CN102605859A - Spatial truss with obliquely arranged main chords and capable of releasing horizontal force and mounting method - Google Patents
Spatial truss with obliquely arranged main chords and capable of releasing horizontal force and mounting method Download PDFInfo
- Publication number
- CN102605859A CN102605859A CN2011100008796A CN201110000879A CN102605859A CN 102605859 A CN102605859 A CN 102605859A CN 2011100008796 A CN2011100008796 A CN 2011100008796A CN 201110000879 A CN201110000879 A CN 201110000879A CN 102605859 A CN102605859 A CN 102605859A
- Authority
- CN
- China
- Prior art keywords
- temporary steel
- temporary
- altitude
- steel
- structural support
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Rod-Shaped Construction Members (AREA)
Abstract
The invention relates to a steel support structure capable of improving structural stress, in particular to a spatial truss with obliquely arranged main chords and capable of releasing horizontal force and a mounting method. The spatial truss comprises a temporary steel structural support and buried parts which are connected with and support supporting feet of the temporary steel structural support. The spatial truss is characterized in that shelving points are arranged on the temporary steel structural support and correspond to structural connecting joints on a high-altitude steel corridor; and the mounting method for the spatial truss with the obliquely arranged main chords and capable of releasing horizontal force includes that a supporting foot in the temporary steel structural support is welded with the corresponding buried part, then the high-altitude steel corridor is hoisted on the temporary steel structural support, the structural connecting joints on the high-altitude steel corridor are connected with the corresponding shelving points on the temporary steel structural support, and after load of the high-altitude steel corridor totally acts on the temporary steel structural support, the rest supporting feet of the temporary steel structural support are fixedly welded with the corresponding buried parts. The spatial truss with the obliquely arranged main chords and capable of releasing horizontal force and the mounting method have the advantages that the size of the section of the temporary steel structural support can be greatly reduced, and consumption of steel materials is reduced.
Description
Technical field
The present invention relates to relate to a kind of steel support structure that can improve structure stress, but particularly a kind of space truss and mounting method of oblique layout main chord of emission levels power.
Background technology
High-altitude steel vestibule structure can be used as the interface channel between the different buildings, and general steel vestibule adopts the form of steel work, supports to different architectural through support style.But often there is building structure construction progress difference, some supportings can occur and carry out, and other is also underway as supporting; This makes that the permanent supporting-point of high-altitude steel vestibule is imperfect; Support high-altitude steel vestibule and some temporary structures need be set, but, can produce very big moment of flexure shelving beam because high-altitude steel vestibule is very big to the load of respectively shelving generation a little; Therefore the now set general steel that consume of temporary steel structure stand are more; And because the leg of beam is shelved in the supporting of temporary steel structure stand is oblique, so can produce certain horizontal load to bottom embedded part structure, therefore set embedded part also need carry bigger horizontal load; If it is improper to be provided with; Possibly cause toppling of high-altitude steel vestibule because embedded part can't load level and rupture, the position and the correct construction technology of shelving a little that therefore high-altitude steel vestibule is set are the keys that solution high-altitude steel vestibule is shelved temporarily.
Summary of the invention
The objective of the invention is to solve prior art high and medium steel vestibule and shelve existing the problems referred to above temporarily, but a kind of space truss and mounting method of oblique layout main chord of emission levels power are provided.But the present invention designs a kind of space truss of oblique layout main chord of emission levels power; Comprise the temporary steel structure stand, connect the embedded part that supports temporary steel structure stand leg; It is characterized in that: on the temporary steel structure stand, be provided with and shelve a little, shelve a little with high-altitude steel vestibule on the structure connected node corresponding.But a kind of space truss mounting method of oblique layout main chord of emission levels power; It is characterized in that: a leg in the temporary steel structure stand is welded with corresponding embedded part; Then high-altitude steel vestibule is lifted on the temporary steel structure stand; With the connection of shelving on the structure connected node on the steel vestibule of high-altitude and the corresponding temporary steel structure stand; After the load of treating high-altitude steel vestibule all affacts the temporary steel structure stand, weld fixing to remaining leg of temporary steel structure stand with corresponding embedded part again.Advantage of the present invention is the sectional dimension that can reduce the temporary steel structure stand greatly, reduces the consumption of steel.
Below in conjunction with instance the present invention is made detailed operation instruction.
Description of drawings
Fig. 1 is temporary steel structure stand of the present invention and high-altitude steel vestibule putting position sketch map.
Fig. 2 temporary steel structure stand of the present invention schematic cross-section.
The specific embodiment
The embedded part 2,6 that comprise temporary steel structure stand 1 among the figure, connects supporting temporary steel structure stand leg be permanent supporting-point, it is characterized in that: setting shelves a little 3 on the temporary steel structure stand, shelve a little with high-altitude steel vestibule 4 on structure connected node 5 corresponding.But a kind of space truss mounting method of oblique layout main chord of emission levels power; It is characterized in that: a leg in the temporary steel structure stand is welded with corresponding embedded part; Then high-altitude steel vestibule is lifted on the temporary steel structure stand; With the connection of shelving on the structure connected node on the steel vestibule of high-altitude and the corresponding temporary steel structure stand; After the load of treating high-altitude steel vestibule all affacts the temporary steel structure stand, weld fixing to remaining leg of temporary steel structure stand with corresponding embedded part again.
Because it is shelving a little of being provided with on the temporary steel structure stand is corresponding with structure connected node on the steel vestibule of high-altitude; Can reduce the moment of flexure that high-altitude steel vestibule that the temporary steel structure stand born produces like this; The main load that lets the temporary steel structure stand born is shearing, thereby has reduced the sectional dimension of temporary steel structure stand greatly.Simultaneously owing to earlier one of them leg of temporary steel structure stand is carried out the welding with embedded part; After the load of treating high-altitude steel vestibule all affacts the temporary steel structure stand; Weld fixing to remaining leg of temporary steel structure stand with corresponding embedded part again; This moment, high-altitude steel vestibule discharged on incomplete fixing leg the horizontal force of temporary steel structure stand, had improved the force-bearing situation of temporary steel structure stand lower leg and embedded part, made all leg sectional dimensions to reduce; And the structural requirement of embedded part also can reduce, thereby greatly reduces the steel that consumed.
Claims (2)
1. but the space truss of the oblique layout main chord of an emission levels power; Comprise the temporary steel structure stand, connect the embedded part that supports temporary steel structure stand leg; It is characterized in that: on the temporary steel structure stand, be provided with and shelve a little, shelve a little with high-altitude steel vestibule on the structure connected node corresponding.
2. but the space truss mounting method of the oblique layout main chord of an emission levels power; It is characterized in that: a leg in the temporary steel structure stand is welded with corresponding embedded part; Then high-altitude steel vestibule is lifted on the temporary steel structure stand; With the connection of shelving on the structure connected node on the steel vestibule of high-altitude and the corresponding temporary steel structure stand; After the load of treating high-altitude steel vestibule all affacts the temporary steel structure stand, weld fixing to remaining leg of temporary steel structure stand with corresponding embedded part again.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011100008796A CN102605859A (en) | 2011-01-05 | 2011-01-05 | Spatial truss with obliquely arranged main chords and capable of releasing horizontal force and mounting method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011100008796A CN102605859A (en) | 2011-01-05 | 2011-01-05 | Spatial truss with obliquely arranged main chords and capable of releasing horizontal force and mounting method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102605859A true CN102605859A (en) | 2012-07-25 |
Family
ID=46523591
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011100008796A Pending CN102605859A (en) | 2011-01-05 | 2011-01-05 | Spatial truss with obliquely arranged main chords and capable of releasing horizontal force and mounting method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102605859A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102936962A (en) * | 2012-11-20 | 2013-02-20 | 永升建设集团有限公司 | Construction method of slanting cantilever steel structure supported by temporary steel frame |
CN105369891A (en) * | 2015-12-08 | 2016-03-02 | 上海市机械施工集团有限公司 | Construction control method of corridor consisting of large-span trusses different in length |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1153854A (en) * | 1995-07-20 | 1997-07-09 | 小野辰雄 | Support |
CN201438607U (en) * | 2009-06-29 | 2010-04-14 | 中国电力工程顾问集团中南电力设计院 | Steel structure bracket of transformation equipment |
CN101845849A (en) * | 2010-06-22 | 2010-09-29 | 中国建筑第二工程局有限公司 | Large-span steel structure corridor erected between new and old buildings and construction method thereof |
-
2011
- 2011-01-05 CN CN2011100008796A patent/CN102605859A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1153854A (en) * | 1995-07-20 | 1997-07-09 | 小野辰雄 | Support |
CN201438607U (en) * | 2009-06-29 | 2010-04-14 | 中国电力工程顾问集团中南电力设计院 | Steel structure bracket of transformation equipment |
CN101845849A (en) * | 2010-06-22 | 2010-09-29 | 中国建筑第二工程局有限公司 | Large-span steel structure corridor erected between new and old buildings and construction method thereof |
Non-Patent Citations (2)
Title |
---|
朱骏: "超高层建筑钢桁架施工与竖向变形控制技术研究", 《建筑施工》 * |
赵大鹏,陆春,王伟良,黄新: "上海虹桥综合交通枢纽西航站楼高空钢连廊安装技术", 《建筑施工》 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102936962A (en) * | 2012-11-20 | 2013-02-20 | 永升建设集团有限公司 | Construction method of slanting cantilever steel structure supported by temporary steel frame |
CN105369891A (en) * | 2015-12-08 | 2016-03-02 | 上海市机械施工集团有限公司 | Construction control method of corridor consisting of large-span trusses different in length |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102733606B (en) | The construction method of High Large Cantilever structure | |
CN103821376B (en) | Single-layer latticed shell high-altitude oblique rail accumulation slippage construction | |
CN102364012A (en) | Method for expanding existing large-span truss | |
CN107190848B (en) | Assembled steel-wood mixed structure system and construction method thereof | |
CN102261043B (en) | Assembled steel pipe upright post system | |
CN203834738U (en) | T-shaped prefabricated mixed coupled wall | |
CN202969987U (en) | Double-layer module type mobile camp | |
CN102605859A (en) | Spatial truss with obliquely arranged main chords and capable of releasing horizontal force and mounting method | |
CN102003078A (en) | Assembling method of net rack | |
CN204282682U (en) | Anti-seismic precast stair composition structure | |
CN206360399U (en) | The existing reinforced concrete coupling beam bracing means of one species " doubly-linked beam " | |
CN104989098A (en) | Laminated plate support frame | |
CN104110072A (en) | Hemispherical hollow welding sphere joint for large-span space steel structure support | |
CN105464215A (en) | Reverse construction method construction method of hanging structure incapable of being provided with vertical temporary support | |
CN104947804A (en) | Steel bracket and construction method for constructing beam column joint structure through steel bracket | |
CN103306378B (en) | Construction method of multidirectional through concrete filled steel tubular column beam joint provided with steel corbels and ring beam | |
CN110230351A (en) | Assembled architecture steel structure system and installation method | |
CN104790674A (en) | Assembling method for pipe truss | |
CN205116776U (en) | Support access structure | |
CN213597442U (en) | Elevator shaft template operation platform that encorbelments | |
CN104018586A (en) | Connecting device for steel structure column and steel structure column | |
CN104032862A (en) | Assembly-type steel beam joint L-shaped mixed coupled wall and construction method thereof | |
CN204456813U (en) | A kind of single support operation platform for elevator hoistways | |
CN203160237U (en) | Anti-floating anchor rod structure of raft | |
CN203320701U (en) | Column-beam node of concrete filled steel tube with multi-directional piercing steel corbels and ring beam |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20120725 |