CN102615223B CN201210088268.6A CN201210088268A CN102615223B CN 102615223 B CN102615223 B CN 102615223B CN 201210088268 A CN201210088268 A CN 201210088268A CN 102615223 B CN102615223 B CN 102615223B
Authority
CN
China
Prior art keywords
ring
forging
rolling
ring forging
trapezoid cross
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210088268.6A
Other languages
Chinese (zh)
Other versions
CN102615223A (en
Inventor
景财年
甘洋洋
蔡元兴
徐淑波
刘敬广
于承雪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Jianzhu University
Original Assignee
Shandong Jianzhu University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Jianzhu University filed Critical Shandong Jianzhu University
Priority to CN201210088268.6A priority Critical patent/CN102615223B/en
Publication of CN102615223A publication Critical patent/CN102615223A/en
Application granted granted Critical
Publication of CN102615223B publication Critical patent/CN102615223B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forging (AREA)

Abstract

The method of rolling two trapezoid cross section flange ring forging parts while of the present invention relates to a kind of.Cylindrical steel billet sawing is first become material section by the method, material section is uniformly heated to austenitizing temperature from room temperature and is incubated, and then by thick for the section of expecting pier, punching, reaming, makes rolling ring blank; The blank obtained is melted down heating, reach target temperature and put into the Ring Rolling Machine pass rolling forming be jointly made up of special-shaped driven roller and special-shaped core roller after insulation, obtain two ends narrow, middle wide, axial height is the ring forging of target trapezoidal flange height twice, above-mentioned gained ring forging is cut in the middle of axial height, be divided into two symmetrically by workpiece, obtain two trapezoid cross section flange ring forging parts, last forging becomes finished product flange through turnery processing.The present invention is that a kind of production efficiency is high, energy-conserving and environment-protective, raising utilization rate of raw materials and product quality trapezoid cross section flange ring forging part roll over ring manufacture method.

Description

The method of rolling two trapezoid cross section flange ring forging parts simultaneously
Technical field
The present invention relates to a kind of method of annular flange part rolling forming, the method for rolling two trapezoid cross section flange ring forging parts while of particularly a kind of.
Background technology
Along with progress and the expanding economy of science and technology, increasing to the demand of annular element especially large-sized ring part in industrial production, in some main equipment, annular element has become the critical component affecting performance indications.Current countries in the world conduct extensive research the production of annular element and processing technology, and the annular element size range that can manufacture constantly expands, and cross sectional shape is more complicated, and Material selec-tion constantly increases, also more and more higher to manufacturing process requirement.
The production of traditional annular element especially large-sized ring part such as wind power flange mainly adopts the methods such as open die forging, Integral die-forged and saddle forging, ring rolling technology is that continuous local plastic shapes technique, compared with traditional handicraft, the remarkable technological and economical advantages such as it has significantly reduction equipment tonnage and investment, vibratory impulse is little, energy-saving material-saving, production cost are low are the advanced manufacturing technologies of all kinds of seamless ring such as bearer ring, gear ring, flange ring, train wheel and rim, gas turbine ring.Ring rolling technology is day by day widely used in many industrial circles such as machinery, automobile, train, boats and ships, petrochemical industry, Aero-Space, atomic energy.Cross section, the trapezoidal rank flange ring that the present invention relates to is of many uses, to structure property and dimension precision requirement high, utilize Ring Rolling Technology & rolling forming to become a kind of trend gradually.
At present, trapezoid cross section ring usually adopt radial rolling add machine cut processing combined, namely first processed the ring of square-section by radial rolling, then by machine cut, square-section ring is processed into trapezoidal rank section ring parts, its work flow is: (1) pier is thick; (2) punching; (3) radial rolling; (4) planar end surface; (5) machine cut processing.The subject matter of this explained hereafter trapezoid cross section ring is: (1) allowance is large, and stock utilization is low; (2) production efficiency is low, and labour intensity is large; (3) ring needs repeatedly to heat, and energy consumption is high; (4) production cost is high; (5) once can only manufacture a flange, utilization rate of equipment and installations is low.
Summary of the invention
For above-mentioned deficiency, the object of the present invention is to provide a kind of can the method for simultaneously rolling two trapezoid cross section flange ring forging parts, this method overcomes the shortcoming that traditional handicraft once can only manufacture a flange, there is saving material, reduce energy consumption, cost is low, the feature that production efficiency is high.
To achieve these goals, the present invention take technical scheme be:
The method of rolling two trapezoid cross section flange ring forging parts simultaneously, its step is as follows:
(1) blanking, becomes material section by cylindrical steel Billet cutting;
(2) above-mentioned material section be slowly heated to design temperature and be incubated, in forging temperature interval, being forged into rolling blank with hydraulic press;
(3) above-mentioned ring blank is melted down be heated to design temperature and be incubated, put into the Ring Rolling Machine pass accurately rolling forming be jointly made up of special-shaped driven roller and special-shaped core roller, obtain the ring forging that axial height is target trapezoidal flange height twice;
(4) forging symmetry after above-mentioned rolling forming is cut into two pieces;
(5) forging after above-mentioned cutting is processed into product through machine cut.
The axial height of to be L=(2.5 ~ 5) B, B the be trapezoid cross section flange ring forging part of the material segment length described in step (1), material section diameter according to ring forging volume with expect that segment body amasss equal condition and determines.
The rate of heat addition described in step (2) is 150 DEG C/h, stop 60 ~ 80 minutes at 630 DEG C ~ 650 DEG C, finally being heated to austenitizing temperature is 1230 DEG C ~ 1260 DEG C, austenitizing holding time is 120 ~ 150 minutes, and described forging heat distortion temperature interval is 850 DEG C ~ 1230 DEG C; Described forging adopts hydraulic press, and forging process is a fire, and blank-making technology is the operations such as pier is thick, punching, reaming.
Ring blank axial height described in step (3) is B 0=2B; Ring blank endoporus maximum gauge is d b0=d b/ k, rolling than k=2 ~ 5, d bfor ring forging endoporus maximum gauge; According to ring forging hole size determination blanking inner hole minimum diameter d s0, d s0=d b0-(d b-d s), wherein d sfor the endoporus minimum diameter of ring forging; Ring blank maximum outside diameter D is determined according to ring forging volume is equal with ring blank volume bwith minimum outer diameter D s, and D b0-D s0=D b-d s, wherein D bfor ring forging maximum outside diameter, D sfor minimum outer diameter; In described rolling forming operation, heating-up temperature is 1230 DEG C ~ 1250 DEG C, and temperature retention time is 60 ~ 90 minutes, and initial forging temperature is 1230 DEG C, and final forging temperature is not less than 850 DEG C.
Rolling forming described in step (3), that the blank after heating and thermal insulation is again put into the Ring Rolling Machine pass rolling forming be jointly made up of special-shaped driven roller and special-shaped core roller, obtain two ends narrow, middle wide, axial height is the ring forging of target trapezoidal flange height twice.
In rolling forming operation described in step (3), feed rate of idle roll is calculated as follows:
v = f 2 n 1 R 1 2 R ( 1 + R 1 R 2 ) 2 ( 1 + R 1 R 2 + R 1 R - R 1 r )
In formula, v is feed rate of idle roll; n 1for driven roller rotating speed; R 1, R 2be respectively driven roller working face maximum radius and core roller working face radius corresponding to ring blank endoporus smallest diameter portion; R and r is respectively ring forging outer radius and inside radius, R=D b/ 2, r=d s/ 2; F is the coefficient of friction between ring and rolling groove, f=0.05-0.4.
Cutting described in step (4) adopts acetylene-oxygen flame cutting, and ring forging cuts, is divided into two pieces trapezoid cross section flange ring forging part by cutting speed 50-200mm/ minute in the middle of axial height.
Machine cut processing device therefor described in step (5) is vertical lathe, and after rough turn processing, workpiece size puts surplus to 4 ~ 12 millimeter by flange ring size, and last finish turning is to dimensional requirement.
The present invention adopts double-piece to close the rolling manufacturing process of rolling, once can production two pieces trapezoid cross section flange, and blank and rolling groove shape are symmetric design, and strain and stress is distributed more even, the operation of rolling is more steady; Ring blank reaches preliminary dimension (size of ring forging) through the distortion of repeatedly continuous rolling, improves the structure and properties of workpiece metal, plastic deformation is distributed more even, shorten the production time, decrease forging heating times, saved raw material, improve production efficiency; By appropriate design ring blank size and rolling working process parameter, save raw material, reduced cost; Reduce the distortion of end face fish tail and buckling deformation, ensure the quality of trapezoid cross section ring.
Accompanying drawing explanation
Fig. 1 is ring forging structural representation of the present invention
Fig. 2 is ring blank structural representation of the present invention
Fig. 3 is rolling forming schematic diagram of the present invention
Fig. 4 is the left diagram of Fig. 3
Detailed description of the invention:
Detailed description of the invention is described in detail, as shown in accompanying drawing 1-4 below in conjunction with drawings and Examples.
Embodiment 1
The method of rolling two trapezoid cross section flange ring forging parts simultaneously, forging material is Q345E steel, requires that the trapezoid cross section flange ring forging part of roll forming is of a size of: ring forging maximum outside diameter D bfor 4000mm, minimum outer diameter D sfor 3900mm, ring forging endoporus minimum diameter d sfor 3600mm, ring forging endoporus maximum diameter d bfor 3700mm, ring forging axial dimension B is 200mm.Its step is as follows:
(1) blanking, becomes material section by cylindrical steel Billet cutting; The axial height of described material segment length to be L=3.5B=750mm, B be trapezoid cross section flange ring forging part, material section diameter according to ring forging volume with expect that segment body amasss equal condition and is defined as 1070mm.
(2) above-mentioned material section is 150 DEG C/h with the rate of heat addition and is slowly heated to 610 DEG C, stop after 80 minutes, then be heated to 1260 DEG C with 150 DEG C/h, temperature retention time is 150 minutes; Getting discharging section at forging initial forging temperature is 1230 DEG C, and final forging temperature is be forged into rolling blank with hydraulic press in the forging temperature interval of 870 DEG C; Forging process is a fire, adopts the operations such as pier is thick, punching, reaming to forge base.
(3) melted down by above-mentioned ring blank and be heated to 1250 DEG C, temperature retention time is 90 minutes, and initial forging temperature is 1220 DEG C, and final forging temperature is not less than 860 DEG C; Take out blank and put into the Ring Rolling Machine pass accurately rolling forming be jointly made up of special-shaped driven roller and special-shaped core roller, radial feed speed v=1.8mm/s, ring blank rolling forming as shown in Figure 3, Figure 4, under the rotation rolling campaign and straight-line feed motion effect of driven roller 1, ring blank 2 is nipped the rolling groove that driven roller 1 and core roller 3 are formed continuously, produce the continuous and local plastic deformation of wall thickness reduction, enlarged-diameter, section of outline shaping, in Fig. 4, the effect of guide roller 4 ensures that the operation of rolling is steady; By turning repeat-rolling distortion, ring blank enlarged-diameter is contacted to signal roller 5, then reach the ring forging of regulation geomery, at this moment ring rolling process terminates more.The axial dimension B of final rolling forming blank 0for 400mm, blanking inner hole largest portion size d b0for 1000mm (k=3.7), endoporus least part diameter d s0for 900mm, ring blank maximum outside diameter D b0for 1810mm, ring blank minimum outer diameter D s0for 1710mm, obtain the ring forging that axial height is target trapezoidal flange height twice.
(4) forging after above-mentioned rolling forming is adopted acetylene-oxygen flame cutting, cutting speed 100mm/ minute, ring forging is cut in the middle of axial height, is divided into two pieces trapezoid cross section flange ring forging part.
(5) rough turn through vertical lathe for forging after above-mentioned cutting, finish turning are shaped, after rough turn processing, workpiece size puts surplus to 8 millimeter by flange ring size, and last finish turning is to dimensional requirement.
Embodiment 2
The method of rolling two trapezoid cross section flange ring forging parts simultaneously, forging material is Q345E steel, requires that the trapezoid cross section flange ring forging part of roll forming is of a size of: ring forging maximum outside diameter D bfor 3200mm, minimum outer diameter D sfor 3100mm, ring forging endoporus minimum diameter d sfor 2800mm, ring forging endoporus maximum diameter d bfor 2900mm, ring forging axial dimension B is 150mm.Its step is as follows:
(1) blanking, becomes material section by cylindrical steel Billet cutting; The axial height of described material segment length to be L=4B=600mm, B be trapezoid cross section flange ring forging part, material section diameter according to ring forging volume with expect that segment body amasss equal condition and is defined as 800mm.
(2) above-mentioned material section is 150 DEG C/h with the rate of heat addition and is slowly heated to 630 DEG C, stop after 70 minutes, then be heated to 1250 DEG C with 150 DEG C/h, temperature retention time is 120 minutes; Getting discharging section at forging initial forging temperature is 1220 DEG C, and final forging temperature is be forged into rolling blank with hydraulic press in the forging temperature interval of 860 DEG C; Forging process is a fire, adopts the operations such as pier is thick, punching, reaming to forge base.
(3) melted down by above-mentioned ring blank and be heated to 1250 DEG C, temperature retention time is 75 minutes, and initial forging temperature is 1220 DEG C, and final forging temperature is not less than 850 DEG C; Take out blank and put into the Ring Rolling Machine pass accurately rolling forming be jointly made up of special-shaped driven roller and special-shaped core roller, radial feed speed v=2.1mm/s, the axial dimension B of rolling forming blank 0for 300mm, blanking inner hole largest portion size d b0for 900mm (k=3.2), endoporus least part diameter d s0for 800mm, ring blank maximum outside diameter D b0for 1532mm, ring blank minimum outer diameter D s0for 1432mm.Obtain the ring forging that axial height is target trapezoidal flange height twice.
(4) forging after above-mentioned rolling forming is adopted acetylene-oxygen flame cutting, cutting speed 120mm/ minute, ring forging is cut in the middle of axial height, is divided into two pieces trapezoid cross section flange ring forging part.
(5) rough turn through vertical lathe for forging after above-mentioned cutting, finish turning are shaped, after rough turn processing, workpiece size puts surplus to 6 millimeter by flange ring size, and last finish turning is to dimensional requirement.
Embodiment 3
The method of rolling two trapezoid cross section flange ring forging parts simultaneously, forging material is Q345E steel, requires that the trapezoid cross section flange ring forging part of roll forming is of a size of: ring forging maximum outside diameter D bfor 2500mm, minimum outer diameter D sfor 2450mm, ring forging endoporus minimum diameter d sfor 2200mm, ring forging endoporus maximum diameter d bfor 2250mm, ring forging axial dimension B is 140mm.Its step is as follows:
(1) blanking, becomes material section by cylindrical steel Billet cutting; The axial height of described material segment length to be L=4B=640mm, B be trapezoid cross section flange ring forging part, material section diameter according to ring forging volume with expect that segment body amasss equal condition and is defined as 630mm.
(2) above-mentioned material section is 150 DEG C/h with the rate of heat addition and is slowly heated to 650 DEG C, stop after 60 minutes, then be heated to 1260 DEG C with 150 DEG C/h, temperature retention time is 90 minutes; Getting discharging section at forging initial forging temperature is 1230 DEG C, and final forging temperature is be forged into rolling blank with hydraulic press in the forging temperature interval of 870 DEG C; Forging process is a fire, adopts the operations such as pier is thick, punching, reaming to forge base.
(3) melted down by above-mentioned ring blank and be heated to 1240 DEG C, temperature retention time is 60 minutes, and initial forging temperature is 1210 DEG C, and final forging temperature is not less than 850 DEG C; Take out blank and put into the Ring Rolling Machine pass accurately rolling forming be jointly made up of special-shaped driven roller and special-shaped core roller, radial feed speed v=2.5mm/s, the axial dimension B of rolling forming blank 0for 280mm, blanking inner hole largest portion size d b0for 650mm (k=3.5), endoporus least part diameter d s0for 600mm, ring blank maximum outside diameter D b0for 1275mm, ring blank minimum outer diameter D s0for 1225mm.Obtain the ring forging that axial height is target trapezoidal flange height twice.
(4) forging after above-mentioned rolling forming is adopted acetylene-oxygen flame cutting, cutting speed 150mm/ minute, ring forging is cut in the middle of axial height, is divided into two pieces trapezoid cross section flange ring forging part.
(5) rough turn through vertical lathe for forging after above-mentioned cutting, finish turning are shaped, after rough turn processing, workpiece size puts surplus to 5 millimeter by flange ring size, and last finish turning is to dimensional requirement.

Claims (7)

1. the method for rolling two trapezoid cross section flange ring forging parts while, is characterized in that realizing according to the following steps:
(1) blanking, becomes material section by cylindrical steel Billet cutting;
(2) above-mentioned material section be slowly heated to design temperature and be incubated, in forging temperature interval, being forged into rolling ring blank with hydraulic press;
Described forging process is a fire, the described rate of heat addition is 150 DEG C/h, stop 60 ~ 80 minutes at 630 DEG C ~ 650 DEG C, finally being heated to austenitizing temperature is 1230 DEG C ~ 1260 DEG C, austenitizing holding time is 120 ~ 150 minutes, and described forging heat distortion temperature interval is 850 DEG C ~ 1230 DEG C; Described forging adopts hydraulic press, blank-making technology is that pier is thick, punching, reaming operation;
(3) above-mentioned ring blank is melted down be heated to design temperature and be incubated, put into the Ring Rolling Machine pass accurately rolling forming be jointly made up of special-shaped driven roller and special-shaped core roller, obtain the ring forging that axial height is target trapezoidal flange height twice;
(4) forging symmetry after above-mentioned rolling forming is cut into two pieces;
(5) forging after above-mentioned cutting is processed into product through machine cut.
2. the method for rolling two trapezoid cross section flange ring forging parts while according to claim 1, it is characterized in that, material segment length described in step (1) is L=(2.5 ~ 5) B, B is the axial height of trapezoid cross section flange ring forging part, and material section diameter amasss equal condition according to ring forging volume with material segment body and determines.
3. according to the method for two the trapezoid cross section flange ring forging parts of rolling while according to claim 1, it is characterized in that, the ring blank axial height described in step (3) is B 0=2B; Ring blank endoporus maximum gauge is d b0=d b/ k, rolling than k=2 ~ 5, d bfor ring forging endoporus maximum gauge; According to ring forging hole size determination blanking inner hole minimum diameter d s0, d s0=d b0-(d b-d s), wherein d sfor the endoporus minimum diameter of ring forging; Ring blank maximum outside diameter D is determined according to ring forging volume is equal with ring blank volume bwith minimum outer diameter D s, and D b0-D s0=D b-d s, wherein D bfor ring forging maximum outside diameter, D sfor minimum outer diameter; In described rolling forming operation, heating-up temperature is 1230 DEG C ~ 1250 DEG C, and temperature retention time is 60 ~ 90 minutes, and initial forging temperature is 1230 DEG C, and final forging temperature is not less than 850 DEG C.
4. according to the method for two the trapezoid cross section flange ring forging parts of rolling while according to claim 1, it is characterized in that, rolling forming described in step (3), that the blank after heating and thermal insulation is again put into the Ring Rolling Machine pass rolling forming be jointly made up of special-shaped driven roller and special-shaped core roller, obtain two ends narrow, middle wide, axial height is the ring forging of target trapezoidal flange height twice.
5. according to the method for two the trapezoid cross section flange ring forging parts of rolling while according to claim 1, it is characterized in that, in the rolling forming operation described in step (3), feed rate of idle roll is calculated as follows:
v = f 2 n 1 R 1 2 R ( 1 + R 1 R 2 ) 2 ( 1 + R 1 R 2 + R 1 R - R 1 r )
In formula, v is feed rate of idle roll; n 1for driven roller rotating speed; R 1, R 2be respectively driven roller working face maximum radius and core roller working face radius corresponding to ring blank endoporus smallest diameter portion; R and r is respectively ring forging outer radius and inside radius, R=D b/ 2, r=d s/ 2; F is the coefficient of friction between ring and rolling groove, f=0.05-0.4.
6. according to the method for two the trapezoid cross section flange ring forging parts of rolling while according to claim 1, it is characterized in that, cutting described in step (4) adopts acetylene-oxygen flame cutting, cutting speed 50-200mm/ minute, ring forging is cut in the middle of axial height, is divided into two pieces trapezoid cross section flange ring forging part.
7. according to the method for two the trapezoid cross section flange ring forging parts of rolling while according to claim 1, it is characterized in that, machine cut processing device therefor described in step (5) is vertical lathe, after rough turn processing, workpiece size puts surplus to 4 ~ 12 millimeter by flange ring size, and last finish turning is to dimensional requirement.
CN201210088268.6A 2012-03-30 2012-03-30 The method of rolling two trapezoid cross section flange ring forging parts simultaneously Active CN102615223B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210088268.6A CN102615223B (en) 2012-03-30 2012-03-30 The method of rolling two trapezoid cross section flange ring forging parts simultaneously

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210088268.6A CN102615223B (en) 2012-03-30 2012-03-30 The method of rolling two trapezoid cross section flange ring forging parts simultaneously

Publications (2)

Publication Number Publication Date
CN102615223A CN102615223A (en) 2012-08-01
CN102615223B true CN102615223B (en) 2015-08-19

Family

ID=46555626

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210088268.6A Active CN102615223B (en) 2012-03-30 2012-03-30 The method of rolling two trapezoid cross section flange ring forging parts simultaneously

Country Status (1)

Country Link
CN (1) CN102615223B (en)

Families Citing this family (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102861840B (en) * 2012-08-31 2014-10-01 武汉理工大学 Three-roll cross rolling forming method for asymmetrical duel-step revolving body parts
CN102836937A (en) * 2012-08-31 2012-12-26 武汉理工大学 Symmetrical composite roll forming method of external step ring with thick wall and small hole
CN102873511A (en) * 2012-09-29 2013-01-16 山东建筑大学 Method for radially rolling and forming ring piece with three steps and complicated section
CN104139278A (en) * 2014-06-30 2014-11-12 张家港海陆环形锻件有限公司 Manufacturing process for oil delivery flange bonnet ring forge piece blank
CN104148396A (en) * 2014-06-30 2014-11-19 贵州安大航空锻造有限责任公司 Core roller and roll forming method of large inner-step-section ring pieces
CN104438989B (en) * 2014-09-26 2016-04-13 西安石油大学 The method of the two-way associating rolling and shaping of a kind of GCr15 steel thin-walled dark cylinder ring
CN105436365B (en) * 2015-12-08 2017-10-03 山西冠力法兰有限公司 Applied to the mould and method for rolling over the ring apparatus production two-in-one forging of flat-type
CN107398519A (en) * 2016-12-01 2017-11-28 贵州安大航空锻造有限责任公司 The rolling and fetal membrane forging of the double flange semi-rings of aluminium alloy are unified into shape method
CN107470526A (en) * 2016-12-01 2017-12-15 贵州安大航空锻造有限责任公司 The rolling and fetal membrane forging of the double flange semi-rings of titanium alloy are unified into shape method
CN107570644A (en) * 2016-12-01 2018-01-12 贵州安大航空锻造有限责任公司 The rolling and fetal membrane forging of the double flange semi-rings of bearing steel are unified into shape method
CN107398518A (en) * 2016-12-01 2017-11-28 贵州安大航空锻造有限责任公司 The rolling and fetal membrane forging of the double flange semi-rings of structural steel are unified into shape method
CN106799448A (en) * 2016-12-01 2017-06-06 贵州安大航空锻造有限责任公司 The rolling and fetal membrane forging of the double flange semi-rings of stainless steel are unified into shape method
CN107252865A (en) * 2016-12-01 2017-10-17 贵州安大航空锻造有限责任公司 The rolling and fetal membrane forging of the double flange semi-rings of high temperature alloy are unified into shape method
CN106734790A (en) * 2016-12-03 2017-05-31 贵州航天新力铸锻有限责任公司 The forging molding process of v-shaped cavity forging
CN106670360A (en) * 2016-12-30 2017-05-17 西南铝业(集团)有限责任公司 Ring piece rolling method
CN107545107B (en) * 2017-08-25 2020-06-19 武汉理工大学 Ring blank for rolling bearing ring with trapezoidal section and ring blank design method
CN108274204A (en) * 2018-03-13 2018-07-13 张家港中环海陆特锻股份有限公司 The manufacturing process of wind-powered electricity generation T section ring
CN110270800B (en) * 2019-07-04 2021-02-12 哈尔滨汽轮机厂有限责任公司 Machining method of vortex-enhanced bearing
CN110788568A (en) * 2019-10-24 2020-02-14 江阴市恒润重工股份有限公司 Processing method of stainless steel forging for high-pressure container
CN111085638B (en) * 2019-12-23 2022-03-29 宝鸡石油机械有限责任公司 Rolling forming method of T-shaped section full-fiber gear ring
CN114192848A (en) * 2021-10-27 2022-03-18 武汉船用机械有限责任公司 Processing method of three-connection seamless ring
CN115283598B (en) * 2022-08-25 2024-06-14 上海电气上重铸锻有限公司 Forging device and forging method for 316LN stainless steel super-large-thickness trapezoid-section forging

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4425779A (en) * 1979-01-12 1984-01-17 Diemer Donald J Method of making single or double flanged track tractor roller for off-highway equipment
EP0839936A1 (en) * 1996-10-31 1998-05-06 Kanai Juyo Kogyo Co., Ltd. Production method of a spinning ring for a ring spinning machine
CN101081426A (en) * 2007-06-14 2007-12-05 兰鹏光 Flange of wind power generation tower barrel forging shaping process
CN101760697A (en) * 2009-12-11 2010-06-30 张家港海陆环形锻件有限公司 Wind tower flange ring forging part for wind power equipment and manufacture method thereof
CN101811246A (en) * 2010-04-02 2010-08-25 张家港海陆环形锻件有限公司 Production method of wind tower flange deformed ring forging
CN102228947A (en) * 2011-04-11 2011-11-02 徐州九鼎锻造科技有限公司 Finish rolling forming technique of numerical control ring rolling machine of internal long neck special-shaped wind power flange

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4425779A (en) * 1979-01-12 1984-01-17 Diemer Donald J Method of making single or double flanged track tractor roller for off-highway equipment
EP0839936A1 (en) * 1996-10-31 1998-05-06 Kanai Juyo Kogyo Co., Ltd. Production method of a spinning ring for a ring spinning machine
CN101081426A (en) * 2007-06-14 2007-12-05 兰鹏光 Flange of wind power generation tower barrel forging shaping process
CN101760697A (en) * 2009-12-11 2010-06-30 张家港海陆环形锻件有限公司 Wind tower flange ring forging part for wind power equipment and manufacture method thereof
CN101811246A (en) * 2010-04-02 2010-08-25 张家港海陆环形锻件有限公司 Production method of wind tower flange deformed ring forging
CN102228947A (en) * 2011-04-11 2011-11-02 徐州九鼎锻造科技有限公司 Finish rolling forming technique of numerical control ring rolling machine of internal long neck special-shaped wind power flange

Also Published As

Publication number Publication date
CN102615223A (en) 2012-08-01

Similar Documents

Publication Publication Date Title
CN102615223B (en) The method of rolling two trapezoid cross section flange ring forging parts simultaneously
CN102615224B (en) The method that inner step profile section ring parts radial-axial rolling is shaped
CN100506422C (en) Flange of wind power generation tower barrel forging shaping process
CN102489639B (en) Fine-grain roll-forming method for large annular piece made of high alloy steel
US20210346941A1 (en) Novel hollow shaft manufacturing method
CN103316926B (en) Cold rolling forming method for automotive hub bearing ring part with L-shaped cross section
CN102601278B (en) Method for radially and axially rolling and forming large-sized double-edge stepped ring parts
CN101658888B (en) Method for manufacturing alligatoring ring matrix with novel structure
CN104139280B (en) The manufacturing process of hub for vehicle wheel
CN104226868B (en) Valve body composite rolling ring forming method for ball valve
CN102218642B (en) Manufacturing method of thick wall steel pipe with small radius-thickness ratio used for building structure
CN102873511A (en) Method for radially rolling and forming ring piece with three steps and complicated section
CN102371288A (en) Preparation method of high-precision and high-strength titanium alloy seamless tube
CN104139279B (en) The manufacturing process of interior trapezoidal grooved ring shape part
CN101786132A (en) Automobile engine valve blank cross wedge rolling accurate forming method
CN103846619A (en) Precision-forged combined body cold forging process and realization device thereof
CN106825378B (en) A kind of H-type thin-walled diskware low load continuous and local incremental forming device and method
CN104015006A (en) Manufacturing method of H-type high-magnesium aluminum alloy hub
CN103521522A (en) Cross wedge rolling precision forming method of axle shaft sleeve
CN104416098A (en) Special-shaped core roller for ring rolling mill
CN108380683B (en) The short route extrusion molding apparatus and method of high-performance metal plate
CN202621784U (en) Ring rolling forming die for automobile gearbox gear sleeve blank
CN214557050U (en) Ring rolling machine core roller die suitable for long-neck welding neck flange
CN107876672A (en) A kind of flanged ball valve end cap rolling ring manufacturing process
CN108273953A (en) Automobile DCT speed changers input outer shaft deep hole cold forging base forming technology

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20120801

Assignee: Elite Energy Equipment Co.,Ltd.

Assignor: SHANDONG JIANZHU University

Contract record no.: X2022980010692

Denomination of invention: Method of rolling two trapezoidal section flange ring forgings at the same time

Granted publication date: 20150819

License type: Common License

Record date: 20220720

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20120801

Assignee: SHANDONG BAODING HEAVY INDUSTRIAL CO.,LTD.

Assignor: SHANDONG JIANZHU University

Contract record no.: X2022980011888

Denomination of invention: Simultaneous rolling method of two trapezoidal section flange ring forgings

Granted publication date: 20150819

License type: Common License

Record date: 20220803

EE01 Entry into force of recordation of patent licensing contract