CN202969987U - Double-layer module type mobile camp - Google Patents
Double-layer module type mobile camp Download PDFInfo
- Publication number
- CN202969987U CN202969987U CN 201220658635 CN201220658635U CN202969987U CN 202969987 U CN202969987 U CN 202969987U CN 201220658635 CN201220658635 CN 201220658635 CN 201220658635 U CN201220658635 U CN 201220658635U CN 202969987 U CN202969987 U CN 202969987U
- Authority
- CN
- China
- Prior art keywords
- barracks
- camp
- double
- corner fittings
- top corner
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Ladders (AREA)
Abstract
The utility model discloses a double-layer module type mobile camp. A bottom main sledge camp and a container type upper camp are connected into a whole through top corner fittings; the outer wall of the bottom main sledge camp is fixedly provided with a platform which is flush with the upper camp through a connecting support; the end part of the platform is provided with an inclined ladder towards the ground; and the bottom main sledge camp comprises hanging bars and supporting bars. The double-layer module type mobile camp disclosed by the utility model has the advantages that the double-layer module type mobile camp is convenient to assemble, disassemble and transport, occupies a small area, can effectively overcome the living difficulty brought by a narrow camp area, and does not affect the work efficiency of moving the camp.
Description
Technical field
The utility model relates to steel work mobile field camp technical field, specifically a kind ofly can produce in factory, the double-deck Modular moving barracks of Fast Installation at the scene.
Background technology
At present, during field construction, due to topography and geomorphology, the barracks erection space is usually limited.In addition, because move frequently the job site, thereby common building is unsuitable for using in field construction, brings difficulty for thus field construction workman's daily life.
The utility model content
The purpose of this utility model is exactly the double-deck Modular moving barracks that a kind of effective minimizing floor space will be provided and also quickly-detachable can fast be installed at the scene, move away from and go combination.
The utility model is achieved in that a kind of double-deck Modular moving barracks, being linked into an integrated entity by the top corner fittings by the main sled barracks in bottom and container-type top barracks forms, and is fixed with the platform equal with barracks ground, top by connecting bearing on the outside wall surface of the main sled barracks in described bottom; The end of described platform is provided with the inclined ladder that leads to ground; The main sled barracks in described bottom comprise trapeze, Tuo Gang.
The main sled barracks in the utility model bottom, container-type top barracks be respectively one independently whole, can use separately, and be convenient to manufacture in factory.The main sled barracks in bottom of the present utility model, container-type top barracks link into an integrated entity by the top corner fittings, are convenient to dismounting and can realize that on-the-spot Fast Installation manages the room in groups jointly.The utility model is set trapeze, the Tuo Gang of main sled barracks in the bottom, is convenient to the migration transportation; The utlity model has the dismounting convenient transportation, floor space is little, can effectively solve the narrow and small inhabitation difficulty of bringing of campsite area, and does not affect the operating efficiency of campsite resettlement.
Under technique scheme, the utility model can be realized like this:
Described top corner fittings is the hollow connector and has through hole three sides, the corner fittings arranged outside of four barracks modules that upper and lower, left and right are adjacent has outside link plate, have four four connecting holes corresponding with the through hole on described adjacent corner fittings on described outside link plate, be provided with interior junction plate on the hollow cavity inwall of described each corner fittings, cross-under has the securing member that described outside link plate and described corner fittings are connected and fixed in each through hole.
Described connection bearing is comprised of the first connection otic placode, the second connection otic placode, bearing pin and flat pole, oblique fulcrum bar.
Inclined ladder is comprised of C shaped steel ladder, steel lattice pedal, guardrail and connection otic placode.
Description of drawings
Fig. 1 is the utility model overall structure combination schematic diagram.
Fig. 2 is bottom main sled barracks structural representation.
Fig. 3 is container-type superstructure barracks.
Fig. 4 is inclined ladder structural representation in the utility model.
Fig. 5 connects the seat structure schematic diagram in the utility model.
Fig. 6 is corner fittings structural representation in top in the utility model.
Fig. 7 is top corner fittings syndeton schematic diagram in the utility model.
The specific embodiment
The utility model is described in further detail below in conjunction with drawings and Examples.
Fig. 1, Fig. 2, shown in Figure 3, double-deck Modular moving barracks are linked into an integrated entity by top corner fittings 10 by the main sled barracks 2 in bottom and container-type top barracks 3 and form.Be fixed with the platform 5 equal with barracks ground, top by connecting bearing 6 on the outside wall surface of the main sled barracks 2 in described bottom.The end of described platform 5 is provided with the inclined ladder 4 that leads to ground.
Shown in Figure 2, the main sled barracks 2 in described bottom are provided with trapeze 7, holder thick stick 8, room ladder 9 and top corner fittings 10.At the bottom of the main sled barracks in described bottom, sledge is shaped steel, not only is provided with trapeze but also be provided with the holder thick stick, has both guaranteed the intensity of room body, has guaranteed that again the quick fixation of room body is put.
Shown in Figure 3, described container-type top 3 end of barracks sledge is shaped steel, and the side is provided with room ladder 9, and four jiaos, barracks are provided with top corner fittings 10, and the top corner fittings 10 that is installed on top is convenient to lifting, and the top corner fittings that is installed on the bottom is convenient to install fixing with the main sled barracks in bottom.
Shown in Figure 4, inclined ladder 4 is comprised of C shaped steel ladder 12, steel lattice pedal 13, guardrail 14 and connection otic placode 15.Inclined ladder 4 is connected with platform 5 by connecting otic placode 15.
Shown in Figure 5, connect bearing 6 and formed by the flat pole 19 of being fixed in body of wall and oblique fulcrum bar 18, described flat pole end is connected to first and connects otic placode 16, and described oblique fulcrum bar end is connected to the second connection otic placode 17, two connection otic placodes and fixes by the bearing pin cross-under.
Fig. 6, shown in Figure 7, described top corner fittings 10 is for the hollow connector and have through hole 20 three sides, the corner fittings arranged outside of four barracks modules that upper and lower, left and right are adjacent has a monoblock outside link plate 1, have four four connecting holes corresponding with the lead to the hole site on described adjacent corner fittings on described outside link plate 1, by through hole 20, interior junction plate 22 is placed in the hollow cavity of described each corner fittings, in each through hole, cross-under has the securing member 21 that described outside link plate 1, interior junction plate 22 and described top corner fittings 10 are connected and fixed.Be provided with packing ring 11 between securing member 21 and outside link plate 1.The utility model is fixed into one by the connection of top corner fittings between barracks, and this syndeton is connected firmly and is convenient to dismounting.
Claims (4)
1. double-deck Modular moving barracks, it is characterized in that being linked into an integrated entity by top corner fittings (10) by the main sled barracks in bottom (2) and container-type top barracks (3) forms, and is fixed with the platform (5) equal with barracks ground, top by connecting bearing (6) on the outside wall surface of the main sled barracks in described bottom (2); The end of described platform (5) is provided with the inclined ladder (4) that leads to ground; The main sled barracks in described bottom (2) comprise trapeze (7), holder thick stick (8).
2. double-deck Modular moving barracks according to claim 1, it is characterized in that, described top corner fittings (10) is for the hollow connector and have through hole three sides, the top corner fittings arranged outside of four barracks modules that upper and lower, left and right are adjacent has outside link plate, have four four connecting holes corresponding with the through hole on described adjacent top corner fittings on described outside link plate, be provided with interior junction plate on the hollow cavity inwall of described each corner fittings, cross-under has the securing member that described outside link plate and described corner fittings are connected and fixed in each through hole.
3. double-deck Modular moving barracks according to claim 1, is characterized in that, described connection bearing (6) is comprised of the first connection otic placode (16), the second connection otic placode (17), bearing pin and flat pole (19), oblique fulcrum bar (18).
4. double-deck Modular moving barracks according to claim 1, is characterized in that, described inclined ladder (4) is comprised of ladder (12), pedal (13), guardrail (14) and connection otic placode (15).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220658635 CN202969987U (en) | 2012-12-04 | 2012-12-04 | Double-layer module type mobile camp |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220658635 CN202969987U (en) | 2012-12-04 | 2012-12-04 | Double-layer module type mobile camp |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202969987U true CN202969987U (en) | 2013-06-05 |
Family
ID=48511081
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201220658635 Expired - Lifetime CN202969987U (en) | 2012-12-04 | 2012-12-04 | Double-layer module type mobile camp |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202969987U (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103590491A (en) * | 2013-11-06 | 2014-02-19 | 芜湖鸿建轻钢结构工程有限公司 | Novel detachable foldable container type prefabricated house |
CN104652855A (en) * | 2015-02-15 | 2015-05-27 | 上海市机械施工集团有限公司 | Moving type movable house |
CN111119511A (en) * | 2019-12-06 | 2020-05-08 | 中冶天工集团有限公司 | One-prying three-room type dragging method for field module campsite room |
CN112573024A (en) * | 2020-12-08 | 2021-03-30 | 中国人民解放军海军士官学校 | Intelligent material storage container |
CN114278118A (en) * | 2021-12-01 | 2022-04-05 | 广东中集建筑制造有限公司 | Modular building |
-
2012
- 2012-12-04 CN CN 201220658635 patent/CN202969987U/en not_active Expired - Lifetime
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103590491A (en) * | 2013-11-06 | 2014-02-19 | 芜湖鸿建轻钢结构工程有限公司 | Novel detachable foldable container type prefabricated house |
CN104652855A (en) * | 2015-02-15 | 2015-05-27 | 上海市机械施工集团有限公司 | Moving type movable house |
CN111119511A (en) * | 2019-12-06 | 2020-05-08 | 中冶天工集团有限公司 | One-prying three-room type dragging method for field module campsite room |
CN112573024A (en) * | 2020-12-08 | 2021-03-30 | 中国人民解放军海军士官学校 | Intelligent material storage container |
CN114278118A (en) * | 2021-12-01 | 2022-04-05 | 广东中集建筑制造有限公司 | Modular building |
CN114278118B (en) * | 2021-12-01 | 2023-12-01 | 广东中集建筑制造有限公司 | Modularized building |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202969987U (en) | Double-layer module type mobile camp | |
CN103541430B (en) | A kind of support connection structure for steel structure corridor | |
CN203080965U (en) | Intelligent steel structure anti-seismic villa | |
CN103132766B (en) | Truss for lifting power transmission line tower connecting leg and erection method | |
CN203150936U (en) | Power distribution cabinet pedestal | |
CN104405155A (en) | Substation room | |
CN107905385A (en) | The assembled arthitecutral structure and method of construction that steel construction is combined with concrete structure | |
CN103912063A (en) | Assembled building system constructed by fabricated plates | |
CN204001416U (en) | For the assemble type truss of the factory building of constructing | |
CN203821596U (en) | Assembled house system built by prefabricated slabs | |
CN202706508U (en) | Overhanging strength bearing steel beam construction member of scaffold | |
CN203256899U (en) | Demountable modularized combined house | |
CN203594247U (en) | Prefabricated assembly type integrated roof self-supporting communication base station | |
CN203755451U (en) | Connecting device for dual-layer full-steel structure floor embedded with channel steel beam and column | |
CN207620365U (en) | Temporary support structure | |
RU154791U1 (en) | REINFORCED CONSTRUCTION COMPONENT OF BUILDING FROM CONTAINER MODULES | |
CN203270608U (en) | Prefabricated combined pipe rack | |
CN202202557U (en) | Novel horizontal truss of attached type lift scaffold | |
CN101514573B (en) | Floor support plate | |
CN207646886U (en) | The assembled arthitecutral structure that steel construction is combined with concrete structure | |
CN203066239U (en) | Multi-storey moving combined building | |
CN203373771U (en) | Split tower crane foundation transforming steel bearing platform | |
CN201883725U (en) | Split communication base station machine room | |
CN202298637U (en) | Energy-saving environment-friendly tower foundation | |
CN209958506U (en) | Assembled movable board house |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term |
Granted publication date: 20130605 |
|
CX01 | Expiry of patent term |