CN102619338B - 超长环梁的预应力筋的施工方法 - Google Patents
超长环梁的预应力筋的施工方法 Download PDFInfo
- Publication number
- CN102619338B CN102619338B CN201110056851.4A CN201110056851A CN102619338B CN 102619338 B CN102619338 B CN 102619338B CN 201110056851 A CN201110056851 A CN 201110056851A CN 102619338 B CN102619338 B CN 102619338B
- Authority
- CN
- China
- Prior art keywords
- prestressing tendon
- unbonded prestressing
- unbonded
- mentioned
- tendon
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Reinforcement Elements For Buildings (AREA)
- Rod-Shaped Construction Members (AREA)
Abstract
Description
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110056851.4A CN102619338B (zh) | 2011-03-09 | 2011-03-09 | 超长环梁的预应力筋的施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110056851.4A CN102619338B (zh) | 2011-03-09 | 2011-03-09 | 超长环梁的预应力筋的施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102619338A CN102619338A (zh) | 2012-08-01 |
CN102619338B true CN102619338B (zh) | 2015-07-15 |
Family
ID=46559521
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201110056851.4A Expired - Fee Related CN102619338B (zh) | 2011-03-09 | 2011-03-09 | 超长环梁的预应力筋的施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102619338B (zh) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103485545B (zh) * | 2013-09-13 | 2016-01-20 | 中南林业科技大学 | 一种无粘结预应力钢绞线试拆再锚施工的方法 |
CN111101533A (zh) * | 2020-01-14 | 2020-05-05 | 中国中材国际工程股份有限公司 | 熟料库的偏心环形基础及其施工方法 |
CN112339065B (zh) * | 2020-10-14 | 2021-11-23 | 燕山大学 | 一种后张法压浆封端工序改进方法 |
CN114961313B (zh) * | 2022-04-11 | 2024-06-11 | 中建国际建设有限公司 | 一种后张预应力楼板锚固端修补方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1066701A (zh) * | 1992-07-01 | 1992-12-02 | 中国建筑科学研究院建筑结构研究所 | 无粘结部分预应力混凝土多跨框架梁 |
CN1978803A (zh) * | 2005-12-06 | 2007-06-13 | 杨中源 | 超长马鞍形预应力环梁无缝施工方法 |
CN101016790A (zh) * | 2007-02-06 | 2007-08-15 | 同济大学 | 大跨预应力梁采用有粘结与无粘结混合配筋设计方法 |
CN101109227A (zh) * | 2007-09-05 | 2008-01-23 | 中国建筑第七工程局 | 单跨大悬臂双预应力劲性钢筋砼大梁施工方法 |
CN102094457A (zh) * | 2011-01-04 | 2011-06-15 | 山西省第三建筑工程公司 | 空间无粘结预应力环梁及其施工工艺 |
-
2011
- 2011-03-09 CN CN201110056851.4A patent/CN102619338B/zh not_active Expired - Fee Related
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1066701A (zh) * | 1992-07-01 | 1992-12-02 | 中国建筑科学研究院建筑结构研究所 | 无粘结部分预应力混凝土多跨框架梁 |
CN1978803A (zh) * | 2005-12-06 | 2007-06-13 | 杨中源 | 超长马鞍形预应力环梁无缝施工方法 |
CN101016790A (zh) * | 2007-02-06 | 2007-08-15 | 同济大学 | 大跨预应力梁采用有粘结与无粘结混合配筋设计方法 |
CN101109227A (zh) * | 2007-09-05 | 2008-01-23 | 中国建筑第七工程局 | 单跨大悬臂双预应力劲性钢筋砼大梁施工方法 |
CN102094457A (zh) * | 2011-01-04 | 2011-06-15 | 山西省第三建筑工程公司 | 空间无粘结预应力环梁及其施工工艺 |
Non-Patent Citations (1)
Title |
---|
无粘结预应力环梁的张拉施工;牛俊平 等;《山西建筑》;20021130;第28卷(第11期);40-41页第3-4部分 * |
Also Published As
Publication number | Publication date |
---|---|
CN102619338A (zh) | 2012-08-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP4040980B2 (ja) | プレストレスト合成トラス桁及びその製造方法 | |
CN105672134A (zh) | 一种下承式钢管混凝土系杆拱桥架设施工方法 | |
CN104988844B (zh) | 二次张拉预应力装配式波形钢腹板组合梁 | |
CN103938546B (zh) | 简支变连续施工方法 | |
KR100991869B1 (ko) | 단경간 및 다경간 피에스씨 거더교 및 그 시공방법 | |
AU2007288151B2 (en) | Tilt-lift method for erecting a bridge | |
CN102409619B (zh) | 一种提高多梁式组合小箱梁桥桥面结构横向整体性的方法 | |
CN102877407B (zh) | 一种曲线桥用波形钢腹板混凝土连续箱梁 | |
CN102619338B (zh) | 超长环梁的预应力筋的施工方法 | |
CN104762871A (zh) | 一种预应力混凝土-钢槽梁结合梁连续梁桥 | |
CN111206492A (zh) | 横向分段预制装配预应力混凝土盖梁构造及拼装方法 | |
CN208151833U (zh) | 一种新型rc—砌体组合拱桥的构造 | |
CN110700103B (zh) | 一种连续性组合梁施工方法 | |
CN109505222A (zh) | 一种装配式网状吊杆系杆拱桥 | |
CN103966953A (zh) | 基于无粘结钢绞线预应力后张的大跨度混凝土梁施工方法 | |
CN202787099U (zh) | 加固混凝土盖梁的体外预应力结构 | |
CN210947839U (zh) | 一种体外预应力加固混凝土梁结构 | |
CN102277836B (zh) | 倾斜式混凝土塔座的施工方法 | |
KR200407182Y1 (ko) | 피씨플레이트 | |
CN107435293A (zh) | 用于预制拼装桥墩的预应力frp筋张拉锚固装置及其施工方法 | |
JP2014227754A (ja) | 橋桁および橋桁の施工方法 | |
KR100400980B1 (ko) | 강선을 이용한 교각 보강공법 및 그 장치 | |
CN111350131A (zh) | 一种三跨桥尾部喂梁架桥机的施工方法 | |
CN209114299U (zh) | 一种单箱多室箱梁桥 | |
CN106121268A (zh) | 预应力钢丝绳综合加固梁板柱的系统及方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20191212 Address after: 314300 Yucheng town Yucheng North Bridge, Haiyan County, Jiaxing City, Zhejiang Province Patentee after: Haiyan Shengxin Standard Parts Co., Ltd. Address before: Changde City, Hunan province 415900 Dragon Town Hanshou County Hanshou County Office of energy (the original East Bank) East Building eighth green house Patentee before: Qing Guangxu |
|
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20201130 Address after: 226600, Jiangsu County, Nantong province Haian corner town industrial concentration area Patentee after: Nantong Jinchao Machine Tool Co.,Ltd. Address before: 314300 Yucheng town Yucheng North Bridge, Haiyan County, Jiaxing City, Zhejiang Province Patentee before: Haiyan Shengxin Standard Parts Co.,Ltd. |
|
TR01 | Transfer of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150715 Termination date: 20210309 |
|
CF01 | Termination of patent right due to non-payment of annual fee |