CN102619557B - Inclined shaft operation car system and operation car method thereof - Google Patents

Inclined shaft operation car system and operation car method thereof Download PDF

Info

Publication number
CN102619557B
CN102619557B CN201210067785.5A CN201210067785A CN102619557B CN 102619557 B CN102619557 B CN 102619557B CN 201210067785 A CN201210067785 A CN 201210067785A CN 102619557 B CN102619557 B CN 102619557B
Authority
CN
China
Prior art keywords
car
track
points
car arrester
arrester
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201210067785.5A
Other languages
Chinese (zh)
Other versions
CN102619557A (en
Inventor
汪邦正
邹舰
翁刘基
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
YANGZHOU KAISITE MACHINERY CO Ltd
Original Assignee
YANGZHOU KAISITE MACHINERY CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by YANGZHOU KAISITE MACHINERY CO Ltd filed Critical YANGZHOU KAISITE MACHINERY CO Ltd
Priority to CN201210067785.5A priority Critical patent/CN102619557B/en
Publication of CN102619557A publication Critical patent/CN102619557A/en
Application granted granted Critical
Publication of CN102619557B publication Critical patent/CN102619557B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Electric Propulsion And Braking For Vehicles (AREA)
  • Train Traffic Observation, Control, And Security (AREA)

Abstract

The invention discloses an inclined shaft operation car system and an operation car method thereof. Two double turnouts of the inclined shaft operation car system are provided with a first shunter and a second shunter respectively; a first track between the first shunter and a grade change point is provided with a first stopper; a second track between the first shunter and the grade change point is provided with a second stopper; a loaded car track is provided with a third stopper and a loaded car track pusher; and an empty car track is provided with a stopper and a car supplementing device. The inclined shaft operation car system has a simple structure and is rational in design; and the original turnouts are substituted by adopting a rotary track, so that an operation car can smoothly pass, and meanwhile, mine cars are effectively organized by using the stoppers to keep the orderliness of the system. The operation car method of the operation car system has the advantages of simplicity, convenience, high automation degree, reduced labor, capabilities of effectively avoiding the personal casualty, reducing the cost and producing excellent economic benefit and social benefit and excellent practicability.

Description

A kind of inclined shaft behaviour's truck system and behaviour's car method thereof
Technical field
The present invention relates to mine production system, be specifically related to a kind of inclined shaft behaviour's truck system and behaviour's car method thereof.
Background technology
In mine production system, inclined shaft behaviour truck system is ubiquitous, due to condition restriction such as geological conditions, roadway opening costs, the process route layout that in inclined shaft double-hook hoisting system, Fig. 1 generally presses in bracket at present, two station tracks in pit shaft are combined into a station track through knick point by one group of bilateral turnout, and then by one group of bilateral turnout, one station track is divided into two station tracks, wherein one is empty wagons line, another thigh fare of attaching most importance to.Its main operating process is as follows:
(1) empty wagons line
Empties X on circuit 1:JK orbital segment empty wagons line passes through manually or winch traction at a slow speed, arrives FD rail section after KF orbital segment, first links up with in groups at FD orbital segment, then through turnout passing DC orbital segment with through CA orbital segment well-sinking W.
Empties X on circuit 2:JK orbital segment empty wagons line passes through manually or winch traction at a slow speed, arrives FD orbital segment after KF orbital segment, first links up with in groups at FD orbital segment, then through turnout passing DP orbital segment with through PS orbital segment well-sinking W.
(2) loaded vehicle line
Circuit 1: the heavy mine car T of upper well, by the bilateral turnout of AC orbital segment and CD orbital segment, enters DF orbital segment, carries out decoupling device, is delivered to GH loaded vehicle line by heavy mine car T by the bilateral turnout of FG orbital segment by artificial winch at a slow speed after decoupling device.
Circuit 2: the heavy mine car T of upper well, by the bilateral turnout of SR orbital segment and PD orbital segment, enters DF orbital segment, carries out decoupling device, is delivered to GH loaded vehicle line by heavy mine car T by the bilateral turnout of FG orbital segment by artificial winch at a slow speed after decoupling device.
Arrange and operating process for above-mentioned process route, the problem that parking exists at present comprises: (1) empties is gone into the well and adopted winch trailer carriage at a slow speed to pull a cart forward, after knick point, by manually plucking rope mode, the personnel that easily cause are strayed into pit shaft, the winch cable accident such as hurt sb.'s feelings at a slow speed; The heavy mine car of upper well adopts winch trailer carriage at a slow speed to pull a cart forward to enter loaded vehicle line; Or empties is gone into the well, heavy mine car enters loaded vehicle and adopts artificial go-cart mode, inefficiency, it is many that labor strength is large, personnel compile duty, and potential safety hazard is high; (2) mechanization, automaticity are low, and on circuit, winch cable, steel wire rope of hoist mix at a slow speed, easily occur security incident; (3) pluck, link up with two ends and adopt track switch connection, the behaviour's vehicle device existing in the market cannot pass through conventional track switch, and parking lot equipment is difficult to realize mechanization, automation.
Summary of the invention
Goal of the invention: for the deficiencies in the prior art, the object of this invention is to provide a kind of inclined shaft behaviour truck system, with by process route is arranged and reasonably innovated, machine is passed through smoothly in order, the safety that improves conevying efficiency and operation, reduces production costs.Another object of the present invention is to provide a kind of behaviour's car method of above-mentioned inclined shaft behaviour truck system.
Technical scheme: in order to realize foregoing invention object, the technical solution used in the present invention is as follows:
Scheme 1: a kind of inclined shaft behaviour truck system, comprise that two strands of tracks that prolong are combined into one track through knick point by one group of bilateral turnout from pit shaft, and then by another group bilateral turnout, one track is divided into two strands of tracks, wherein one be empty wagons track, another Car Track of strand attaching most importance to; Be provided with points at described bilateral turnout place; On each track in two points outsides, be equipped with car arrester; Be provided with loaded vehicle track hand cart machine at described loaded vehicle track; On described empty wagons track, be provided with and mend car device.
When the first described points and the second points while or difference, it is translation points.
Described points is original place rotation points; Described original place rotation points comprises the framework that is fixedly located at rail fork, is provided with axle in framework, is provided with rotary disk on axle, is provided with turnout rail on rotary disk, is connected with location-plate on axle; Described axle is realized the original place of turnout rail and is rotated under the driving of driving mechanism.On described framework, be provided with the fixed track for being connected with turnout rail.
Behaviour's car method of above-mentioned inclined shaft behaviour truck system, comprises empty wagons behaviour's car method and loaded vehicle behaviour car method;
Described empty wagons behaviour car method is: inclined shaft behaviour car car puller pushes through the empties of going into the well between the 5th car arrester and the 4th car arrester the 4th car arrester, the second points and the first points opened, then mine car is stopped at before the second car arrester, hook in groups,, meeting and going into the well after requirement, the second car arrester is opened, and inclined shaft behaviour car car puller slides into pit shaft after empties is pushed through to knick point certainly; Then the second car arrester, the 4th car arrester are closed, and the 5th car arrester is opened, and empty wagons line is mended car device and mend car between the 5th car arrester and the 4th car arrester, mend car and finish, and the 5th car arrester cuts out;
Or,
Inclined shaft behaviour car car puller pushes through the empties of going into the well between the 5th car arrester and the 4th car arrester the 4th car arrester, the second points and the first points opened, then mine car is stopped at before the first car arrester, hook in groups,, meeting and going into the well after requirement, the first car arrester is opened, and inclined shaft behaviour car car puller slides into pit shaft after empties is pushed through to knick point certainly; Then the first car arrester, the 4th car arrester are closed, and the 5th car arrester is opened, and empty wagons line is mended car device and mend car between the 5th car arrester and the 4th car arrester, mend car and finish, and the 5th car arrester cuts out;
Described loaded vehicle behaviour car method is: the heavy mine car that well comes from pit shaft is by the second car arrester, the first points, mine car slows down and stops at monorail, decoupling device, heavy mine car is pulled through the second points and the 3rd car arrester by loaded vehicle track hand cart machine, is stopped on loaded vehicle track;
Or,
The heavy mine car that well comes from pit shaft is by the first car arrester, the first points, and mine car slows down and stops at monorail, decoupling device, and heavy mine car is pulled through the second points and the 3rd car arrester by loaded vehicle track hand cart machine, is stopped on loaded vehicle track.
Scheme 2:
A kind of inclined shaft car puller system, comprise that two strands of tracks that prolong are combined into one track through a knick point by the first bilateral turnout from pit shaft, and then by the second bilateral turnout, one track is divided into two strands of tracks, wherein one is empty wagons track, another thigh Car Track of attaching most importance to has secondary knick point between two bilateral turnouts; Establish the second points at the second described bilateral turnout place; On the track of the second points both sides, be equipped with car arrester; Be provided with loaded vehicle track hand cart machine at described loaded vehicle track; Be provided with and mend car device at described empty wagons track.
Described points is translation points.
Described points is original place rotation points; Described original place rotation points comprises the framework that is fixedly located at rail fork, is provided with axle in framework, is provided with rotary disk on axle, is provided with turnout rail on rotary disk, is connected with location-plate on axle; Described axle is realized the original place of turnout rail and is rotated under the driving of driving mechanism.On described framework, be provided with the fixed track for being connected with turnout rail.
The go-cart method of above-mentioned inclined shaft car puller system, comprises empty wagons go-cart method and loaded vehicle go-cart method;
Described empty wagons go-cart method is: inclined shaft car puller pushes through the empties of going into the well between the 5th car arrester and the 4th car arrester the 4th car arrester, the points opened, stop on the track of the 6th car arrester front end, hook in groups,, meeting and going into the well after requirement, the 6th car arrester is opened, and inclined shaft car puller slides into pit shaft certainly along the first track or the second track after empties is pushed through to the second knick point; Then the 6th car arrester, the 4th car arrester are closed, and the 5th car arrester is opened, and empty wagons line is mended car device and mend car between the 5th car arrester and the 4th car arrester, mend car and finish, and the 5th car arrester cuts out;
Described loaded vehicle go-cart method is: the heavy mine car that well comes from pit shaft is by the first bilateral turnout, the 6th car arrester, mine car slows down and stops at track, decoupling device, heavy mine car is pulled through the second points and the 3rd car arrester by loaded vehicle track hand cart machine, is stopped on loaded vehicle track.
Beneficial effect: inclined shaft behaviour truck system of the present invention, simple in structure, reasonable in design, adopt rotation rail to replace original track switch, making to grasp car can pass through smoothly, adopts car arrester effectively to organize car simultaneously, makes this system in perfect order.Behaviour's car method of behaviour's truck system, simple and convenient, automaticity is high, reduces labour, can effectively avoid casualties, reduces costs, and has good practicality, can produce good economic benefit and social effect.
Brief description of the drawings
Fig. 1 is the structural representation of existing inclined shaft behaviour truck system;
Fig. 2 is the structural representation of the present invention program's 1 inclined shaft behaviour truck system;
The structural representation of Fig. 3 the present invention program 2 inclined shaft behaviour truck systems;
Fig. 4 is the structural representation of original place rotation points;
Fig. 5 is the working state schematic representation of original place rotation points;
Fig. 6 is the structural representation of translation points;
Fig. 7 is the working state schematic representation of translation points.
Detailed description of the invention
Below in conjunction with concrete accompanying drawing, the present invention is described further.
The inclined shaft behaviour truck system of the present invention's innovation, total two schemes, specific as follows:
Scheme 1, as shown in Figure 2, inclined shaft behaviour truck system, comprise that two strands of tracks that prolong are combined into one track through knick point 6 by one group of bilateral turnout from pit shaft, and then by another group bilateral turnout, one track is divided into two strands of tracks, wherein one be empty wagons track 8, another Car Track 7 of strand attaching most importance to.Establish respectively the first points 4 and the second points 5 at two bilateral turnout places; On the first track 1 between described the first points 4 and knick point 6, be provided with the first car arrester 9; On the second track 2 between the first points 4 and knick point 6, be provided with the second car arrester 10; On loaded vehicle track 7, be provided with the 3rd car arrester 11 and loaded vehicle track hand cart machine 15; On empty wagons track 8, be provided with the 4th car arrester 12 and the 5th car arrester 13, between the 4th car arrester 12 and the 5th car arrester 13, be provided with inclined shaft behaviour car car puller 14.Wherein, the 5th car arrester 13 is optional car arrester, and the 4th car arrester 12 is must car arrester.
Behaviour's car method of inclined shaft behaviour truck system, comprises empty wagons behaviour's car method and loaded vehicle behaviour car method.
Empty wagons behaviour car method comprises circuit 1 and circuit 2.
Circuit 1: inclined shaft behaviour car car puller 14 pushes through the empties of going into the well between the 5th car arrester 13 and the 4th car arrester 12 the 4th car arrester 12, the second points 5 and the first points 4 opened, then mine car is stopped at before the second car arrester 10, hook in groups,, meeting and going into the well after requirement, the second car arrester 10 is opened, and inclined shaft behaviour car car puller 14 slides into pit shaft after empties is pushed through to knick point 6 certainly; Then the second car arrester 10, the 4th car arrester 12 are closed, and the 5th car arrester 13 is opened, and empty wagons line is mended car device and mend car between the 5th car arrester 13 and the 4th car arrester 12, mend car and finish, and the 5th car arrester 13 cuts out.Wherein, the 5th car arrester 13 is optional car arrester, and the 4th car arrester 12 is must car arrester.
Circuit 2: inclined shaft behaviour car car puller 14 pushes through the empties of going into the well between the 5th car arrester 13 and the 4th car arrester 12 the 4th car arrester 12, the second points 5 and the first points 4 opened, then mine car is stopped at before the first car arrester 9, hook in groups,, meeting and going into the well after requirement, the first car arrester 9 is opened, and inclined shaft behaviour car car puller 14 slides into pit shaft after empties is pushed through to knick point 6 certainly; Then the first car arrester 9, the 4th car arrester 12 are closed, and the 5th car arrester 13 is opened, and empty wagons line is mended car device and mend car between the 5th car arrester 13 and the 4th car arrester 12, mend car and finish, and the 5th car arrester 13 cuts out.Wherein, the 5th car arrester 13 is optional car arrester, and the 4th car arrester 12 is must car arrester.
Loaded vehicle behaviour car method comprises circuit 1 and circuit 2.
Circuit 1: the heavy mine car that well comes from pit shaft is by the second car arrester 10, the first points 14, and mine car slows down and stops at monorail 13, decoupling device, heavy mine car is pulled through the second points 5 and the 3rd car arrester 11 by loaded vehicle track hand cart machine 15, is stopped on loaded vehicle track 7.
Circuit 2: the heavy mine car that well comes from pit shaft is by the first car arrester 9, the first points 4, and mine car slows down and stops at monorail 3, decoupling device, heavy mine car is pulled through the second points 5 and the 3rd car arrester 11 by loaded vehicle track hand cart machine 15, is stopped on loaded vehicle track 7.
Scheme 2: as shown in Figure 3, inclined shaft car puller system comprises that two strands of tracks that prolong from pit shaft are combined into one track through a knick point 6 by the first bilateral turnout 18, and then by the second bilateral turnout, one track is divided into two strands of tracks, wherein one is empty wagons track 8, another thigh Car Track 7 of attaching most importance to has secondary knick point 16 between two bilateral turnouts.Establish the second points 5 at the second bilateral turnout place; On the track 3 between the second points 5 and secondary knick point 10, be provided with the 6th car arrester 17; Be provided with the 3rd car arrester 11 and loaded vehicle track hand cart machine 15 at loaded vehicle track 7; Be provided with the 4th car arrester 12 and the 5th car arrester 13 at empty wagons track 8, between the 4th car arrester 12 and the 5th car arrester 13, be provided with inclined shaft car puller 14.Wherein, the 5th car arrester 13 is optional car arrester, and the 4th car arrester 12 is must car arrester.
The go-cart method of inclined shaft car puller system, comprises empty wagons go-cart method and loaded vehicle go-cart method.
Empty wagons go-cart method is: inclined shaft car puller 14 pushes through the empties of going into the well between the 5th car arrester 13 and the 4th car arrester 12 the 4th car arrester 12, the second points 5 opened, stop on the track 3 of the 6th car arrester 17 front ends, hook in groups,, meeting and going into the well after requirement, the 6th car arrester 17 is opened, inclined shaft car puller 14 by empties push through the second knick point 10 rear along the first track 1 or the second track 2 from sliding into pit shaft; Then the 6th car arrester 17, the 4th car arrester 12 are closed, and the 5th car arrester 13 is opened, and empty wagons line is mended car device and mend car between the 5th car arrester 13 and the 4th car arrester 12, mend car and finish, and the 5th car arrester 13 cuts out.Wherein, the 5th car arrester 13 is optional car arrester, and the 4th car arrester 12 is must car arrester.
Loaded vehicle go-cart method is: the heavy mine car that well comes from pit shaft is by the first bilateral turnout 18, the 6th car arrester 17, mine car slows down and stops at track 3, decoupling device, heavy mine car is pulled through the second points 5 and the 3rd car arrester 11 by loaded vehicle track hand cart machine 15, is stopped on loaded vehicle track 7.
No matter be scheme 1 or scheme 2, mentioned points can be all translation points or original place rotation points.As shown in Figure 5, core texture is on support 20, to be provided with two tracks 21 arranged side by side to the structure of translation points, and support carries out translation under driving mechanism, as shown in Figure 6, just can realize the switching between track.As shown in Figure 3, original place rotation points comprises the framework 16 that is fixedly located at rail fork, is provided with axle 22 in framework 16, is provided with rotary disk 20 on axle 22, is provided with turnout rail 21 on rotary disk 20, is connected with location-plate 19 on axle 22; Axle 22 is realized the original place of turnout rail 21 and is rotated under the driving of driving mechanism 18.Driving mechanism 18 is oil cylinder or cylinder, and connected mode can be the conventional connection in mechanical field.Location-plate 19 can be conventional elasticity location-plate, positions as relative fixture using installation base station or the framework 16 of axle 22.In the time of work, as shown in Figure 4, under the driving of oil cylinder or cylinder, rotary disk 20 carries out original place rotation taking axle 22 as the center of circle, realizes the both sides of bilateral turnout and replaces arbitrarily.
Inclined shaft behaviour truck system of the present invention, simple in structure, reasonable in design, adopt rotation rail to replace original track switch, making to grasp car can pass through smoothly, adopts car arrester effectively to organize car simultaneously, makes this system in perfect order.Behaviour's car method of behaviour's truck system, simple and convenient, automaticity is high, reduces labour, can effectively avoid casualties, reduces costs, and has good practicality, can produce good economic benefit and social effect.

Claims (3)

1. an inclined shaft behaviour truck system, comprise that two strands of tracks that prolong are combined into one track through knick point (6) by one group of bilateral turnout from pit shaft, and then by another group bilateral turnout, one track is divided into two strands of tracks, be divided into one in two strands of tracks for empty wagons track (8), another thigh Car Track (7) of attaching most importance to; It is characterized in that: be provided with loaded vehicle track hand cart machine (15) at described loaded vehicle track (7); Establish respectively the first points (4) and the second points (5) at two bilateral turnout places; On the first track (1) between described the first points (4) and knick point (6), be provided with the first car arrester (9); On the second track (2) between the first points (4) and knick point (6), be provided with the second car arrester (10); Be provided with the 3rd car arrester (11) and loaded vehicle track hand cart machine (15) at described loaded vehicle track (7); On described empty wagons track (8), be provided with and mend car device; The car arrester that described empty wagons track (8) is established comprises the 4th car arrester (12) and the 5th car arrester (13); Described benefit car device comprises inclined shaft car puller (14), electric locomotive, and inclined shaft car puller (14) is located between the 4th car arrester (12) and the 5th car arrester (13); In described the first points (4) and the second points (5), has one at least for original place rotation points; Described original place rotation points comprises the framework (16) that is fixedly located at rail fork, in framework (16), be provided with axle (22), on axle (22), be provided with rotary disk (20), on rotary disk (20), be provided with turnout rail (21), on axle (22), be connected with location-plate (19); Described axle (22) is realized the original place of turnout rail (21) and is rotated under the driving of driving mechanism (18); On described framework (16), be provided with the fixed track (17) for being connected with turnout rail (21).
2. inclined shaft behaviour truck system according to claim 1, is characterized in that: in described the first points (4) and the second points (5), one is original place rotation points, and another is translation points.
3. an inclined shaft car puller system, comprise that two strands of tracks that prolong are combined into one track through a knick point by the first bilateral turnout from pit shaft, and then by the second bilateral turnout, one track is divided into two strands of tracks, be divided into one in two strands of tracks for empty wagons track (8), another thigh Car Track (7) of attaching most importance to has secondary knick point between two bilateral turnouts; It is characterized in that: establish points at the second described bilateral turnout place; On the track (3) between points and secondary knick point, be provided with the first car arrester; Be provided with the second car arrester and loaded vehicle track hand cart machine (15) at loaded vehicle track (7); Be provided with the 3rd car arrester and the 4th car arrester at empty wagons track (8), between the 3rd car arrester and the 4th car arrester, be provided with inclined shaft car puller (14); Described points is original place rotation points; Described original place rotation points comprises the framework (16) that is fixedly located at rail fork, in framework (16), be provided with axle (22), on axle (22), be provided with rotary disk (20), on rotary disk (20), be provided with turnout rail (21), on axle (22), be connected with location-plate (19); Described axle (22) is realized the original place of turnout rail (21) and is rotated under the driving of driving mechanism (18); On described framework (16), be provided with the fixed track (17) for being connected with turnout rail (21).
CN201210067785.5A 2012-03-15 2012-03-15 Inclined shaft operation car system and operation car method thereof Expired - Fee Related CN102619557B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210067785.5A CN102619557B (en) 2012-03-15 2012-03-15 Inclined shaft operation car system and operation car method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210067785.5A CN102619557B (en) 2012-03-15 2012-03-15 Inclined shaft operation car system and operation car method thereof

Publications (2)

Publication Number Publication Date
CN102619557A CN102619557A (en) 2012-08-01
CN102619557B true CN102619557B (en) 2014-10-22

Family

ID=46559736

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210067785.5A Expired - Fee Related CN102619557B (en) 2012-03-15 2012-03-15 Inclined shaft operation car system and operation car method thereof

Country Status (1)

Country Link
CN (1) CN102619557B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105421162B (en) * 2015-12-10 2017-08-11 中国水利水电第十四工程局有限公司 A kind of construction method of inclined shaft running track
CN114165285A (en) * 2021-12-12 2022-03-11 枣庄矿业(集团)有限责任公司田陈煤矿 Signal handle hook control device for trolley on upper and lower wellhead tracks of coal mine auxiliary vertical shaft

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB191401938A (en) * 1914-01-24 1915-01-21 William Thomas Shimmin Improvements in Crossings, Points, Turn-outs and similar Connections for Railways, Tramways and the like, particularly directed to the Tracks of Temporary Workings such as those in or about Quarries, Mines and similar Places.
GB825828A (en) * 1955-01-06 1959-12-23 Automatic Telephone & Elect Improvements in or relating to electrical signalling systems for rail traffic-control
CN201002621Y (en) * 2007-02-15 2008-01-09 山东盛泉矿业有限公司 Coal mine down-hole bidirectional suspending beam type car pusher
CN201024361Y (en) * 2007-03-30 2008-02-20 王广胜 Coal mine down-hole floating crossing
CN201050021Y (en) * 2006-11-30 2008-04-23 李红勤 Donkey tail turnout for excavation working face mine car
CN201105737Y (en) * 2007-12-03 2008-08-27 王连军 Mining pneumatic car puller
CN201424035Y (en) * 2009-05-06 2010-03-17 王连军 Mine car pusher
CN101671981A (en) * 2009-09-23 2010-03-17 上海大屯能源股份有限公司 Integrated car yard of mine tunneling frontal shunting and moving method
CN102261023A (en) * 2011-06-09 2011-11-30 扬州凯思特机械有限公司 Movable rail switch
CN202163451U (en) * 2011-06-09 2012-03-14 扬州凯思特机械有限公司 Car supplementing device for car puller
CN202520377U (en) * 2012-03-15 2012-11-07 扬州凯思特机械有限公司 Deviated well operating vehicle system

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102006020546B4 (en) * 2006-04-30 2009-11-26 Stahn, Uwe, Dipl.-Ing. Active rail-bound transport system with passive points and gauge change

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB191401938A (en) * 1914-01-24 1915-01-21 William Thomas Shimmin Improvements in Crossings, Points, Turn-outs and similar Connections for Railways, Tramways and the like, particularly directed to the Tracks of Temporary Workings such as those in or about Quarries, Mines and similar Places.
GB825828A (en) * 1955-01-06 1959-12-23 Automatic Telephone & Elect Improvements in or relating to electrical signalling systems for rail traffic-control
CN201050021Y (en) * 2006-11-30 2008-04-23 李红勤 Donkey tail turnout for excavation working face mine car
CN201002621Y (en) * 2007-02-15 2008-01-09 山东盛泉矿业有限公司 Coal mine down-hole bidirectional suspending beam type car pusher
CN201024361Y (en) * 2007-03-30 2008-02-20 王广胜 Coal mine down-hole floating crossing
CN201105737Y (en) * 2007-12-03 2008-08-27 王连军 Mining pneumatic car puller
CN201424035Y (en) * 2009-05-06 2010-03-17 王连军 Mine car pusher
CN101671981A (en) * 2009-09-23 2010-03-17 上海大屯能源股份有限公司 Integrated car yard of mine tunneling frontal shunting and moving method
CN102261023A (en) * 2011-06-09 2011-11-30 扬州凯思特机械有限公司 Movable rail switch
CN202163451U (en) * 2011-06-09 2012-03-14 扬州凯思特机械有限公司 Car supplementing device for car puller
CN202520377U (en) * 2012-03-15 2012-11-07 扬州凯思特机械有限公司 Deviated well operating vehicle system

Also Published As

Publication number Publication date
CN102619557A (en) 2012-08-01

Similar Documents

Publication Publication Date Title
CN202520377U (en) Deviated well operating vehicle system
CN102616247B (en) Train unhooking robot
CN203269392U (en) Road emergency rescue device
CN104264539B (en) Colliery wire saws road railer track switch
CN102619557B (en) Inclined shaft operation car system and operation car method thereof
CN108691253A (en) A kind of parallel-moving type rack rails switch mechanism
EP2335994A1 (en) Goods train
CN201024361Y (en) Coal mine down-hole floating crossing
CN203246992U (en) Inclined-mine forking uncoupling field
CN114148222A (en) Flexible mobile contact net for large freight yard containers and operation method
CN211592577U (en) Monorail bidirectional mine field car pusher
CN209177447U (en) A kind of prefabricated component transport device
CN203716014U (en) Quick rail recycling crane
CN1043023C (en) Multiple marshaling heavy-duty train coupling stress cutting division tractive method
CN208328571U (en) A kind of parallel-moving type rack rails switch mechanism
CN202366954U (en) Roller changing device
CN102616250B (en) Synthetic protection device and working method thereof for monorail crane turnout
CN209191939U (en) It is de- to hang anti-collision control device in cableway terminal
CN204139006U (en) Colliery wire saws road railer track switch
CN220536946U (en) Automatic conveying device for train tails
CN204279485U (en) Preventing railway train runaway device
CN212709424U (en) Special self-recovery heavy hydraulic car arrester for railcar in gold mine area
CN203237245U (en) Novel drive mechanism for coal mine aerial passenger device
CN107985125B (en) Electrified railway loading and unloading district power transmission device based on portable contact net
CN202827618U (en) Mine inserting claw type man car noose-type hand braking device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141022

Termination date: 20200315