CN102620614A - 洞库出渣漏斗的施工方法 - Google Patents

洞库出渣漏斗的施工方法 Download PDF

Info

Publication number
CN102620614A
CN102620614A CN2012101149940A CN201210114994A CN102620614A CN 102620614 A CN102620614 A CN 102620614A CN 2012101149940 A CN2012101149940 A CN 2012101149940A CN 201210114994 A CN201210114994 A CN 201210114994A CN 102620614 A CN102620614 A CN 102620614A
Authority
CN
China
Prior art keywords
construction method
hole
funnel
cave depot
tap
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012101149940A
Other languages
English (en)
Other versions
CN102620614B (zh
Inventor
李文华
佘玉明
范德沛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway No 2 Engineering Group Co Ltd
China Railway Erju 6th Engineering Co Ltd
Original Assignee
CHINA RAILWAY ERJU MECHANIZED ROAD BUILDING ENGINEERING Co Ltd
China Railway Erju Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHINA RAILWAY ERJU MECHANIZED ROAD BUILDING ENGINEERING Co Ltd, China Railway Erju Co Ltd filed Critical CHINA RAILWAY ERJU MECHANIZED ROAD BUILDING ENGINEERING Co Ltd
Priority to CN201210114994.0A priority Critical patent/CN102620614B/zh
Publication of CN102620614A publication Critical patent/CN102620614A/zh
Application granted granted Critical
Publication of CN102620614B publication Critical patent/CN102620614B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Drilling And Exploitation, And Mining Machines And Methods (AREA)
  • Earth Drilling (AREA)

Abstract

本发明公开了一种洞库出渣漏斗的施工方法,涉及地下大型洞库工程领域,所述施工方法包括以下步骤:(1)开挖通道;(2)钻机钻孔;(3)炮孔装药和爆破;(4)出渣漏斗出渣。本发明洞库出渣漏斗的施工方法中,采用中深孔一次爆破形成出渣漏斗,施工人员不需要按照传统浅孔爆破循环实施“井下作业”,提高了施工安全性和生产效率,雷管消耗量降低约60%,护壁钢筋混凝土用量减少100%,施工时间降低约96%。

Description

洞库出渣漏斗的施工方法
技术领域
本发明涉及地下大型洞库工程领域,特别涉及洞库出渣漏斗的施工方法。
背景技术
随着国防和民用地下大型洞库的开发利用,越发显示地下洞库的优越性,在军事工程上使用,可大大提高其隐蔽性,出其不意,克敌制胜;在民用工程上使用,可大大节约土地资源,合理规划布局,提高社会文明程度。
目前,地下大型洞库工程开挖仍然是采用传统的小型钻机打眼爆破开挖,先施工上下支洞至罐室位置,采用手风钻打眼爆破,在上支洞开挖“竖井”至下支洞,形成一个上支洞出碴通道。采用传统小型钻机施工出渣漏斗时,是按照开挖竖井模式分若干次爆破→出渣→通风→护壁的循环来实现的,施工人员要进入“井下”从事打眼爆破、出渣、护壁等作业若干次,安全隐患大;并且施工人员进入“井下”从事若干次循环作业,使得工作效率大大降低;施工成本也相应增加。
发明内容
本发明的目的在于克服现有技术中所存在的上述不足,提供一种施工安全性高、施工效率高、施工成本低的洞库出渣漏斗的施工方法。
为了实现上述发明目的,本发明提供了以下技术方案:
一种洞库出渣漏斗的施工方法,所述方法包括以下步骤:
(1)开挖通道:将上支通道挖至洞库顶部,并做好穹顶的初期支护;
将下支通道挖至洞库底部,精确定位洞库下支通道的掌子面所对应的上支通道的位置,并测定上、下支通道间岩层的厚度;
(2)钻机钻孔:确定出渣漏斗中心的平面位置,根据上、下支通道间岩层的厚度,确定钻机钻出炮孔的深度;
首先在所述出渣漏斗中心钻出中空孔,所述中空孔将上支通道和下支通道连通;然后在出渣漏斗所在的平面上钻出由多个掏槽孔构成的第一爆破圈,所述第一爆破圈以中空孔为中心;最后在出渣漏斗所在的平面上钻出由多个周边孔构成的第二爆破圈,所述第二爆破圈以中空孔为中心、直径大于第一爆破圈的直径;
(3)炮孔装药和爆破:在炮孔内装炸药时,先在掏槽孔内装炸药,然后再向周边孔内装炸药;所述炮孔中部用炮泥隔离,所述炮孔顶部用炮泥堵塞;
装药完成后,对炮孔实施微差爆破,形成出渣漏斗;
(4)出渣漏斗出渣:洞库出渣漏斗形成后,洞库内自上而下分层爆破、下支通道出渣循环作业。
挖上支通道时,要保证穹顶中部下方有操作钻机的空间;所述多个掏槽孔在第一爆破圈的圆周上,多个周边孔在第二爆破圈的圆周上;爆破后的石渣通过出渣漏斗堆积到下支通道,然后在下支通道出渣。
优选的,上述洞库出渣漏斗的施工方法中,所述施工方法中的步骤(2)具体为:所述掏槽孔和周边孔的深度比上、下支通道之间的岩石厚度短1~2米。
优选的,上述洞库出渣漏斗的施工方法中,所述施工方法中的步骤(2)具体为:所述炮孔的直径大于或等于75毫米。
优选的,上述洞库出渣漏斗的施工方法中,所述施工方法中的步骤(2)具体为:所述第二爆破圈直径为2~4米。
优选的,上述洞库出渣漏斗的施工方法中,所述施工方法中的步骤(2)具体为:所述掏槽孔和周边孔的总数量为5~10个;
优选的,上述洞库出渣漏斗的施工方法中,所述施工方法中的步骤(2)具体为:所述钻机按照炮孔的设定位置钻垂直孔,炮孔开孔误差在5cm以内,倾斜度误差在1°以内。
优选的,上述洞库出渣漏斗的施工方法中,所述施工方法中的步骤(3)具体为:所述炮孔内的炸药利用孔内延期雷管进行逐一爆破。
优选的,上述洞库出渣漏斗的施工方法中,所述施工方法中的步骤(3)具体为:所述炮孔中部用炮泥隔离的隔离间距为炸药殉爆距离的6~10倍。
优选的,上述洞库出渣漏斗的施工方法中,所述施工方法中的步骤(3)具体为:所述用炮泥隔离的下部掏槽孔同时起爆,下部周边孔延期90~110毫秒后逐一起爆;所述用炮泥隔离的上部掏槽孔在下部掏槽孔起爆后延期40~60毫秒后同时起爆,上部周边孔较上部掏槽孔延期90~110毫秒后逐一起爆。
优选的,上述洞库出渣漏斗的施工方法中,所述施工方法中的步骤(4)具体为:所述出渣漏斗形成后,洞库上支通道利用出渣漏斗作为一个临空面,采取自上而下中深孔台阶爆破方法,开挖至洞库底部。
与现有技术相比,本发明的有益效果
1、本发明洞库出渣漏斗的施工方法中,采用中深孔一次爆破形成出渣漏斗,施工人员不需要实施“井下作业”,提高了施工的安全性。
2、本发明洞库出渣漏斗的施工方法中,只需爆破一次就形成出渣漏斗,避免了传统施工方法中需进入“井下”循环作业,大大提高了施工效率,一个作业小组一天便可完成1个甚至2个出渣漏斗。
3、本发明洞库出渣漏斗的施工方法中,由于只需要一次爆破便形成出渣漏斗,雷管消耗量降低约60%,护壁钢筋混凝土用量减少100%,施工时间降低约96%。
附图说明:
图1为本发明洞库出渣漏斗的施工方法中炮孔布置示意图。
图2为本发明洞库出渣漏斗的施工方法中洞库的纵断面示意图。
图3为本发明洞库出渣漏斗的施工方法中孔眼布置及装药结构示意图。
图4为本发明洞库出渣漏斗的施工方法中洞库的俯视图。
图中标记:1-中空孔,2-掏槽孔,3-周边孔,4-上支通道,5-下支通道,6-穹顶,7-出渣漏斗,8-炮孔。
具体实施方式
下面结合试验例及具体实施方式对本发明作进一步的详细描述。但不应将此理解为本发明上述主题的范围仅限于以下的实施例,凡基于本发明内容所实现的技术均属于本发明的范围。
实施例1
在实施洞库出渣漏斗的施工方法时,在爆破作业过程中必须按照“爆破安全规程”管理、使用爆破器材。
一种洞库出渣漏斗的施工方法,采用如下步骤:
(1)开挖通道:
完成通向洞库的上支通道4、下支通道5,完成洞库穹顶6的初期支护,潜孔钻机进场。精确测出洞库漏斗处上、下支通道间的岩石厚度;
(2)钻机钻孔:
清理穹顶下上支通道场地,按照实际现场,确定出渣漏斗7中心的平面位置,根据上、下支通道岩层的厚度,确定钻机钻孔的深度,该炮孔比上、下支通道之间的岩石厚度短1.5米;所述炮孔的直径为90毫米;所述钻机垂直钻孔,炮孔开孔误差为5cm,倾斜度误差为1°;
首先在所述出渣漏斗中心钻出中空孔1,所述中空孔1将上支通道4和下支通道5连通;然后在出渣漏斗所在的平面上钻出由4个掏槽孔2构成的第一爆破圈,所述第一爆破圈以中空孔为中心;最后在出渣漏斗所在的平面上钻出由4个周边孔3构成的第二爆破圈,所述第二爆破圈以中空孔为中心、直径大于第一爆破圈的直径,所述第二爆破圈直径为3米;
(3)炮孔装药和爆破:
在炮孔内装炸药时,先在掏槽孔内装炸药,然后再向周边孔内装炸药,所述炮孔内的炸药是利用孔内延期雷管进行逐一爆破;所述炮孔中部用炮泥隔离,隔离间距为炸药殉爆距离的10倍,所述炮孔顶部用炮泥堵塞,如图3所示,图中炮孔8内黑色填充部分为炮泥;
装药完成后,对炮孔实施微差爆破,所述用炮泥隔离的下部掏槽孔同时起爆,下部周边孔延期100毫秒后逐一起爆;所述用炮泥隔离的上部掏槽孔在下部掏槽孔起爆后延期50毫秒后同时起爆,上部周边孔较上部掏槽孔延期100毫秒后逐一起爆,形成出渣漏斗;
(4)出渣漏斗出渣:
出渣漏斗爆破实施后,洞库的上支通道与下支通道垂直贯通,爆破石渣全部通过出渣漏斗进入洞库下支通道内。清理洞库上支通道松散石渣全部通过出渣漏斗进入洞库下支通道,洞库上支通道利用出渣漏斗作为一个临空面,采取自上而下中深孔台阶爆破,开挖洞库至底部,洞库下支通道采用小型装渣机械装渣,运输机械将石渣运出洞。形成洞库上部打眼、爆破、清理,洞库下支通道出渣的施工循环,直至完成洞库开挖任务。 

Claims (10)

1.一种洞库出渣漏斗的施工方法,其特征在于,所述施工方法包括以下步骤:
(1)开挖通道:将上支通道挖至洞库顶部,并做好穹顶的初期支护;
将下支通道挖至洞库底部,精确定位洞库下支通道的掌子面所对应的上支通道的位置,并测定上、下支通道间岩层的厚度;
(2)钻机钻孔:确定出渣漏斗中心的平面位置,根据上、下支通道间岩层的厚度,确定钻机钻出炮孔的深度;
首先在所述出渣漏斗中心钻出中空孔,所述中空孔将上支通道和下支通道连通;然后在出渣漏斗所在的平面上钻出由多个掏槽孔构成的第一爆破圈,所述第一爆破圈以中空孔为中心;最后在出渣漏斗所在的平面上钻出由多个周边孔构成的第二爆破圈,所述第二爆破圈以中空孔为中心、直径大于第一爆破圈的直径;
(3)炮孔装药和爆破:在炮孔内装炸药时,先在掏槽孔内装炸药,然后再向周边孔内装炸药;所述炮孔中部用炮泥隔离,所述炮孔顶部用炮泥堵塞;
装药完成后,对炮孔实施微差爆破,形成出渣漏斗;
(4)出渣漏斗出渣:洞库出渣漏斗形成后,洞库内自上而下分层爆破、下支通道出渣循环作业。
2.根据权利要求1所述的洞库出渣漏斗的施工方法,其特征在于,所述施工方法中的步骤(2)具体为:所述掏槽孔和周边孔的深度比上、下支通道之间的岩石厚度短1~2米。
3.根据权利要求2所述的洞库出渣漏斗的施工方法,其特征在于,所述施工方法中的步骤(2)具体为:所述炮孔的直径大于或等于75毫米。
4.根据权利要求3所述的洞库出渣漏斗的施工方法,其特征在于,所述施工方法中的步骤(2)具体为:所述第二爆破圈直径为2~4米。
5.根据权利要求4所述的洞库出渣漏斗的施工方法,其特征在于,所述施工方法中的步骤(2)具体为:所述掏槽孔和周边孔的总数量为5~10个。
6.根据权利要求2至5项中任意一项所述的洞库出渣漏斗的施工方法,其特征在于,所述施工方法中的步骤(2)具体为:所述钻机按照炮孔的设定位置钻垂直孔,炮孔开孔误差在5cm以内,倾斜度误差在1°以内。
7.根据权利要求1所述的洞库出渣漏斗的施工方法,其特征在于,所述施工方法中的步骤(3)具体为:所述炮孔内的炸药利用孔内延期雷管进行逐一爆破。
8.根据权利要求7所述的洞库出渣漏斗的施工方法,其特征在于,所述施工方法中的步骤(3)具体为:所述炮孔中部用炮泥隔离的隔离间距为炸药殉爆距离的6~10倍。
9.根据权利要求8所述的洞库出渣漏斗的施工方法,其特征在于,所述施工方法中的步骤(3)具体为:所述用炮泥隔离的下部掏槽孔同时起爆,下部周边孔延期90~110毫秒后逐一起爆;所述用炮泥隔离的上部掏槽孔在下部掏槽孔起爆后延期40~60毫秒后同时起爆,上部周边孔较上部掏槽孔延期90~110毫秒后逐一起爆。
10.根据权利要求1所述的洞库出渣漏斗的施工方法,其特征在于,所述施工方法中的步骤(4)具体为:所述出渣漏斗形成后,洞库上支通道利用出渣漏斗作为一个临空面,采取自上而下中深孔台阶爆破方法,开挖至洞库底部。
CN201210114994.0A 2012-04-19 2012-04-19 洞库出渣漏斗的施工方法 Active CN102620614B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210114994.0A CN102620614B (zh) 2012-04-19 2012-04-19 洞库出渣漏斗的施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210114994.0A CN102620614B (zh) 2012-04-19 2012-04-19 洞库出渣漏斗的施工方法

Publications (2)

Publication Number Publication Date
CN102620614A true CN102620614A (zh) 2012-08-01
CN102620614B CN102620614B (zh) 2015-08-19

Family

ID=46560690

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210114994.0A Active CN102620614B (zh) 2012-04-19 2012-04-19 洞库出渣漏斗的施工方法

Country Status (1)

Country Link
CN (1) CN102620614B (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103726858A (zh) * 2013-12-28 2014-04-16 中铁三局集团有限公司 地下大型洞库工程球柱组合体开挖方法
CN103982204A (zh) * 2014-05-15 2014-08-13 攀钢集团工程技术有限公司 一种高大硐室的漏斗式施工方法
CN105841563A (zh) * 2016-04-21 2016-08-10 西北矿冶研究院 一种能实现漏斗一次成井和扩漏的中深孔爆破方法
CN107642359A (zh) * 2017-09-26 2018-01-30 中铁隧道集团二处有限公司 地铁车站附属风亭竖井段开挖出渣结构及施工方法
CN110030001A (zh) * 2019-05-30 2019-07-19 广西大学 一种山岭隧道出洞的施工方法

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1212360A (zh) * 1998-09-07 1999-03-31 韦华南 天井深孔法掘进中的爆破法扩孔工艺
CN1434191A (zh) * 2002-01-25 2003-08-06 中国人民解放军工程兵第四十一旅 深井爆破成井施工方法

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1212360A (zh) * 1998-09-07 1999-03-31 韦华南 天井深孔法掘进中的爆破法扩孔工艺
CN1434191A (zh) * 2002-01-25 2003-08-06 中国人民解放军工程兵第四十一旅 深井爆破成井施工方法

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
中国人民建设银行河北省分行编: "《建筑安装工程预算》", 31 August 1984, article "洞库掘进、排渣及施工临时设施", pages: 292 *
李延春等: "超深孔一次爆破成井施工工艺研究", 《爆破》, vol. 29, no. 1, 31 March 2012 (2012-03-31) *
陶颂霖: "一次钻孔分段爆破的深孔爆破技术在井下的应用", 《中南大学学报(自然科学版)》, no. 1, 31 March 1983 (1983-03-31) *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103726858A (zh) * 2013-12-28 2014-04-16 中铁三局集团有限公司 地下大型洞库工程球柱组合体开挖方法
CN103982204A (zh) * 2014-05-15 2014-08-13 攀钢集团工程技术有限公司 一种高大硐室的漏斗式施工方法
CN103982204B (zh) * 2014-05-15 2016-01-06 攀钢集团工程技术有限公司 一种高大硐室的漏斗式施工方法
CN105841563A (zh) * 2016-04-21 2016-08-10 西北矿冶研究院 一种能实现漏斗一次成井和扩漏的中深孔爆破方法
CN107642359A (zh) * 2017-09-26 2018-01-30 中铁隧道集团二处有限公司 地铁车站附属风亭竖井段开挖出渣结构及施工方法
CN110030001A (zh) * 2019-05-30 2019-07-19 广西大学 一种山岭隧道出洞的施工方法
CN110030001B (zh) * 2019-05-30 2020-06-30 广西大学 一种山岭隧道出洞的施工方法

Also Published As

Publication number Publication date
CN102620614B (zh) 2015-08-19

Similar Documents

Publication Publication Date Title
CN103306679B (zh) “︱型”自由面掏槽一次成井工艺
CN101328809B (zh) 无底柱深孔后退式采矿方法
CN107631669B (zh) 一种高地应力条件下的掏槽爆破优化设计方法
CN101338999B (zh) 低渗透砂岩型铀矿床爆破增渗的方法
CN108374661A (zh) 一种中导井一次爆破成井方法
CN103195466A (zh) 一种定向水压爆破提高煤层透气性的方法
CN105674816A (zh) 用于非煤矿山的中深孔爆破一次成井方法
CN103244180B (zh) 一种留小煤柱沿空掘巷围岩控制方法
CN102620614B (zh) 洞库出渣漏斗的施工方法
CN104296609B (zh) 深孔梯段爆破中含不同坚硬程度岩层的控制爆破方法
CN103528444B (zh) 一种采场岩爆卸压防治方法
CN101266123B (zh) 一种破碎站基坑掘凿方法
CN102758633A (zh) 一种围岩情况较好的大断面隧道的施工方法
CN104913696A (zh) 边坡开挖光面爆破法施工方法
CN205537381U (zh) 非煤矿山中深孔爆破一次成井的炮孔布置结构
CN104613831A (zh) 一种在竖井周边眼外围增设周边辅助眼的施工方法
CN102494572A (zh) 四周空孔中心实孔掏槽掘进爆破方法
CN102817633B (zh) 深孔裂隙控制爆破的抽放瓦斯的装置及预裂方法
CN108362179A (zh) 一种星形节能掏槽方法
CN103726858A (zh) 地下大型洞库工程球柱组合体开挖方法
CN106121652A (zh) 一种闭坑露天矿山矿石回采方法
CN102305580A (zh) 一种应用数码雷管实现全断面光面爆破施工方法
CN110307762A (zh) 一种基于深孔逐孔起爆技术的天井快速成井方法
CN110260735A (zh) 一种菱形大直径空孔直眼掏槽结构及平巷施工工艺
CN110173238A (zh) 厚煤层立体化巷道布置网络化爆破增透抽采全厚瓦斯方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20160104

Address after: Jinniu District Kam Tong Road Chengdu city Sichuan province 610031 No. 16

Patentee after: CHINA RAILWAY NO.2 BUREAU ENGINEERING Co.,Ltd.

Address before: 610041, No. nine, No. 156, building B, high building, Xing Xing Road, Chengdu hi tech Zone, Sichuan

Patentee before: CHINA RAILWAY ERJU Co.,Ltd.

Patentee before: CHINA RAILWAY ERJU MECHANIZED ROAD BUILDING ENGINEERING Co.,Ltd.

CP01 Change in the name or title of a patent holder

Address after: No. 16, Jinniu District Road, Jinniu District Road, Chengdu, Sichuan

Patentee after: CHINA RAILWAY NO.2 ENGINEERING GROUP Co.,Ltd.

Address before: No. 16, Jinniu District Road, Jinniu District Road, Chengdu, Sichuan

Patentee before: CHINA RAILWAY NO.2 BUREAU ENGINEERING Co.,Ltd.

CP01 Change in the name or title of a patent holder
TR01 Transfer of patent right

Effective date of registration: 20190125

Address after: No. 16, Jinniu District Road, Jinniu District Road, Chengdu, Sichuan

Co-patentee after: CHINA RAILWAY ERJU 6TH ENGINEERING CO.,LTD.

Patentee after: CHINA RAILWAY NO.2 ENGINEERING GROUP Co.,Ltd.

Address before: No. 16, Jinniu District Road, Jinniu District Road, Chengdu, Sichuan

Patentee before: CHINA RAILWAY NO.2 ENGINEERING GROUP Co.,Ltd.

TR01 Transfer of patent right