RCS [TKS/EBS]) according to independent claims; Based on the planning allocation project of Technological Economy foundation structure, should comprise following several different levels on the Internet:
On the Intranet based on the planning allocation project of Technological Economy foundation structure (RCS [TKS/EBS])
On the industry the Internet based on the planning allocation project of Technological Economy foundation structure (RCS [TKS/EBS])
On the national the Internet based on the planning allocation project of Technological Economy foundation structure (RCS [TKS/EBS])
On the Internet user terminal based on the planning allocation project of Technological Economy foundation structure (RCS [TKS/EBS])
1 described the present invention inquires on the Internet planning allocation project based on internal-external conspiracy relation (SOS [ESS/ISS]) according to independent claims; Based on the planning allocation project of internal-external conspiracy relation, should comprise following several different levels on the Internet:
On the Intranet based on the planning allocation project of internal-external conspiracy relation (SOS [ESS/ISS])
On the industry the Internet based on the planning allocation project of internal-external conspiracy relation (SOS [ESS/ISS])
On the national the Internet based on the planning allocation project of internal-external conspiracy relation (SOS [ESS/ISS])
On the Internet user terminal based on the planning allocation project of internal-external conspiracy relation (SOS [ESS/ISS]).
5. dependent claims---for the planning configuration at Internet user terminal, 1 described the present invention sets up the Hiberarchy Decomposition model of planning allocation project according to independent claims, and this right is characterised in that:
Plan in the layoutprocedure IU user; The transmission of any signal and information produces hysteresis always, and practical problem quite a few must be by non-linear portrayal, and because the existence of disturbing factor; Some loop is temporary transient interrupts or when connecting again, causes the variation on the hysteresis control system recurring structure; In addition; Because the scale of control; Like multilayer, pass the response of the control system between rank, multiloop, negative feedback, many inputs, many output, be the variation on the big system configurations of control that lag behind of group more than one, and owing to the uncertainty of modeling more; Therefore study organize when lagging behind the interval more more and become the structure and related robust stabilizing problem that non-linear correlation is controlled big system, significant [230]
Consideration becomes non-linear correlation when having the many hysteresis of many groups interval IU user plans the big system of configuration control, and it is represented by the individual related subsystem of w:
Figure 828467DEST_PATH_IMAGE002
Figure 201110342211X100001DEST_PATH_IMAGE003
Figure 89684DEST_PATH_IMAGE004
Figure 201110342211X100001DEST_PATH_IMAGE005
?
Figure 820880DEST_PATH_IMAGE006
Figure 201110342211X100001DEST_PATH_IMAGE007
(?2.?87? a?)
Figure 201110342211X100001DEST_PATH_IMAGE009
(?2.?87? b?)
Here,
xR Ni For IU user plans the state of configuration-system,
UR Mi For IU user plans the control input of disposal subject,
YR Fi For IU user plans the output of configuration-system,
FR L i Plan the interference of the decision of the senior level that configuration-system is outer for IU user;
Figure 256650DEST_PATH_IMAGE010
Figure 201110342211X100001DEST_PATH_IMAGE011
plans that by basic I U user the IU user that configuration association matrix
Figure 842352DEST_PATH_IMAGE012
produces plans the configuration association matrix; Be designated as
Figure 201110342211X100001DEST_PATH_IMAGE013
, i.e.
Figure 68934DEST_PATH_IMAGE014
or
Figure 201110342211X100001DEST_PATH_IMAGE015
;
The time bending moment battle array A ( r) ( t), A ( s) ( t), B ( d) ( t), C ( h) ( t) be the uncertain matrix of suitable dimension, and excursion satisfies:
Figure 874341DEST_PATH_IMAGE016
,
Figure 201110342211X100001DEST_PATH_IMAGE017
, ?(?2.?88?)
Figure 917569DEST_PATH_IMAGE020
;? ;?
Figure 580632DEST_PATH_IMAGE022
;?
Figure 201110342211X100001DEST_PATH_IMAGE023
Wherein
Figure 604826DEST_PATH_IMAGE024
,
Figure 201110342211X100001DEST_PATH_IMAGE025
Figure 11537DEST_PATH_IMAGE026
is the certainty matrix; And have
Figure 368569DEST_PATH_IMAGE028
Figure 201110342211X100001DEST_PATH_IMAGE029
6. dependent claims---for the Internet user terminal, 1 described the present invention sets up the rationalization evaluation model of allocation project according to independent claims, and this right is characterised in that:
Influence the Internet user and plan that allocation project design and the rational principal element of estimating have: design and evaluation objective A, design and interpretational criteria (index, model, structure) T, the design with the evaluation colony G, design and evaluation model MAnd design and estimator's preference ηIf design is designated as with the reliability of evaluation system R, then
R?=? f?(? A?,? T?, ?G?,? M, η)
The Internet user is planned the design and the evaluation of allocation project, should only not regard professional person's thing as, also should have the representative of various interest groups to participate in; In design and evaluation procedure, design will be brought into play multiple function with evaluation colony, design and evaluation objective as setting; Set up design and evaluation structure; Set up design and assessment indicator system, (qualitatively) design and evaluation index etc. are confirmed in definite design and evaluation index weight;
If plan that with the Internet user who estimates allocation project rationalizes index and forms with reference to ordered series of numbers with to be designed; The Internet user plans that allocation project rationalizes the evaluation criterion index and forms relatively ordered series of numbers of quilt; Then available grey relational grade representes that the Internet user with evaluation to be designed plans allocation project and degree of closeness at different levels, and the least squared criterion of utilization expansion is constructed target function and planned that through asking conditional extremum to set up the Internet user allocation project rationalizes the grey evaluation model;
Be provided with mThe item evaluation index nIndividual Internet user plans that the allocation project factor forms with reference to ordered series of numbers:
x ?j? =?{? x ?j ?(? i?)?|? i?=?1,?2,…,? m?j?=?1,?2,…,? n?} (?2.?15.?1?)
cThe level Internet user plans that allocation project rationalizes evaluation criterion and forms relatively ordered series of numbers of quilt
x ?h? =?{? x ?h ?(? i?)?|? h?=?I,?II,…,? c?i?=?1,?2,…,? m?} (?2.?15.?2?)
Note x j With x h iThe absolute difference of individual index
h? ( ?i?)?=?|? x ?j ?(? i?) x ?h ?(? i?)?| (?2.?15.?3?)
Then x j With x h The iThe degree of closeness of individual index is used grey incidence coefficient ζ( x j , x h ) be expressed as [43]
Figure 766314DEST_PATH_IMAGE030
(?2.?15.?4?)
In the formula
Figure 201110342211X100001DEST_PATH_IMAGE031
Be the two-stage lowest difference;
Figure 779270DEST_PATH_IMAGE032
Be two-stage maximum difference; ρFor resolution ratio is arranged, span is 0< ρ<1, generally get ρHigher resolution was promptly arranged in=0. 5 o'clock.
7. dependent claims---for the Internet user terminal, 1 described the present invention sets up the technical scheme of allocation project according to independent claims.
CN201110342211XA 2011-11-03 2011-11-03 ICT technical support design for internet user terminal planning and configuration project Pending CN102638506A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110342211XA CN102638506A (en) 2011-11-03 2011-11-03 ICT technical support design for internet user terminal planning and configuration project

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110342211XA CN102638506A (en) 2011-11-03 2011-11-03 ICT technical support design for internet user terminal planning and configuration project

Publications (1)

Publication Number Publication Date
CN102638506A true CN102638506A (en) 2012-08-15

Family

ID=46622749

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110342211XA Pending CN102638506A (en) 2011-11-03 2011-11-03 ICT technical support design for internet user terminal planning and configuration project

Country Status (1)

Country Link
CN (1) CN102638506A (en)

Similar Documents

Publication Publication Date Title
CN102970315A (en) Information communication technology (ICT) support design of market allocation body of enterprise value chain
CN102624811A (en) ICT technical support design for providing engineering for enterprise value chain network configuration
CN102624805A (en) ICT technical support design for providing engineering for internet user terminal market configuration
CN102624904A (en) Design basis for planning configuration unit of internet user terminal
CN102655521A (en) Design of ICT (information communication technology) technical support of regional value chain market allocation engineering
CN102624814A (en) Information and communication technology (ICT) support design for market allocation engineering of industrial value chain
CN102638515A (en) ICT technical support design for global value chain network configuration project
CN102624812A (en) ICT technical support design for providing engineering foundation for global value chain market configuration
CN102638506A (en) ICT technical support design for internet user terminal planning and configuration project
CN102724242A (en) ICT technical support design for coordination configuration engineering of internet user terminal
CN102624839A (en) ICT technical support design for providing environment for internet user terminal planning configuration
CN102624821A (en) ICT technical support design for providing engineering for regional value chain network configuration
CN102752351A (en) Information and communication technology (ICT) support design of national value chain network configuration engineering
CN102739746A (en) Information communication technology (ICT)/technical support design of Internet user terminal coordination configuration environment
CN102624799A (en) ICT technical support design for providing engineering for regional value chain planning and configuration
CN102638558A (en) Information communication technology (ICT) support design for enterprise value chain market configuration engineering
CN102780742A (en) Information communication technology (ICT) support design of national value chain market configuration project
CN102710708A (en) Information and communication technology (ICT) support design for global value chain planning configuration project
CN102651766A (en) Information communication technology (ICT) technical supporting design for engineering for planning and configuring value chain of enterprise
CN102710715A (en) Information and communication technology (ICT) support design for industry value chain network configuration project
CN102752353A (en) Information and communication technology (ICT) support design of industrial value chain planning and configuration engineering
CN102710693A (en) Information and communication technology (ICT) support design for Internet user terminal market allocation environment
CN103269350A (en) Internet user terminal harmonious configuration unit design foundation
CN103188274A (en) ICT network connecting technology for Internet user terminal coordination configuration system
CN103001997A (en) ICT technical support design of internet user terminal planning configuration body

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20120815