CN102624792A - ICT technical support design for national value chain planning and configuration environment - Google Patents

ICT technical support design for national value chain planning and configuration environment Download PDF

Info

Publication number
CN102624792A
CN102624792A CN2011103355755A CN201110335575A CN102624792A CN 102624792 A CN102624792 A CN 102624792A CN 2011103355755 A CN2011103355755 A CN 2011103355755A CN 201110335575 A CN201110335575 A CN 201110335575A CN 102624792 A CN102624792 A CN 102624792A
Authority
CN
China
Prior art keywords
value chain
planning configuration
national value
bearing capacity
surroundings
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011103355755A
Other languages
Chinese (zh)
Inventor
李宗诚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2011103355755A priority Critical patent/CN102624792A/en
Publication of CN102624792A publication Critical patent/CN102624792A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

An ICT technical support design for national value chain planning and configuration environment is a novel technique which is set up by taking internet users as the center and further taking a multi-hierarchy GVC (global value chain) as the center, taking the joint and coordination performed by a cognitive system and a practice system based on computer auxiliary systems and the internet as a main line of a developing process of an HIIS (high intelligent integrated system) and setting up basic models, normal forms and equation systems of network configuration dynamics and game organization synergetics on the basis of setting up new logic foundation, mathematic foundation and scientific foundation and in order to modify a 'cloud' computing system into a universal 'Heaven-Earth' computing system.

Description

The ICT technical support design of national value chain planning configuration surroundings
Technical field
This invention is applicant Li Zongcheng, and formally (generic name is the 375th in " GVC network technology support system [DCN/IIL (VCSE)] " to 600 patent of invention clusters that State Patent Office submits to through electronic system in September, 2011.
This invention with the patent of invention cluster (generic name be in " GVC network technology support system [DCN/IIL (VCSE)] " the 361st, the 362nd, the 363rd, the 364th, the 365th, the 366th, the 367th, the 368th, the 369th, the 370th, the 371st, the 372nd, the 373rd, the 374th, the 376th, the 377th, the 378th, the 379th, the 320th,, constitute patent of invention crowd " national value chain planning configuration ICT technique support system (ICT-PAM/[NVC]) " jointly.
" GVC network technology support system [DCN/IIL (VCSE)] " that the applicant proposes to comprise this invention, is made up of 600 patents of invention; Its bulking property target is; With GVC system (GVC) is core; The connection of carrying out based on computer and network thereof with Natural Intelligence and Artificial Intelligence and coordinate main line as general intelligence integrated system (GIIS) Upgrade process; Set up brand-new logical foundations, Fundamentals of Mathematics, scientific basic and brand-new technology basis and engineering foundation; Be that relative closure, static relatively " resource pool "---system for cloud computing injects soul, intelligence and life; Build global intelligent integral contract network computer architecture (CS/HSN (GII)), Global Internet is made becomes the technique support system that really has life and ecological holographic joint management character.On this basis; With GVC system (GVC) is core; The connection of carrying out based on computer aided system and the Internet with cognitive system and practice system and coordinate main line as high-grade intelligent integrated system (HIIS) evolution process; Foundation is based on the brand-new theoretical intelligent integrated scientific and technical system (IIS & IIT) of metasystem (MS) science; Logistics net, energy net, Network and Finance Network and the knowledge knowledge network of each field all departments combine together with being dispersed in all over the world with the novel Global Internet of life-giving vigor; Carry out the GVC system engineering energetically, set up the global intelligent integral really have life and ecological holographic joint management character and dynamically converge open network system (DCN/HII (GVC)), thereby build intelligent integrated net, life the Internet and ecological operation net.GVC system engineering technology cluster exploitation total strategy---inventor Li Zong really is referred to as " since the beginning of history " plan through implementing, and " cloud " counting system that flicker is indefinite is transformed into " world " counting system that converges logical all things on earth, connects longitude and latitude.
The main purpose of this invention is through brand-new logical foundations, Fundamentals of Mathematics, scientific basic and brand-new technology basis and engineering foundation, and the ICT network docking technique of environment is provided for national value chain planning configuration.
All related Mathematical Modelings are the really independent foundation of inventor Li Zong basically in this specification, have original innovation.
This invention belongs to that (network technology of PA/NVC) is supported the field towards national value chain planning configuration, planning organization and planning management; Be towards the national value chain and then towards the intelligent integrated technical foundation of national value chain planning configuration-system, people, mechanism and tissue guided into from flicker indefinite " cloud " (counting system) converge the key of " world " (brand-new counting system) of logical all things on earth.
PA/NVC is a kind of solution of national value catenary system engineering; By means of the brand-new Information technology and the network technology; Importing the service strategy of national value chain and operation mode whole is among the inside and outside related system of national value chain planning configuration of trunk with the information system; It is the just change on the science and technology, but involves national value chain organization internal comprehensive integration and the configuration all about the flow process on the cross-region of personnel, fund, logistics, manufacturing and national value chain tissue or transnational border related with the outside.  
PA/NVC is physical resources configuration (logistics), human resources configuration (stream of people), fund resource distribution (wealth stream), information resources configuration (information flow) the integrated national value chain configuration software to the inside and outside association of national value chain planning configuration.The DIM analysis that generates the merchant through Rule Design merchant, system integrator, module towards the inside and outside association of national value chain planning configuration proposes to describe vertical related department of future generation, horizontal related department and value resource planning (VRP) software towards the inside and outside related ultimate consumer of national value chain planning configuration, social governor motion, the SHF analysis of relative both at home and abroad with Li Zongcheng.It will comprise national value chain planning configuration inside and outside related user/service system framework, use graphical user interface, use open system and make.Except the existing standard function, it also comprises other characteristic, disposes the adjustment report of inside and outside association etc. like quality, process enactment configuration and the planning of national value chain of the inside and outside association of national value chain planning configuration.Particularly, thus the basic technology that PA/NVC adopts will be more prone to upgrading will for simultaneously the independence of the inside and outside related user software and hardware of national value chain planning configuration two aspects.The key of PA/NVC be all users of the inside and outside association of national value chain planning configuration can cutting its use, thereby have natural ease for use.
Background technology
In recent years, the fusion of ICT industry three macroreticulars and system for cloud computing technology were pushed ahead international and domestic always energetically.Grid attempts to realize the overall sharing of interconnected internet resource, comprises information resources, data resource, computational resource and software resource etc.
But at present, the fusion of ICT industry three macroreticulars just is being absorbed in the dangerous condition of dying young, the novelty wretched insufficiency of cloud computing technology, and the application of cloud computing meets with all restrictions, and the exploitation of cloud computing system meets with heat, cold difficult situation out of trade in the industry.The fast development of the Along with computer technology and the network technology, along with the increase day by day of financial innovation and financial risks, market competition is further aggravated, and the space and the scope of the competition of national value chain further enlarge, and the integrated of global economy also constantly pushed ahead.Twentieth century progressively develops into the configuration thought of how effectively utilizing and disposing whole resource mainly towards the thought of the comprehensive configuration of national value chain internal resource the nineties thereupon.Under this situation, Li Zongcheng has at first proposed the notion report of PA/NVC.
The logical set of the remittance of setting up integrated economic multiattribute measure space based on intelligence, based on intelligence the logical operator of the remittance of integrated economic more rules metric matrix, integrated economic multiple-factor becomes the comprehensive remittance of power and is open to the custom and is and based on intelligence on the basis of the remittance pass function of integrated economic multiplicity algebra system based on intelligence, it is platform and the brand-new network system that logistics network, knowledge network and banking network are combined together that the inventor proposes will develop and set up with the information network---" whole world dynamically converge open network "; And then propose to develop and to set up and a kind of cloud computing and grid computing included at interior brand-new counting system---dispose and " world " computation schema of allocation of financial resource towards knowledge resource configuration, physical resources; Again and then to propose to develop and to set up a kind of serve as crucial and brand-new operation system that various cognitive operation and practice are combined together with computer operating system and internet operating system---and " holographic co-operation system " (OS/HSO).
The GVC that the inventor proposes dynamically converges open network system DCN/IIL (VCSE); Be meant with the multimodal value chain system (VCS of multilayer level; From value of the product chain PVC, national value chain NVC; To industry value chain IVC, regional value chain RVC; So that national value chain NVC, GVC GVC) be core; Be fused to the major technique support with telecommunications network (MCN), computer network (WWW) and broadcasting and television network (BTN) three macroreticulars, logistics net (MN), ability drift net (EN), information network (IN), Network and Finance Network (FN) and knowledge knowledge network (KN) five macroreticulars are combined together, the global open network system of full field, total system, overall process comprehensive integration business service is provided.
Calculating of the open network and the world thereof and the holographic co-operation (abbreviation OS/HSO of system dynamically converge in the whole world that inventor's proposition will be developed and set up; Operating System of Holo-synergetic Oganization), be a complete complex system.The world is calculated and is intended to through the logistics under the information network support, knowledge, the full open network that converges of finance; The computational entity that a plurality of costs are relatively low is integrated into a complete intelligent integrated system with powerful calculating ability; And, this powerful computing ability is distributed in the terminal use's hand of information network inside and outside by brand-new business models such as information network inside and outside SaaS/HSO, PaaS/HSO, IaaS/HSO, MSP/HSO.
The whole world is dynamically converged open network and is calculated notion to can be regarded as a kind of be platform and logistics network, knowledge network and banking network compiled connect the application model of getting up with the information network.Not only computer-oriented and information network are calculated in the whole world dynamically remittance open network, and towards logistics network, knowledge network and banking network.It is attempted to surmount information calculations and information network and calculates, and information calculations and information network calculating and logistics network, knowledge network and banking network is compiled connect and operation is closely linked, and realization is intelligent integrated.
As the basis of this invention, brand-new logical foundations comprises the logical logic of holographic remittance, the logical logic of the two poles of the earth remittance, the logical logic of the holographic remittance in the two poles of the earth; Brand-new Fundamentals of Mathematics comprise holographic logical mathematics, the logical mathematics of the two poles of the earth remittance, the system's transition analyze mathematics of converging; Brand-new scientific basic comprises resource distribution dynamics, holographic coordination, the system behavio(u)r theory of value, game coordination, the equilibrium economics that liquidates, holographic logical physics and the perforation science (interdisciplinary science and cross-section science)---metasystem science and the intelligent integrated science that are formed by the big comprehensive of a series of brand-new theories of converging; The brand-new technology basis is is core with the value chain system, towards the synergitic brand-new systems technology of holography (cluster); Brand-new engineering foundation is is core with the value chain system, towards the synergitic brand-new system engineering of holography (cluster).
Summary of the invention
(1) for the national value chain; The inventor is on logical foundations, Fundamentals of Mathematics, scientific basic and the brand-new technology basis and the engineering foundation of its foundation; " world " counting system that converges logical all things on earth, connects longitude and latitude for " cloud " counting system that flicker is indefinite is transformed into; Adhere to that with the GVC system be core; With the connection of cognitive system (RS and computer aided system thereof) and practice system (PS and computer aided system thereof) with coordinate main line, set up the dynamical foundation of planning configuration surroundings design as high-grade intelligent integrated system (HIIS) evolution process.
(1. 1) inventor regards the national value chain as resource configuration system and process, and sets up network configuration dynamics normal form.Therefore; With the lowermost layer of hierarchical chart as evaluation index; We can be according to the relation between environmental factor and the bearing capacity; Set up judgment matrix, methods such as the maximum characteristic vector method of integrated use sum of squares approach, Saaty, geometric average method, expert's method are determined the relative importance (weight) of this one deck to last layer.Utilize the counting backward technique in the AHP method, can each value of statistical indicant be carried out consistent the standardization, that is: through utilizing formula
Figure 2011103355755100002DEST_PATH_IMAGE002
Solve the nondimensionalization problem between the index, and in the matrix after make changing each element value 0 and l between, and its monotonicity is constant.
Because the value chain system can be divided into value of the product chain system PVC, enterprise value chain system EVC, industry value chain system IVC and national economy value chain system NVC and these five levels of global economy value chain system GVC; We can correspondingly be divided into five levels with the various environment in the planning configuration-system, that is:
PVC more basic environment (narrow sense environment) BE of production programming configuration (PA/PVC), EVC more basic environment (narrow sense environment) BE of production programming configuration (PA/EVC), IVC more basic environment (narrow sense environment) BE of production programming configuration (PA/IVC) and NVC more basic environment (narrow sense environment) BE of production programming configuration (PA/NVC) and GVC be basic environment (narrow sense environment) BE of production programming configuration (PA/GVC) again;
PVC again the combinational environment CE of production programming configuration (PA/PVC), EVC again the combinational environment CE of production programming configuration (PA/EVC), IVC again the combinational environment CE of production programming configuration (PA/IVC) and NVC again the combinational environment CE of production programming configuration (PA/NVC) and GVC be the combinational environment CE of production programming configuration (PA/GVC) again;
PVC again the single system environment SSE of production programming configuration (PA/PVC), EVC again the single system environment SSE of production programming configuration (PA/EVC), IVC again the single system environment SSE of production programming configuration (PA/IVC) and NVC again the single system environment SSE of production programming configuration (PA/NVC) and GVC be the single system environment SSE of production programming configuration (PA/GVC) again;
PVC again the complication system environment CSE of production programming configuration (PA/PVC), EVC again the complication system environment CSE of production programming configuration (PA/EVC), IVC again the complication system environment CSE of production programming configuration (PA/IVC) and NVC again the complication system environment CSE of production programming configuration (PA/NVC) and GVC be the complication system environment CSE of production programming configuration (PA/GVC) again;
PVC again the complex large system environment GSE of production programming configuration (PA/PVC), EVC again the complex large system environment GSE of production programming configuration (PA/EVC), IVC again the complex large system environment GSE of production programming configuration (PA/IVC) and NVC again the complex large system environment GSE of production programming configuration (PA/NVC) and GVC be the complex large system environment GSE of production programming configuration (PA/GVC) again.
For the planning configuration of national value chain, we should consider following three kinds of configuration surroundings:
(I) fundamental plan configuration surroundings
Figure 2011103355755100002DEST_PATH_IMAGE004
: based on the complementarity of product composition key element (raw material, parts and relevant auxiliary products) and same project ( a, like product, similar enterprise, belong to field, similar industry together, belong to the zone together, belong to country together) multilayer level value chain ( MVC a ) last formed planning configuration surroundings (CDE I);
(II) subordinate planning configuration surroundings
Figure 2011103355755100002DEST_PATH_IMAGE006
: project-based complementarity and disparity items ( aWith b) multilayer level value chain ( MVC a With MVC b ) between formed planning configuration surroundings (CDE II);
(III) the planning configuration surroundings of deriving
Figure 2011103355755100002DEST_PATH_IMAGE008
: in similar project (like product, similar enterprise, belong to field, similar industry together, belong to the zone together, belong to country together) aDifferent multilayer level value chains ( MVC a, i With MVC a, j , ij) between formed planning configuration surroundings (CDE III).
And then say it, we should consider following different situation:
The cooperation configuration surroundings that on same national economy value chain system, forms
Figure 2011103355755100002DEST_PATH_IMAGE010
; Produce the cooperation configuration surroundings that forms on each stage again in same national economy value chain system; Produce the cooperation configuration surroundings
Figure 2011103355755100002DEST_PATH_IMAGE014
that forms on each link in each stage again in same national economy value chain system.
Because SA of cooperative economy system and executive system EA respectively have the target of oneself S A With E A , thereby the cooperative economy system S A And executive system E A Behavior between interaction several kinds of situation possibly appear:
I) cooperative economy system S A And executive system E A Have common target, their behavior is synergistic;
II) cooperative economy system S A And executive system E A Have opposite target, their behavior is to hinder each other;
III) neither belong to common situation, also do not belong to conflict situations, this is a situation not in the know, and in this case, executive system produces the effect of a kind of non-premediation (involuntary) to the cooperative economy system of complicacy.
Traditional planned economy is the economy of administrationization basically, in this economy, and first kind of situation commonly.
If with four parameters ( U N , V N ; U A , V A ) represent the state of cooperative economy system, so, the operation of cooperative economy system just can be envisioned as certain natural resources amount U N Or administrative stock number U A With certain stock number V N Or V A A series of exchanges.
V N Depend on U N And cooperative economy system S A And natural environment E N Structure and behavior, V N Depend on U A And cooperative economy system S A And executive system E A Structure and behavior.See conversely, U N Depend on V N And planning configuration-system S A And natural environment E N Structure and behavior, U A Depend on V A And planning configuration-system S A And executive system E A Structure and behavior.All in all, following expression should be arranged:
V N = V N ( U N , U A , S A , E N , E A ) ( 2. 13. 3 a )
U N = U N ( V N , V A , S A , E N , E A ) ( 2. 13. 4 a )
V A = V A ( U N , U A , S A , E N , E A ) ( 2. 13. 3 b )
U A = U A ( V N , V A , S A , E N , E A ) ( 2. 13. 4 b )
Existing according to (2. 13. 3) formula discuss extremely favourable ( U N , V N ; U A , V A ) basis amount in the exchange V N0 With V A0
For cooperative economy system
Figure 2011103355755100002DEST_PATH_IMAGE016
; Extensive type
Figure 2011103355755100002DEST_PATH_IMAGE022
of natural environment
Figure 2011103355755100002DEST_PATH_IMAGE018
and executive system ;
Figure 2011103355755100002DEST_PATH_IMAGE024
and
Figure 2011103355755100002DEST_PATH_IMAGE026
; Under conflict situations, exist the basis amount
Figure 2011103355755100002DEST_PATH_IMAGE028
V N ( U N , U A , S A , E N , E A ) = V N ( U N , U A , S A 0 , E N 0 , E A 0 ) ( 2. 13. 5 a )
V A ( U N , U A , S A , E N , E A ) = V A ( U N , U A , S A 0 , E N 0 , E A 0 ) ( 2. 13. 5 b )
In (2. 13. 5) formula S A0 Be class
Figure 157040DEST_PATH_IMAGE022
In extreme value (optimum) system, E N0 Be class In extreme value (optimum) environment, E A0 Be class
Figure 920783DEST_PATH_IMAGE026
In extreme value (optimum) system.When the planning configuration-system S A With administrative environment E A Interaction when belonging to situation not in the know, (2. 13. 5) formula can be rewritten as
Figure 2011103355755100002DEST_PATH_IMAGE032
V N ( U N , U A , S A , E N , E A ) = V N ( U N , U A , S A 0 , E N 0 , E A 0 ) ( 2. 13. 6 a )
V A ( U N , U A , S A , E N , E A ) = V A ( U N , U A , S A 0 , E N 0 , E A 0 ) ( 2. 13. 6 b )
Under the situation that does not have max and min, correspondingly get sup and inf in (2. 13. 5) and (2. 13. 6) formula.
Order xRepresent state variable, it describes the state of planning configuration-system; a, bRepresent control variables, b, aNatural environment and administrative environment are described respectively.The canonical form of cusp sudden change does v( x)= x 4+ A x 2+ B x, its dynamical equation does
Figure 2011103355755100002DEST_PATH_IMAGE036
Here vBe damping constant, its value is very little.Under this condition, the transient process of system is very short, along with a, bVariation, xDetermined at once.The state of control variables decision systems.
Change former problem, consider aAlso as the situation of state variable.If x 1= x, x 2= a, and x 2Dynamical equation do
Figure 2011103355755100002DEST_PATH_IMAGE038
C is a positive constant. vNot really little.Obtain new problem
Figure 2011103355755100002DEST_PATH_IMAGE040
Figure 433541DEST_PATH_IMAGE038
The planning configuration-system is in non-steady state, and its motion receives v, bControl.In this problem, x 1, x 2Representative planning configuration-system internal state, v, bRepresent environment (control).Environment no longer determines state, and it only influences the state variation of planning system.
Fig. 1 be with A, B2 is the phase path of starting point C A , C N v, bVariation can cause the variation of track.
Fig. 2 is C A With vVariation.Fig. 3 is C A With bVariation.
Scheming us from these can find, can not cause the sudden change between the state though natural environment changes, and can cause two sudden changes between the track.
When structure economic system, natural environment and this three's of administrative restriction Coordination Model; We can consider three problems: the one, the administration domination is handled as exogenous variable and with alternative manner; Promptly provide by the external world; Behind model running, produce update information, administrative parameter is revised, and the Administration Control feasibility is made an appraisal.The 2nd, the uncertain problem that concerns between each socio-economic factor.This relation is non-linear at least, or decide with certain probability.The 3rd, the uncertain problem of consequence.Same policy is at different times, and all can there be different effects the different location.Analyze this problem usable probability model, except providing desired value, can also provide the distribution of separating, need a large amount of data reliably but do like this.By administrative submodel set out the economy that constitutes with administrative, can make economic system, natural environment and this three of administrative environment produce information each other with the natural resources Coordination Model, and form closed-system in kind, administrative instruction stream mutual exchanging action.
The operation of this model at first provides the administration change prediction under the certain condition, through the reconfiguration piece of supplying with, obtains the effective supply to cooperative economy.Therewith abreast, available various mathematical methods are analyzed the cooperation economic structure, confirm the effect of each economic department in reaching the planned target process.
The model general diagram is shown in Fig. 4.Administrationization economic entity and environmental resource provide mathematical analysis, the required initial data of planning in the model, and appraisement system then provides one group of interpretational criteria of model running.Suppose that the multidimensional criterion value is definite by following process: at first according to policymaker, designer and relevant expert's suggestion, confirm various single criterions, and form a criterion value system according to various rules of combination and come the result of model running is made an appraisal.Collect the data vector of gained X 1With the interpretational criteria vector X 2Send into administration and Economic Analysis Model together, can provide the result of administrationization economic analysis; The administrative vector of this two-part output X 4With structure vector X 5Multidate information about planned economy all departments is provided again.
(1. 2) all in all, arbitrary national value chain planning configuration-system faces following basic natural environmental condition:
We can regard the internal structure of cooperative economy system by these three 3-D solid structures that functional group is formed of economical running, population production and development of resources as.
Shown in Fig. 5, three-dimensional value function is rolled into a ball the composition structure respectively has characteristics, and function is had one's own work to do and unified value goal.Here it is, and they carry out power conversion and material circulation through energy stream, flow of material, monetary value flow, form different product to adapt to the requirement of planning index.
This joint is tentatively inquired into relevant distribution equation system and the model thereof of setting up nature and social ecomodel synergetics for the economic big system of cooperation (non-complete collaborative), to begin to take shape nature and social ecomodel synergetics analysis foundation.
The new equation system of this joint foundation at first is the combination and the unification of non-linear stochastic differential equation group and certainty constraints relation, secondly is real system function of state and combination and the unification of system mode function (or non-reasonable system mode function) on nature and society ecological regular synergetics equation group basis rationally.
In national value chain planning configuration action scope, all activities are to the iThe utilization of kind of resource will receive nature the iBut the restriction of the bearing capacity of kind of resource aspect (but but comprising instantaneous bearing capacity and long-term bearing capacity).
The now following several respects of this basic restriction table:
a. in national value chain planning configuration action scope, all activities are to the iPlant the actual utilization of resource y 1 i Receive nature iKind of resource can the confession amount y * 1 i Restriction, promptly y 1 i y * 1 i
b. in national value chain planning configuration action scope, all activities are to the iPlant the actual converted amount of resource y 2 i Receive nature iPlant the convertible amount of resource y * 2 i Restriction, promptly y 2 i y * 2 i
c. in national value chain planning configuration action scope, all activities are to the iThe reality of planting resource substitutes amount y 3 i Receive nature iPlant the alternative amount of resource y * 3 i Restriction, promptly y 3 i y * 3 i
d. in national value chain planning configuration action scope, all activities are to the iThe actual reproduction amount of the data of kind y 4 i Receive nature iPlant the reproducible amounts of resource y * 4 i Restriction, promptly y 4 i y * 4 i
National value chain planning configuration-system constitutes national value chain planning configuration natural ecosystems jointly with natural environment on every side.For this type system, we need divide five action scopes to consider national value chain planning configuration ecological balance condition.
In self-organizing competition action scope, aspect certain resource, realize balance of nature, national value chain planning configuration-system just receives following essential condition constraint:
a1. nature is iPlant the bearing capacity of resource aspect BN i ( t) attenuation rate β i ( t) the time period of being considered [ t 0, t 1] in must be not more than arbitrarily small number ε i , promptly
β i ( t ) ≤ ε i , t∈ [ t 0 , t 1 ] ( 2. 232 )
a2. the national value chain of self-organizing competition is planned configuration-system G 1To iPlant the utilization of natural resources DG 1, i ( t) the time period of being considered [ t 0, t 1] in must approach the bearing capacity of nature aspect i kind resource BN i ( t), promptly
| DG 1, i ( t ) – BN i ( t ) | ≤ η i β i ( t ) ≤ ε i , t∈ [ t 0 , t 1 ] ( 2. 233 )
Concentrating tissue competition action scope, aspect certain resource, realize balance of nature, national value chain planning configuration-system just should receive following essential condition constraint:
b1. nature is iPlant the bearing capacity of resource aspect BN i ( t) attenuation rate β i ( t) the period of being considered [ t 0, t 1] in must be not more than arbitrarily small number ε i , promptly
β i ( t ) ≤ ε i , t∈ [ t 0 , t 1 ] ( 2. 234 )
b2. concentrate the national value chain planning configuration-system of tissue competition G 2To iPlant the utilization of natural resources DG 2, i ( t) the time period of being considered [ t 0, t 1] in must approach the bearing capacity of nature aspect i kind resource BN i ( t), promptly
| DG 2, i ( t ) – BN i ( t ) | ≤ η i β i ( t ) ≤ ε i , t∈ [ t 0 , t 1 ]( 2. 235 )
In basic synergy territory, aspect certain resource, realize balance of nature, national value chain planning configuration-system just should receive following essential condition constraint:
c1. nature is iPlant the bearing capacity of resource aspect BN i ( t) attenuation rate β i ( t) the period of being considered [ t 0, t 1] in must be not more than arbitrarily small number ε i , promptly
β i ( t ) ≤ ε i , t∈ [ t 0 , t 1 ] ( 2. 236 )
c2. basic collaborative national value chain planning configuration-system G 3To iPlant the utilization of natural resources DG 3, i ( t) the time period of being considered [ t 0, t 1] in must approach nature the iPlant the bearing capacity of resource aspect BN i (t), promptly
| DG 3, i ( t ) – BN i ( t ) | ≤ η i β i ( t ) ≤ ε i , t∈ [ t 0 , t 1 ] ( 2. 237 )
In self-organizing cooperation action scope, aspect certain resource, realize balance of nature, national value chain planning configuration-system just should receive following essential condition constraint:
d1. nature is iPlant the bearing capacity of resource aspect BN i ( t) attenuation rate β i ( t) the period of being considered [ t 0, t 1] in must be not more than arbitrarily small number ε i , promptly
β i ( t ) ≤ ε i , t∈ [ t 0 , t 1 ] ( 2. 238 )
d2. the national value chain of self-organizing cooperation is planned configuration-system G 4To iPlant the utilization of natural resources DG 4, i ( t) the period of being considered [ t 0, t 1] in must approach nature the iPlant the bearing capacity of resource aspect BN i ( t), promptly
| DG 4, i ( t ) – BN i ( t ) | ≤ η i β i ( t ) ≤ ε i , t∈ [ t 0 , t 1 ]( 2. 239 )
Organize the cooperation action scope concentrated, aspect certain resource, realize balance of nature, national value chain planning configuration-system just should receive following essential condition constraint:
e1. nature is iPlant the bearing capacity of resource aspect BN i ( t) attenuation rate β i ( t) the period of being considered [ t 0, t 1] in must be not more than arbitrarily small number ε i , promptly
β i ( t ) ≤ ε i , t∈ [ t 0 , t 1 ] ( 2. 240 )
e2. concentrate the national value chain planning configuration-system of tissue cooperation G 5To iPlant the utilization of natural resources DG 5, i ( t) the period of being considered [ t 0, t 1] in must approach nature the iPlant the bearing capacity of resource aspect BN i ( t), promptly
| DG 5, i ( t ) – BN i ( t ) | ≤ η i β i ( t ) ≤ ε i , t∈ [ t 0 , t 1 ]( 2. 241 )
(1. 3) all in all, arbitrary national value chain planning configuration-system faces following basic social environmental condition:
In national value chain planning configuration action scope, all activities are to the iThe utilization of kind of resource will receive society the iBut the restriction of the bearing capacity of kind of resource aspect (but but comprising instantaneous bearing capacity and long-term bearing capacity).
The now following several respects of this basic restriction table:
a. in national value chain planning configuration action scope, all activities are to the iPlant the actual utilization of resource z 1 i Receive in the society iKind of resource can the confession amount z * 1 i Restriction, promptly z 1 i z * 1 i
b. in national value chain planning configuration action scope, all activities are to the iPlant the actual converted amount of resource z 2 i Receive society to the iKind of resource can the confession amount z * 2 i Restriction, promptly z 2 i z * 2 i
c. in national value chain planning configuration action scope, all activities are to the iThe reality of planting resource substitutes amount z 3 i Receive in the society iPlant the alternative amount of resource z * 3 i Restriction, promptly z 3 i z * 3 i
d. in national value chain planning configuration action scope, all activities are to the iPlant the actual reproduction amount of resource z 4 i Receive in the society iPlant the reproducible amounts of resource z * 4 i Restriction, promptly z 4 i z * 4 i
National value chain planning configuration-system constitutes the social ecosystem of national value chain planning configuration jointly with social environment on every side.For this type system, we need divide five action scopes to consider social ecological balance condition.
In self-organizing competition action scope, realize the social ecological balance aspect certain resource, national value chain planning configuration-system just should receive following essential condition constraint:
a1. society is the iPlant the bearing capacity of resource aspect BS i ( t) attenuation rate α i ( t) the time period of being considered [ t 0, t 1] in must be not more than arbitrarily small number ε i , promptly
α i ( t ) ≤ ε i , t∈ [ t 0 , t 1 ] ( 2. 242 )
a2. the national value chain of self-organizing competition is planned configuration-system G 1To iPlant the utilization of resource DG 1, i ( t) the time period of being considered [ t 0, t 1] in must approach society the iPlant the bearing capacity of resource aspect BS i ( t), promptly
| DG 1, i ( t ) – BS i ( t ) | ≤ η i α i ( t ) ≤ ε i , t∈ [ t 0 , t 1 ] ( 2. 243 )
Concentrating tissue competition action scope, realize the social ecological balance aspect certain resource, national value chain planning configuration-system just should receive following essential condition constraint:
b1. society is the iPlant the bearing capacity of resource aspect BS i ( t) attenuation rate α i ( t) the time period of being considered [ t 0, t 1] in must be not more than arbitrarily small number ε i , promptly
α i ( t ) ≤ ε i , t∈ [ t 0 , t 1 ] ( 2. 244 )
b2. concentrate the national value chain planning configuration-system of tissue competition G 2To iPlant the utilization of resource DG 2, i ( t) the period of being considered [ t 0, t 1] in must approach society the iPlant the bearing capacity of resource aspect BS i ( t), promptly
| DG 2, i ( t ) – BS i ( t ) | ≤ η i α i ( t ) ≤ ε i , t∈ [ t 0 , t 1 ] ( 2. 245 )
In basic synergy territory, aspect certain resource, realize the social practice balance, national value chain planning configuration-system will receive following essential condition constraint:
c1. society is the iPlanting the resource aspect is bearing capacity BS i ( t) attenuation rate α i ( t) the time period of being considered [ t 0, t 1] in must be not more than arbitrarily small number ε i , promptly
α i ( t ) ≤ ε i , t∈ [ t 0 , t 1 ] ( 2. 246 )
c2. basic collaborative national value chain planning configuration-system G 3To iPlant the utilization of resource DG 3, i ( t) the time period of being considered [ t 0, t 1] in must approach society the iPlant the bearing capacity of resource aspect BS i ( t), promptly
| DG 3, i ( t ) – BS i ( t ) | ≤ η i α i ( t ) ≤ ε i , t∈ [ t 0 , t 1 ] ( 2. 247 )
In self-organizing cooperation action scope, realize the social ecological balance aspect certain resource, national value chain planning configuration-system just should receive following essential condition constraint:
d1. society is the iPlant the bearing capacity of resource aspect BS i ( t) attenuation rate α i ( t) the time period of being considered [ t 0, t 1] in must be not more than arbitrarily small number ε i , promptly
α i ( t ) ≤ ε i , t∈ [ t 0 , t 1 ] ( 2. 248 )
d2. the national value chain of self-organizing cooperation is planned configuration-system G 4To iPlant the utilization of resource DG 4, i ( t) the period of being considered [ t 0, t 1] in must approach society the iPlant the bearing capacity of resource aspect BS i ( t), promptly
| DG 4, i ( t ) – BS i ( t ) | ≤ η i α i ( t ) ≤ ε i , t∈ [ t 0 , t 1 ] ( 2. 249 )
Organize the cooperation action scope concentrated, realize the social ecological balance aspect certain resource, national value chain planning configuration-system just should receive following essential condition constraint:
e1. society is the iPlant the bearing capacity of resource aspect BS i ( t) attenuation rate α i ( t) the time period of being considered [ t 0, t 1] in must be not more than arbitrarily small number ε i , promptly
α i ( t ) ≤ ε i , t∈ [ t 0 , t 1 ] ( 2. 250 )
e2. concentrate the national value chain planning configuration-system of tissue cooperation G 5To iPlant the utilization of resource DG 5, i ( t) the time period of being considered [ t 0, t 1] in must approach society the iPlant the bearing capacity of resource aspect BS i ( t), promptly
| DG 5, i ( t ) – BS i ( t ) | ≤ η i α i ( t ) ≤ ε i , t∈ [ t 0 , t 1 ]( 2. 251 )
(2) for the national value chain; The inventor is on logical foundations, Fundamentals of Mathematics, scientific basic and the brand-new technology basis and the engineering foundation of its foundation; " world " counting system that converges logical all things on earth, connects longitude and latitude for " cloud " counting system that flicker is indefinite is transformed into; Adhere to that with the GVC system be core; With the connection of cognitive system (RS and computer aided system thereof) and practice system (PS and computer aided system thereof) with coordinate main line, set up the know-why of planning configuration surroundings design as high-grade intelligent integrated system (HIIS) evolution process.
(2. 1) whole national value chain planning big system of configuration and exist feedback mechanism widely with the interaction of nature one social environment is shown in Fig. 6.National value chain planning configuration tissue makes decisions according to certain target (or complex); Import certain people, thing, information; Make the mankind between different departments field, carry out harmonious activity (also having feedback mechanism here), the result exports new people, thing, information.This brings huge motive force on the one hand the existence and the development of society, can cause negative effect to natural environment on the other hand.Two feedback informations are arranged respectively here; The one, the social base (bearing capacity) of national value chain planning disposal subject or system compares with the social quality index (desired value) on operation basis; Finding out that deviation that mankind's activity brings is progressively dwindled or the feedback information when widening is given policy-making body, is the feedback factor of national value chain planning layoutprocedure in this social base; On the other hand; The harmful effect that people, thing, the information of output causes to natural environment; Compare with natural quality index (desired value); This information is fed back to decision-making section, and to influence next decision process, environmental aspect is exactly the feedback factor of national value chain planning configuration affects natural environment here.Wherein social base index (desired value) all is that national value chain planning configuration tissue is confirmed according to the overall goal of the coordinated development of each different stages of development with environmental aspect index (desired value).National value chain planning configuration tissue is regulated control according to this target utilization feedback mechanism and is not departed from predeterminated target to keep mankind's activity, keeps human history and stablizes sustained and coordinated development.
For the collaborative type national value chain planning of holography configuration surroundings, we need carry out component analysis and evaluation, and then carry out step analysis and evaluation.
As a kind of system of complicacy, holographic collaborative type national value chain planning configuration surroundings has oneself general nature environment and balance of nature condition and mass society environment and social ecological balance condition thereof.The effect basis of holographic collaborative type national value chain planning configuration surroundings is NVC planning configuration nature bearing capacity and the social bearing capacity of NVC planning configuration.The restriction that holographic synergetic internet operational system should be subjected to NVC planning configuration nature bearing capacity is subjected to the restriction that social bearing capacity is disposed in NVC planning again.See that from the process of reproduction holographic collaborative type national value chain planning configuration surroundings comprises: collaborative subsystem environment, collaborative consumption subsystem environment, coordinated exchange subsystem environment and the collaborative assignment subsystem environment produced.
NVC planning configuration nature bearing capacity and the social bearing capacity of NVC planning configuration constitute constraints to the effect of the Internet operation on the whole.Each item democratic system and each item principle of centrality constitute constraints to the main body of the Internet operation on the whole.To the mankind on the whole, the prime design requirement of internet environment is, impels the operation of the Internet should be tending towards the social the Internet balance of a certain period, is tending towards the ecological the Internet balance of a certain period again; Should constantly keep long-term social the Internet balance, constantly keep long-term ecological the Internet balance again.The design centre of internet environment is for setting up big collaborative the Internet main body reasonable process arrangement, effective policy environment and sound social security to be provided.
(2. 2) inventor inquires on the Internet planning configuration surroundings based on product efficacy structure (EVS [PES]).User based on the product efficacy structure on the Internet plans configuration surroundings, should comprise following several different levels:
On the Intranet based on the planning configuration surroundings of product efficacy structure (EVS [PES])
On the industry the Internet based on the planning configuration surroundings of product efficacy structure (EVS [PES])
On the national the Internet based on the planning configuration surroundings of product efficacy structure (EVS [PES])
On the national value chain based on the planning configuration surroundings of product efficacy structure (EVS [PES])
The inventor inquires on the Internet planning configuration surroundings based on Technological Economy foundation structure (RCS [TKS/EBS]).Based on the planning configuration surroundings of Technological Economy foundation structure, should comprise following several different levels on the Internet:
On the Intranet based on the planning configuration surroundings of Technological Economy foundation structure (RCS [TKS/EBS])
On the industry the Internet based on the planning configuration surroundings of Technological Economy foundation structure (RCS [TKS/EBS])
On the national the Internet based on the planning configuration surroundings of Technological Economy foundation structure (RCS [TKS/EBS])
On the national value chain based on the planning configuration surroundings of Technological Economy foundation structure (RCS [TKS/EBS])
The inventor inquires on the Internet planning configuration surroundings based on internal-external conspiracy relation (SOS [ESS/ISS]).Based on the planning configuration surroundings of internal-external conspiracy relation, should comprise following several different levels on the Internet:
On the Intranet based on the planning configuration surroundings of internal-external conspiracy relation (SOS [ESS/ISS])
On the industry the Internet based on the planning configuration surroundings of internal-external conspiracy relation (SOS [ESS/ISS])
On the national the Internet based on the planning configuration surroundings of internal-external conspiracy relation (SOS [ESS/ISS])
On the national value chain based on the planning configuration surroundings of internal-external conspiracy relation (SOS [ESS/ISS])
General collaborative type national value chain planning configuration surroundings comprises following nine types collaborative configuration-system environment:
(A1) outside concentrating worked in coordination with/the inner national value chain planning configuration-system environment (as the combination of administrative configuration-system environment, budget configuration-system environment, congenial configuration-system environment, the configuration-system environment of deriving etc.) of concentrating collaborative type;
(A2) outside concentrating worked in coordination with/the inner national value chain planning configuration-system environment (as the combination of administrative configuration-system environment, budget configuration-system environment, congenial configuration-system environment, the configuration-system environment of deriving etc.) that disperses collaborative type;
(A3) the national value chain planning configuration-system environment (as the combination of administrative configuration-system environment, budget configuration-system environment, congenial configuration-system environment, the configuration-system environment of deriving etc.) of collaborative/inner collecting and distributing collaborative type is concentrated in the outside;
(A4) outside disperses to work in coordination with/the inner national value chain planning configuration-system environment (as the combination of administrative configuration-system environment, budget configuration-system environment, congenial configuration-system environment, the configuration-system environment of deriving etc.) of working in coordination with type of concentrating;
(A5) outside disperses to work in coordination with/the inner national value chain planning configuration-system environment (as the combination of administrative configuration-system environment, budget configuration-system environment, congenial configuration-system environment, the configuration-system environment of deriving etc.) that disperses to work in coordination with type;
(A6) outside disperses the national value chain planning configuration-system environment (as the combination of administrative configuration-system environment, budget configuration-system environment, congenial configuration-system environment, the configuration-system environment of deriving etc.) of collaborative/inner collecting and distributing collaborative type;
(A7) outside collecting and distributing working in coordination with/inner national value chain planning configuration-system environment (as the combination of administrative configuration-system environment, budget configuration-system environment, congenial configuration-system environment, the configuration-system environment of deriving etc.) of concentrating collaborative type;
(A8) outside collecting and distributing working in coordination with/inner national value chain planning configuration-system environment (as the combination of administrative configuration-system environment, budget configuration-system environment, congenial configuration-system environment, the configuration-system environment of deriving etc.) that disperses collaborative type;
(A9) the national value chain planning configuration-system environment (as the combination of administrative configuration-system environment, budget configuration-system environment, congenial configuration-system environment, the configuration-system environment of deriving etc.) of outside collecting and distributing working in coordination with/inner collecting and distributing collaborative type.
For collaborative type and holographic collaborative type national value chain planning configuration-system, the various factors of integrated environment and condition constitute two basic aspect: NVC planning configuration nature bearing capacities and the social bearing capacity of NVC planning configuration respectively.Here; NVC planning configuration nature bearing capacity is meant that nature is the ability that the operation and development of the Internet provide certain or various resource and condition, and the social bearing capacity of NVC planning configuration is meant the social ability that certain or various resource and condition are provided for the operation and development of the Internet.For the bulking property innovation of the Internet operation, NVC planning configuration nature bearing capacity and the social bearing capacity of NVC planning configuration all are the importances of can not ignore.
According to the synergitic general rationality requirement of holography; We not only should consider, estimate NVC planning configuration nature bearing capacity and the social bearing capacity of NVC planning configuration from individual NVC user or the NVC user's of mechanism scope, and should further consider, estimate NVC planning configuration nature bearing capacity and the social bearing capacity of NVC planning configuration from all NVC users.It is not the simple summation that various countries NVC plans configuration nature bearing capacity that the nature bearing capacity is disposed in whole world NVC planning, and the social bearing capacity of global NVC planning configuration neither be planned the simple summation that disposes social bearing capacity by various countries NVC.In fact, between various countries NVC planning configuration nature bearing capacity, between the social bearing capacity of various countries NVC planning configuration and between various countries NVC planning configuration nature bearing capacity and the social bearing capacity of various countries NVC planning configuration, exist conspiracy relation widely.
(2. 3) are according to the synergitic general rationality requirement of holography; We not only should consider, estimate in the past NVC planning configuration nature bearing capacity and the social bearing capacity of NVC planning configuration; And should consider, estimate NVC planning configuration nature bearing capacity and the social bearing capacity of NVC planning configuration of current period, also should consider, estimate in the future the NVC planning configuration nature bearing capacity of period (or over a long time) and plan with NVC and dispose social bearing capacity.No matter NVC planning configuration nature bearing capacity or the social bearing capacity of NVC planning configuration are not the simple summations of residue bearing capacity, current bearing capacity and potential bearing capacity.Between residue bearing capacity, current bearing capacity and potential bearing capacity, exist conspiracy relation.
(B1) in the multiple inscape of NVC planning configuration nature bearing capacity system, the macrovariable that plays the dominating system effect can be divided into three kinds:
a. the flow of material variable M SE ( t); b. the energy flow variables E SE ( t); c. collaborative variable K SEN ( t).
Based on NVC planning configuration nature bearing capacity notion, " NVC planning configuration nature bearing capacity dynamical equation " as follows:
P SEN ( t ) = P SEN [ M SE ( t ), E SE ( t ), K SEN ( t ) ] = F SEN ( X SE 1 ( t ), X SE 2 ( t ), …, X SE 6 ( t )) ( 2. 15. 8 )
In the formula, P SEN ( t)--- tThe NVC planning configuration nature bearing capacity exponential quantity in period; X SE1 ( t)--- tThe bearing capacity of the ground key element index in period; X SE2 ( t)--- tThe energy bearing capacity key element index in period; X SE3 ( t)--- tThe waters bearing capacity key element index in period; X SE4 ( t)--- tThe Forest carrying capacity key element index in period; X SE5 ( t)--- tThe mineral reserve bearing capacity key element index in period; X SE6 ( t)--- tThe atmosphere bearing capacity key element index in period; F SEN ( X SE1 ( t), X SE2 ( t) ..., X SE6 ( t))---about X SE i ( t) nonlinear function.
(B2) in the multiple inscape of the NVC planning social bearing capacity system of configuration, the macrovariable that plays the dominating system effect can be divided into three kinds:
a. " firmly " variable H SE ( t); b. " soft " variable S SE ( t); c. " working in coordination with " variable K SES ( t).
Based on the social bearing capacity notion of NVC planning configuration, " the social bearing capacity dynamical equation of NVC planning configuration " as follows:
P SES ( t ) = P SES [ H SE ( t ), S SE ( t ), K SES ( t ) ] = F SES ( Y SE 1 ( t ), Y SE 2 ( t ), …, Y SE 6 ( t )) ( 2. 15. 9 )
In the formula, P SES ( t)--- tThe social bearing capacity exponential quantity of NVC planning configuration in period; Y SE1 ( t)--- tThe political bearing capacity key element index in period; Y SE2 ( t)--- tThe cultural bearing capacity key element index in period; Y SE3 ( t)--- tThe science bearing capacity key element index in period; Y SE4 ( t)--- tThe education bearing capacity key element index in period; Y SE5 ( t)--- tThe defence bearing capacity key element index in period; Y SE6 ( t)--- tThe diplomatic bearing capacity key element index in period; F S ( Y SE1 ( t), Y SE2 ( t) ..., Y SE6 ( t))---about Y SE i ( t) nonlinear function.
(B3) NVC planning configuration nature bearing capacity and the social bearing capacity of NVC planning configuration interconnect, work in coordination with each other, form " synthetic environmental carrying capacity ".Synthetic environmental carrying capacity totally can be regarded as and is made up of a large amount of matter essential factor and spiritual key element, social pattern key element and natural form key element.For synthetic environmental carrying capacity, be suitable for the examination method that dynamics and statistics combine.
Formula (2. 15. 8) and (2. 15. 9) are combined, can provide " synthetic environmental carrying capacity dynamical equation " as follows:
P SE ( t ) = P SE [ M SE ( t ), E SE ( t ), K SEN ( t ), H SE ( t ), S SE ( t ), K SES ( t ) ]
= F SE ( X SE 1 ( t ), X SE 2 ( t ), …, X SE 6 ( t ); Y SE 1 ( t ), Y SE 2 ( t ), …, Y SE 6 ( t )) ( 2. 15. 10 )
In the formula, P SE ( t)--- tThe synthetic environmental carrying capacity exponential quantity in period;
F SE ( X SE 1 ( t ), X SE 2 ( t ), …, X SE 6 ( t ); Y SE 1 ( t ), Y SE 2 ( t ), …, Y SE 6 ( t ))
---about X SE i ( t) and Y SE i ( t) nonlinear function.
(2. 4) multimodal planning configuration surroundings of multilayer level
I, the outside resource distribution environment CDE [VC, ECC/ICC] that concentrates cooperation/inside to concentrate the cooperation type
I B1) outside that on same national value chain, forms concentrates cooperation/inside to concentrate cooperation type configuration environment
Figure 2011103355755100002DEST_PATH_IMAGE042
I B2) producing the outside that forms on each stage again at same national value chain concentrates cooperation/inside to concentrate cooperation type configuration environment
Figure 2011103355755100002DEST_PATH_IMAGE044
I B3) producing the outside that forms on each link in each stage again at same national value chain concentrates cooperation/inside to concentrate cooperation type configuration environment
Figure 2011103355755100002DEST_PATH_IMAGE046
.
II, the outside resource distribution environment CDE [VC, ECC/IDC] that concentrates cooperation/inside to disperse the cooperation type
II B1) outside that on same national value chain, forms concentrates cooperation/inside to disperse cooperation type configuration environment
Figure 2011103355755100002DEST_PATH_IMAGE048
II B2) producing the outside that forms on each stage again at same national value chain concentrates cooperation/inside to disperse cooperation type configuration environment
II B3) producing the outside that forms on each link in each stage again at same national value chain concentrates cooperation/inside to disperse cooperation type configuration environment
Figure 2011103355755100002DEST_PATH_IMAGE052
.
III, the outside resource distribution environment CDE [VC, ECC/IMC] that concentrates cooperation/inner collecting and distributing cooperation type
III B1) cooperation/inner collecting and distributing cooperation type configuration environment is concentrated in the outside that on same national value chain, forms
Figure 2011103355755100002DEST_PATH_IMAGE054
III B2) produces the outside that forms on each stage again at same national value chain and concentrate cooperation/inner collecting and distributing cooperation type configuration environment
III B3) produces the outside that forms on each link in each stage again at same national value chain and concentrate cooperation/inner collecting and distributing cooperation type configuration environment
Figure 2011103355755100002DEST_PATH_IMAGE058
.
IV, the outside resource distribution environment CDE [VC, EDC/ICC] that disperses cooperation/inside to concentrate the cooperation type
IV B1) outside that on same national value chain, forms disperses cooperation/inside to concentrate cooperation type configuration environment
Figure 2011103355755100002DEST_PATH_IMAGE060
IV B2) producing the outside that forms on each stage again at same national value chain disperses cooperation/inside to concentrate cooperation type configuration environment
IV B3) producing the outside that forms on each link in each stage again at same national value chain disperses cooperation/inside to concentrate cooperation type configuration environment
Figure 2011103355755100002DEST_PATH_IMAGE064
.
V, the outside resource distribution environment CDE [VC, EDC/IDC] that disperses cooperation/outside to disperse the cooperation type
V B1) outside that on same national value chain, forms disperses cooperation/outside to disperse cooperation type configuration environment
V B2) producing the outside that forms on each stage again at same national value chain disperses cooperation/outside to disperse cooperation type configuration environment
V B3) producing the outside that forms on each link in each stage again at same national value chain disperses cooperation/outside to disperse cooperation type configuration environment
Figure 2011103355755100002DEST_PATH_IMAGE070
.
VI, the outside resource distribution environment CDE [VC, EDC/IMC] that disperses cooperation/inner collecting and distributing cooperation type
VI B1) outside that on same national value chain, forms disperses cooperation/inner collecting and distributing cooperation type configuration environment
VI B2) produces the outside that forms on each stage again at same national value chain and disperse cooperation/inner collecting and distributing cooperation type configuration environment
Figure 2011103355755100002DEST_PATH_IMAGE074
VI B3) produces the outside that forms on each link in each stage again at same national value chain and disperse cooperation/inner collecting and distributing cooperation type configuration environment .
The resource distribution environment CDE [VC, EMC/ICC] of cooperation type is concentrated in VII, outside collecting and distributing cooperation/inside
VII B1) cooperation type configuration environment is concentrated in the outside collecting and distributing cooperation/inside that on same national value chain, forms
Figure 2011103355755100002DEST_PATH_IMAGE078
VII B2) produces the outside collecting and distributing cooperation/inside that forms on each stage again at same national value chain and concentrate cooperation type configuration environment
Figure 2011103355755100002DEST_PATH_IMAGE080
VII B3) produces the outside collecting and distributing cooperation/inside that forms on each link in each stage again at same national value chain and concentrate cooperation type configuration environment
Figure 2011103355755100002DEST_PATH_IMAGE082
.
VIII, outside collecting and distributing cooperation/inside disperse the resource distribution environment CDE [VC, EMC/IDC] of cooperation type
VIII B1) the outside collecting and distributing cooperation that on same national value chain, forms/inside disperses cooperation type configuration environment
Figure 2011103355755100002DEST_PATH_IMAGE084
VIII B2) produces the outside collecting and distributing cooperation/inside that forms on each stage again at same national value chain and disperse cooperation type configuration environment
Figure 2011103355755100002DEST_PATH_IMAGE086
VIII B3) produces the outside collecting and distributing cooperation/inside that forms on each link in each stage again at same national value chain and disperse cooperation type configuration environment
Figure 2011103355755100002DEST_PATH_IMAGE088
.
The resource distribution environment CDE [VC, EMC/IMC] of IX, outside collecting and distributing cooperation/inner collecting and distributing cooperation type
IX B1) the outside collecting and distributing cooperation that on same national value chain, forms/inner collecting and distributing cooperation type configuration environment
Figure 2011103355755100002DEST_PATH_IMAGE090
IX B2) produces the outside collecting and distributing cooperation/inner collecting and distributing cooperation type configuration environment that forms on each stage again at same national value chain
Figure 2011103355755100002DEST_PATH_IMAGE092
IX B3) produces the outside collecting and distributing cooperation/inner collecting and distributing cooperation type configuration environment
Figure 2011103355755100002DEST_PATH_IMAGE094
that forms on each link in each stage again at same national value chain.
(3) for the national value chain; The inventor is on logical foundations, Fundamentals of Mathematics, scientific basic and the brand-new technology basis and the engineering foundation of its foundation; " world " counting system that converges logical all things on earth, connects longitude and latitude for " cloud " counting system that flicker is indefinite is transformed into; Adhere to that with the GVC system be core; Introduce suitable, be used for reflecting respectively general Complex Adaptive Systems basic motive, base load, basic effect, consume basically, the various basic collaborative variablees of inner cooperation and competition and outside cooperation and competition, set up the engineering scheme of planning configuration surroundings.
(3. 1) for environment and planning configuration system, we can consider several so interactional factors: social environment, natural environment, economic equilibrium condition, ecological balance condition, decision structure, message structure, dynamic structure etc.
Environment-institutional structure system mainly reflects environment and the interactional rule of economic structure.From dynamic relationship, planning configuration system is characterized by the intensity of decision-making, the vertical interchange speed of information, the scope and the quantity of distribution.And intensity, the vertical interchange speed of information, the scope of distribution and the influence that quantity receives social environment, the level of economic development and natural environment etc. of decision-making.This system's causality such as Fig. 7.
In environment-institutional structure system, three sub-systems are arranged: environment-decision structure system, environment-message structure system, environment-dynamic structure system.
In environment-decision structure system, planning configuration decisions structure is characterized by the factors such as intensity, economic decision-making ability and economic decision-making scope of economic decision-making.The intensity of economic decision-making depends on the society and politics power center in this economy.The intensity of economic decision-making is high more, and the economic decision-making ability is also high more, and the economic decision-making scope is also big more.Aspect in addition, the economic decision-making ability will be retrained by resources supplIes.Feedback causality such as Fig. 8 of environment one decision structure system.
In environment-message structure system, planning configuration information structure is characterized by the factors such as vertical interchange speed, information processing capability and information transmission scope of information.The vertical interchange speed of economic information depends on the social power center in this economy.Information processing capability is relevant with the interchange speed of information on the one hand, and the aspect is relevant with resource constraint in addition.Information processing capability is high more, and the scope that information is transmitted is also big more.Environment one message structure system feedback causality such as Fig. 9.
In environment-dynamic structure system, planning configuration dynamic structure is characterized by the scope and the quantity of the planning index tightness, distribution capability and the distribution that distribute.Environment-dynamic structure system feedback causality such as Figure 10.
Traditional planning configuration system often receives a kind of serious interference of unsettled administrative environment.Stable administrative environment is meant that the environment of administration system will stablize; Political dispute over a long time between the leader can not take place; Huge change can not appear on principles and policies; More can not form the administrative interest group of opposition each other, the stable continuity that shows as on the administrative economic policy of administrative environment.Relate to national macroeconomic policy and long-term goal imagination, should be fixed up according to the law of country, unlikely change and the variation of leader's will because of certain leader changed.The stable institutionalization that also shows as political target of administrative environment.Can not disturb the carrying out of economic construction because of the needs of politics, can not realize certain political target of leader with upsetting economic way.The stable seriousness that also shows as administrative decree of administrative environment.Can not replace decree with the individual will, even hack and issue decree.Unsettled administrative environment can be to whole administration system generation significant impact.It makes administrative organization become more chaotic on the one hand, makes the administration efficient that becomes lower.On the other hand, can make administration staff's job enthusiasm low again.
(3. 2) joint management internally concern, national value chain planning configuration surroundings can be divided into following 9 seed categories:
The inner planning configuration surroundings of concentrating cooperation type network national value chain to organize URN (on, oc, os, [ICC])
The inner planning configuration surroundings of concentrating competition type network national value chain to organize URN (on, oc, os, [ICK])
Inner coordination type network national value chain is organized the planning configuration surroundings of URN (on, oc, os, [ICH])
The inner planning configuration surroundings that disperses cooperation type network national value chain to organize URN (on, oc, os, [IDC])
The inner planning configuration surroundings that disperses competition type network national value chain to organize URN (on, oc, os, [IDK])
Inner decentralized coordinating type network national value chain is organized the planning configuration surroundings of URN (on, oc, os, [IDH])
Inner collecting and distributing cooperation type network national value chain is organized the planning configuration surroundings of URN (on, oc, os, [IMC])
Inner collecting and distributing competition type network national value chain is organized the planning configuration surroundings of URN (on, oc, os, [IMK])
Inner collecting and distributing coordination type network national value chain is organized the planning configuration surroundings of URN (on, oc, os, [IMH])
Concern that from outside joint management national value chain planning configuration surroundings can be divided into following 9 seed categories:
The outside planning configuration surroundings of concentrating cooperation type network national value chain to organize URN (on, oc, os, [ECC])
The outside planning configuration surroundings of concentrating competition type network national value chain to organize URN (on, oc, os, [ECK])
Outside coordination type network national value chain is organized the planning configuration surroundings of URN (on, oc, os, [ECH])
The outside planning configuration surroundings that disperses cooperation type network national value chain to organize URN (on, oc, os, [EDC])
The outside planning configuration surroundings that disperses competition type network national value chain to organize URN (on, oc, os, [EDK])
Outside decentralized coordinating type network national value chain is organized the planning configuration surroundings of URN (on, oc, os, [EDH])
Outside collecting and distributing cooperation type network national value chain is organized the planning configuration surroundings of URN (on, oc, os, [EMC])
Outside collecting and distributing competition type network national value chain is organized the planning configuration surroundings of URN (on, oc, os, [EMK])
Outside collecting and distributing coordination type network national value chain is organized the planning configuration surroundings of URN (on, oc, os, [EMH])
Joint management concerns from the inside and outside, and national value chain planning configuration surroundings can be divided into following 81 seed categories, and is shown in figure 11:
The outside planning configuration surroundings of concentrating cooperation/inside to concentrate cooperation type network national value chain URN ([ECC/ICC])
The outside planning configuration surroundings of concentrating cooperation/inside to concentrate competition type network national value chain URN ([ECC/ICK])
The outside planning configuration surroundings of concentrating cooperation/inner coordination type network national value chain URN ([ECC/ICH])
The outside planning configuration surroundings of concentrating cooperation/inside to disperse cooperation type network national value chain URN ([ECC/IDC])
The outside planning configuration surroundings of concentrating cooperation/inside to disperse competition type network national value chain URN ([ECC/IDK])
The outside planning configuration surroundings of concentrating cooperation/inner decentralized coordinating type network national value chain URN ([ECC/IDH])
The outside planning configuration surroundings of concentrating cooperation/inner collecting and distributing cooperation type network national value chain URN ([ECC/IMC])
The outside planning configuration surroundings of concentrating cooperation/inner collecting and distributing competition type network national value chain URN ([ECC/IMK])
The outside planning configuration surroundings of concentrating cooperation/inner collecting and distributing coordination type network national value chain URN ([ECC/IMH])
The outside planning configuration surroundings of concentrating competition/inside to concentrate cooperation type network national value chain URN ([ECK/ICC])
The outside planning configuration surroundings of concentrating competition/inside to concentrate competition type network national value chain URN ([ECK/ICK])
The outside planning configuration surroundings of concentrating competition/inner coordination type network national value chain URN ([ECK/ICH])
The outside planning configuration surroundings of concentrating competition/inside to disperse cooperation type network national value chain URN ([ECK/IDC])
The outside planning configuration surroundings of concentrating competition/inside to disperse competition type network national value chain URN ([ECK/IDK])
The outside planning configuration surroundings of concentrating competition/inner decentralized coordinating type network national value chain URN ([ECK/IDH])
The outside planning configuration surroundings of concentrating competition/inner collecting and distributing cooperation type network national value chain URN ([ECK/IMC])
The outside planning configuration surroundings of concentrating competition/inner collecting and distributing competition type network national value chain URN ([ECK/IMK])
The outside planning configuration surroundings of concentrating competition/inner collecting and distributing coordination type network national value chain URN ([ECK/IMH])
The planning configuration surroundings of cooperation type network national value chain URN ([ECH/ICC]) is concentrated in outside coordination/inside
The planning configuration surroundings of competition type network national value chain URN ([ECH/ICK]) is concentrated in outside coordination/inside
The planning configuration surroundings of outside coordination/inner coordination type network national value chain URN ([ECH/ICH])
Outside coordination/inside disperses the planning configuration surroundings of cooperation type network national value chain URN ([ECH/IDC])
Outside coordination/inside disperses the planning configuration surroundings of competition type network national value chain URN ([ECH/IDK])
The planning configuration surroundings of outside coordination/inner decentralized coordinating type network national value chain URN ([ECH/IDH])
The planning configuration surroundings of outside coordination/inner collecting and distributing cooperation type network national value chain URN ([ECH/IMC])
The planning configuration surroundings of outside coordination/inner collecting and distributing competition type network national value chain URN ([ECH/IMK])
The planning configuration surroundings of outside coordination/inner collecting and distributing coordination type network national value chain URN ([ECH/IMH])
The outside planning configuration surroundings that disperses cooperation/inside to concentrate cooperation type network national value chain URN ([EDC/ICC])
The outside planning configuration surroundings that disperses cooperation/inside to concentrate competition type network national value chain URN ([EDC/ICK])
The outside planning configuration surroundings that disperses cooperation/inner coordination type network national value chain URN ([EDC/ICH])
The outside planning configuration surroundings that disperses cooperation/inside to disperse cooperation type network national value chain URN ([EDC/IDC])
The outside planning configuration surroundings that disperses cooperation/inside to disperse competition type network national value chain URN ([EDC/IDK])
The outside planning configuration surroundings that disperses cooperation/inner decentralized coordinating type network national value chain URN ([EDC/IDH])
The outside planning configuration surroundings that disperses cooperation/inner collecting and distributing cooperation type network national value chain URN ([EDC/IMC])
The outside planning configuration surroundings that disperses cooperation/inner collecting and distributing competition type network national value chain URN ([EDC/IMK])
The outside planning configuration surroundings that disperses cooperation/inner collecting and distributing coordination type network national value chain URN ([EDC/IMH])
The outside planning configuration surroundings that disperses competition/inside to concentrate cooperation type network national value chain URN ([EDK/ICC])
The outside planning configuration surroundings that disperses competition/inside to concentrate competition type network national value chain URN ([EDK/ICK])
The outside planning configuration surroundings that disperses competition/inner coordination type network national value chain URN ([EDK/ICH])
The outside planning configuration surroundings that disperses competition/inside to disperse cooperation type network national value chain URN ([EDK/IDC])
The outside planning configuration surroundings that disperses competition/inside to disperse competition type network national value chain URN ([EDK/IDK])
The outside planning configuration surroundings that disperses competition/inner decentralized coordinating type network national value chain URN ([EDK/DH])
The outside planning configuration surroundings that disperses competition/inner collecting and distributing cooperation type network national value chain URN ([EDK/IMC])
The outside planning configuration surroundings that disperses competition/inner collecting and distributing competition type network national value chain URN ([EDK/IMK])
The outside planning configuration surroundings that disperses competition/inner collecting and distributing coordination type network national value chain URN ([EDK/IMH])
The planning configuration surroundings of cooperation type network national value chain URN ([EDH/ICC]) is concentrated in outside decentralized coordinating/inside
The planning configuration surroundings of competition type network national value chain URN ([EDH/ICK]) is concentrated in outside decentralized coordinating/inside
The planning configuration surroundings of outside decentralized coordinating/inner coordination type network national value chain URN ([EDH/ICH])
Outside decentralized coordinating/inside disperses the planning configuration surroundings of cooperation type network national value chain URN ([EDH/IDC])
Outside decentralized coordinating/inside disperses the planning configuration surroundings of competition type network national value chain URN ([EDH/IDK])
The planning configuration surroundings of outside decentralized coordinating/inner decentralized coordinating type network national value chain URN ([EDH/IDH])
The planning configuration surroundings of outside decentralized coordinating/inner collecting and distributing cooperation type network national value chain URN ([EDH/IMC])
The planning configuration surroundings of outside decentralized coordinating/inner collecting and distributing competition type network national value chain URN ([EDH/IMK])
The planning configuration surroundings of outside decentralized coordinating/inner collecting and distributing coordination type network national value chain URN ([EDH/IMH])
The planning configuration surroundings of cooperation type network national value chain URN ([EMC/ICC]) is concentrated in outside collecting and distributing cooperation/inside
The planning configuration surroundings of competition type network national value chain URN ([EMC/ICK]) is concentrated in outside collecting and distributing cooperation/inside
The planning configuration surroundings of outside collecting and distributing cooperation/inner coordination type network national value chain URN ([EMC/ICH])
Outside collecting and distributing cooperation/inside disperses the planning configuration surroundings of cooperation type network national value chain URN ([EMC/IDC])
Outside collecting and distributing cooperation/inside disperses the planning configuration surroundings of competition type network national value chain URN ([EMC/IDK])
The planning configuration surroundings of outside collecting and distributing cooperation/inner decentralized coordinating type network national value chain URN ([EMC/IDH])
The planning configuration surroundings of cooperation type network national value chain URN ([EMC/IMC]) is concentrated in outside collecting and distributing cooperation/inside
The planning configuration surroundings of competition type network national value chain URN ([EMC/IMK]) is concentrated in outside collecting and distributing cooperation/inside
The planning configuration surroundings of outside collecting and distributing cooperation/inner coordination type network national value chain URN ([EMC/IMH])
The planning configuration surroundings of cooperation type network national value chain URN ([EMK/ICC]) is concentrated in outside collecting and distributing competition/inside
The planning configuration surroundings of competition type network national value chain URN ([EMK/ICK]) is concentrated in outside collecting and distributing competition/inside
The planning configuration surroundings of outside collecting and distributing competition/inner coordination type network national value chain URN ([EMK/ICH])
Outside collecting and distributing competition/inside disperses the planning configuration surroundings of cooperation type network national value chain URN ([EMK/IDC])
Outside collecting and distributing competition/inside disperses the planning configuration surroundings of competition type network national value chain URN ([EMK/IDK])
The planning configuration surroundings of outside collecting and distributing competition/inner decentralized coordinating type network national value chain URN ([EMK/IDH])
The planning configuration surroundings of outside collecting and distributing competition/inner collecting and distributing cooperation type network national value chain URN ([EMK/IMC])
The planning configuration surroundings of outside collecting and distributing competition/inner collecting and distributing competition type network national value chain URN ([EMK/IMK])
The planning configuration surroundings of outside collecting and distributing competition/inner collecting and distributing coordination type network national value chain URN ([EMK/IMH])
The planning configuration surroundings of cooperation type network national value chain URN ([EMH/ICC]) is concentrated in outside collecting and distributing coordination/inside
The planning configuration surroundings of competition type network national value chain URN ([EMH/ICK]) is concentrated in outside collecting and distributing coordination/inside
The planning configuration surroundings of outside collecting and distributing coordination/inner coordination type network national value chain URN ([EMH/ICH])
Outside collecting and distributing coordination/inside disperses the planning configuration surroundings of cooperation type network national value chain URN ([EMH/IDC])
Outside collecting and distributing coordination/inside disperses the planning configuration surroundings of competition type network national value chain URN ([EMH/IDK])
The planning configuration surroundings of outside collecting and distributing coordination/inner decentralized coordinating type network national value chain URN ([EMH/IDH])
The planning configuration surroundings of outside collecting and distributing coordination/inner collecting and distributing cooperation type network national value chain URN ([EMH/IMC])
The planning configuration surroundings of outside collecting and distributing coordination/inner collecting and distributing competition type network national value chain URN ([EMH/IMK])
The planning configuration surroundings of outside collecting and distributing coordination/inner collecting and distributing coordination type network national value chain URN ([EMH/IMH])
(3. 3) should be set up rational standard or interpretational criteria for the design of new national value chain planning configuration surroundings.This reasonability should and can only be established from the overall interests of the mankind.Furthermore; Standard design field as new economics; Big collaborative national value chain planning configuration surroundings and with the interconnecting and interacting of internet operational system; Should both adapt with the Individual of Humanity interests, the group interest with the mankind adapts again, also will adapt with all interests of the mankind; Should adapt with the mankind's immediate interests, the future benefit with the mankind adapts again, also will adapt with the mankind's permanent interests.
Influencing the design of national value chain planning configuration surroundings has with the rational principal element of estimating: design and evaluation objective A, design and interpretational criteria (index, model, structure) T, the design with the evaluation colony G, design and evaluation model MAnd design and estimator's preference ηIf design is designated as with the reliability of evaluation system R, then
R = f ( A , T , G , M, η)
To the design and the evaluation of national value chain planning configuration surroundings, should only not regard professional person's thing as, also should there be the representative of various interest groups to participate in.In design and evaluation procedure, design will be brought into play multiple function with evaluation colony, design and evaluation objective as setting; Set up design and evaluation structure; Set up design and assessment indicator system, (qualitatively) design and evaluation index etc. are confirmed in definite design and evaluation index weight.
If rationalize the index composition with reference to ordered series of numbers with the national value chain planning configuration surroundings of estimating with to be designed; National value chain planning configuration surroundings rationalizes the evaluation criterion index and forms relatively ordered series of numbers of quilt; Then available grey relational grade is represented national value chain planning configuration surroundings and degree of closeness at different levels to be designed and evaluation, uses the least squared criterion structure target function of expansion and plans that through asking conditional extremum to set up the national value chain configuration surroundings rationalizes the grey evaluation model.
Be provided with mThe item evaluation index nIndividual national value chain planning configuration surroundings factor is formed with reference to ordered series of numbers:
x j = { x j ( i ) | i = 1, 2,…, m j = 1, 2,…, n } ( 2. 15. 1 )
cLevel national value chain planning configuration surroundings rationalizes evaluation criterion and forms relatively ordered series of numbers of quilt x h = x h ( i) | h=I, II ..., c i=1,2 ..., m,
Note x j With x h iThe absolute difference △ of individual index h ( i)=| x j ( i) x h ( i) |, then x j With x h The iThe degree of closeness of individual index is used grey incidence coefficient ζ( x j , x h ) be expressed as [43]
Figure 2011103355755100002DEST_PATH_IMAGE096
( 2. 15. 4 )
In the formula Be the two-stage lowest difference;
Figure 2011103355755100002DEST_PATH_IMAGE100
Be two-stage maximum difference; ρFor resolution ratio is arranged, span is 0< ρ<1, generally get ρHigher resolution was promptly arranged in=0. 5 o'clock.
If the weight of various evaluation indexes does w i ( i=1,2 ..., m), then there is grey relational grade to do
Figure 2011103355755100002DEST_PATH_IMAGE102
( 2. 15. 5 )
With the least squared criterion in the classical mathematics---square distance and minimum, expand to power square distance and minimum criteria, then rationalize index with national value chain planning configuration surroundings x j With the grade scale index x h Between diversity factor u H j For the Weighted distance of weighing is expressed as
Figure 2011103355755100002DEST_PATH_IMAGE104
( 2. 15. 6 )
To be designed should being divided into the national value chain planning configuration surroundings of estimating makes u H j Minimum rank.Then there is following national value chain planning configuration surroundings to rationalize the grey evaluation model
Figure 2011103355755100002DEST_PATH_IMAGE106
Figure 2011103355755100002DEST_PATH_IMAGE108
( 2. 15. 7 )
4, description of drawings
Fig. 1, Fig. 2 and Fig. 3 explanation:
Order xRepresent state variable, it describes the state of planning configuration-system; a, bRepresent control variables, b, aNatural environment and administrative environment are described respectively.The canonical form of cusp sudden change does v( x)= x 4+ A x 2+ B x, its dynamical equation does
Figure 473695DEST_PATH_IMAGE036
Here vBe damping constant, its value is very little.Under this condition, the transient process of system is very short, along with a, bVariation, xDetermined at once.The state of control variables decision systems. v, bRepresent environment (control).Environment no longer determines state, and it only influences the state variation of planning system.
Fig. 1 be with A, B2 is the phase path of starting point C A , C N v, bVariation can cause the variation of track.
Fig. 2 is C A With vVariation.
Fig. 3 is C A With bVariation.
Scheming us from these can find, can not cause the sudden change between the state though natural environment changes, and can cause two sudden changes between the track.
Fig. 4 explanation:
The model general diagram is shown in Fig. 4.Administrationization economic entity and environmental resource provide mathematical analysis, the required initial data of planning in the model, and appraisement system then provides one group of interpretational criteria of model running.Suppose that the multidimensional criterion value is definite by following process: at first according to policymaker, designer and relevant expert's suggestion, confirm various single criterions, and form a criterion value system according to various rules of combination and come the result of model running is made an appraisal.Collect the data vector of gained X 1With the interpretational criteria vector X 2Send into administration and Economic Analysis Model together, can provide the result of administrationization economic analysis; The administrative vector of this two-part output X 4With structure vector X 5Multidate information about planning configuration all departments is provided again.
Fig. 5 explanation:
All in all, arbitrary national value chain planning configuration-system faces following basic natural environmental condition: we can regard the internal structure of cooperative economy system by these three 3-D solid structures that functional group is formed of economical running, population production and development of resources as.Shown in Fig. 5, three-dimensional value function is rolled into a ball the composition structure respectively has characteristics, and function is had one's own work to do and unified value goal.Here it is, and they carry out power conversion and material circulation through energy stream, flow of material, monetary value flow, form different product to adapt to the requirement of planning index.
Fig. 6 explanation:
The whole national value chain planning big system of configuration and exist feedback mechanism widely with the interaction of nature one social environment is shown in Fig. 6.National value chain planning configuration tissue makes decisions according to certain target (or complex); Import certain people, thing, information; Make the mankind between different departments field, carry out harmonious activity (also having feedback mechanism here), the result exports new people, thing, information.This brings huge motive force on the one hand the existence and the development of society, can cause negative effect to natural environment on the other hand.Two feedback informations are arranged respectively here; The one, the social base (bearing capacity) of national value chain planning disposal subject or system compares with the social quality index (desired value) on operation basis; Finding out that deviation that mankind's activity brings is progressively dwindled or the feedback information when widening is given policy-making body, is the feedback factor of national value chain planning layoutprocedure in this social base; On the other hand; The harmful effect that people, thing, the information of output causes to natural environment; Compare with natural quality index (desired value); This information is fed back to decision-making section, and to influence next decision process, environmental aspect is exactly the feedback factor of national value chain planning configuration affects natural environment here.
Fig. 7, Fig. 8, Fig. 9 and Figure 10 explanation:
Environment-institutional structure system mainly reflects environment and the interactional rule of economic structure.From dynamic relationship, planning configuration system is characterized by the intensity of decision-making, the vertical interchange speed of information, the scope and the quantity of distribution.And intensity, the vertical interchange speed of information, the scope of distribution and the influence that quantity receives social environment, the level of economic development and natural environment etc. of decision-making.This system's causality such as Fig. 7.
In environment-institutional structure system, three sub-systems are arranged: environment-decision structure system, environment-message structure system, environment-dynamic structure system.In environment-decision structure system, planning configuration decisions structure is characterized by the factors such as intensity, economic decision-making ability and economic decision-making scope of economic decision-making.The intensity of economic decision-making depends on the society and politics power center in this economy.The intensity of economic decision-making is high more, and the economic decision-making ability is also high more, and the economic decision-making scope is also big more.Aspect in addition, the economic decision-making ability will be retrained by resources supplIes.Feedback causality such as Fig. 8 of environment one decision structure system.
In environment-message structure system, planning configuration information structure is characterized by the factors such as vertical interchange speed, information processing capability and information transmission scope of information.The vertical interchange speed of economic information depends on the social power center in this economy.Information processing capability is relevant with the interchange speed of information on the one hand, and the aspect is relevant with resource constraint in addition.Information processing capability is high more, and the scope that information is transmitted is also big more.Environment one message structure system feedback causality such as Fig. 9.
In environment-dynamic structure system, planning configuration dynamic structure is characterized by the scope and the quantity of the planning index tightness, distribution capability and the distribution that distribute.Environment-dynamic structure system feedback causality such as Figure 10.
Figure 11 explanation:
Joint management concerns from the inside and outside, and national value chain planning configuration surroundings can be divided into following 81 seed categories, and is shown in figure 11.
5, embodiment
Await developing the PA/NVC system of foundation; Be undoubtedly a kind of advanced person's economic science technical system, a kind of advanced management science and technology system and a kind of advanced person's the system engineering theory and practice, it involves a wide range of knowledge, and throws the National People's Congress; Implementation cycle is long; Difficulty is big, has certain risk, need take scientific methods to guarantee the success of the project implementation.
C 1 national value chain planning configuration project implementary plan
Actual based on national value chain tissue, confirm that whole project divides two stages to carry out:
First stage, mainly implement the inside and outside association of national value chain planning configuration system's control, sell configuration, receivable configuration, logistics arrangement, deal with configuration, stock's configuration, inventory auditing, product data configuration (containing the configuration of national value chain structure, Process configuration), expense budget configuration (containing the expense configuration), monetary items are adjusted, PDM data preparation and demand analysis, hardware net environmental structure, national value chain are planned and disposed.Cycle is about 12 months.Main the integrated of national value chain planning inside and outside related logistics of configuration and cash flow, standard, the transparent configurations accomplished.
Second stage is production master program, material demand planning, power balance, workshop project configuration, quality configuration, equipment metering configuration, human resources configuration, solution analysis, the national value chain planning configuration of the inside and outside association of integrated national value chain planning configuration.Cycle is about 16 months.Main realize the market with the inside and outside association of national value chain planning configuration be demand, with vertically and the master ga(u)ge that laterally drives divides core into, be the holographic concertedness enterprise schema of main contents with the input and output of the inside and outside association of national value chain planning configuration; Be controlled at goods effectively; Compress stock to greatest extent; Improve delivery date, satisfy market demand apace.
The overall goal of C 2 planning configurations
a. to implement national value chain planning configuration project is opportunity, promotes the national value chain by the transformation to the configuration mode of transparent, collaborative, standard, lean of traditional close, poor efficiency, extensive style configuration mode, the realization of support national value chain strategic objective.
b. strengthen national value chain configurations.Set up the national value chain planning inside and outside associated data standard of configuration and the coding scheme of standard, promote national value chain basis to rectify; Strengthen product design, the technical papers standard configurations of the inside and outside association of national value chain planning configuration; Dispose by norm when the raw materials consumption of the inside and outside association of refinement national value chain planning configuration, man-hour, the occupation of capital, table of equipment; National value chain standard campaign of the inside and outside association of standard national value chain planning configuration; Strengthen the customer resources information configuration of the inside and outside association of national value chain planning configuration; The cost of the inside and outside association of refinement national value chain planning configuration and price configuration; Strengthen the delivery flow process and the role norm configuration of the inside and outside association of national value chain planning configuration.
c. improve configuration, decision-making technique.The IRP of the inside and outside association of realization national value chain planning configuration, the data integration and the database overall situation of each subsystem are shared; Set up the national value chain Back ground Information structure of the inside and outside association of national value chain planning configuration, comprise integrated information network and comprehensive mutual form of unified data; The neat cover stock configuration and the analysis of the inside and outside association of national value chain planning configuration; The process consuming cost of the inside and outside association of national value chain planning configuration is adjusted; The inside and outside association of national value chain planning configuration sell risk control and customer resources configuration on credit; Vertically reach the integrated application of the horizontal main system operation planning that drives, material demand planning, order configuration; The real-time cost accounting of the branch product of the inside and outside association of national value chain planning configuration; Fast Quotation; The profit budget and the breakeven analysis of the inside and outside association of national value chain planning configuration; Online multidimensional data analysis is supported decision application.
d. be configured to standard with national value chain planning, the configuration of system improving national value chain is supported the national value chain and is carried out phyletic evolution, and the national value chain that forms transparent, open, collaborative, standard, lean is cultural.
The implementation content of C 3 planning configurations
a. the logistics arrangement of the inside and outside association of national value chain planning configuration.Rely on brand-new information system support; In time transmit the demand of the inside and outside related production system of national value chain planning configuration; And through planning the information integration of disposing inside and outside related logistics system with the national value chain; Rapidly the inside and outside related demand of producing of national value chain planning configuration is made fast reaction, guarantee the Qi Taoxing of the inside and outside related production material of national value chain planning configuration.National value chain planning configuration-system proposes the inside and outside related demand planning of producing of national value chain planning configuration according to system's operation planning; The inside and outside related production system of national value chain planning configuration can propose the inside and outside related logistics arrangement planning of national value chain planning configuration according to the neat cover situation of material planning inquiry raw material and parts; Rely on the inside and outside related information of national value chain planning configuration of national value chain planning configuration-system integrated, set up the perfect inside and outside affiliated supplier's configuration scheme of national value chain planning configuration; With the foundation of information such as delivery date of the inside and outside affiliated supplier of national value chain planning configuration, article quality as supplier evaluation; Arrange the inside and outside affiliated supplier's evaluation result of national value chain planning configuration share distribution, Payments Policy to combine with logistics; Set up the inside and outside related logistics of national value chain planning configuration and arrange the information bank of configurations such as cycle, economic lot size, safety inventory, for ensureing that in time material supplies provide foundation.
b. sale, stock and the production system of the inside and outside association of national value chain planning configuration.System's operation planning is the programmatic document that instructs the inside and outside related activity in production of national value chain planning configuration.For the enforcement of safeguards system operation planning, Feed stream arrangement planning, cooperation part planning, workshop project planning, the equipment that can produce the inside and outside association of national value chain planning configuration simultaneously use a series of supporting planning such as planning, moulds of industrial equipment planning.System's operation planning and these planning are guiding principle and purpose relation, and guiding principle is lifted and could be opened by order.
c. the cost configuration of the inside and outside association of national value chain planning configuration.Production cost to the inside and outside association of national value chain planning configuration is planned, adjusts, is controlled and disposes; Set up the departmental cost budget method of the inside and outside association of national value chain planning configuration; And with thing in cost analysis compare; Make progressively department of budget, accurate, provide the data of usefulness for national value chain organizational decision making.
d. the configuration of dealing with of inside and outside association is disposed in the planning of national value chain.The account payable subsystem of the inside and outside association of national value chain planning configuration mainly disposes the various contact funds that the national value chain takes place with supplier in running; Help national value chain configuration person to grasp the flow direction of fund effectively; Control the outflow of national value chain fund through monitoring the payment situation, form the good circulation of circulating fund.The account payable subsystem of the inside and outside association of national value chain planning configuration is filled in invoice, tax and logistics operational costs usefulness based on logistics arrangement activity, also can directly call the order that logistics arranges subsystem to generate.Invoice amount is shared with the warehouse-in material, can confirm to put in storage material payment situation.Generate the account payable account after invoice is transferred items, payment order and account payable account are settled accounts, and confirm the received payment amount of money and the arrearage amount of money, can handle advance payment simultaneously.In order to grasp following cash flow artificial situation in real time; The system of the inside and outside association of national value chain planning configuration also provides the rich querying statistical function, and arranges subsystem, the integrated use of account subsystem with the inside and outside related logistics of national value chain planning configuration.
e. the receivable configuration of the inside and outside association of national value chain planning configuration.National value chain tissue is through planning the application of configuration-system to the national value chain, data shares the interchange of completion data message on network between the monetary items department of the inside and outside association of realization national value chain planning configuration and sales department; The income design schedule money of the monetary items portion of the inside and outside association of national value chain planning configuration will serve as according to registering with the invoice for sales of sales department; The income design schedule money of the inside and outside association of national value chain planning configuration is by collecting toward vostro account.Gathering, the invoice for sales of the inside and outside association of national value chain planning configuration has according to complying with clear and definite flow process source.The returned money clearing time can be assigned to each account due, make income design schedule age, collect the aging reflection in advance in time, accurately, not only can take in design schedule age, collect aging analysis of accounts in advance, can also carry out the returned money aging analysis of accounts.
6,600 patent of invention common implementing plan brief introductions
Through 30 years freely explore; Independent inventor Li Zongcheng is taught in September, 2011 and formally submits 600 applications for a patent for invention to State Patent Office through the electronic application system, and submits materials such as 600 parts of claims that amount to about 3,600 ten thousand words, specification, accompanying drawing to.
Through 30 years freely explore; Independent inventor Li Zongcheng professor is delivering through international and domestic academic journals and academic conference on more than the 80 piece of paper basis of (not containing the achievement that cooperation is accomplished); Independent recently writing is accomplished eight ones has the academic monumental work (amounting to 3,000 ten thousand words) of substantial connection with these 600 technological inventions declaring, plans in September, 2011 after, to handle successively formally publication matters.
600 technological invention patents that this is declared; Be that inventor Li Zong really explores and a brand new technical cluster that establishes one's own system of foundation through 30 years independence and freedom, its generic name is " GVC network technology support system " [DCN/HII (GVC)].
Based on great initiative academic research achievement and 600 state-of-the-art technology inventions that a series of independence and freedom are accomplished, inventor Li Zong really proposes a strategy that can be referred to as " since the beginning of history " plan---GVC system engineering technology cluster exploitation total strategy.
The total strategy target of GVC network technology support system can be summed up as following content:
1, aspect technological development basic (front end of ICT industrial chain); With the multimodal GVC system of multilayer level (GVC) is core; The connection of carrying out based on computer and network thereof with Natural Intelligence and Artificial Intelligence and coordinate main line as general intelligence integrated system (IIS) Upgrade process; Set up brand-new logical foundations, Fundamentals of Mathematics, scientific basic and brand-new technology basis and engineering foundation; Be that relative closure, static relatively " resource pool "---system for cloud computing injects soul, intelligence and life; Build global intelligent integral network computer system (CS/HSN (GII)), Global Internet is made becomes the technique support system that really has life and ecological holographic joint management.
2, in the application facet (end of ICT industrial chain) of brand new technical; With the multimodal GVC system of multilayer level (GVC) is core; The connection of carrying out based on computer aided system and the Internet with cognitive system and practice system and coordinate main line as high-grade intelligent integrated system (HIIS) evolution process; Foundation is based on the brand-new theoretical intelligent integrated scientific and technical system (IIS & IIT) of metasystem (MS) science; With the novel Global Internet of life-giving vigor be dispersed in all over the world logistics net, energy net, Network and Finance Network and the knowledge knowledge network of each field all departments combine together (DCN); Carry out the GVC system engineering energetically; Set up the global intelligent integral really have life and ecological holographic joint management and dynamically converge open network system (DCN/HII (GVC)), thereby build intelligent integrated net, life the Internet and ecological operation net.
GVC system engineering technology cluster exploitation total strategy---the inventor is referred to as " since the beginning of history " plan through implementing, and " cloud " counting system that flicker is indefinite is transformed into " world " counting system that converges logical all things on earth, connects longitude and latitude.
Revolution is calculated in the world based on cloud computing is changed; System is a core with the multimodal GVC of multilayer level; With modern electronic technology, modern communication technology and present information network technology serves as to support the basis; Logistics network, energy network, information network, banking network and knowledge network are combined closely; Set up efficient, intensive, as to have life (or ecological) the self-organizing character big system of intelligent integrated dynamic remittance open network; Greatly simplify Team Management's (and business administration), division management (and management of industry), district management and national management and whole world management; Effectively reduce team (and enterprise) infrastructure cost, department's (and industry) infrastructure cost, region base facility cost and national basis facility cost and global basis facility cost; Improve team (and enterprise) level of IT application, department's (and industry) level of IT application, area information level and national information level and global IT application level comprehensively; All social tissues and activity thereof are become configuration node and the activity thereof in the global multilayer level multi-mode system effect chain network system; Especially all social economic organizations and activity thereof are become configuration node and the activity thereof in the global multilayer level multi-mode value chain network system, cause more educated, intelligent and networked society, tissue, the individual base attribute that becomes the most at last.

Claims (7)

1. independent claims---the ICT technical support design of national value chain planning configuration surroundings; Be that the applicant is setting up on brand-new logical foundations, Fundamentals of Mathematics, scientific basic and brand-new technology basis and the engineering foundation; " world " counting system that converges logical all things on earth, connects longitude and latitude for " cloud " counting system that flicker is indefinite is transformed into; With Internet user is the center; And then be the center with GVC system (GVC); The connection of carrying out based on computer and network thereof with Natural Intelligence and Artificial Intelligence and coordinate main line as general intelligence integrated system (IIS) Upgrade process, through setting up the new technology that network configuration dynamics basic model and normal form put forward, this right is characterised in that:
A, for the ICT technical support of national value chain planning configuration surroundings, brand-new logical foundations comprises that the holographic logical logic, the two poles of the earth of converging converge that logical logic, the two poles of the earth are holographic converges logical logic; Brand-new Fundamentals of Mathematics comprise holographic logical mathematics, the logical mathematics of the two poles of the earth remittance, the system's transition analyze mathematics of converging; Brand-new scientific basic comprises resource distribution dynamics, holographic coordination, the system behavio(u)r theory of value, game coordination, the equilibrium economics that liquidates, holographic logical physics and the perforation science (interdisciplinary science and cross-section science)---metasystem science and the intelligent integrated science that are formed by the big comprehensive of a series of brand-new theories of converging; The brand-new technology basis is is core with the value chain system, towards the synergitic brand-new systems technology of holography (cluster); Brand-new engineering foundation is is core with the value chain system, towards the synergitic brand-new system engineering of holography (cluster);
B, for the ICT technical support of national value chain planning configuration surroundings; " world " calculating itself is an extremely complicated system; Has very complicated holographic joint management structure; Here; On the one hand, various computers and infrastructure thereof, auxiliary device and the network equipment (comprising server, browser) couple together with holographic joint management pattern (comprising ICC, ICK, ICH, IDC, IDK, IDH, IMC, IMK, IMH, ECC, ECK, ECH, EDC, EDK, EDH, EMC, EMK, EMH) and form the computer interconnected network tissue; On the other hand; Various users and effect chain thereof couple together with holographic joint management pattern (comprising ICC, ICK, ICH, IDC, IDK, IDH, IMC, IMK, IMH, ECC, ECK, ECH, EDC, EDK, EDH, EMC, EMK, EMH) and form natural intelligence socialization tissue, and this natural intelligence socialization tissue and computer interconnected network tissue form " world " counting system CS/HSN (GII) that the inventor censured jointly;
C, for the ICT technical support of national value chain planning configuration surroundings, set up the dynamical foundation of planning configuration surroundings design, and then set up the know-why of planning configuration surroundings design;
D, for the ICT technical support of national value chain planning configuration surroundings; Introduce suitable, be used for reflecting respectively general Complex Adaptive Systems basic motive, base load, basic effect, consume basically, the various basic collaborative variablees of inner cooperation and competition and outside cooperation and competition, set up the engineering concept and the technical scheme of planning configuration surroundings.
2. dependent claims---for the national value chain, set up the overall normal form of planning configuration surroundings design according to the independent claims 1 described inventor, this right is characterised in that:
Because the value chain system can be divided into value of the product chain system PVC, enterprise value chain system EVC, industry value chain system IVC and national economy value chain system NVC and these five levels of global economy value chain system GVC; We can correspondingly be divided into five levels with the various environment in the planning configuration-system, that is:
PVC is the complication system environment CSE of production programming configuration (PA/PVC) again;
EVC is the complication system environment CSE of production programming configuration (PA/EVC) again;
IVC is the complication system environment CSE of production programming configuration (PA/IVC) again;
NVC is the complication system environment CSE of production programming configuration (PA/NVC) again;
GVC is the complication system environment CSE of production programming configuration (PA/GVC) again;
The 1 described inventor regards the national value chain as resource configuration system and process according to independent claims, and sets up network configuration dynamics normal form; Therefore; With the lowermost layer of hierarchical chart as evaluation index; We can be according to the relation between environmental factor and the bearing capacity; Set up judgment matrix, methods such as the maximum characteristic vector method of integrated use sum of squares approach, Saaty, geometric average method, expert's method are determined the relative importance (weight) of this one deck to last layer; Utilize the counting backward technique in the AHP method, can each value of statistical indicant be carried out consistent the standardization, that is: through utilizing formula
Figure 2011103355755100001DEST_PATH_RE-DEST_PATH_IMAGE002
Solve the nondimensionalization problem between the index, and in the matrix after make changing each element value 0 and l between, and its monotonicity is constant.
3. dependent claims---for the national value chain, set up the dynamics restriction condition of planning configuration surroundings according to the independent claims 1 described inventor, this right is characterised in that:
National value chain planning configuration-system constitutes national value chain planning configuration natural ecosystems jointly with natural environment on every side; For this type system, we need divide five action scopes to consider national value chain planning configuration ecological balance condition;
In self-organizing competition action scope, aspect certain resource, realize balance of nature, national value chain planning configuration-system just receives following essential condition constraint:
a1. nature is iPlant the bearing capacity of resource aspect BN i ( t) attenuation rate β i ( t) the time period of being considered [ t 0, t 1] in must be not more than arbitrarily small number ε i , promptly
β i ( t ) ≤ ε i , t∈ [ t 0 , t 1 ] ( 2. 232 )
a2. the national value chain of self-organizing competition is planned configuration-system G 1To iPlant the utilization of natural resources DG 1, i ( t) the time period of being considered [ t 0, t 1] in must approach the bearing capacity of nature aspect i kind resource BN i ( t), promptly
| DG 1, i ( t ) – BN i ( t ) | ≤ η i β i ( t ) ≤ ε i , t∈ [ t 0 , t 1 ] ( 2. 233 )
Concentrating tissue competition action scope, aspect certain resource, realize balance of nature, national value chain planning configuration-system just should receive following essential condition constraint:
b1. nature is iPlant the bearing capacity of resource aspect BN i ( t) attenuation rate β i ( t) the period of being considered [ t 0, t 1] in must be not more than arbitrarily small number ε i , promptly
β i ( t ) ≤ ε i , t∈ [ t 0 , t 1 ] ( 2. 234 )
b2. concentrate the national value chain planning configuration-system of tissue competition G 2To iPlant the utilization of natural resources DG 2, i ( t) the time period of being considered [ t 0, t 1] in must approach the bearing capacity of nature aspect i kind resource BN i ( t), promptly
| DG 2, i ( t ) – BN i ( t ) | ≤ η i β i ( t ) ≤ ε i , t∈ [ t 0 , t 1 ]( 2. 235 )
In basic synergy territory, aspect certain resource, realize balance of nature, national value chain planning configuration-system just should receive following essential condition constraint:
c1. nature is iPlant the bearing capacity of resource aspect BN i ( t) attenuation rate β i ( t) the period of being considered [ t 0, t 1] in must be not more than arbitrarily small number ε i , promptly
β i ( t ) ≤ ε i , t∈ [ t 0 , t 1 ] ( 2. 236 )
c2. basic collaborative national value chain planning configuration-system G 3To iPlant the utilization of natural resources DG 3, i ( t) the time period of being considered [ t 0, t 1] in must approach nature the iPlant the bearing capacity of resource aspect BN i (t), promptly
| DG 3, i ( t ) – BN i ( t ) | ≤ η i β i ( t ) ≤ ε i , t∈ [ t 0 , t 1 ] ( 2. 237 )
In self-organizing cooperation action scope, aspect certain resource, realize balance of nature, national value chain planning configuration-system just should receive following essential condition constraint:
d1. nature is iPlant the bearing capacity of resource aspect BN i ( t) attenuation rate β i ( t) the period of being considered [ t 0, t 1] in must be not more than arbitrarily small number ε i , promptly
β i ( t ) ≤ ε i , t∈ [ t 0 , t 1 ] ( 2. 238 )
d2. the national value chain of self-organizing cooperation is planned configuration-system G 4To iPlant the utilization of natural resources DG 4, i ( t) the period of being considered [ t 0, t 1] in must approach nature the iPlant the bearing capacity of resource aspect BN i ( t), promptly
| DG 4, i ( t ) – BN i ( t ) | ≤ η i β i ( t ) ≤ ε i , t∈ [ t 0 , t 1 ]( 2. 239 )
Organize the cooperation action scope concentrated, aspect certain resource, realize balance of nature, national value chain planning configuration-system just should receive following essential condition constraint:
e1. nature is iPlant the bearing capacity of resource aspect BN i ( t) attenuation rate β i ( t) the period of being considered [ t 0, t 1] in must be not more than arbitrarily small number ε i , promptly
β i ( t ) ≤ ε i , t∈ [ t 0 , t 1 ] ( 2. 240 )
e2. concentrate the national value chain planning configuration-system of tissue cooperation G 5To iPlant the utilization of natural resources DG 5, i ( t) the period of being considered [ t 0, t 1] in must approach nature the iPlant the bearing capacity of resource aspect BN i ( t), promptly
| DG 5, i ( t ) – BN i ( t ) | ≤ η i β i ( t ) ≤ ε i , t∈ [ t 0 , t 1 ]( 2. 241 )
National value chain planning configuration-system constitutes the social ecosystem of national value chain planning configuration jointly with social environment on every side; For this type system, we need divide five action scopes to consider social ecological balance condition;
In self-organizing competition action scope, realize the social ecological balance aspect certain resource, national value chain planning configuration-system just should receive following essential condition constraint:
a1. society is the iPlant the bearing capacity of resource aspect BS i ( t) attenuation rate α i ( t) the time period of being considered [ t 0, t 1] in must be not more than arbitrarily small number ε i , promptly
α i ( t ) ≤ ε i , t∈ [ t 0 , t 1 ] ( 2. 242 )
a2. the national value chain of self-organizing competition is planned configuration-system G 1To iPlant the utilization of resource DG 1, i ( t) the time period of being considered [ t 0, t 1] in must approach society the iPlant the bearing capacity of resource aspect BS i ( t), promptly
| DG 1, i ( t ) – BS i ( t ) | ≤ η i α i ( t ) ≤ ε i , t∈ [ t 0 , t 1 ] ( 2. 243 )
Concentrating tissue competition action scope, realize the social ecological balance aspect certain resource, national value chain planning configuration-system just should receive following essential condition constraint:
b1. society is the iPlant the bearing capacity of resource aspect BS i ( t) attenuation rate α i ( t) the time period of being considered [ t 0, t 1] in must be not more than arbitrarily small number ε i , promptly
α i ( t ) ≤ ε i , t∈ [ t 0 , t 1 ] ( 2. 244 )
b2. concentrate the national value chain planning configuration-system of tissue competition G 2To iPlant the utilization of resource DG 2, i ( t) the period of being considered [ t 0, t 1] in must approach society the iPlant the bearing capacity of resource aspect BS i ( t), promptly
| DG 2, i ( t ) – BS i ( t ) | ≤ η i α i ( t ) ≤ ε i , t∈ [ t 0 , t 1 ] ( 2. 245 )
In basic synergy territory, aspect certain resource, realize the social practice balance, national value chain planning configuration-system will receive following essential condition constraint:
c1. society is the iPlanting the resource aspect is bearing capacity BS i ( t) attenuation rate α i ( t) the time period of being considered [ t 0, t 1] in must be not more than arbitrarily small number ε i , promptly
α i ( t ) ≤ ε i , t∈ [ t 0 , t 1 ] ( 2. 246 )
c2. basic collaborative national value chain planning configuration-system G 3To iPlant the utilization of resource DG 3, i ( t) the time period of being considered [ t 0, t 1] in must approach society the iPlant the bearing capacity of resource aspect BS i ( t), promptly
| DG 3, i ( t ) – BS i ( t ) | ≤ η i α i ( t ) ≤ ε i , t∈ [ t 0 , t 1 ] ( 2. 247 )
In self-organizing cooperation action scope, realize the social ecological balance aspect certain resource, national value chain planning configuration-system just should receive following essential condition constraint:
d1. society is the iPlant the bearing capacity of resource aspect BS i ( t) attenuation rate α i ( t) the time period of being considered [ t 0, t 1] in must be not more than arbitrarily small number ε i , promptly
α i ( t ) ≤ ε i , t∈ [ t 0 , t 1 ] ( 2. 248 )
d2. the national value chain of self-organizing cooperation is planned configuration-system G 4To iPlant the utilization of resource DG 4, i ( t) the period of being considered [ t 0, t 1] in must approach society the iPlant the bearing capacity of resource aspect BS i ( t), promptly
| DG 4, i ( t ) – BS i ( t ) | ≤ η i α i ( t ) ≤ ε i , t∈ [ t 0 , t 1 ] ( 2. 249 )
Organize the cooperation action scope concentrated, realize the social ecological balance aspect certain resource, national value chain planning configuration-system just should receive following essential condition constraint:
e1. society is the iPlant the bearing capacity of resource aspect BS i ( t) attenuation rate α i ( t) the time period of being considered [ t 0, t 1] in must be not more than arbitrarily small number ε i , promptly
α i ( t ) ≤ ε i , t∈ [ t 0 , t 1 ] ( 2. 250 )
e2. concentrate the national value chain planning configuration-system of tissue cooperation G 5To iPlant the utilization of resource DG 5, i ( t) the time period of being considered [ t 0, t 1] in must approach society the iPlant the bearing capacity of resource aspect BS i ( t), promptly
| DG 5, i ( t ) – BS i ( t ) | ≤ η i α i ( t ) ≤ ε i , t∈ [ t 0 , t 1 ]。
4. dependent claims---for the planning configuration of national value chain, according to the feedback mechanism design that the independent claims 1 described inventor sets up the planning configuration surroundings, this right is characterised in that:
Inquire on the Internet planning configuration surroundings according to the independent claims 1 described inventor based on product efficacy structure (EVS [PES]); User based on the product efficacy structure on the Internet plans configuration surroundings, should comprise following several different levels:
On the Intranet based on the planning configuration surroundings of product efficacy structure (EVS [PES])
On the industry the Internet based on the planning configuration surroundings of product efficacy structure (EVS [PES])
On the national the Internet based on the planning configuration surroundings of product efficacy structure (EVS [PES])
On the national value chain based on the planning configuration surroundings of product efficacy structure (EVS [PES])
Inquire on the Internet planning configuration surroundings according to the independent claims 1 described inventor based on Technological Economy foundation structure (RCS [TKS/EBS]); Based on the planning configuration surroundings of Technological Economy foundation structure, should comprise following several different levels on the Internet:
On the Intranet based on the planning configuration surroundings of Technological Economy foundation structure (RCS [TKS/EBS])
On the industry the Internet based on the planning configuration surroundings of Technological Economy foundation structure (RCS [TKS/EBS])
On the national the Internet based on the planning configuration surroundings of Technological Economy foundation structure (RCS [TKS/EBS])
On the national value chain based on the planning configuration surroundings of Technological Economy foundation structure (RCS [TKS/EBS])
Inquire on the Internet planning configuration surroundings according to the independent claims 1 described inventor based on internal-external conspiracy relation (SOS [ESS/ISS]); Based on the planning configuration surroundings of internal-external conspiracy relation, should comprise following several different levels on the Internet:
On the Intranet based on the planning configuration surroundings of internal-external conspiracy relation (SOS [ESS/ISS])
On the industry the Internet based on the planning configuration surroundings of internal-external conspiracy relation (SOS [ESS/ISS])
On the national the Internet based on the planning configuration surroundings of internal-external conspiracy relation (SOS [ESS/ISS])
On the national value chain based on the planning configuration surroundings of internal-external conspiracy relation (SOS [ESS/ISS])
General collaborative type national value chain planning configuration surroundings comprises following nine types collaborative configuration-system environment.
5. dependent claims---for the planning configuration of national value chain, set up planning configuration surroundings bearing capacity dynamical equation system according to the independent claims 1 described inventor, this right is characterised in that:
In the multiple inscape of NVC planning configuration nature bearing capacity system, the macrovariable that plays the dominating system effect can be divided into three kinds:
a. the flow of material variable M SE ( t); b. the energy flow variables E SE ( t); c. collaborative variable K SEN ( t);
Based on NVC planning configuration nature bearing capacity notion, " NVC planning configuration nature bearing capacity dynamical equation " as follows:
P SEN ( t ) = P SEN [ M SE ( t ), E SE ( t ), K SEN ( t ) ] = F SEN ( X SE 1 ( t ), X SE 2 ( t ), …, X SE 6 ( t )) ( 2. 15. 8 )
In the formula, P SEN ( t)--- tThe NVC planning configuration nature bearing capacity exponential quantity in period;
X SE1 ( t)--- tThe bearing capacity of the ground key element index in period;
X SE2 ( t)--- tThe energy bearing capacity key element index in period;
X SE3 ( t)--- tThe waters bearing capacity key element index in period;
X SE4 ( t)--- tThe Forest carrying capacity key element index in period;
X SE5 ( t)--- tThe mineral reserve bearing capacity key element index in period;
X SE6 ( t)--- tThe atmosphere bearing capacity key element index in period;
F SEN ( X SE1 ( t), X SE2 ( t) ..., X SE6 ( t))---about X SE i ( t) nonlinear function;
In the multiple inscape of the NVC planning social bearing capacity system of configuration, the macrovariable that plays the dominating system effect can be divided into three kinds:
a. " firmly " variable H SE ( t); b. " soft " variable S SE ( t); c. " working in coordination with " variable K SES ( t);
Based on the social bearing capacity notion of NVC planning configuration, " the social bearing capacity dynamical equation of NVC planning configuration " as follows:
P SES ( t ) = P SES [ H SE ( t ), S SE ( t ), K SES ( t ) ] = F SES ( Y SE 1 ( t ), Y SE 2 ( t ), …, Y SE 6 ( t )) ( 2. 15. 9 )
In the formula,
P SES ( t)--- tThe social bearing capacity exponential quantity of NVC planning configuration in period; Y SE1 ( t)--- tThe political bearing capacity key element index in period; Y SE2 ( t)--- tThe cultural bearing capacity key element index in period; Y SE3 ( t)--- tThe science bearing capacity key element index in period; Y SE4 ( t)--- tThe education bearing capacity key element index in period; Y SE5 ( t)--- tThe defence bearing capacity key element index in period; Y SE6 ( t)--- tThe diplomatic bearing capacity key element index in period; F S ( Y SE1 ( t), Y SE2 ( t) ..., Y SE6 ( t))---about Y SE i ( t) nonlinear function.
6. dependent claims---for the national value chain, set up the Design Pattern of planning configuration surroundings according to the independent claims 1 described inventor, this right is characterised in that:
Joint management concerns internally, and national value chain planning configuration surroundings can be divided into following 9 seed categories:
The inner planning configuration surroundings of concentrating cooperation type network national value chain to organize URN (on, oc, os, [ICC])
The inner planning configuration surroundings of concentrating competition type network national value chain to organize URN (on, oc, os, [ICK])
Inner coordination type network national value chain is organized the planning configuration surroundings of URN (on, oc, os, [ICH])
The inner planning configuration surroundings that disperses cooperation type network national value chain to organize URN (on, oc, os, [IDC])
The inner planning configuration surroundings that disperses competition type network national value chain to organize URN (on, oc, os, [IDK])
Inner decentralized coordinating type network national value chain is organized the planning configuration surroundings of URN (on, oc, os, [IDH])
Inner collecting and distributing cooperation type network national value chain is organized the planning configuration surroundings of URN (on, oc, os, [IMC])
Inner collecting and distributing competition type network national value chain is organized the planning configuration surroundings of URN (on, oc, os, [IMK])
Inner collecting and distributing coordination type network national value chain is organized the planning configuration surroundings of URN (on, oc, os, [IMH])
Concern that from outside joint management national value chain planning configuration surroundings can be divided into following 9 seed categories:
The outside planning configuration surroundings of concentrating cooperation type network national value chain to organize URN (on, oc, os, [ECC])
The outside planning configuration surroundings of concentrating competition type network national value chain to organize URN (on, oc, os, [ECK])
Outside coordination type network national value chain is organized the planning configuration surroundings of URN (on, oc, os, [ECH])
The outside planning configuration surroundings that disperses cooperation type network national value chain to organize URN (on, oc, os, [EDC])
The outside planning configuration surroundings that disperses competition type network national value chain to organize URN (on, oc, os, [EDK])
Outside decentralized coordinating type network national value chain is organized the planning configuration surroundings of URN (on, oc, os, [EDH])
Outside collecting and distributing cooperation type network national value chain is organized the planning configuration surroundings of URN (on, oc, os, [EMC])
Outside collecting and distributing competition type network national value chain is organized the planning configuration surroundings of URN (on, oc, os, [EMK])
Outside collecting and distributing coordination type network national value chain is organized the planning configuration surroundings of URN (on, oc, os, [EMH]).
7. dependent claims---for the national value chain, set up the evaluation method and the criterion of the design of planning configuration surroundings according to the independent claims 1 described inventor, this right is characterised in that:
Be provided with mThe item evaluation index nIndividual national value chain planning configuration surroundings factor is formed with reference to ordered series of numbers:
x j = { x j ( i ) | i = 1, 2,…, m j = 1, 2,…, n } ( 2. 15. 1 )
cLevel national value chain planning configuration surroundings rationalizes evaluation criterion and forms relatively ordered series of numbers of quilt
x h = { x h ( i ) | h = I, II,…, c i = 1, 2,…, m } ( 2. 15. 2 )
Note x j With x h iThe absolute difference of individual index
h ( i ) = | x j ( i ) x h ( i ) | ( 2. 15. 3 )
Then x j With x h The iThe degree of closeness of individual index is used grey incidence coefficient ζ( x j , x h ) be expressed as [43]
Figure 2011103355755100001DEST_PATH_RE-DEST_PATH_IMAGE004
( 2. 15. 4 )
In the formula Be the two-stage lowest difference;
Figure 2011103355755100001DEST_PATH_RE-DEST_PATH_IMAGE008
Be two-stage maximum difference; ρFor resolution ratio is arranged, span is 0< ρ<1, generally get ρHigher resolution was promptly arranged in=0. 5 o'clock.
CN2011103355755A 2011-10-31 2011-10-31 ICT technical support design for national value chain planning and configuration environment Pending CN102624792A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011103355755A CN102624792A (en) 2011-10-31 2011-10-31 ICT technical support design for national value chain planning and configuration environment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011103355755A CN102624792A (en) 2011-10-31 2011-10-31 ICT technical support design for national value chain planning and configuration environment

Publications (1)

Publication Number Publication Date
CN102624792A true CN102624792A (en) 2012-08-01

Family

ID=46564475

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011103355755A Pending CN102624792A (en) 2011-10-31 2011-10-31 ICT technical support design for national value chain planning and configuration environment

Country Status (1)

Country Link
CN (1) CN102624792A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108764613A (en) * 2018-04-13 2018-11-06 中国地质大学(武汉) A kind of Land Use Transition coupling degree evaluation visualization system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108764613A (en) * 2018-04-13 2018-11-06 中国地质大学(武汉) A kind of Land Use Transition coupling degree evaluation visualization system

Similar Documents

Publication Publication Date Title
CN102624792A (en) ICT technical support design for national value chain planning and configuration environment
CN102624811A (en) ICT technical support design for providing engineering for enterprise value chain network configuration
CN102710707A (en) Information and communication technology (ICT) support design for global value chain planning configuration environment
CN102710690A (en) Information and communication technology (ICT) support design for global value chain market allocation environment
CN102739729A (en) Design on ICT (information communication technology) technical support of industrial value chain market allocation environment
CN102780739A (en) ICT (Information And Communications Technology) technical support design of regional value chain planning configuration environment
CN102780746A (en) Information communication technology (ICT) support design of enterprise value chain market configuration environment
CN102638544A (en) ICT technical support design for national value chain market configuration environment
CN102752348A (en) Information and communication technology (ICT) support design of enterprise value chain planning and configuration environments
CN102710684A (en) Information and communication technology (ICT) support design for regional value chain market allocation environment
CN102811249A (en) Information communication technology (ICT) technical support design of national value chain network configuration environment
CN102761590A (en) ICT (information and communication technology) technical support design for network configuration environment of enterprise value chain
CN102769656A (en) Information and communications technology (ICT) technical support design of network allocation environment of industrial value chain
CN103095789A (en) Information and communications technology (ICT) technical support design of industrial value chain planning configuration environment
CN102624814A (en) Information and communication technology (ICT) support design for market allocation engineering of industrial value chain
CN102655521A (en) Design of ICT (information communication technology) technical support of regional value chain market allocation engineering
CN102624812A (en) ICT technical support design for providing engineering foundation for global value chain market configuration
CN102638515A (en) ICT technical support design for global value chain network configuration project
CN102594854A (en) Integrated circuit technology (ICT) support design for national value chain planning configuration justice system
CN102739746A (en) Information communication technology (ICT)/technical support design of Internet user terminal coordination configuration environment
CN102710693A (en) Information and communication technology (ICT) support design for Internet user terminal market allocation environment
CN102624839A (en) ICT technical support design for providing environment for internet user terminal planning configuration
CN102821131A (en) Information and communication technology (ICT) technical support design of market allocation dynamic foundation of enterprise value chains
CN102638558A (en) Information communication technology (ICT) support design for enterprise value chain market configuration engineering
CN102651766A (en) Information communication technology (ICT) technical supporting design for engineering for planning and configuring value chain of enterprise

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20120801