CN102624799A - ICT technical support design for providing engineering for regional value chain planning and configuration - Google Patents

ICT technical support design for providing engineering for regional value chain planning and configuration Download PDF

Info

Publication number
CN102624799A
CN102624799A CN2011103356974A CN201110335697A CN102624799A CN 102624799 A CN102624799 A CN 102624799A CN 2011103356974 A CN2011103356974 A CN 2011103356974A CN 201110335697 A CN201110335697 A CN 201110335697A CN 102624799 A CN102624799 A CN 102624799A
Authority
CN
China
Prior art keywords
value chain
configuration
planning
regional value
chain planning
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011103356974A
Other languages
Chinese (zh)
Inventor
李宗诚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2011103356974A priority Critical patent/CN102624799A/en
Publication of CN102624799A publication Critical patent/CN102624799A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

An ICT technical support design for providing engineering for regional value chain planning and configuration is a novel technique which is set up by taking internet users as the center and further taking a multi-hierarchy GVC (global value chain) as the center, taking the joint and coordination performed by a cognitive system and a practice system based on computer auxiliary systems and the internet as a main line of a developing process of an HIIS (high intelligent integrated system) and setting up basic models, normal forms and equation systems of network configuration dynamics and game organization synergetics on the basis of setting up new logic foundation, mathematic foundation and scientific foundation and in order to modify a 'cloud' computing system into a universal 'Heaven-Earth' computing system.

Description

The ICT technical support design of zone value chain planning allocation project
Technical field
This invention is applicant Li Zongcheng, and formally (generic name is the 356th in " GVC network technology support system [DCN/IIL (VCSE)] " to 600 patent of invention clusters that State Patent Office submits to through electronic system in September, 2011.
(generic name is the 341st, the 342nd, the 343rd, the 344th, the 345th, the 346th, the 347th, the 348th, the 349th, the 350th, the 351st, the 352nd, the 353rd, the 354th, the 355th, the 357th, the 358th, the 359th, the 360th in " GVC network technology support system [DCN/IIL (VCSE)] " to this invention, constitutes patent of invention crowd " regional value chain planning configuration ICT technique support system (ICT-PAM/[RVC]) " jointly with the patent of invention cluster.
" GVC network technology support system [DCN/IIL (VCSE)] " that the applicant proposes to comprise this invention, is made up of 600 patents of invention; Its bulking property target is; With GVC system (GVC) is core; The connection of carrying out based on computer and network thereof with Natural Intelligence and Artificial Intelligence and coordinate main line as general intelligence integrated system (GIIS) Upgrade process; Set up brand-new logical foundations, Fundamentals of Mathematics, scientific basic and brand-new technology basis and engineering foundation; Be that relative closure, static relatively " resource pool "---system for cloud computing injects soul, intelligence and life; Build global intelligent integral contract network computer architecture (CS/HSN (GII)), Global Internet is made becomes the technique support system that really has life and ecological holographic joint management character.On this basis; With GVC system (GVC) is core; The connection of carrying out based on computer aided system and the Internet with cognitive system and practice system and coordinate main line as high-grade intelligent integrated system (HIIS) evolution process; Foundation is based on the brand-new theoretical intelligent integrated scientific and technical system (IIS & IIT) of metasystem (MS) science; Logistics net, energy net, Network and Finance Network and the knowledge knowledge network of each field all departments combine together with being dispersed in all over the world with the novel Global Internet of life-giving vigor; Carry out the GVC system engineering energetically, set up the global intelligent integral really have life and ecological holographic joint management character and dynamically converge open network system (DCN/HII (GVC)), thereby build intelligent integrated net, life the Internet and ecological operation net.GVC system engineering technology cluster exploitation total strategy---inventor Li Zong really is referred to as " since the beginning of history " plan through implementing, and " cloud " counting system that flicker is indefinite is transformed into " world " counting system that converges logical all things on earth, connects longitude and latitude.
The main purpose of this invention is through brand-new logical foundations, Fundamentals of Mathematics, scientific basic and brand-new technology basis and engineering foundation, and the ICT network docking technique of engineering is provided for regional value chain planning configuration.
All related Mathematical Modelings are the really independent foundation of inventor Li Zong basically in this specification, have original innovation.
This invention belongs to facing area value chain planning configuration, planning organization and planning management, and (network technology of PA/RVC) is supported the field; Be the intelligent integrated technical foundation of facing area value chain and then facing area value chain planning configuration-system, people, mechanism and tissue guided into the key of " world " (brand-new counting system) of the logical all things on earth of remittance from flicker indefinite " cloud " (counting system).
PA/RVC is a kind of solution of regional value chain system engineering; By means of the brand-new Information technology and the network technology; Importing the service strategy of regional value chain and operation mode whole is among the inside and outside related system of regional value chain planning configuration of trunk with the information system; It is the just change on the science and technology, but involves regional value chain organization internal comprehensive integration and the configuration all about the flow process on the cross-region of personnel, fund, logistics, manufacturing and regional value chain tissue or transnational border related with the outside.  
PA/RVC is to physical resources configuration (logistics), the human resources configuration (stream of people) of the inside and outside association of regional value chain planning configuration, fund resource distribution (wealth stream), information resources configuration (information flow) integrated regional value chain configuration software.The DIM that Rule Design merchant, system integrator, module through the inside and outside association of facing area value chain planning configuration generates the merchant analyzes and Li Zongcheng proposes the inside and outside related ultimate consumer of facing area value chain planning configuration, social governor motion, the SHF of relative analyzes both at home and abroad, describes vertical related department of future generation, horizontal related department and value resource planning (VRP) software.It uses graphical user interface with inclusion region value chain planning configuration inside and outside related user/service system framework, uses open system and makes.Except the existing standard function, it also comprises other characteristic, disposes the adjustment report of inside and outside association etc. like quality, process enactment configuration and the planning of regional value chain of the inside and outside association of regional value chain planning configuration.Particularly, thus the basic technology that PA/RVC adopts will be more prone to upgrading will for simultaneously the independence of the inside and outside related user software and hardware of regional value chain planning configuration two aspects.The key of PA/RVC be all users of the inside and outside association of regional value chain planning configuration can cutting its use, thereby have natural ease for use.
Background technology
In recent years, the fusion of ICT industry three macroreticulars and system for cloud computing technology were pushed ahead international and domestic always energetically.Grid attempts to realize the overall sharing of interconnected internet resource, comprises information resources, data resource, computational resource and software resource etc.
But at present, the fusion of ICT industry three macroreticulars just is being absorbed in the dangerous condition of dying young, the novelty wretched insufficiency of cloud computing technology, and the application of cloud computing meets with all restrictions, and the exploitation of cloud computing system meets with heat, cold difficult situation out of trade in the industry.The fast development of the Along with computer technology and the network technology, along with the increase day by day of financial innovation and financial risks, market competition is further aggravated, and the space and the scope of regional value chain competition further enlarge, and the integrated of global economy also constantly pushed ahead.Twentieth century main facing area value chain nineties internal resource is the thought of configuration comprehensively, progressively develops into the configuration thought of how effectively utilizing and disposing whole resource thereupon.Under this situation, Li Zongcheng has at first proposed the notion report of PA/RVC.
The logical set of the remittance of setting up integrated economic multiattribute measure space based on intelligence, based on intelligence the logical operator of the remittance of integrated economic more rules metric matrix, integrated economic multiple-factor becomes the comprehensive remittance of power and is open to the custom and is and based on intelligence on the basis of the remittance pass function of integrated economic multiplicity algebra system based on intelligence, it is platform and the brand-new network system that logistics network, knowledge network and banking network are combined together that the inventor proposes will develop and set up with the information network---" whole world dynamically converge open network "; And then propose to develop and to set up and a kind of cloud computing and grid computing included at interior brand-new counting system---dispose and " world " computation schema of allocation of financial resource towards knowledge resource configuration, physical resources; Again and then to propose to develop and to set up a kind of serve as crucial and brand-new operation system that various cognitive operation and practice are combined together with computer operating system and internet operating system---and " holographic co-operation system " (OS/HSO).
The GVC that the inventor proposes dynamically converges open network system DCN/IIL (VCSE); Be meant with the multimodal value chain system (VCS of multilayer level; From value of the product chain PVC, regional value chain RVC; To industry value chain IVC, regional value chain RVC; So that national value chain NVC, GVC GVC) be core; Be fused to the major technique support with telecommunications network (MCN), computer network (WWW) and broadcasting and television network (BTN) three macroreticulars, logistics net (MN), ability drift net (EN), information network (IN), Network and Finance Network (FN) and knowledge knowledge network (KN) five macroreticulars are combined together, the global open network system of full field, total system, overall process comprehensive integration business service is provided.
Calculating of the open network and the world thereof and the holographic co-operation (abbreviation OS/HSO of system dynamically converge in the whole world that inventor's proposition will be developed and set up; Operating System of Holo-synergetic Oganization), be a complete complex system.The world is calculated and is intended to through the logistics under the information network support, knowledge, the full open network that converges of finance; The computational entity that a plurality of costs are relatively low is integrated into a complete intelligent integrated system with powerful calculating ability; And, this powerful computing ability is distributed in the terminal use's hand of information network inside and outside by brand-new business models such as information network inside and outside SaaS/HSO, PaaS/HSO, IaaS/HSO, MSP/HSO.
The whole world is dynamically converged open network and is calculated notion to can be regarded as a kind of be platform and logistics network, knowledge network and banking network compiled connect the application model of getting up with the information network.Not only computer-oriented and information network are calculated in the whole world dynamically remittance open network, and towards logistics network, knowledge network and banking network.It is attempted to surmount information calculations and information network and calculates, and information calculations and information network calculating and logistics network, knowledge network and banking network is compiled connect and operation is closely linked, and realization is intelligent integrated.
As the basis of this invention, brand-new logical foundations comprises the logical logic of holographic remittance, the logical logic of the two poles of the earth remittance, the logical logic of the holographic remittance in the two poles of the earth; Brand-new Fundamentals of Mathematics comprise holographic logical mathematics, the logical mathematics of the two poles of the earth remittance, the system's transition analyze mathematics of converging; Brand-new scientific basic comprises resource distribution dynamics, holographic coordination, the system behavio(u)r theory of value, game coordination, the equilibrium economics that liquidates, holographic logical physics and the perforation science (interdisciplinary science and cross-section science)---metasystem science and the intelligent integrated science that are formed by the big comprehensive of a series of brand-new theories of converging; The brand-new technology basis is is core with the value chain system, towards the synergitic brand-new systems technology of holography (cluster); Brand-new engineering foundation is is core with the value chain system, towards the synergitic brand-new system engineering of holography (cluster).
Summary of the invention
(1) for regional value chain; The inventor is on logical foundations, Fundamentals of Mathematics, scientific basic and the brand-new technology basis and the engineering foundation of its foundation; " world " counting system that converges logical all things on earth, connects longitude and latitude for " cloud " counting system that flicker is indefinite is transformed into; Adhere to that with the GVC system be core; With the connection of cognitive system (RS and computer aided system thereof) and practice system (PS and computer aided system thereof) with coordinate main line, set up the dynamical foundation of planning allocation project design as high-grade intelligent integrated system (HIIS) evolution process.
(1. 1) await developing energetically the PA/RVC of foundation; Be the information integration of a facing area value chain planning operation (Planning Operation of Enterprise Vlue Chain), and PA/IVC is an information integration towards supply chain planning operation (Planning Operation of Supply Chain).Outside manufacturing, supply and marketing, monetary items function and the various back-up system and the technology of PA/IVC system, PA/RVC combines vertically reaching laterally related product, project and field on the regional value chain, has following a series of brand-new technology:
The ICT technical support design of the 341st regional value chain planning configuration mechanism
The ICT technical support design of the 342nd regional value chain planning dispensing unit
The ICT technical support design of the 343rd regional value chain planning configuration dynamic foundation
The ICT technical support design of the 344th regional value chain planning configuration odds ratio
The 345th the holographic collaborative ICT technical support design of regional value chain planning configuration
The ICT technical support design of the 346th regional value chain planning configuration production function
The 347th regional value chain planning configuration is worth the ICT technical support design of metering
The ICT technical support design of the 348th regional value chain planning configuration joint management
The 349th regional value chain planning configuration holography balancing technique basis that liquidates
The 350th regional value chain planning configuration holography balanced tabular technology that liquidates
The ICT technical support design of the 351st regional value chain planning disposal subject
The ICT technical support design of the 352nd regional value chain planning configuration load
The ICT technical support design of the 353rd regional value chain planning configuration mode
The ICT technical support design of the 354th regional value chain planning configuration-system
The ICT technical support design of the 355th regional value chain planning configuration surroundings
The ICT technical support design of the 356th regional value chain planning allocation project
The ICT technical support basis of the 357th the just system of regional value chain planning configuration
The 358th regional value chain planning configuration intelligent integral system-computed technical foundation
The 359th regional value chain planning configuration intelligent integral operation system technology basis
The 360th regional value chain planning configuration intelligent integral dynamically converges and leads to technical foundation
(1. 2) inventor regards regional value chain as resource configuration system and process, and sets up network configuration dynamics normal form.
With the lowermost layer of hierarchical chart as evaluation index; We can be according to the relation between environmental factor and the bearing capacity; Set up judgment matrix; Methods such as the maximum characteristic vector method of integrated use sum of squares approach, Saaty, geometric average method, expert's method are determined the relative importance (weight) of this one deck to last layer.Utilize the counting backward technique in the AHP method, can each value of statistical indicant be carried out consistent the standardization, that is: through utilizing formula
Figure 2011103356974100002DEST_PATH_IMAGE002
Solve the nondimensionalization problem between the index, and in the matrix after make changing each element value 0 and l between, and its monotonicity is constant.
(1. 3) all in all, arbitrary regional value chain planning configuration-system faces following basic natural environmental condition:
In regional value chain planning configuration action scope, all activities are to the iThe utilization of kind of resource will receive nature the iBut the restriction of the bearing capacity of kind of resource aspect (but but comprising instantaneous bearing capacity and long-term bearing capacity).
The now following several respects of this basic restriction table:
a. in regional value chain planning configuration action scope, all activities are to the iPlant the actual utilization of resource y 1 i Receive nature iKind of resource can the confession amount y * 1 i Restriction, promptly y 1 i y * 1 i
b. in regional value chain planning configuration action scope, all activities are to the iPlant the actual converted amount of resource y 2 i Receive nature iPlant the convertible amount of resource y * 2 i Restriction, promptly y 2 i y * 2 i
c. in regional value chain planning configuration action scope, all activities are to the iThe reality of planting resource substitutes amount y 3 i Receive nature iPlant the alternative amount of resource y * 3 i Restriction, promptly y 3 i y * 3 i
d. in regional value chain planning configuration action scope, all activities are to the iThe actual reproduction amount of the data of kind y 4 i Receive nature iPlant the reproducible amounts of resource y * 4 i Restriction, promptly y 4 i y * 4 i
Value chain planning configuration-system in zone constitutes regional value chain planning configuration natural ecosystems jointly with natural environment on every side.For this type system, we need divide five action scopes to come consideration of regional value chain planning configuration ecological balance condition.
In self-organizing competition action scope, aspect certain resource, realize balance of nature, regional value chain planning configuration-system just receives following essential condition constraint:
a1. nature is iPlant the bearing capacity of resource aspect BN i ( t) attenuation rate β i ( t) the time period of being considered [ t 0, t 1] in must be not more than arbitrarily small number ε i , promptly
β i? (? t?)?≤? ε i? , t∈?[? t? 0?,? t? 1?] (?2.?232?)
a2. the regional value chain of self-organizing competition is planned configuration-system G 1To iPlant the utilization of natural resources DG 1, i ( t) the time period of being considered [ t 0, t 1] in must approach the bearing capacity of nature aspect i kind resource BN i ( t), promptly
| ?DG ?1,? i? (? t?)?–? BN i? (? t?)?|?≤? η i ? β i? (? t?)?≤? ε i? ,? t∈?[? t? 0?,? t? 1?]?(?2.?233?)
Concentrating tissue competition action scope, aspect certain resource, realize balance of nature, regional value chain planning configuration-system just should receive following essential condition constraint:
b1. nature is iPlant the bearing capacity of resource aspect BN i ( t) attenuation rate β i ( t) the period of being considered [ t 0, t 1] in must be not more than arbitrarily small number ε i , promptly
β i? (? t?)?≤? ε i? , t∈?[? t? 0?,? t? 1?] (?2.?234?)
b2. concentrate the regional value chain planning configuration-system of tissue competition G 2To iPlant the utilization of natural resources DG 2, i ( t) the time period of being considered [ t 0, t 1] in must approach the bearing capacity of nature aspect i kind resource BN i ( t), promptly
| ?DG ?2,? i? (? t?)?–? BN i? (? t?)?|?≤? η i ? β i? (? t?)?≤? ε i? ,? t∈?[? t? 0?,? t? 1?](?2.?235?)
In basic synergy territory, aspect certain resource, realize balance of nature, regional value chain planning configuration-system just should receive following essential condition constraint:
c1. nature is iPlant the bearing capacity of resource aspect BN i ( t) attenuation rate β i ( t) the period of being considered [ t 0, t 1] in must be not more than arbitrarily small number ε i , promptly
β i? (? t?)?≤? ε i? , t∈?[? t? 0?,? t? 1?] (?2.?236?)
c2. basic collaborative regional value chain planning configuration-system G 3To iPlant the utilization of natural resources DG 3, i ( t) in the time period of being considered
[ t 0, t 1] in must approach nature the iPlant the bearing capacity of resource aspect BN i (t), promptly
| ?DG ?3,? i? (? t?)?–? BN i? (? t?)?|?≤? η i ? β i? (? t?)?≤? ε i? ,? t∈?[? t? 0?,? t? 1?]?(?2.?237?)
In self-organizing cooperation action scope, aspect certain resource, realize balance of nature, regional value chain planning configuration-system just should receive following essential condition constraint:
d1. nature is iPlant the bearing capacity of resource aspect BN i ( t) attenuation rate β i ( t) the period of being considered [ t 0, t 1] in must be not more than arbitrarily small number ε i , promptly
β i? (? t?)?≤? ε i? , t∈?[? t? 0?,? t? 1?] ?(?2.?238?)
d2. the regional value chain of self-organizing cooperation is planned configuration-system G 4To iPlant the utilization of natural resources DG 4, i ( t) in the period of being considered
[ t 0, t 1] in must approach nature the iPlant the bearing capacity of resource aspect BN i ( t), promptly
| ?DG ?4,? i? (? t?)?–? BN i? (? t?)?|?≤? η i ? β i? (? t?)?≤? ε i? ,? t∈?[? t? 0?,? t? 1?](?2.?239?)
Organize the cooperation action scope concentrated, aspect certain resource, realize balance of nature, regional value chain planning configuration-system just should receive following essential condition constraint:
e1. nature is iPlant the bearing capacity of resource aspect BN i ( t) attenuation rate β i ( t) the period of being considered [ t 0, t 1] in must be not more than arbitrarily small number ε i , promptly
β i? (? t?)?≤? ε i? , t∈?[? t? 0?,? t? 1?] ?(?2.?240?)
e2. concentrate the regional value chain planning configuration-system of tissue cooperation G 5To iPlant the utilization of natural resources DG 5, i ( t) the period of being considered [ t 0, t 1] in must approach nature the iPlant the bearing capacity of resource aspect BN i ( t), promptly
| ?DG ?5,? i? (? t?)?–? BN i? (? t?)?|?≤? η i ? β i? (? t?)?≤? ε i? ,? t∈?[? t? 0?,? t? 1?](?2.?241?)
(1. 4) all in all, arbitrary regional value chain planning configuration-system faces following basic social environmental condition:
In regional value chain planning configuration action scope, all activities are to the iThe utilization of kind of resource will receive society the iBut the restriction of the bearing capacity of kind of resource aspect (but but comprising instantaneous bearing capacity and long-term bearing capacity).
The now following several respects of this basic restriction table:
a. in regional value chain planning configuration action scope, all activities are to the iPlant the actual utilization of resource z 1 i Receive in the society iKind of resource can the confession amount z * 1 i Restriction, promptly z 1 i z * 1 i
b. in regional value chain planning configuration action scope, all activities are to the iPlant the actual converted amount of resource z 2 i Receive society to the iKind of resource can the confession amount z * 2 i Restriction, promptly z 2 i z * 2 i
c. in regional value chain planning configuration action scope, all activities are to the iThe reality of planting resource substitutes amount z 3 i Receive in the society iPlant the alternative amount of resource z * 3 i Restriction, promptly z 3 i z * 3 i
d. in regional value chain planning configuration action scope, all activities are to the iPlant the actual reproduction amount of resource z 4 i Receive in the society iPlant the reproducible amounts of resource z * 4 i Restriction, promptly z 4 i z * 4 i
Value chain planning configuration-system in zone constitutes the social ecosystem of regional value chain planning configuration jointly with social environment on every side.For this type system, we need divide five action scopes to consider social ecological balance condition.
In self-organizing competition action scope, realize the social ecological balance aspect certain resource, regional value chain planning configuration-system just should receive following essential condition constraint:
a1. society is the iPlant the bearing capacity of resource aspect BS i ( t) attenuation rate α i ( t) the time period of being considered [ t 0, t 1] in must be not more than arbitrarily small number ε i , promptly
α i? (? t?)?≤? ε i? , t∈?[? t? 0?,? t? 1?] (?2.?242?)
a2. the regional value chain of self-organizing competition is planned configuration-system G 1To iPlant the utilization of resource DG 1, i ( t) the time period of being considered [ t 0, t 1] in must approach society the iPlant the bearing capacity of resource aspect BS i ( t), promptly
| ?DG ?1,? i? (? t?)?–? BS i? (? t?)?|?≤? η i ? α i? (? t?)?≤? ε i? ,? t∈?[? t? 0?,? t? 1?]?(?2.?243?)
Concentrating tissue competition action scope, realize the social ecological balance aspect certain resource, regional value chain planning configuration-system just should receive following essential condition constraint:
b1. society is the iPlant the bearing capacity of resource aspect BS i ( t) attenuation rate α i ( t) the time period of being considered [ t 0, t 1] in must be not more than arbitrarily small number ε i , promptly
α i? (? t?)?≤? ε i? , t∈?[? t? 0?,? t? 1?] (?2.?244?)
b2. concentrate the regional value chain planning configuration-system of tissue competition G 2To iPlant the utilization of resource DG 2, i ( t) the period of being considered [ t 0, t 1] in must approach society the iPlant the bearing capacity of resource aspect BS i ( t), promptly
| ?DG ?2,? i? (? t?)?–? BS i? (? t?)?|?≤? η i ? α i? (? t?)?≤? ε i? ,? t∈?[? t? 0?,? t? 1?]?(?2.?245?)
In basic synergy territory, aspect certain resource, realize the social practice balance, regional value chain planning configuration-system will receive following essential condition constraint:
c1. society is the iPlanting the resource aspect is bearing capacity BS i ( t) attenuation rate α i ( t) the time period of being considered [ t 0, t 1] in must be not more than arbitrarily small number ε i , promptly
α i? (? t?)?≤? ε i? , t∈?[? t? 0?,? t? 1?] (?2.?246?)
c2. basic collaborative regional value chain planning configuration-system G 3To iPlant the utilization of resource DG 3, i ( t) the time period of being considered [ t 0, t 1] in must approach society the iPlant the bearing capacity of resource aspect BS i ( t), promptly
| ?DG ?3,? i? (? t?)?–? BS i? (? t?)?|?≤? η i ? α i? (? t?)?≤? ε i? ,? t∈?[? t? 0?,? t? 1?]?(?2.?247?)
In self-organizing cooperation action scope, realize the social ecological balance aspect certain resource, regional value chain planning configuration-system just should receive following essential condition constraint:
d1. society is the iPlant the bearing capacity of resource aspect BS i ( t) attenuation rate α i ( t) the time period of being considered [ t 0, t 1] in must be not more than arbitrarily small number ε i , promptly
α i? (? t?)?≤? ε i? , t∈?[? t? 0?,? t? 1?] (?2.?248?)
d2. the regional value chain of self-organizing cooperation is planned configuration-system G 4To iPlant the utilization of resource DG 4, i ( t) the period of being considered [ t 0, t 1] in must approach society the iPlant the bearing capacity of resource aspect BS i ( t), promptly
| ?DG ?4,? i? (? t?)?–? BS i? (? t?)?|?≤? η i ? α i? (? t?)?≤? ε i? ,? t∈?[? t? 0?,? t? 1?]?(?2.?249?)
Organize the cooperation action scope concentrated, realize the social ecological balance aspect certain resource, regional value chain planning configuration-system just should receive following essential condition constraint:
e1. society is the iPlant the bearing capacity of resource aspect BS i ( t) attenuation rate α i ( t) the time period of being considered [ t 0, t 1] in must be not more than arbitrarily small number ε i , promptly
α i? (? t?)?≤? ε i? , t∈?[? t? 0?,? t? 1?] (?2.?250?)
e2. concentrate the regional value chain planning configuration-system of tissue cooperation G 5To iPlant the utilization of resource DG 5, i ( t) the time period of being considered [ t 0, t 1] in must approach society the iPlant the bearing capacity of resource aspect BS i ( t), promptly
| ?DG ?5,? i? (? t?)?–? BS i? (? t?)?|?≤? η i ? α i? (? t?)?≤? ε i? ,? t∈?[? t? 0?,? t? 1?](?2.?251?)
(1. 5) for regional value chain planning configuration, and the various factors of integration engineering and condition constitute two basic aspect: RVC planning configuration nature bearing capacities respectively and plan with RVC and dispose social bearing capacity.Here; RVC planning configuration nature bearing capacity is meant that nature is the ability that the operation and development of the Internet provide certain or various resource and condition, and the social bearing capacity of RVC planning configuration is meant the social ability that certain or various resource and condition are provided for the operation and development of the Internet.For the bulking property innovation of the Internet operation, RVC planning configuration nature bearing capacity and the social bearing capacity of RVC planning configuration all are the importances of can not ignore.
General rationality requirement according to holographic joint management; We not only should consider, estimate RVC planning configuration nature bearing capacity and the social bearing capacity of RVC planning configuration from the scope in a state or an area, and should further consider, estimate RVC planning configuration nature bearing capacity and the social bearing capacity of RVC planning configuration from global range.It is not the simple summation that various countries RVC plans configuration nature bearing capacity that the nature bearing capacity is disposed in whole world RVC planning, and the social bearing capacity of global RVC planning configuration neither be planned the simple summation that disposes social bearing capacity by various countries RVC.In fact, between various countries RVC planning configuration nature bearing capacity, between the social bearing capacity of various countries RVC planning configuration and between various countries RVC planning configuration nature bearing capacity and the social bearing capacity of various countries RVC planning configuration, exist conspiracy relation widely.
General rationality requirement according to holographic joint management; We not only should consider, estimate in the past RVC planning configuration nature bearing capacity and the social bearing capacity of RVC planning configuration; And should consider, estimate RVC planning configuration nature bearing capacity and the social bearing capacity of RVC planning configuration of current period, also should consider, estimate in the future the RVC planning configuration nature bearing capacity of period (or over a long time) and plan with RVC and dispose social bearing capacity.No matter RVC planning configuration nature bearing capacity or the social bearing capacity of RVC planning configuration are not the simple summations of residue bearing capacity, current bearing capacity and potential bearing capacity.Between residue bearing capacity, current bearing capacity and potential bearing capacity, exist conspiracy relation.
(B1) in the multiple inscape of RVC planning configuration nature bearing capacity system, the macrovariable that plays the dominating system effect can be divided into three kinds:
a. the flow of material variable M SE ( t); b. the energy flow variables E SE ( t); c. collaborative variable K SEN ( t).
Based on RVC planning configuration nature bearing capacity notion, " RVC planning configuration nature bearing capacity dynamical equation " as follows:
P ?SEN? (? t?)?=? P ?SEN? [? M ?SE ?(? t?),? E ?SE ?(? t?),? K ?SEN? (? t?)?]
=? F ?SEN? (? X ?SE?1? (? t?),? X ?SE?2? (? t?),?…,? X ?SE?6? (? t?)) (?2.?15.?8?)
In the formula, P SEN ( t)--- tThe RVC planning configuration nature bearing capacity exponential quantity in period;
X SE1 ( t)--- tThe bearing capacity of the ground key element index in period;
X SE2 ( t)--- tThe energy bearing capacity key element index in period;
X SE3 ( t)--- tThe waters bearing capacity key element index in period;
X SE4 ( t)--- tThe Forest carrying capacity key element index in period;
X SE5 ( t)--- tThe mineral reserve bearing capacity key element index in period;
X SE6 ( t)--- tThe atmosphere bearing capacity key element index in period;
F SEN ( X SE1 ( t), X SE2 ( t) ..., X SE6 ( t))---about X SE i ( t) nonlinear function.
(B2) in the multiple inscape of the RVC planning social bearing capacity system of configuration, the macrovariable that plays the dominating system effect can be divided into three kinds:
a. " firmly " variable H SE ( t); b. " soft " variable S SE ( t); c. " working in coordination with " variable K SES ( t).
Based on the social bearing capacity notion of RVC planning configuration, " the social bearing capacity dynamical equation of RVC planning configuration " as follows:
P ?SES? (? t?)?=? P ?SES? [? H ?SE ?(? t?),? S ?SE ?(? t?),? K ?SES? (? t?)?]
=? F ?SES? (? Y ?SE?1? (? t?),? Y ?SE?2? (? t?),?…,? Y ?SE?6? (? t?)) (?2.?15.?9?)
In the formula, P SES ( t)--- tThe social bearing capacity exponential quantity of RVC planning configuration in period;
Y SE1 ( t)--- tThe political bearing capacity key element index in period;
Y SE2 ( t)--- tThe cultural bearing capacity key element index in period;
Y SE3 ( t)--- tThe science bearing capacity key element index in period;
Y SE4 ( t)--- tThe education bearing capacity key element index in period;
Y SE5 ( t)--- tThe defence bearing capacity key element index in period;
Y SE6 ( t)--- tThe diplomatic bearing capacity key element index in period;
F S ( Y SE1 ( t), Y SE2 ( t) ..., Y SE6 ( t))---about Y SE i ( t) nonlinear function.
(B3) RVC planning configuration nature bearing capacity and the social bearing capacity of RVC planning configuration interconnect, work in coordination with each other, form " integration engineering bearing capacity ".The integration engineering bearing capacity totally can be regarded as and is made up of a large amount of matter essential factor and spiritual key element, social pattern key element and natural form key element.For the integration engineering bearing capacity, be suitable for the examination method that dynamics and statistics combine.
Formula (2. 15. 8) and (2. 15. 9) are combined, can provide " integration engineering bearing capacity dynamical equation " as follows:
P ?SE? (? t?)?=? P ?SE? [? M ?SE ?(? t?),? E ?SE ?(? t?),? K ?SEN? (? t?),? H ?SE ?(? t?),? S ?SE ?(? t?),? K ?SES? (? t?)?]
=? F ?SE? (? X ?SE?1? (? t?),? X ?SE?2? (? t?),?…,? X ?SE?6? (? t?);? Y ?SE?1? (? t?),? Y ?SE?2? (? t?),?…,? Y ?SE?6? (? t?))
(?2.?15.?10?)
In the formula, P SE ( t)--- tThe integration engineering bearing capacity exponential quantity in period;
F SE ( X SE1 ( t), X SE2 ( t) ..., X SE6 ( t); Y SE1 ( t), Y SE2 ( t) ..., Y SE6 ( t))---about
X SE i ( t) and Y SE i ( t) nonlinear function.
(2) for regional value chain; The inventor is on logical foundations, Fundamentals of Mathematics, scientific basic and the brand-new technology basis and the engineering foundation of its foundation; " world " counting system that converges logical all things on earth, connects longitude and latitude for " cloud " counting system that flicker is indefinite is transformed into; Adhere to that with the GVC system be core; With the connection of cognitive system (RS and computer aided system thereof) and practice system (PS and computer aided system thereof) with coordinate main line, set up the know-why of planning allocation project design as high-grade intelligent integrated system (HIIS) evolution process.
(2. 1) for the planning configuration of regional value chain, the inventor sets up the main functional modules design of planning configuration-system.
A funding arrangement module (resource distribution accounting, the finance configuration of the inside and outside association of regional value chain planning configuration)
The resource distribution of the inside and outside association of A1 zone value chain planning configuration is adjusted
The funding arrangement of the inside and outside association of A 2 regional value chain planning configurations
The operation control configuration module of the inside and outside association of B zone value chain planning configuration (planning and implementation of the inside and outside association of regional value chain planning configuration)
The main system operation planning of B1, the inside and outside association of regional value chain planning configuration
The material demand planning of B2, the inside and outside association of regional value chain planning configuration
The ability need planning of B3, the inside and outside association of regional value chain planning configuration
The DIM control of B4, the inside and outside association of regional value chain planning configuration
The manufacturer's standard of B5, the inside and outside association of regional value chain planning configuration
C logistics configuration module (supply and the configuration of the inside and outside association of regional value chain planning configuration)
The distribution configuration of the inside and outside association of C 1 regional value chain planning configuration
Stock's control of the inside and outside association of C 2 regional value chain planning configurations
The logistics arrangement of the inside and outside association of C 3 regional value chain planning configurations
Batch tracking configuration of the inside and outside association of C 4 regional value chain planning configurations
D human resources configuration module
The HRP aid decision of the inside and outside association of D 1 regional value chain planning configuration
The human resources configuration of the inside and outside association of D 2 regional value chain planning configurations
The personal income of the inside and outside association of D 3 regional value chain planning configurations is adjusted
The configuration in man-hour of the inside and outside association of D 4 regional value chain planning configurations
(2. 2) whole regional value chain planning big system of configuration and exist feedback mechanism widely with the interaction of nature one social engineering is shown in Fig. 1.Zone value chain planning configuration tissue makes decisions according to certain target (or complex); Import certain people, thing, information; Make the mankind between different departments field, carry out harmonious activity (also having feedback mechanism here), the result exports new people, thing, information.This brings huge motive force on the one hand the existence and the development of society, can cause negative effect to natural engineering on the other hand.Two feedback informations are arranged respectively here; The one, the social base (bearing capacity) of regional value chain planning disposal subject or system compares with the social quality index (desired value) on operation basis; Finding out that deviation that mankind's activity brings is progressively dwindled or the feedback information when widening is given policy-making body, is the feedback factor of regional value chain planning layoutprocedure in this social base; On the other hand; The harmful effect that the people of output, thing, information cause for the nature engineering; Compare with natural quality index (desired value); This information is fed back to decision-making section, and to influence next decision process, the engineering situation is exactly the feedback factor of regional value chain planning configuration affects nature engineering here.Wherein social base index (desired value) all is that regional value chain planning configuration tissue is confirmed according to the overall goal of the coordinated development of each different stages of development with engineering situation index (desired value).Value chain planning configuration tissue in zone is regulated control according to this target utilization feedback mechanism and is not departed from predeterminated target to keep mankind's activity, keeps human history and stablizes sustained and coordinated development.
For holographic synergetic zone value chain planning allocation project, we need carry out component analysis and evaluation, and then carry out step analysis and evaluation.
As a kind of system of complicacy, holographic collaborative type zone value chain planning allocation project has oneself general nature engineering and balance of nature condition and mass society engineering and social ecological balance condition thereof.The effect basis of holographic synergetic zone value chain planning allocation project is RVC planning configuration nature bearing capacity and the social bearing capacity of RVC planning configuration.The restriction that holographic synergetic zone value chain configuration-system should be subjected to RVC planning configuration nature bearing capacity is subjected to the restriction that RVC plans the social bearing capacity of configuration again.See that from the process of reproduction holographic collaborative type zone value chain planning allocation project comprises: collaborative subsystem engineering, collaborative consumption subsystem engineering, coordinated exchange subsystem engineering and the collaborative assignment subsystem engineering of producing.
RVC planning configuration nature bearing capacity and the social bearing capacity of RVC planning configuration constitute constraints to the effect of the Internet operation on the whole.Each item democratic system and each item principle of centrality constitute constraints to the main body of the Internet operation on the whole.To the mankind on the whole, the prime design requirement of the Internet engineering is, impels the operation of the Internet should be tending towards the social the Internet balance of a certain period, is tending towards the ecological the Internet balance of a certain period again; Should constantly keep long-term social the Internet balance, constantly keep long-term ecological the Internet balance again.The design centre of the Internet engineering is for setting up big collaborative the Internet main body reasonable process arrangement, effective policy engineering and sound social security to be provided.
The inventor inquires on the Internet planning allocation project based on product efficacy structure (EVS [PES]).Based on the planning allocation project of product efficacy structure, should comprise following several different levels on the Internet:
On the Intranet based on the planning allocation project of product efficacy structure (EVS [PES])
On the industry the Internet based on the planning allocation project of product efficacy structure (EVS [PES])
On the national the Internet based on the planning allocation project of product efficacy structure (EVS [PES])
On the value chain of zone based on the planning allocation project of product efficacy structure (EVS [PES])
The inventor inquires on the Internet planning allocation project based on Technological Economy foundation structure (RCS [TKS/EBS]).Based on the planning allocation project of Technological Economy foundation structure, should comprise following several different levels on the Internet:
On the Intranet based on the planning allocation project of Technological Economy foundation structure (RCS [TKS/EBS])
On the industry the Internet based on the planning allocation project of Technological Economy foundation structure (RCS [TKS/EBS])
On the national the Internet based on the planning allocation project of Technological Economy foundation structure (RCS [TKS/EBS])
On the value chain of zone based on the planning allocation project of Technological Economy foundation structure (RCS [TKS/EBS])
The inventor inquires on the Internet planning allocation project based on internal-external conspiracy relation (SOS [ESS/ISS]).Based on the planning allocation project of internal-external conspiracy relation, should comprise following several different levels on the Internet:
On the Intranet based on the planning allocation project of internal-external conspiracy relation (SOS [ESS/ISS])
On the industry the Internet based on the planning allocation project of internal-external conspiracy relation (SOS [ESS/ISS])
On the national the Internet based on the planning allocation project of internal-external conspiracy relation (SOS [ESS/ISS])
On the value chain of zone based on the planning allocation project of internal-external conspiracy relation (SOS [ESS/ISS])
(2. 2) inventor considers that the basic cofactor kinetics relation that will work in coordination with type zone value chain planning configuration-system is divided into two aspects, that is: the basic motive effect relation and the ecological dynamic effect relation of collaborative type zone value chain planning configuration-system.
The factor that constitutes collaborative type zone value chain planning configuration-system basic motive effect relation can be divided into two aspects; That is: be based on collaborative configuration effect and the competition configuration load that resource configuration system constitutes on the one hand, be based on collaborative configuration income and competition deployment cost that resource configuration system constitutes on the other hand.With regard to first aspect, the collaborative configuration effect that constitutes based on resource configuration system is not only with respect to collaborative configuration-system resource external load, and with respect to the resource load of collaborative configuration-system inside.This fundamental relation factor affecting also determines the adequate condition that synergetic zone value chain planning configuration-system exists and changes.The basic motive factorial analysis constitutes the feasibility analysis field of basic motive effect.With regard to second aspect, relevant with the social necessary effect of collaborative configuration based on the collaborative configuration income that resource configuration system constitutes with collaborative deployment cost, thus relevant with the value of collaborative configuration mechanism.This fundamental relation factor affecting also determines the necessary condition that synergetic zone value chain planning configuration-system exists and changes.The basic effect factorial analysis constitutes the efficiency analysis field of basic motive effect.
The factor that constitutes synergetic zone value chain planning configuration-system ecological dynamic effect relation can be divided into two aspects; That is: be based on cooperative surroundings carrying and the competitive environment load that resource configuration system constitutes on the one hand, be based on collaborative ecological income and the ecological cost of competition that resource configuration system constitutes on the other hand.With regard to first aspect, based on the not only outside environmental load of the collaborative configuration effect of resource configuration system formation with respect to joint management, and the environmental load inner with respect to joint management.This ecological relationship factor affecting also determines the adequate condition that synergetic zone value chain planning configuration-system exists and changes.The ecological dynamic factorial analysis constitutes the feasibility analysis field of ecological dynamic effect.With regard to second aspect, relevant with the social necessary effect of competition configuration mechanism based on the collaborative ecological income that resource configuration system constitutes with collaborative ecological cost, thus relevant with the value of collaborative configuration mechanism.This ecological relationship factor affecting also determines the necessary condition that synergetic zone value chain planning configuration-system exists and changes.The ecological effect factorial analysis constitutes the efficiency analysis field of ecological dynamic effect.
We can regard the collaborative type zone value chain system of network integration by collaborative type zone value chain main body (intelligentized self-organizing control system) as S S M , effective object (supply and demand both sides) S S O , general technique basis S S T And basis of property right S S P And environment S S E The complex large system that interconnects, interacts and form, note is done:
S ?S?S =?<?S ?S?M?,?S ?S?O?,?S ?S?T?,?S ?S?P?,?S ?S?E?,?ψ ?S?>, S ?S =?{?S ?S?M?,?S ?S?O?,?S ?S?T?,?S ?S?P?,?S ?S?E?}
Wherein
S S M ---collaborative type zone value chain main body S S M Can remember work S S M =< s S M , ψ S M >, wherein
s S M Be elementary organization's unit set s SM = s S M1 , s S M2 ,, s S M n ,
ψ S M Structure function for self-organizing control system ψ S M = ψ S M ( X),
XElementary organization's location mode vector for cooperative system X=( x 1, x 2,, x n ),
S S M, i =< s S M, i , S S M i >( i=1,2,, w) be cooperative system S S M =< s S M , ψ S M >Subsystem,
hBe cooperative system< S S M , h>Structure function, S S M = S S M1 , S S M2 ,, S S M w , h= h( S S M ).
Typical case synergetic zone value chain configuration tissue or main body can regard as by
The regional value chain game tissue of the concentrated cooperation type in outside concentrated cooperation/inside ( S M A1 )
The regional value chain game tissue of outside dispersion cooperation/inside dispersion cooperation type ( S M A2 )
The regional value chain game tissue of outside collecting and distributing working in coordination with/inner collecting and distributing collaborative type ( S M B0 )
The regional value chain game tissue of the outside concentrated competition in concentrated competition/inside type ( S M C1 )
The regional value chain game tissue of outside dispersion competition/inside dispersion competition type ( S M C2 ) wait the complication system of common formation, can remember work S M tap That is:
S ?M?S?tap ?=?< ?S ?M?tap ,? ψ ?M?S?tap >, S ?M?tap ?=?{ ?S ?M?A?1? ,? S ?M?A?2? ,? S ?M?B?0? ,? S ?M?C?1? ,? S ?M?C?2? }
Wherein, ψ M S tap Be typical joint management structure function.
General synergetic zone value chain configuration tissue or main body can regard as by
The regional value chain game tissue of outside concentrated working in coordination with/inner concentrated collaborative type ( S M B1 )
The regional value chain game tissue of outside concentrated working in coordination with/collaborative type of inner dispersion ( S M B2 )
The regional value chain game tissue of outside concentrated working in coordination with/inner collecting and distributing collaborative type ( S M B3 )
Outside disperse collaborative/inner regional value chain game tissue of concentrating collaborative type ( S M B4 )
Outside disperse collaborative/inner regional value chain game tissue that disperses collaborative type ( S M B5 )
The regional value chain game tissue of collaborative/inner collecting and distributing collaborative type that the outside disperses ( S M B6 )
The regional value chain game tissue of outside collecting and distributing working in coordination with/inner concentrated collaborative type ( S M B7 )
The regional value chain game tissue of outside collecting and distributing working in coordination with/collaborative type of inner dispersion ( S M B8 )
The regional value chain game tissue of outside collecting and distributing working in coordination with/inner collecting and distributing collaborative type ( S M B9 )
Deng the common complication system that constitutes, can remember work S M gen That is:
S ?M?S?gen ?=?< ?S ?M?gen ,? ψ ?M?S?gen >
S ?M?gen ?=?{ ?S ?M?B?1? ,? S ?M?B?2? ,? S ?M?B?3? ,? S ?M?B?4? ,? S ?M?B?5? ,? S ?M?B?6? ,? S ?M?B?7? ,? S ?M?B?8? ,? S ?M?B?9? }
Wherein, ψ M S gen Be general joint management structure function.
S SP ---the property right combination foundation S SP Always link together with certain property rights system combination.If each involved party in the collaborative type zone value chain planning configuration-system on average has the amount of property right M d, k Many more, it is also just high more that the rights and interests of this system are enjoyed level.Can provide following new function:
Figure 2011103356974100002DEST_PATH_IMAGE004
In the formula RExpression rights and interests function, M d, k Be k( k=1,2,, l) plant the tax power configuration amount that property right makes up, promptly
Figure 2011103356974100002DEST_PATH_IMAGE006
Wherein, C d, k Be k( k=1,2,, l) plant the configuration intensity of property right combination, x k Be k( k=1,2,, l) plant the quantity of property right combination. M d, k Can regard as k( k=1,2,, l) plant the property right amount of property right combination.
S S T ---broad sense planning configuring technical basis S S T Mainly comprise the generally collaborative basis of thing, planning configuring technical basis and be that master's information is basic with the planning index strength signal of extensive stock combination.
General collaborative basic condition S SG Can be divided into material base condition, information basic condition and spiritual basis condition.Further, can the general basis of working in coordination with type zone value chain be regarded as mainly and be made up of five types of element of resources, note is done
S ?SG ?={? S ?S?M? ,? S ?S?E? ,? S ?S?I? ,? S ?S?K? ,? S ?S?G? }。
Wherein, all are by the material of collaborative type zone value chain main body control or utilization S S M And the energy S S E Constitute the material base of practice, all are by the communications facility of collaborative type zone value chain main body control or utilization S SI Constitute the information basis of collaborative type zone value chain, the knowledge that all are grasped or utilized by collaborative type zone value chain main body
S S K And intelligence S S G Constitute the spiritual basis of collaborative type zone value chain.As the basic basic condition of the technology of collaborative type zone value chain system key factor from collaborative type zone value chain.
Planning configuring technical basis S T It is a multi-level complicated dynamic system that comprises multiple factor.In the value chain system process of arbitrary collaborative type zone, always have the integral body of structure function between the technological and various technology and exist and play a role as one.
The technical system of modern collaborative type zone value chain can be regarded as by applied in the planning layoutprocedure
Member (is basic building block with planning index, the market price and seal and contract documents) S W14 ,
Instrument (is basic tool with quota ticket, currency and quota certification and financial product) S W13 ,
Means (is basic means with administrative power, budget power and common interests and individual interest) S W12 ,
Instrument (is underlying instrument with internal regulator, external regulator filter and planning execution device and city's field detector) S W11 ,
Equipment (with plan analogue system, market robot control system(RCS) and vertically connect and the transverse splicing system is a basic equipment) S W10 ,
Facility (with administrative office system and the marketing field basic facilities of doing) S W9 ,
Program (is base program with administrative procedures, transaction program and cooperation program and competition program) S W8 ,
Rule (is primitive rule with plan rules, market rules and cooperative system and competitive system) S W7 ,
Technology (with planned regulation technology, market regulation is technological and leadership skill and Negotiation Skills are basic skills) S W6 ,
Plan (is basic plan with short-term plan, budget layout and planning for a long time and contention scheme) S W5 ,
Method (is basic skills with plan management method, market method for organizing and cooperation method and competing method) S W4 ,
Strategy (is elementary tactics with cooperation policy, competitive strategy and cooperative game and competition game) S W3 ,
Tactics (deepening and share out the work and help one another with specialty is elementary tactic) S W2 ,
Strategy (is basic strategy with collaborative positioning strategy) S W1
Etc. the complexity dynamic system of different levels various factors formation, promptly
S ?T?S =?<? S ?T ,? ψ ?T >?(? S ?T =?{? S ?T?1? ,? S ?T?2? ,?···,? S ?T?14? })。
Here, can be with planning configuring technical system S T Be divided into 14 levels ( i=1,2,, 14): S T =< s ST , ψ ST >---multi-level multifactor planning configuring technical systems, wherein s T Be the elements combination of planning configuring technical systems, promptly
{? s ST11? ,? s ST?12? ,?···,? s ST?1? k?1? ,? s ST?21? ,? s ST?22? ,?···,? s ST?2? k?2? ,?···?,? s ST?14?1? ,? s ST?14?2? ,?···,? s ST?14? k?14 ?};
ψ ST Structure function for the planning configuring technical systems; ψ ST = ψ ST ( X), XBe planning configuring technical systems key element state vector, promptly
(? x ?11?,? x ?12?,?···,? x ?1? k?1? ,? x ?21?,? x ?22?,?···,? x ?2? k?2? ,?···?,? x ?14?1?,? x ?14?2?,?···,? x ?14? k?14 ?);
Wherein,
< A ST, I j , S ST i j >Be the planning configuring technical systems< A ST , ψ ST > iThe level subsystem, i=1,2,, 14; j=0,1,2,, k i
D( h i , S ST i ) for planning configuring technical systems< A ST , ψ ST > iHiberarchy Decomposition;
S ST i Be iThe state vector of level subsystem, promptly ( S STi1 , S STi2 ,, S STik i );
h i Be iThe level subsystem< S ST i , h i >Structure function;
S ST?i ?=?{? S STi1? ,? S STi2? ,?···,? S STik?i }
For the value chain of collaborative type zone, the planning index signaling mechanism of grouping of commodities is basic information basis S S V In the value chain of collaborative type zone, the configuration intensity of various resources mainly shows as the planning index intensity index of grouping of commodities.Collaborative type zone value chain main body is mainly carried out FEEDBACK CONTROL and adjusting according to the planning index strength signal of grouping of commodities to relation between market supply and demand.
Can regard the planning index intensity of the complex large system grouping of commodities of modern times collaborative type zone value chain as planning index intensity by the member grouping of commodities c 14, the instrument grouping of commodities planning index intensity c 13, the means grouping of commodities planning index intensity c 12, the instrument grouping of commodities planning index intensity c 11, the equipment grouping of commodities planning index intensity c 10, the facility grouping of commodities planning index intensity c 9, the program grouping of commodities planning index intensity c 8, the rule (comprising system) grouping of commodities planning index intensity c 7, the skill grouping of commodities planning index intensity c 6, the plan (comprising design) grouping of commodities planning index intensity c 5, the method grouping of commodities planning index intensity c 4, policy commercial product combination planning index intensity c 3, technological commodity combination planning index intensity c 2, strategic commodity combination planning index intensity c 1The complexity dynamic system that the planning index intensity that makes up etc. the different levels extensive stock constitutes, promptly
c ?S =?<? c,? ψ> ?(? c=?{ c ?1?,? c 2?,?···,? c 14?})
At this, with the planning index intensity of complex large system grouping of commodities cBe divided into 14 levels ( i=1,2,, 14)
S S O ---effective object, S SO = S I, SO , S II, SO ,, S X, SO ,
Object S SO Be product supply and demand both sides and product.We can expand product concept and be the Generalized Product notion.Forms such as basic product, joint product, single system product, complication system product and complex large system product can be summed up as element of resource, resource node (model), configuration node (model) respectively, organize node (model) and organize node set.In the basic product space, joint product space, single system product space, complication system product space and complex large system product space etc. can set up corresponding quota index system and corresponding value basis.
As the subordinate factor of collaborative type zone value chain planning configuration-system, configuration load or configuration object S C Can be divided into typical case's collaborative configuration load or object S C, Sre , general collaborative configuration load or object S C, Col With complete collaborative configuration load or object S C, Soc
Typical case synergetic zone value chain configuration load or object can regard as by
The resource distribution load of the concentrated cooperation type in outside concentrated cooperation/inside ( S C A1 )
The resource distribution load of outside dispersion cooperation/inside dispersion cooperation type ( S C A2 )
The resource distribution load of outside collecting and distributing working in coordination with/inner collecting and distributing collaborative type ( S C B0 )
The resource distribution load of the outside concentrated competition in concentrated competition/inside type ( S C C1 )
The resource distribution load of outside dispersion competition/inside dispersion competition type ( S C C2 )
Deng the common complication system that constitutes, can remember work S C tap That is:
S ?C?S?tap ?=?< ?S ?C?tap ,? ψ ?C?S?tap >
S ?C?tap ?=?{ ?S ?C?A?1? ,? S ?C?A?2? ,? S ?C?B?0? ,? S ?C?C?1? ,? S ?C?C?2? }
Wherein, ψ C S tap Be the collaborative configuration of typical case load structure function.
General synergetic zone value chain configuration load or object can regard as by
The resource distribution load of outside concentrated working in coordination with/inner concentrated collaborative type ( S C B1 )
The resource distribution load of outside concentrated working in coordination with/collaborative type of inner dispersion ( S C B2 )
The resource distribution load of outside concentrated working in coordination with/inner collecting and distributing collaborative type ( S C B3 )
Outside disperse collaborative/inner resource distribution load of concentrating collaborative type ( S C B4 )
Outside disperse collaborative/inner resource distribution load that disperses collaborative type ( S C B5 )
The resource distribution load of collaborative/inner collecting and distributing collaborative type that the outside disperses ( S C B6 )
The resource distribution load of outside collecting and distributing working in coordination with/inner concentrated collaborative type ( S C B7 )
The resource distribution load of outside collecting and distributing working in coordination with/collaborative type of inner dispersion ( S C B8 )
The resource distribution load of outside collecting and distributing working in coordination with/inner collecting and distributing collaborative type ( S C B9 )
Deng the common complication system that constitutes, can remember work S C gen That is:
S ?C?S?gen ?=?< ?S ?C?gen ,? ψ ?C?S?gen >
S ?C?gen ?=?{ ?S ?C?B?1? ,? S ?C?B?2? ,? S ?C?B?3? ,? S ?C?B?4? ,? S ?C?B?5? ,? S ?C?B?6? ,? S ?C?B?7? ,? S ?C?B?8? ,? S ?C?B?9? }
Wherein, ψ C S gen Be general collaborative configuration load structure function.
S P E ---cooperative surroundings S PE More varied, varied.We can regard as by collaborative production environment working in coordination with type zone value chain environment S PPE , collaborative consumer environment S PCE , the coordinated exchange environment S PXE , collaborative distribution environments P PDE The system that interconnects, interacts and form, note is done:
S ?P?ES?? =?<? S ?PPE? ,? S ?PCE? ,? S ?PXE? ,? S ?PDE? ,? ψ E ?>,
S ?PE?? =?{ ?S ?PPE? ,? S ?PCE? ,? S ?PXE? ,? S ?PDE? }
ψ P ---the structure function of collaborative type zone value chain system, ψ P = ψ P ( X)
X---collaborative type zone value chain system key element state vector, promptly
(? x ?11?,? x ?12?,?···,? x ?1? h1? ,? x ?21?,? x ?22?,?···,? x ?2? h?2? ,?···?,? x m?1? ,? x m?2? ,?···,? x mhm ?)
< S I j, P , s I j >---collaborative type zone value chain system< S i, P , ψ P > iThe level subsystem,
i?=?1,?2,?···,? mj?=?0,?1,?2,?···,? k ?i?
D( h i , s i )---collaborative type zone value chain system< P i , ψ P > iHiberarchy Decomposition
s i ---the iThe state vector of level subsystem, promptly ( s i1 , s i2 ,, s Ik i )
h i ---the iThe level subsystem< s i , h i >Structure function, s i = s i1 , s i2 ,, s Ik i , h i = h i ( g i )
U ?i?j? ——{? e ?i? |? ψ ?P (? e ?i? )?≥? j ?i? }
Min U I j ( ψ)--- ψ P ( X) minimum vector set, j=0,1,2,, k i
P---the state probability vector of collaborative type zone value chain system, promptly ( P(0), P(1), P(2),, P( k i ))
∧---conjunction means in lattice operation and gets little computing
∨---extract, in lattice operation, mean and get macrooperation
MCBSES---the relevant checks and balances system of multi-level multimode
MIF---monotonic increase discrete function
(2. 3) provide the big system of RVC planning configuration carries out Hiberarchy Decomposition by structure and function Mathematical Modeling at present.We can be modeled as this hierarchical set (hierarchical set) of hierarchical structure directed graph (1evel structured diagraphs) [200] [201]
To the big system of RVC planning configuration G I After carrying out Hiberarchy Decomposition by structure and function, G I Structurally can represent to become a hierarchical set
Figure 2011103356974100002DEST_PATH_IMAGE008
(?2.?2?)
The effect of RVC planning configuration-system generally comprises the effect of RVC planning disposal subject, the effect of RVC planning configuration object, the effect of RVC planning configuring technical and the effect of RVC planning configuration surroundings.RVC planning configuration-system effect (GFE) is the concentrated expression of RVC planning disposal subject effect (MFE), RVC planning configuration object effect (QFE), RVC planning configuring technical effect (WFE) and RVC planning configuration surroundings effect (EFE); Furtherly, RVC planning configuration-system effect is comprehensive and comprehensive performance of RVC planning disposal subject effect.
The target of the effect of RVC planning disposal subject and society and requirement and self or high-rise RVC plan that the target and the requirement of disposal subject are associated; The effect of the effect of RVC planning configuration object and RVC planning configuring technical all is associated with the target and the requirement of RVC planning disposal subject; The effect of RVC planning configuration surroundings is associated with the target and the requirement of RVC planning configuration-system; The target of the effect of RVC planning configuration-system and society and requirement and self or high-rise RVC plan that the target and the requirement of disposal subject are associated.
Analytic hierarchy process (AHP) (AHP-Analytic Hierarchy Process) can be used for the GFD process.Theory framework based on RVC planning configuration effect; The utilization resulting social desirability of AHP (or requirement of main body self), plan requirement, subitem task characteristic, subitem operation and change require the integrated ordered weight of RVC planning configuration overall goal comparatively accurate; The consistency of judging is remarkable, and can use C.R. (Consistent Ratio) index to verify.Based on this idea, according to the four-stage of GFD process, plan that with society and RVC total satisfaction of disposal subject is a general objective, we can set up total satisfaction and pass stratum's aggregated(particle) structure.
In RVC planning layoutprocedure; The transmission of any signal and information produces hysteresis always, and practical problem quite a few must be by non-linear portrayal, and because the existence of disturbing factor; Some loop is temporary transient interrupts or when connecting again, causes the variation on the hysteresis control system recurring structure.In addition; Because the scale of control; Like multilayer, pass the response of the control system between rank, multiloop, negative feedback, many inputs, many output, be the variation on the big system configurations of control that lag behind of group more than one, and owing to the uncertainty of modeling more; Therefore study organize when lagging behind the interval more more and become the structure and related robust stabilizing problem that non-linear correlation is controlled big system, significant [230]
Consideration becomes the RVC planning configuration of non-linear correlation and controls big system when having the many hysteresis of many groups interval, it is represented by the individual related subsystem of w:
Figure 2011103356974100002DEST_PATH_IMAGE016
Figure 2011103356974100002DEST_PATH_IMAGE018
?
Figure 2011103356974100002DEST_PATH_IMAGE020
(?2.?87? a?)
Figure 2011103356974100002DEST_PATH_IMAGE024
Figure 2011103356974100002DEST_PATH_IMAGE026
Figure 951999DEST_PATH_IMAGE022
(?2.?87? b?)
Here,
xR Ni Be the state of RVC planning configuration-system,
UR Mi Be the control input of RVC planning disposal subject,
YR Fi Be the output of RVC planning configuration-system,
FR L i Interference for the outer decision of the senior level of RVC planning configuration-system;
Figure 2011103356974100002DEST_PATH_IMAGE028
Figure 2011103356974100002DEST_PATH_IMAGE030
is the RVC planning configuration association matrix that is produced by basic RVC planning configuration association matrix
Figure 2011103356974100002DEST_PATH_IMAGE032
; Be designated as
Figure 2011103356974100002DEST_PATH_IMAGE034
, i.e.
Figure 2011103356974100002DEST_PATH_IMAGE036
or
Figure 2011103356974100002DEST_PATH_IMAGE038
;
The time bending moment battle array A ( r) ( t), A ( s) ( t), B ( d) ( t), C ( h) ( t) be the uncertain matrix of suitable dimension, and excursion satisfies:
Figure 2011103356974100002DEST_PATH_IMAGE040
,
Figure 2011103356974100002DEST_PATH_IMAGE044
, (?2.?88?)
Figure 2011103356974100002DEST_PATH_IMAGE048
;
Figure 2011103356974100002DEST_PATH_IMAGE050
;
Figure 2011103356974100002DEST_PATH_IMAGE052
;
Figure 2011103356974100002DEST_PATH_IMAGE054
Wherein ,
Figure 2011103356974100002DEST_PATH_IMAGE058
Figure 2011103356974100002DEST_PATH_IMAGE060
is the certainty matrix.And have
Figure 2011103356974100002DEST_PATH_IMAGE062
Figure 2011103356974100002DEST_PATH_IMAGE064
(?2.?89?)
Hysteresis non-linearity more than many groups become the related big system of RVC planning configuration control (2. 87) when interval; If do not consider its perturbations associations and hysteresis disturbance associations and nonlinear terms, then formula (2. 87) turns to the linear time varying control system of no hysteresis non-structure disturbance parameter and does
Figure 2011103356974100002DEST_PATH_IMAGE068
Figure 2011103356974100002DEST_PATH_IMAGE070
(?2.?90?)
To
Figure 2011103356974100002DEST_PATH_IMAGE072
and incidence matrices
Figure 2011103356974100002DEST_PATH_IMAGE074
Figure 2011103356974100002DEST_PATH_IMAGE076
of lagging behind; If it is asymptotically stable having the null solution that many hysteresis non-linearities become the closed-loop system of the related big system of RVC planning configuration control (2. 87) when interval, become the related big system relationship robust stabilizing of RVC planning configuration control when then weighing-appliance has many hysteresis non-linearities interval.
(3) for regional value chain; The inventor is on logical foundations, Fundamentals of Mathematics, scientific basic and the brand-new technology basis and the engineering foundation of its foundation; " world " counting system that converges logical all things on earth, connects longitude and latitude for " cloud " counting system that flicker is indefinite is transformed into; Adhere to that with the GVC system be core; Introduce suitable, be used for reflecting respectively general Complex Adaptive Systems basic motive, base load, basic effect, consume basically, the various basic collaborative variablees of inner cooperation and competition and outside cooperation and competition, set up the rationalization evaluation model and the technical scheme of planning configuration-system engineering.
(3. 1) should be set up rational standard or interpretational criteria for the design of new region value chain planning allocation project.This reasonability should and can only be established from the overall interests of the mankind.Furthermore; Standard design field as new economics; Big collaborative regional value chain planning allocation project and with the interconnecting and interacting of regional value chain configuration-system; Should both adapt with the Individual of Humanity interests, the group interest with the mankind adapts again, also will adapt with all interests of the mankind; Should adapt with the mankind's immediate interests, the future benefit with the mankind adapts again, also will adapt with the mankind's permanent interests.
The design of influence area value chain planning allocation project has with the rational principal element of estimating: design and evaluation objective A, design and interpretational criteria (index, model, structure) T, the design with the evaluation colony G, design and evaluation model MAnd design and estimator's preference ηIf design is designated as with the reliability of evaluation system R, then
R?=? f?(? A?,? T?, ?G?,? M, η)
To the design and the evaluation of regional value chain planning allocation project, should only not regard professional person's thing as, also should there be the representative of various interest groups to participate in.In design and evaluation procedure, design will be brought into play multiple function with evaluation colony, design and evaluation objective as setting; Set up design and evaluation structure; Set up design and assessment indicator system, (qualitatively) design and evaluation index etc. are confirmed in definite design and evaluation index weight.
If rationalize the index composition with reference to ordered series of numbers with the regional value chain planning allocation project of estimating with to be designed; Zone value chain planning allocation project rationalizes the evaluation criterion index and forms relatively ordered series of numbers of quilt; Then available grey relational grade is represented regional value chain planning allocation project and degree of closeness at different levels to be designed and evaluation, uses the least squared criterion structure target function of expansion and plans that through asking conditional extremum to set up regional value chain allocation project rationalizes the grey evaluation model.
Be provided with mThe item evaluation index nIndividual regional value chain planning allocation project factor is formed with reference to ordered series of numbers:
x ?j? =?{? x ?j ?(? i?)?|? i?=?1,?2,…,? m?j?=?1,?2,…,? n?} (?2.?15.?1?)
cThe regional value chain planning of level allocation project rationalizes evaluation criterion and forms relatively ordered series of numbers of quilt x h = x h ( i) | h=I, II ..., c i=1,2 ..., m, note x j With x h iThe absolute difference △ of individual index h ( i)=| x j ( i) x h ( i) |, then x j With x h The iThe degree of closeness of individual index is used grey incidence coefficient ζ( x j , x h ) be expressed as [43]
Figure 2011103356974100002DEST_PATH_IMAGE078
(?2.?15.?4?)
In the formula
Figure 2011103356974100002DEST_PATH_IMAGE080
Be the two-stage lowest difference; Be two-stage maximum difference; ρFor resolution ratio is arranged, span is 0< ρ<1, generally get ρHigher resolution was promptly arranged in=0. 5 o'clock.
If the weight of various evaluation indexes does w i ( i=1,2 ..., m), then there is grey relational grade to do
Figure 2011103356974100002DEST_PATH_IMAGE084
(?2.?15.?5?)
With the least squared criterion in the classical mathematics---square distance and minimum, expand to power square distance and minimum criteria, then rationalize index with regional value chain planning allocation project x j With the grade scale index x h Between diversity factor u H j For the Weighted distance of weighing is expressed as
Figure 2011103356974100002DEST_PATH_IMAGE086
(?2.?15.?6?)
To be designed should being divided into the regional value chain planning allocation project of estimating makes u H j Minimum rank.Then rationalize the grey evaluation model just like lower area value chain planning allocation project
(?2.?15.?7?)
(3. 2) advantage of future scenarios: PA/RVC and problem of enforcement aspect
The advantage of C1 future scenarios: PA/RVC
a. the camera choice property of the inside and outside association of regional value chain planning configuration
In the face of the market of keen competition, the planning of steadily cooperation and network across time and space; The zone value chain is organized in the internationalization running that is full of the exchange rate fluctuation risk; As can not comprise that income design schedule, expenditure design schedule, total design schedule etc. carry out the running of camera choice property, so to the various exchange rate, various countries' customer order, various transaction; Even regional value chain profit in one's hands, also can because of the fluctuation of the exchange rate or slowly project shrink.Under PA/RVC state, the data message and the data of the inside and outside association of regional value chain planning configuration are interlocks and are updated at any time that each stakeholder can grasp instant information at any time.
b. the polynary integration of the inside and outside association of regional value chain planning configuration
Under PA/RVC state, the various information of the inside and outside association of regional value chain planning configuration integrated will provide necessary condition for the scientification of decision-making.PA/RVC gets up the various information integrations of the inside and outside association of regional value chain planning configuration; Be connected like a cork; Just make budget, planning more accurate, control more practicable, also make actual numeral that takes place and the variance analysis between the budget, configuration control is more easy and quick.
c. the multidimensional relevance of the inside and outside association of regional value chain planning configuration
Under PA/RVC state, on the one hand, close association between upstream department and middle reaches department and the lower dept longitudinally; On the other hand, close association between horizontal department of system and cooperation department and the supporting department.This vertical association with laterally related in, core product and project, dominant traffic and project, outside ventures and project, auxiliary products and project and derived product and project combine, and form regional value chain; And Rule Design merchant, system integrator, module generation merchant, ultimate consumer and social governor motion and domestic and international relative combine, and form benefit community.
d. the holographic concertedness of the inside and outside association of regional value chain planning configuration
Under PA/RVC state; As the market of competition configuration mechanism, as the planning of cooperation configuration mechanism with as the network of coordinating configuration mechanism; Interconnect, cooperatively interact, determine the holographic concertedness in inside and the outside holographic concertedness of regional value chain jointly.The holographic concertedness in the inside of zone value chain is mainly reflected on the conspiracy relation between Rule Design merchant, system integrator, the module generation merchant, and the outside holographic concertedness of regional value chain is mainly reflected on the conspiracy relation between ultimate consumer, social governor motion, the domestic and international relative.
e. the expection adaptability of the inside and outside association of regional value chain planning configuration
The vertical related department subsystem of PA/RVC system, horizontal related department subsystem and project center subsystem; Integrating monetary items accounting, resource distribution accounting, cost-benefit adjusts; Merge with other subsystems again; The synergitic metasystem of this holography is integrated, and the information providing of the inside and outside association of regional value chain planning configuration, helps regional value chain project is done prospective analysis and prediction.
Attention problem in C 2 future scenarios: PA/RVC implementation process
a. the demand analysis of the inside and outside association of regional value chain planning configuration, confirm real-world objects
State's inner region value chain development is more and more faster, and configuration mode does not catch up with the development in market gradually, so be badly in need of improving configuration with PA/RVC system, often there is the demand risk in this situation.The zone value chain is before preparing Using P A/RVC system; Need carry out demand analysis reasoningly: whether can solve on financial resources regional value chain and can support whether the enforcement configurations work of PA/RVC makes personnel's quality is enough highly before last PA/RVC, whether need to prepare consulting firm's assistance can determine what is correct thing in order if what system is the current problem that presses for solution most of regional value chain be; And then doing things right, risk will reduce greatly.
b. the enforcement of the inside and outside association of regional value chain planning configuration is prepared
Zone value chain tissue utilizes PA/RVC to improve regional value chain competitiveness, cooperation power and coordination power, still, reaches PA/RVC highway, and " driving license " of being admitted to configuration specification is the most basic assurance.If the configurations of regional value chain own is lack of standardization, just must carry out the preparation that fights a protracted war, otherwise the implementation cycle is long, regional value chain and supplier's confidence will get a hard knock, and the stranded risk of project will strengthen; Do not look to PA/RVC to change the configuration mode and delivery flow process of regional value chain, it is configuration tool and advanced idea, can control it, see regional value chain tissue and supplier's ability.
c. the collaborative engineering of holography of stakeholder's fellowship of the inside and outside association of regional value chain planning configuration
Awaiting developing the PA/RVC of foundation, is the collaborative engineering of holography of metasystem property.The stakeholder's fellowship that has only the inside and outside association of regional value chain planning configuration just can make the enforcement of PA/RVC succeed.In fact, the enforcement of PA/RVC is Rule Design merchant, system integrator, module generates the process of carrying out game between merchant, ultimate consumer, social governor motion and the domestic and international relative, is that cooperative game occupies a kind of broad sense equilibrium under the superiority condition.It is high that team is implemented in the initial stage learning enthusiasm to PA/RVC, is one of necessary condition of successful implementation PA/RVC but continue confidence.
d. set up the project configuration system of the inside and outside association of regional value chain planning configuration.
Await developing the PA/RVC project of foundation; It is a regional value chain configuration-system engineering that has system complexity, holographic concertedness, implements characteristics such as difficulty is quite big, the application cycle is quite long; Therefore, regional value chain is organized in PA/RVC application process, must be from the angle of system engineering and scientific allocation; Establish and improve engineering project configuration scheme and operating mechanism, guarantee the successful implementation of PA/RVC project.Main contents comprise: work out PA/RVC application target clear and definite, that quantize; Carry out the training education of modern configuration knowledge such as PA/RVC, introduce the information-based consulting of regional value chain, carry out PA/RVC project demands analysis; Carry out regional value chain configuration innovation; Carry out the reorganization of delivery flow process, carry out PA/RVC project supervisory system and carry out PA/RVC project appraisal system etc., be implementing important reform and the innovation that PA/RVC regards regional value chain tissue itself as.
e. strengthen training, deepen the understanding
f. consulting merchant, supplier's immediate service of the inside and outside association of regional value chain planning configuration
PA/RVC is not a simple configuration tool, but is representing advanced delivery flow process and configuration thought.Its enforcement is a complex engineering, is organically blending of IT technological innovation and configuration innovation.This needs PA/RVC supplier and regional value chain to make joint efforts for a long time, even needs the participation of third party's professional consultation service provider can realize fully really that PA/RVC uses, and reaches re-set target.
g. the data Back ground Information of the inside and outside association of regional value chain planning configuration perfect
Information is the assurance of normal operation, and data must be accurately.A lot of regional value chains are difficult to drop into enough energy in the preparation of basic data, the result is " having imported hurrock, the still rubbish of output at last ".For the system high efficiency operation, data must be accomplished complete, accurate.In order to improve the operational efficiency of system, regional value chain should be carried out reasonable coding to corresponding data, helps the information trace and the inquiry of system like this.The basic operation platform of PA/RVC is exactly to be based upon in the element task of data, for the normal operation after PA/RVC importing is laid a good foundation.
C 3 future scenarios: the pattern of successful implementation PA/RVC
PA/RVC system implementation successfully has two primary conditions, and one is suitable software, and another is effective implementation method.Wherein effective implementation method can reduce the content of ten aspects haply:
The one, the support and the promise of the advanced configuration layer of the inside and outside association of regional value chain planning configuration;
The 2nd, there is one not only to understand configuration but also be proficient in the enforcement of software and seek advice from troop;
The 3rd, reaffirming and supervising of inside and outside associated configuration information system scope of project disposed in regional value chain planning;
The 4th, the inside and outside associated configuration information system project team's of regional value chain planning configuration composition;
The 5th, the degree of going deep into of the inside and outside associated configuration information system project work of regional value chain planning configuration;
The 6th, the feasible in detail inside and outside associated item planning of regional value chain planning configuration;
The 7th, the feasible in detail inside and outside associated item continuation planning of regional value chain planning configuration;
The 8th, the inside and outside associated item of regional value chain planning configuration must have suitable resource;
The 9th, " summary of experience ", the quality configuration assessment of the inside and outside related department of All Ranges value chain planning configuration;
The tenth, the inside and outside associated item of regional value chain planning configuration from modeling, test, try the conversion configurations that formally puts into operation out.
Zone value chain tissue is selected software; Whether needn't investigate it is real PA/RVC software; Select software function to distinguish, and will select the software that is suitable for based on the difference of the products characteristics of regional value chain, system organization mode, operation configuration characteristics by the size of regional value chain.
Delivery flow process reorganization is that regional value chain is organized the thinking again of existing process flow operation mode and design again, should follow following basic principle: must serve as to lead to adjust institutional framework, must let the executor that the power of decision-making, the participation that must obtain the policymaker and support are arranged, must select suitable flow process to recombinate, must set up the unobstructed channel of communication, institutional framework must to be the center rather than to be the center with the task with target and output with the target of regional value chain tissue.
A complete PA/RVC system must be a system that ten minutes is numerous and jumbled; (Rule Design merchant, system integrator, module generate relation configuration RD between the merchant/DIM) to the inner kernel software PA/RVC/DIM of its existing configuring area value chain, extend to the outside software PA/RVC/SHF of regional value chain (ultimate consumer, social governor motion, the RD of the configuration of the relation between the relative both at home and abroad/SHF) in addition; Existingly be configured to the main supply chain that logistics/cash flow is an object, configuration supportive supply chain---configurations such as human resources, device resource, financing are arranged again, and to the support of policy-making supply chain.Any one regional value chain is organized all can not overnight just can realize the system that this is huge.Each regional value chain all has characteristics of oneself and the subject matter that will solve, and need confirm to implement target and step based on self actual conditions.
Await developing the PA/RVC of foundation, be not only a kind of software, especially a regional value chain solution.Therefore; Even same set of software; Different its implementation methods of regional value chain is also different; For example implement which module? How to carry out the classification training? Which rank of is PA/RVC configured to? Is configuration thin to what degree? With the manual configuration merger time how long? When get rid of manual configuration? How to strengthen the enforcement of PA/RVC planning? These all will be confirmed according to the demand and the configure base of regional value chain; And formulate practicable target and implementary plan, guarantee the successful implementation of PA/RVC.
It is incremental, a continuous perfecting process that the zone value chain is implemented PA/RVC, has only improving constantly of stakeholder's quality, just can guarantee deepening continuously of system.Can combine stakeholder's economic benefit and action through the chapter system of establishing rules to regional value chain stakeholder, stakeholder's enthusiasm can be improved like this, and the consciousness of being familiar with flow process also can be enhanced.
C 4 future scenarios: decision PA/RVC implements the influencing factor of success or failure
a. the stakeholder is to the influence of PA/RVC implementation result.
The stakeholder is the important factors that PA/RVC implements, and these stakeholder comprise that decision of the senior level person, Rule Design merchant, system integrator, module generate merchant, PA/RVC enforcement and user of service, advisory agent etc.
b. organizational factor is to the influence of PA/RVC implementation result.
When the factor of PA/RVC being implemented success or failure was analyzed, we should set about from the organizational factor of the inside and outside association of regional value chain planning configuration.Some organizational factors such as the institutional framework of the inside and outside association of zone value chain planning configuration, size of the organization, organizational environment, tissue delivery flow process all can exert an influence to implementation result and the enforcement degree of PA/RVC more or less.The motivation that different regional value chain sizes of the organization is implemented for PA/RVC, carry out strategy, adopt the type of PA/RVC, to the modification degree of fundamental system, implement performance etc. and have bigger difference.
What need carry out proof analysis future is, which type of effect institutional framework, tissue play to the adaptability of PA/RVC, size of the organization etc. to PA/RVC result of implementation.But,, perhaps also have some other factor,, make regional value chain tissue can't improve the success rate that PA/RVC implements significantly like historical, culture and strategic even company has carried out better controlled to these factors.
c. culture is to the influence of PA/RVC implementation result.
When PA/RVC system developed under different cultural backgrounds, regional value chain tissue can embody the different social category, and this social category is difficult to change owing to technical stability, and this has just caused some the incompatibility problems in PA/RVC enforcement.Country origin culture that Here it is is to the influencing factor of PA/RVC.
Need future usefulness case study such as people and proof analysis to explain that international regional value chain is organized in PA/RVC and receives the influence of national difference in implementing, and study these difference content and influence modes.What need consideration is that six big-differences such as culture/language, configuration mode, government, company policy, supervision, legal requiremnt, internal technology personnel reserved resources, stakeholder's technical ability, geography, time zone all are the factors of the transnational successful implementation PA/RVC of influence.Through the method for positive research, we can analyze the influence to PA/RVC implementation result such as the country source of PA/RVC software, the quality of consulting firm, high-rise support of disposing, user.Implementing PA/RVC is not only new software of exploitation, but a kind of cultural comprehensive change and innovation.
From above research to cultural factor, we can not compare the cultural difference of software development zone value chain the country one belongs to and software implementation zone value chain the country one belongs to, and ignore regional value chain culture only from country origin culture incision.In fact, regional value chain culture also is to influence the extremely important factor that PA/RVC implements, because the acceptance level to PA/RVC is different in different regional value chain culture.
4, description of drawings
Fig. 1 explanation:
The whole regional value chain planning big system of configuration and exist feedback mechanism widely with the interaction of nature one social engineering is shown in Fig. 1.Zone value chain planning configuration tissue makes decisions according to certain target (or complex); Import certain people, thing, information; Make the mankind between different departments field, carry out harmonious activity (also having feedback mechanism here), the result exports new people, thing, information.This brings huge motive force on the one hand the existence and the development of society, can cause negative effect to natural engineering on the other hand.Two feedback informations are arranged respectively here; The one, the social base (bearing capacity) of regional value chain planning disposal subject or system compares with the social quality index (desired value) on operation basis; Finding out that deviation that mankind's activity brings is progressively dwindled or the feedback information when widening is given policy-making body, is the feedback factor of regional value chain planning layoutprocedure in this social base; On the other hand; The harmful effect that the people of output, thing, information cause for the nature engineering; Compare with natural quality index (desired value); This information is fed back to decision-making section, and to influence next decision process, the engineering situation is exactly the feedback factor of regional value chain planning configuration affects nature engineering here.
Fig. 2 explanation:
For the evaluation of regional value chain planning disposal subject ability integration, a lot of because of factor of evaluation (index), need set up multistage fuzzy level valency model, as shown in Figure 2.If have in certain regional value chain configuration tissue NThe individual is to be appraised, and is selected mIndividual benchmark people (Utopian regional value chain planning disposal subject), wherein N>> mThis system organization contains KIndividual primary subsystem, the number to be appraised of each subsystem is respectively n 1, n 2..., n i ..., n k , then have
Figure 2011103356974100002DEST_PATH_IMAGE092
If note Then the organization system appraisee is P 1, P 2..., P N1 ..., P N1+1 ..., P N2 ..., P N2+1 ..., P N i ..., P N i+ 1 ..., P N k– 1 , P N k– 1+1 ..., P N k
Fig. 3 explanation:
Based on resource distribution dynamics, holographic coordination and the game coordination principle that the inventor sets up, we can carry out overall merit from entity and value two aspects to the synergetic zone value chain planning disposal subject towards regional value chain configuration respectively.
This overall evaluation system such as Fig. 3.Aspect entity, we can come the analyzed area value chain to dispose the property of tissue through the regional value chain planning disposal subject ability enhancement degree of measuring.But, the ability of regional value chain planning disposal subject comprises many fuzzy qualitative factors, like independence, decision-making capability, risk holding capacity, harmony, the sense of duty, self-organizing level, operating efficiency or the like.Want the regional value chain of science, reasonably evaluation to plan the disposal subject capacity situation, just need quantitatively judge these qualitative factors.
Fig. 4 explanation:
Zone value chain planning disposal subject ability evaluation index is more, can be divided into different levels between index, and it passs stratum's aggregated(particle) structure such as Fig. 4.Visible by figure, regional value chain planning disposal subject merit rating problem, relate to a plurality of factors such as decision-making capability, risk tolerance, the coordination ability, assets degree of concern.Quilt comments object (regional value chain configuration tissue or individual) to have certain ambiguity with respect to these evaluation of indexes (excellent, good, in, poor, bad), needs the utilization fuzzy set theory to study.
5, embodiment
Await developing the PA/RVC system of foundation; Be undoubtedly a kind of advanced person's economic science technical system, a kind of advanced management science and technology system and a kind of advanced person's the system engineering theory and practice, it involves a wide range of knowledge, and throws the National People's Congress; Implementation cycle is long; Difficulty is big, has certain risk, need take scientific methods to guarantee the success of the project implementation.
E 1 regional value chain planning configuration project implementary plan
Actual according to regional value chain tissue, confirm that whole project divides two stages to carry out:
First stage, mainly implement the inside and outside association of regional value chain planning configuration system's control, sell configuration, receivable configuration, logistics arrangement, deal with configuration, stock's configuration, inventory auditing, product data configurations (containing regional value chain structural arrangements, Process configuration), expense budget configuration (containing the expense configuration), monetary items are adjusted, PDM data preparation and demand analysis, hardware net environmental structure, regional value chain are planned and disposed.Cycle is about 12 months.Main the integrated of regional value chain planning inside and outside related logistics of configuration and cash flow, standard, the transparent configurations accomplished.
Second stage is production master program, material demand planning, power balance, workshop project configuration, quality configuration, equipment metering configuration, human resources configuration, solution analysis, the regional value chain planning configuration of the inside and outside association of integrated region value chain planning configuration.Cycle is about 16 months.Main realize the market with the inside and outside association of regional value chain planning configuration be demand, with vertically and the master ga(u)ge that laterally drives divides core into, be the holographic concertedness enterprise schema of main contents with the input and output of the inside and outside association of regional value chain planning configuration; Be controlled at goods effectively; Compress stock to greatest extent; Improve delivery date, satisfy market demand apace.
The overall goal of E 2 planning configurations
a. to implement regional value chain planning configuration project is opportunity, promotes regional value chain by the transformation to the configuration mode of transparent, collaborative, standard, lean of traditional close, poor efficiency, extensive style configuration mode, the realization of supporting zone value chain strategy target.
b. reinforced region value chain configurations.Set up the regional value chain planning inside and outside associated data standard of configuration and the coding scheme of standard, promote regional value chain basis to rectify; Product design, the technical papers standard configurations of the inside and outside association of reinforced region value chain planning configuration; Dispose by norm when the raw materials consumption of the inside and outside association of refinement zone value chain planning configuration, man-hour, the occupation of capital, table of equipment; Regional value chain standard campaign of the inside and outside association of standard zone value chain planning configuration; The customer resources information configuration of the inside and outside association of reinforced region value chain planning configuration; The cost and the price configuration of the inside and outside association of refinement zone value chain planning configuration; The delivery flow process of the inside and outside association of reinforced region value chain planning configuration and role norm configuration.
c. improve configuration, decision-making technique.Realize that the IRP of the inside and outside association of regional value chain planning configuration, the data integration and the database overall situation of each subsystem share; Set up the regional value chain Back ground Information structure of the inside and outside association of regional value chain planning configuration, comprise integrated information network and comprehensive mutual form of unified data; The neat cover stock configuration and the analysis of the inside and outside association of zone value chain planning configuration; The process consuming cost of the inside and outside association of zone value chain planning configuration is adjusted; The inside and outside association of zone value chain planning configuration sell risk control and customer resources configuration on credit; Vertically reach the integrated application of the horizontal main system operation planning that drives, material demand planning, order configuration; The real-time cost accounting of the branch product of the inside and outside association of zone value chain planning configuration; Fast Quotation; The profit budget and the breakeven analysis of the inside and outside association of zone value chain planning configuration; Online multidimensional data analysis is supported decision application.
d. be configured to standard with the planning of regional value chain, the value chain configuration of system improving zone, the supporting zone value chain is carried out phyletic evolution, and the regional value chain that forms transparent, open, collaborative, standard, lean is cultural.
The implementation content of E 3 planning configurations
a. the logistics arrangement of the inside and outside association of regional value chain planning configuration.Rely on brand-new information system support; The demand of the inside and outside related production system of the configuration of delivery areas value chain planning in time; And through planning the information integration of disposing inside and outside related logistics system with regional value chain; Rapidly the inside and outside related demand of producing of regional value chain planning configuration is made fast reaction, guarantee the Qi Taoxing of the inside and outside related production material of regional value chain planning configuration.Zone value chain planning configuration-system proposes the inside and outside related demand planning of producing of regional value chain planning configuration according to system's operation planning; Value chain planning configuration inside and outside related production system in zone can propose the inside and outside related logistics arrangement planning of regional value chain planning configuration according to the neat cover situation of material planning inquiry raw material and parts; Rely on the inside and outside related information of regional value chain planning configuration of regional value chain planning configuration-system integrated, set up the perfect inside and outside affiliated supplier's configuration scheme of regional value chain planning configuration; With the foundation of information such as delivery date of the inside and outside affiliated supplier of regional value chain planning configuration, article quality as supplier evaluation; Arrange the inside and outside affiliated supplier's evaluation result of regional value chain planning configuration share distribution, Payments Policy to combine with logistics; Set up the inside and outside related logistics of regional value chain planning configuration and arrange the information bank of configurations such as cycle, economic lot size, safety inventory, for ensureing that in time material supplies provide foundation.
b. sale, stock and the production system of the inside and outside association of regional value chain planning configuration.System's operation planning is the programmatic document that instructs the inside and outside related activity in production of regional value chain planning configuration.For the enforcement of safeguards system operation planning, Feed stream arrangement planning, cooperation part planning, workshop project planning, the equipment that can produce the inside and outside association of regional value chain planning configuration simultaneously use a series of supporting planning such as planning, moulds of industrial equipment planning.System's operation planning and these planning are guiding principle and purpose relation, and guiding principle is lifted and could be opened by order.
c. the cost configuration of the inside and outside association of regional value chain planning configuration.Production cost to the inside and outside association of regional value chain planning configuration is planned, adjusts, is controlled and disposes; Set up the departmental cost budget method of the inside and outside association of regional value chain planning configuration; And with thing in cost analysis compare; Make budget progressively department learn, accurately, provide the data of usefulness for regional value chain organizational decision making.
d. the configuration of dealing with of inside and outside association is disposed in regional value chain planning.The various contact funds that the main configuring area value chain of account payable subsystem of the inside and outside association of zone value chain planning configuration takes place with supplier in running; Help regional value chain configuration person to grasp the flow direction of fund effectively; Come the outflow of control area value chain fund through monitoring the payment situation, form the good circulation of circulating fund.The account payable subsystem of the inside and outside association of zone value chain planning configuration is filled in invoice, tax and logistics operational costs usefulness based on logistics arrangement activity, also can directly call the order that logistics arranges subsystem to generate.Invoice amount is shared with the warehouse-in material, can confirm to put in storage material payment situation.Generate the account payable account after invoice is transferred items, payment order and account payable account are settled accounts, and confirm the received payment amount of money and the arrearage amount of money, can handle advance payment simultaneously.In order to grasp following cash flow artificial situation in real time; The system of the inside and outside association of zone value chain planning configuration also provides the rich querying statistical function, and arranges subsystem, the integrated use of account subsystem with the inside and outside related logistics of regional value chain planning configuration.
e. the receivable configuration of the inside and outside association of regional value chain planning configuration.Zone value chain tissue is through the application to regional value chain planning configuration-system, and that realizes data between monetary items department and the sales department of the inside and outside association of regional value chain planning configuration shares the interchange of completion data message on network; The income design schedule money of the monetary items portion of the inside and outside association of zone value chain planning configuration will serve as according to registering with the invoice for sales of sales department; The income design schedule money of the inside and outside association of zone value chain planning configuration is by collecting toward vostro account.Gathering, the invoice for sales of the inside and outside association of zone value chain planning configuration has according to complying with clear and definite flow process source.The returned money clearing time can be assigned to each account due, make income design schedule age, collect the aging reflection in advance in time, accurately, not only can take in design schedule age, collect aging analysis of accounts in advance, can also carry out the returned money aging analysis of accounts.
6,600 patent of invention common implementing plan brief introductions
Through 30 years freely explore; Independent inventor Li Zongcheng is taught in September, 2011 and formally submits 600 applications for a patent for invention to State Patent Office through the electronic application system, and submits materials such as 600 parts of claims that amount to about 3,600 ten thousand words, specification, accompanying drawing to.
Through 30 years freely explore; Independent inventor Li Zongcheng professor is delivering through international and domestic academic journals and academic conference on more than the 80 piece of paper basis of (not containing the achievement that cooperation is accomplished); Independent recently writing is accomplished eight ones has the academic monumental work (amounting to 3,000 ten thousand words) of substantial connection with these 600 technological inventions declaring, plans in September, 2011 after, to handle successively formally publication matters.
600 technological invention patents that this is declared; Be that inventor Li Zong really explores and a brand new technical cluster that establishes one's own system of foundation through 30 years independence and freedom, its generic name is " GVC network technology support system " [DCN/HII (GVC)].
Based on great initiative academic research achievement and 600 state-of-the-art technology inventions that a series of independence and freedom are accomplished, inventor Li Zong really proposes a strategy that can be referred to as " since the beginning of history " plan---GVC system engineering technology cluster exploitation total strategy.
The total strategy target of GVC network technology support system can be summed up as following content:
1, aspect technological development basic (front end of ICT industrial chain); With the multimodal GVC system of multilayer level (GVC) is core; The connection of carrying out based on computer and network thereof with Natural Intelligence and Artificial Intelligence and coordinate main line as general intelligence integrated system (IIS) Upgrade process; Set up brand-new logical foundations, Fundamentals of Mathematics, scientific basic and brand-new technology basis and engineering foundation; Be that relative closure, static relatively " resource pool "---system for cloud computing injects soul, intelligence and life; Build global intelligent integral network computer system (CS/HSN (GII)), Global Internet is made becomes the technique support system that really has life and ecological holographic joint management.
2, in the application facet (end of ICT industrial chain) of brand new technical; With the multimodal GVC system of multilayer level (GVC) is core; The connection of carrying out based on computer aided system and the Internet with cognitive system and practice system and coordinate main line as high-grade intelligent integrated system (HIIS) evolution process; Foundation is based on the brand-new theoretical intelligent integrated scientific and technical system (IIS & IIT) of metasystem (MS) science; With the novel Global Internet of life-giving vigor be dispersed in all over the world logistics net, energy net, Network and Finance Network and the knowledge knowledge network of each field all departments combine together (DCN); Carry out the GVC system engineering energetically; Set up the global intelligent integral really have life and ecological holographic joint management and dynamically converge open network system (DCN/HII (GVC)), thereby build intelligent integrated net, life the Internet and ecological operation net.
GVC system engineering technology cluster exploitation total strategy---the inventor is referred to as " since the beginning of history " plan through implementing, and " cloud " counting system that flicker is indefinite is transformed into " world " counting system that converges logical all things on earth, connects longitude and latitude.
Revolution is calculated in the world based on cloud computing is changed; System is a core with the multimodal GVC of multilayer level; With modern electronic technology, modern communication technology and present information network technology serves as to support the basis; Logistics network, energy network, information network, banking network and knowledge network are combined closely; Set up efficient, intensive, as to have life (or ecological) the self-organizing character big system of intelligent integrated dynamic remittance open network; Greatly simplify Team Management's (and business administration), division management (and management of industry), district management and national management and whole world management; Effectively reduce team (and enterprise) infrastructure cost, department's (and industry) infrastructure cost, region base facility cost and national basis facility cost and global basis facility cost; Improve team (and enterprise) level of IT application, department's (and industry) level of IT application, area information level and national information level and global IT application level comprehensively; All social tissues and activity thereof are become configuration node and the activity thereof in the global multilayer level multi-mode system effect chain network system; Especially all social economic organizations and activity thereof are become configuration node and the activity thereof in the global multilayer level multi-mode value chain network system, cause more educated, intelligent and networked society, tissue, the individual base attribute that becomes the most at last.

Claims (7)

1. independent claims---the ICT technical support design of regional value chain planning allocation project; Be that the applicant is setting up on brand-new logical foundations, Fundamentals of Mathematics, scientific basic and brand-new technology basis and the engineering foundation; " world " counting system that converges logical all things on earth, connects longitude and latitude for " cloud " counting system that flicker is indefinite is transformed into; With Internet user is the center; And then be the center with GVC system (GVC); The connection of carrying out based on computer and network thereof with Natural Intelligence and Artificial Intelligence and coordinate main line as general intelligence integrated system (IIS) Upgrade process, through setting up the new technology that network configuration dynamics basic model and normal form put forward, this right is characterised in that:
A, for the ICT technical support of regional value chain planning allocation project, brand-new logical foundations comprises that the holographic logical logic, the two poles of the earth of converging converge that logical logic, the two poles of the earth are holographic converges logical logic; Brand-new Fundamentals of Mathematics comprise holographic logical mathematics, the logical mathematics of the two poles of the earth remittance, the system's transition analyze mathematics of converging; Brand-new scientific basic comprises resource distribution dynamics, holographic coordination, the system behavio(u)r theory of value, game coordination, the equilibrium economics that liquidates, holographic logical physics and the perforation science (interdisciplinary science and cross-section science)---metasystem science and the intelligent integrated science that are formed by the big comprehensive of a series of brand-new theories of converging; The brand-new technology basis is is core with the value chain system, towards the synergitic brand-new systems technology of holography (cluster); Brand-new engineering foundation is is core with the value chain system, towards the synergitic brand-new system engineering of holography (cluster);
B, for the ICT technical support of regional value chain planning allocation project; " world " calculating itself is an extremely complicated system; Has very complicated holographic joint management structure; Here; On the one hand, various computers and infrastructure thereof, auxiliary device and the network equipment (comprising server, browser) couple together with holographic joint management pattern (comprising ICC, ICK, ICH, IDC, IDK, IDH, IMC, IMK, IMH, ECC, ECK, ECH, EDC, EDK, EDH, EMC, EMK, EMH) and form the computer interconnected network tissue; On the other hand; Various users and effect chain thereof couple together with holographic joint management pattern (comprising ICC, ICK, ICH, IDC, IDK, IDH, IMC, IMK, IMH, ECC, ECK, ECH, EDC, EDK, EDH, EMC, EMK, EMH) and form natural intelligence socialization tissue, and this natural intelligence socialization tissue and computer interconnected network tissue form " world " counting system CS/HSN (GII) that the inventor censured jointly;
C, for the ICT technical support of regional value chain planning allocation project, set up the technical system and the dynamical foundation of the design of planning allocation project, and then set up the know-why of planning allocation project design;
D, for the ICT technical support of regional value chain planning allocation project; Introduce suitable, be used for reflecting respectively general Complex Adaptive Systems basic motive, base load, basic effect, consume basically, the various basic collaborative variablees of inner cooperation and competition and outside cooperation and competition, set up the rationalization evaluation model and the technical scheme of planning configuration-system engineering.
2. dependent claims---for regional value chain, set up the technical system of planning allocation project design according to the independent claims 1 described inventor, this right is characterised in that:
Await developing energetically the PA/RVC of foundation; Be the information integration of a facing area value chain planning operation (Planning Operation of Enterprise Value Chain), and PA/IVC is an information integration towards supply chain planning operation (Planning Operation of Supply Chain); Outside manufacturing, supply and marketing, monetary items function and the various back-up system and the technology of PA/IVC system, PA/RVC combines vertically reaching laterally related product, project and field on the regional value chain, has following a series of brand-new technology:
The ICT technical support design of the 341st regional value chain planning configuration mechanism
The ICT technical support design of the 342nd regional value chain planning dispensing unit
The ICT technical support design of the 343rd regional value chain planning configuration dynamic foundation
The ICT technical support design of the 344th regional value chain planning configuration odds ratio
The 345th the holographic collaborative ICT technical support design of regional value chain planning configuration
The ICT technical support design of the 346th regional value chain planning configuration production function
The 347th regional value chain planning configuration is worth the ICT technical support design of metering
The ICT technical support design of the 348th regional value chain planning configuration joint management
The 349th regional value chain planning configuration holography balancing technique basis that liquidates
The 350th regional value chain planning configuration holography balanced tabular technology that liquidates
The ICT technical support design of the 351st regional value chain planning disposal subject
The ICT technical support design of the 352nd regional value chain planning configuration load
The ICT technical support design of the 353rd regional value chain planning configuration mode
The ICT technical support design of the 354th regional value chain planning configuration-system
The ICT technical support design of the 355th regional value chain planning configuration surroundings
The ICT technical support design of the 356th regional value chain planning allocation project
The ICT technical support basis of the 357th the just system of regional value chain planning configuration
The 358th regional value chain planning configuration intelligent integral system-computed technical foundation
The 359th regional value chain planning configuration intelligent integral operation system technology basis
The 360th regional value chain planning configuration intelligent integral dynamically converges and leads to technical foundation.
3. dependent claims---for regional value chain, set up the dynamics normal form of planning allocation project according to the independent claims 1 described inventor, this right is characterised in that:
Value chain planning configuration-system in zone constitutes regional value chain planning configuration natural ecosystems jointly with natural environment on every side; For this type system, we need divide five action scopes to come consideration of regional value chain planning configuration ecological balance condition;
In self-organizing competition action scope, aspect certain resource, realize balance of nature, regional value chain planning configuration-system just receives following essential condition constraint:
a1. nature is iPlant the bearing capacity of resource aspect BN i ( t) attenuation rate β i ( t) the time period of being considered [ t 0, t 1] in must be not more than arbitrarily small number ε i , promptly
β i? (? t?)?≤? ε i? , t∈?[? t? 0?,? t? 1?] (?2.?232?)
a2. the regional value chain of self-organizing competition is planned configuration-system G 1To iPlant the utilization of natural resources DG 1, i ( t) the time period of being considered [ t 0, t 1] in must approach the bearing capacity of nature aspect i kind resource BN i ( t), promptly
| ?DG ?1,? i? (? t?)?–? BN i? (? t?)?|?≤? η i ? β i? (? t?)?≤? ε i? ,? t∈?[? t? 0?,? t? 1?]?(?2.?233?)
Concentrating tissue competition action scope, aspect certain resource, realize balance of nature, regional value chain planning configuration-system just should receive following essential condition constraint:
b1. nature is iPlant the bearing capacity of resource aspect BN i ( t) attenuation rate β i ( t) the period of being considered [ t 0, t 1] in must be not more than arbitrarily small number ε i , promptly
β i? (? t?)?≤? ε i? , t∈?[? t? 0?,? t? 1?] (?2.?234?)
b2. concentrate the regional value chain planning configuration-system of tissue competition G 2To iPlant the utilization of natural resources DG 2, i ( t) the time period of being considered [ t 0, t 1] in must approach the bearing capacity of nature aspect i kind resource BN i ( t), promptly
| ?DG ?2,? i? (? t?)?–? BN i? (? t?)?|?≤? η i ? β i? (? t?)?≤? ε i? ,? t∈?[? t? 0?,? t? 1?](?2.?235?)
In basic synergy territory, aspect certain resource, realize balance of nature, regional value chain planning configuration-system just should receive following essential condition constraint:
c1. nature is iPlant the bearing capacity of resource aspect BN i ( t) attenuation rate β i ( t) the period of being considered [ t 0, t 1] in must be not more than arbitrarily small number ε i , promptly
β i? (? t?)?≤? ε i? , t∈?[? t? 0?,? t? 1?] (?2.?236?)
c2. basic collaborative regional value chain planning configuration-system G 3To iPlant the utilization of natural resources DG 3, i ( t) the time period of being considered [ t 0, t 1] in must approach nature the iPlant the bearing capacity of resource aspect BN i (t), promptly
| ?DG ?3,? i? (? t?)?–? BN i? (? t?)?|?≤? η i ? β i? (? t?)?≤? ε i? ,? t∈?[? t? 0?,? t? 1?]?(?2.?237?)
In self-organizing cooperation action scope, aspect certain resource, realize balance of nature, regional value chain planning configuration-system just should receive following essential condition constraint:
d1. nature is iPlant the bearing capacity of resource aspect BN i ( t) attenuation rate β i ( t) the period of being considered [ t 0, t 1] in must be not more than arbitrarily small number ε i , promptly
β i? (? t?)?≤? ε i? , t∈?[? t? 0?,? t? 1?] ?(?2.?238?)
d2. the regional value chain of self-organizing cooperation is planned configuration-system G 4To iPlant the utilization of natural resources DG 4, i ( t) the period of being considered [ t 0, t 1] in must approach nature the iPlant the bearing capacity of resource aspect BN i ( t), promptly
| ?DG ?4,? i? (? t?)?–? BN i? (? t?)?|?≤? η i ? β i? (? t?)?≤? ε i? ,? t∈?[? t? 0?,? t? 1?](?2.?239?)
Organize the cooperation action scope concentrated, aspect certain resource, realize balance of nature, regional value chain planning configuration-system just should receive following essential condition constraint:
e1. nature is iPlant the bearing capacity of resource aspect BN i ( t) attenuation rate β i ( t) the period of being considered [ t 0, t 1] in must be not more than arbitrarily small number ε i , promptly
β i? (? t?)?≤? ε i? , t∈?[? t? 0?,? t? 1?] ?(?2.?240?)
e2. concentrate the regional value chain planning configuration-system of tissue cooperation G 5To iPlant the utilization of natural resources DG 5, i ( t) the period of being considered [ t 0, t 1] in must approach nature the iPlant the bearing capacity of resource aspect BN i ( t), promptly
| ?DG ?5,? i? (? t?)?–? BN i? (? t?)?|?≤? η i ? β i? (? t?)?≤? ε i? ,? t∈?[? t? 0?,? t? 1?](?2.?241?)
Value chain planning configuration-system in zone constitutes the social ecosystem of regional value chain planning configuration jointly with social environment on every side; For this type system, we need divide five action scopes to consider social ecological balance condition;
In self-organizing competition action scope, realize the social ecological balance aspect certain resource, regional value chain planning configuration-system just should receive following essential condition constraint:
a1. society is the iPlant the bearing capacity of resource aspect BS i ( t) attenuation rate α i ( t) the time period of being considered [ t 0, t 1] in must be not more than arbitrarily small number ε i , promptly
α i? (? t?)?≤? ε i? , t∈?[? t? 0?,? t? 1?] (?2.?242?)
a2. the regional value chain of self-organizing competition is planned configuration-system G 1To iPlant the utilization of resource DG 1, i ( t) the time period of being considered [ t 0, t 1] in must approach society the iPlant the bearing capacity of resource aspect BS i ( t), promptly
| ?DG ?1,? i? (? t?)?–? BS i? (? t?)?|?≤? η i ? α i? (? t?)?≤? ε i? ,? t∈?[? t? 0?,? t? 1?]?(?2.?243?)
Concentrating tissue competition action scope, realize the social ecological balance aspect certain resource, regional value chain planning configuration-system just should receive following essential condition constraint:
b1. society is the iPlant the bearing capacity of resource aspect BS i ( t) attenuation rate α i ( t) the time period of being considered [ t 0, t 1] in must be not more than arbitrarily small number ε i , promptly
α i? (? t?)?≤? ε i? , t∈?[? t? 0?,? t? 1?] (?2.?244?)
b2. concentrate the regional value chain planning configuration-system of tissue competition G 2To iPlant the utilization of resource DG 2, i ( t) the period of being considered [ t 0, t 1] in must approach society the iPlant the bearing capacity of resource aspect BS i ( t), promptly
| ?DG ?2,? i? (? t?)?–? BS i? (? t?)?|?≤? η i ? α i? (? t?)?≤? ε i? ,? t∈?[? t? 0?,? t? 1?]?(?2.?245?)
In basic synergy territory, aspect certain resource, realize the social practice balance, regional value chain planning configuration-system will receive following essential condition constraint:
c1. society is the iPlanting the resource aspect is bearing capacity BS i ( t) attenuation rate α i ( t) the time period of being considered [ t 0, t 1] in must be not more than arbitrarily small number ε i , promptly
α i? (? t?)?≤? ε i? , t∈?[? t? 0?,? t? 1?] (?2.?246?)
c2. basic collaborative regional value chain planning configuration-system G 3To iPlant the utilization of resource DG 3, i ( t) the time period of being considered [ t 0, t 1] in must approach society the iPlant the bearing capacity of resource aspect BS i ( t), promptly
| ?DG ?3,? i? (? t?)?–? BS i? (? t?)?|?≤? η i ? α i? (? t?)?≤? ε i? ,? t∈?[? t? 0?,? t? 1?]?(?2.?247?)
In self-organizing cooperation action scope, realize the social ecological balance aspect certain resource, regional value chain planning configuration-system just should receive following essential condition constraint:
d1. society is the iPlant the bearing capacity of resource aspect BS i ( t) attenuation rate α i ( t) the time period of being considered [ t 0, t 1] in must be not more than arbitrarily small number ε i , promptly
α i? (? t?)?≤? ε i? , t∈?[? t? 0?,? t? 1?] (?2.?248?)
d2. the regional value chain of self-organizing cooperation is planned configuration-system G 4To iPlant the utilization of resource DG 4, i ( t) the period of being considered [ t 0, t 1] in must approach society the iPlant the bearing capacity of resource aspect BS i ( t), promptly
| ?DG ?4,? i? (? t?)?–? BS i? (? t?)?|?≤? η i ? α i? (? t?)?≤? ε i? ,? t∈?[? t? 0?,? t? 1?]?(?2.?249?)
Organize the cooperation action scope concentrated, realize the social ecological balance aspect certain resource, regional value chain planning configuration-system just should receive following essential condition constraint:
e1. society is the iPlant the bearing capacity of resource aspect BS i ( t) attenuation rate α i ( t) the time period of being considered [ t 0, t 1] in must be not more than arbitrarily small number ε i , promptly
α i? (? t?)?≤? ε i? , t∈?[? t? 0?,? t? 1?] (?2.?250?)
e2. concentrate the regional value chain planning configuration-system of tissue cooperation G 5To iPlant the utilization of resource DG 5, i ( t) the time period of being considered [ t 0, t 1] in must approach society the iPlant the bearing capacity of resource aspect BS i ( t), promptly
| ?DG ?5,? i? (? t?)?–? BS i? (? t?)?|?≤? η i ? α i? (? t?)?≤? ε i? ,? t∈?[? t? 0?,? t? 1?]。
4. dependent claims---for the planning configuration of regional value chain, according to the feedback mechanism design that the independent claims 1 described inventor sets up the planning allocation project, this right is characterised in that:
Inquire on the Internet planning allocation project according to the independent claims 1 described inventor based on product efficacy structure (EVS [PES]); Based on the planning allocation project of product efficacy structure, should comprise following several different levels on the Internet:
On the Intranet based on the planning allocation project of product efficacy structure (EVS [PES])
On the industry the Internet based on the planning allocation project of product efficacy structure (EVS [PES])
On the national the Internet based on the planning allocation project of product efficacy structure (EVS [PES])
On the value chain of zone based on the planning allocation project of product efficacy structure (EVS [PES])
Inquire on the Internet planning allocation project according to the independent claims 1 described inventor based on Technological Economy foundation structure (RCS [TKS/EBS]); Based on the planning allocation project of Technological Economy foundation structure, should comprise following several different levels on the Internet:
On the Intranet based on the planning allocation project of Technological Economy foundation structure (RCS [TKS/EBS])
On the industry the Internet based on the planning allocation project of Technological Economy foundation structure (RCS [TKS/EBS])
On the national the Internet based on the planning allocation project of Technological Economy foundation structure (RCS [TKS/EBS])
On the value chain of zone based on the planning allocation project of Technological Economy foundation structure (RCS [TKS/EBS])
Inquire on the Internet planning allocation project according to the independent claims 1 described inventor based on internal-external conspiracy relation (SOS [ESS/ISS]); Based on the planning allocation project of internal-external conspiracy relation, should comprise following several different levels on the Internet:
On the Intranet based on the planning allocation project of internal-external conspiracy relation (SOS [ESS/ISS])
On the industry the Internet based on the planning allocation project of internal-external conspiracy relation (SOS [ESS/ISS])
On the national the Internet based on the planning allocation project of internal-external conspiracy relation (SOS [ESS/ISS])
On the value chain of zone based on the planning allocation project of internal-external conspiracy relation (SOS [ESS/ISS]).
5. dependent claims---for the planning configuration of regional value chain, set up the Hiberarchy Decomposition model of planning allocation project according to the independent claims 1 described inventor, this right is characterised in that:
In RVC planning layoutprocedure; The transmission of any signal and information produces hysteresis always, and practical problem quite a few must be by non-linear portrayal, and because the existence of disturbing factor; Some loop is temporary transient interrupts or when connecting again, causes the variation on the hysteresis control system recurring structure; In addition; Because the scale of control; Like multilayer, pass the response of the control system between rank, multiloop, negative feedback, many inputs, many output, be the variation on the big system configurations of control that lag behind of group more than one, and owing to the uncertainty of modeling more; Therefore study organize when lagging behind the interval more more and become the structure and related robust stabilizing problem that non-linear correlation is controlled big system, significant;
Consideration becomes the RVC planning configuration of non-linear correlation and controls big system when having the many hysteresis of many groups interval, it is represented by the individual related subsystem of w:
Figure 2011103356974100001DEST_PATH_RE-DEST_PATH_IMAGE001
Figure 2011103356974100001DEST_PATH_RE-DEST_PATH_IMAGE003
Figure DEST_PATH_RE-990532DEST_PATH_IMAGE004
Figure 2011103356974100001DEST_PATH_RE-DEST_PATH_IMAGE005
?
Figure DEST_PATH_RE-239110DEST_PATH_IMAGE006
(?2.?87? a?)
Figure DEST_PATH_RE-227795DEST_PATH_IMAGE008
Figure 2011103356974100001DEST_PATH_RE-DEST_PATH_IMAGE009
Figure DEST_PATH_RE-511009DEST_PATH_IMAGE007
(?2.?87? b?)
Here,
xR Ni Be the state of RVC planning configuration-system,
UR Mi Be the control input of RVC planning disposal subject,
YR Fi Be the output of RVC planning configuration-system,
FR L i Interference for the outer decision of the senior level of RVC planning configuration-system;
Figure DEST_PATH_RE-926947DEST_PATH_IMAGE010
Figure 2011103356974100001DEST_PATH_RE-DEST_PATH_IMAGE011
is the RVC planning configuration association matrix that is produced by basic RVC planning configuration association matrix
Figure DEST_PATH_RE-193980DEST_PATH_IMAGE012
; Be designated as
Figure 2011103356974100001DEST_PATH_RE-DEST_PATH_IMAGE013
, i.e.
Figure DEST_PATH_RE-861722DEST_PATH_IMAGE014
or
Figure 2011103356974100001DEST_PATH_RE-DEST_PATH_IMAGE015
;
The time bending moment battle array A ( r) ( t), A ( s) ( t), B ( d) ( t), C ( h) ( t) be the uncertain matrix of suitable dimension, and excursion satisfies:
Figure DEST_PATH_RE-124076DEST_PATH_IMAGE016
,
Figure DEST_PATH_RE-586281DEST_PATH_IMAGE018
,
Figure 2011103356974100001DEST_PATH_RE-DEST_PATH_IMAGE019
(?2.?88?)
Figure DEST_PATH_RE-934086DEST_PATH_IMAGE020
; ; ;
Figure 2011103356974100001DEST_PATH_RE-DEST_PATH_IMAGE023
Wherein ,
Figure 2011103356974100001DEST_PATH_RE-DEST_PATH_IMAGE025
Figure DEST_PATH_RE-155486DEST_PATH_IMAGE026
is the certainty matrix; And have
Figure 2011103356974100001DEST_PATH_RE-DEST_PATH_IMAGE027
Figure DEST_PATH_RE-990586DEST_PATH_IMAGE028
)
Figure 2011103356974100001DEST_PATH_RE-DEST_PATH_IMAGE029
6. dependent claims---for regional value chain, set up the rationalization evaluation model of planning the configuration-system engineering according to the independent claims 1 described inventor, this right is characterised in that:
The design of influence area value chain planning allocation project has with the rational principal element of estimating: design and evaluation objective A, design and interpretational criteria (index, model, structure) T, the design with the evaluation colony G, design and evaluation model MAnd design and estimator's preference ηIf design is designated as with the reliability of evaluation system R, then
R?=? f?(? A?,? T?, ?G?,? M, η)
If the weight of various evaluation indexes does w i ( i=1,2 ..., m), then there is grey relational grade to do
Figure DEST_PATH_RE-734551DEST_PATH_IMAGE030
(?2.?15.?5?)
With the least squared criterion in the classical mathematics---square distance and minimum, expand to power square distance and minimum criteria, then rationalize index with regional value chain planning allocation project x j With the grade scale index x h Between diversity factor u H j For the Weighted distance of weighing is expressed as
Figure DEST_PATH_RE-DEST_PATH_IMAGE031
(?2.?15.?6?)
To be designed should being divided into the regional value chain planning allocation project of estimating makes u H j Minimum rank; Then rationalize the grey evaluation model just like lower area value chain planning allocation project
Figure DEST_PATH_RE-DEST_PATH_IMAGE033
7. dependent claims---for regional value chain, set up the technical scheme of planning the configuration-system engineering according to the independent claims 1 described inventor, this right is characterised in that:
Actual according to regional value chain tissue, confirm that whole project divides two stages to carry out:
First stage, mainly implement the inside and outside association of regional value chain planning configuration system's control, sell configuration, receivable configuration, logistics arrangement, deal with configuration, stock's configuration, inventory auditing, product data configurations (containing regional value chain structural arrangements, Process configuration), expense budget configuration (containing the expense configuration), monetary items are adjusted, PDM data preparation and demand analysis, hardware net environmental structure, regional value chain are planned and disposed; Cycle is about 12 months; Main the integrated of regional value chain planning inside and outside related logistics of configuration and cash flow, standard, the transparent configurations accomplished;
Second stage is production master program, material demand planning, power balance, workshop project configuration, quality configuration, equipment metering configuration, human resources configuration, solution analysis, the regional value chain planning configuration of the inside and outside association of integrated region value chain planning configuration; Cycle is about 16 months; Main realize the market with the inside and outside association of regional value chain planning configuration be demand, with vertically and the master ga(u)ge that laterally drives divides core into, be the holographic concertedness enterprise schema of main contents with the input and output of the inside and outside association of regional value chain planning configuration; Be controlled at goods effectively; Compress stock to greatest extent; Improve delivery date, satisfy market demand apace.
CN2011103356974A 2011-10-31 2011-10-31 ICT technical support design for providing engineering for regional value chain planning and configuration Pending CN102624799A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011103356974A CN102624799A (en) 2011-10-31 2011-10-31 ICT technical support design for providing engineering for regional value chain planning and configuration

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011103356974A CN102624799A (en) 2011-10-31 2011-10-31 ICT technical support design for providing engineering for regional value chain planning and configuration

Publications (1)

Publication Number Publication Date
CN102624799A true CN102624799A (en) 2012-08-01

Family

ID=46564482

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011103356974A Pending CN102624799A (en) 2011-10-31 2011-10-31 ICT technical support design for providing engineering for regional value chain planning and configuration

Country Status (1)

Country Link
CN (1) CN102624799A (en)

Similar Documents

Publication Publication Date Title
CN102624811A (en) ICT technical support design for providing engineering for enterprise value chain network configuration
CN102624812A (en) ICT technical support design for providing engineering foundation for global value chain market configuration
CN102655521A (en) Design of ICT (information communication technology) technical support of regional value chain market allocation engineering
CN102638515A (en) ICT technical support design for global value chain network configuration project
CN102624814A (en) Information and communication technology (ICT) support design for market allocation engineering of industrial value chain
CN102624904A (en) Design basis for planning configuration unit of internet user terminal
CN102624805A (en) ICT technical support design for providing engineering for internet user terminal market configuration
CN102624799A (en) ICT technical support design for providing engineering for regional value chain planning and configuration
CN102710708A (en) Information and communication technology (ICT) support design for global value chain planning configuration project
CN102624821A (en) ICT technical support design for providing engineering for regional value chain network configuration
CN102638558A (en) Information communication technology (ICT) support design for enterprise value chain market configuration engineering
CN102780742A (en) Information communication technology (ICT) support design of national value chain market configuration project
CN102651766A (en) Information communication technology (ICT) technical supporting design for engineering for planning and configuring value chain of enterprise
CN102752353A (en) Information and communication technology (ICT) support design of industrial value chain planning and configuration engineering
CN102710715A (en) Information and communication technology (ICT) support design for industry value chain network configuration project
CN102752351A (en) Information and communication technology (ICT) support design of national value chain network configuration engineering
CN102624792A (en) ICT technical support design for national value chain planning and configuration environment
CN102638506A (en) ICT technical support design for internet user terminal planning and configuration project
CN102724242A (en) ICT technical support design for coordination configuration engineering of internet user terminal
CN102624854A (en) ICT technical support design for enterprise value chain planning and configuration units
CN102739746A (en) Information communication technology (ICT)/technical support design of Internet user terminal coordination configuration environment
CN102761590A (en) ICT (information and communication technology) technical support design for network configuration environment of enterprise value chain
CN102624839A (en) ICT technical support design for providing environment for internet user terminal planning configuration
CN102769656A (en) Information and communications technology (ICT) technical support design of network allocation environment of industrial value chain
CN102710707A (en) Information and communication technology (ICT) support design for global value chain planning configuration environment

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20120801