一种预制装配叠合式钢筋混凝土拱涵 Download PDFInfo
- Publication number
- CN102587300A CN102587300A CN201210057532XA CN201210057532A CN102587300A CN 102587300 A CN102587300 A CN 102587300A CN 201210057532X A CN201210057532X A CN 201210057532XA CN 201210057532 A CN201210057532 A CN 201210057532A CN 102587300 A CN102587300 A CN 102587300A
- Authority
- CN
- China
- Prior art keywords
- prefabricated
- arch
- cover plate
- reinforced concrete
- inverted
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
- Road Paving Structures (AREA)
Abstract
本发明公开了一种预制装配叠合式钢筋混凝土拱涵,它含现浇钢筋混凝土基础1、预制倒T型墙板2、预制带角腿的盖板3、预制拱板4、洞内后浇钢筋混凝土内底板5、洞外后浇钢筋混凝土边条6、后浇钢筋混凝土三角带7部件。预制带角腿的盖板3含下角腿8、上角腿9部件。整个拱圈对地基、基础沉降差异不敏感,不会开裂,拱圈侧向竖立、盖板水平、墙板横卧水平制作。该结构具有施工安全、方便、进度快、质量好、耐久性佳。它适应面广,功能符合。
Description
技术领域
本发明涉及一种涵洞,具体涉及一种高填方或深埋深路基下的下穿结构物拱涵。
背景技术
目前,拱涵施工是现场浇注混凝土完成,或现场砌筑砌体建造。这些方式存在设计、施工先天缺陷,导致拱涵质量差、进度慢、维修多、成本贵。具体表现为:拱涵是高填方路堤的下穿结构,它必然位于地势比较低的山谷或沟谷处,这些位置的地形、地貌较差、地质情况一般较为不良、不均匀,无论地基如何处理(端承桩除外),在高填方的重荷载作用下,基础出现沉降和不均匀沉降是不可避免的。这些不均匀沉降在路基施工时或施工后的一段较长时间周期是存在的,有的在运营阶段还随地下水位的变化而变化。而拱涵结构先天性对位移敏感,如果上述沉降差在设计阶段能预测或确定,那么在拱涵设计时可以加以考虑。但实际情况是地质不均匀、现场施工条件差而引起的不均匀的基础沉降是必然的、不易预测的。这导致设计没法考虑这些不利沉降差,从而不能确保拱涵不会产生裂缝。现浇钢筋混凝土拱圈施工时存在一些先天质量缺陷,如:拱圈混凝土的现场浇注过程中,混凝土在一个拱曲面上不利振捣、水泥浆易流动、混凝土的水灰比在拱圈上不均匀,导致拱圈混凝土强度不均匀、施工缝多、形不成一个整体、外观质量也不佳等。石料砌体拱圈施工中,同样存在一些先天缺陷,如:石料的强度、大小、形状、组砌方式,砂浆的品质和砌缝的饱满度等等因素难以控制,这些缺陷影响砌体强度。因此结构形式应改变,现场施工应改为工厂预制。
发明内容
本发明所要解决的技术问题是提供一种新结构形式、新施工方式,使拱涵能高质量、快速度地实施。
解决方案是在现有的钢筋混凝土拱涵的基础上,包括两侧墙板、带角腿的水平盖板、拱板、三角形边条,其特征在于还包括现浇混凝土施工边条、现浇混凝土内底板,两侧墙板为预制倒T型墙板,盖板为底面、顶面均带角腿的预制水平盖板,在开挖的基础上现浇的钢筋混凝土基础底板,两侧预制倒T型墙板安放在基础底板上,预制带角腿的盖板安放在预制倒T型墙板的顶部,基础底板和预制倒T型墙板的连接钢筋相连,浇注混凝土形成现浇混凝土施工边条和现浇混凝土内底板,拱板吊装在带四个角腿的水平盖板上,对拱板微调、对位后,现浇拱板的拱脚与水平盖板的角腿形成的三角带,各构件之间的缝隙,填塞防水材料,形成新式拱涵。
这样的钢筋混凝土拱涵为一种预制装配叠合式钢筋混凝土拱涵,它的墙板、水平盖板和拱板等主要构件是在工厂预制,拱板在工厂侧向竖立预制,质量好。最终所有预制构件都具有质量好、制作快、成本低等特点,整个拱涵的施工可并行作业,使拱涵施工进度快,可以加快路基施工,降低工程造价。
这种新结构可以容许基础出现沉降差,而不对整个拱涵结构产生附加内力,也就不会增大拱涵开裂的概率。
由于设置拱涵处,路基覆土厚,拱涵净高不受路基高程限制而可调整,因此设置水平盖梁,即不影响涵洞泄水量,也不限制过人及通车净空,可满足涵洞使用功能要求。
这种新结构消除了台背回填对结构引起的不利影响,有利于台背高质量回填;
与钢结构涵洞相比,无需防腐,维护量少,耐久性好,全寿命成本低。
附图说明
图1是本发明的三维结构示意图;
图2是本发明的构件三维示意图;
图例说明:
1为现浇钢筋混凝土基础, 2为预制倒T型墙板 ;
3为预制带角腿的盖板 , 4 为预制拱板;
5为洞内后浇钢筋混凝土内底板, 6为洞外后浇钢筋混凝土边条;
7为后浇钢筋混凝土三角带, 8为下角腿;
9为上角腿。
具体实施方式
本发明如附图所示:现浇钢筋混凝土基础1,预制倒T型墙板2,预制带角腿的盖板3,预制拱板4,洞内后浇钢筋混凝土内底板5,洞外后浇钢筋混凝土边条6,后浇钢筋混凝土三角带 7,下角腿8,上角腿9。先施工现浇钢筋混凝土基础1,在现浇钢筋混凝土基础1上划吊装定位线,吊装涵洞两侧的预制倒T型墙板2,将预制倒T型墙板2微调、对齐、垫水平,将预制带角腿的盖板3吊在两侧预制倒T型墙板2之上,将预制倒T型墙板2的预留钢筋与现浇钢筋混凝土基础1的预留钢筋相连接,安装钢筋混凝土内底板5的钢筋,浇筑内板5和外边条6。将预制拱板4吊放在预制带角腿的盖板3之上,将其微调、对齐、垫水平,浇筑钢筋混凝土三角带 7,拱涵主体机构完成,将后浇混凝土养护到设计强度后,回填台背填土。
Claims (10)
1.一种预制装配叠合式钢筋混凝土拱涵,拱涵的拱圈与拱涵的垂直墙体断开,断开面在拱涵起拱的拱脚处,将拱涵分成上下两部分。
2.上部分由预制拱板4、预制带角腿的盖板3和后浇钢筋混凝土三角带7组成。
3.下部分由现浇钢筋混凝土基础1、预制倒T形墙板2、内底板5、外边条6组成。
4. 倒T形侧板2、预制带角腿的盖板3、预制拱板4均为以竖向为轴形状左右对称构件,均为重心居中构件。
5. 预制带角腿的盖板3的底面设两个对称角腿8,其两端的顶面设两个对称角腿9,角腿8为梯形带状,角腿9为矩形带状。
6.现浇钢筋混凝土基础1、内底板5、外边条6约束预制倒T形墙板2的底座转动和水平移动。
7.两块倒T形墙板2构件支撑预制带角腿的盖板3,预制带角腿的盖板3支撑拱板4。
8. 预制带角腿的盖板3的下角腿8约束预制倒T形墙板2的上端水平向内移动,并承受预制倒T形墙板2的上端向内水平力。
9.预制带角腿的盖板3的上角腿9约束预制拱板4两端水平向外移动,并承受预制拱板4两端向外水平力。
10.拱板3侧向竖立制作,盖板3水平制作,倒T形墙板2横卧水平制作。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210057532.XA CN102587300B (zh) | 2012-03-06 | 2012-03-06 | 一种预制装配叠合式钢筋混凝土拱涵 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210057532.XA CN102587300B (zh) | 2012-03-06 | 2012-03-06 | 一种预制装配叠合式钢筋混凝土拱涵 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102587300A true CN102587300A (zh) | 2012-07-18 |
CN102587300B CN102587300B (zh) | 2016-04-13 |
Family
ID=46476494
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210057532.XA Active CN102587300B (zh) | 2012-03-06 | 2012-03-06 | 一种预制装配叠合式钢筋混凝土拱涵 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102587300B (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106702916A (zh) * | 2017-02-03 | 2017-05-24 | 中交第二公路勘察设计研究院有限公司 | U形装配式钢筋混凝土盖板涵洞及其施工方法 |
CN110318783A (zh) * | 2019-06-03 | 2019-10-11 | 北京城建集团有限责任公司 | 一种厚顶板拱形结构闭合钢筋框架及优化方法 |
CN110616647A (zh) * | 2019-09-26 | 2019-12-27 | 苏交科集团股份有限公司 | 一种全预制滑移拼装涵洞及其施工工艺 |
GB2590293A (en) * | 2018-08-13 | 2021-06-23 | Omachron Intellectual Property Inc | Cyclonic air treatment member and surface cleaning apparatus including the same |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1124320A (zh) * | 1994-12-05 | 1996-06-12 | 邓军 | 预制装配式钢筋混凝土隧道及道施工工艺 |
US20030143029A1 (en) * | 2002-01-30 | 2003-07-31 | Con/Span Bridge Systems Ltd. | Precast concrete culvert system |
JP2004019100A (ja) * | 2002-06-12 | 2004-01-22 | Kajima Corp | 地下構造物の構築方法および地下構造物 |
CN201891088U (zh) * | 2010-12-08 | 2011-07-06 | 南京联众机电制造有限公司 | 一种半圆拱形涵管及其承载支座 |
CN102182151A (zh) * | 2011-04-09 | 2011-09-14 | 刘山健 | 一种钢筋混凝土涵洞 |
JP2012007410A (ja) * | 2010-06-25 | 2012-01-12 | Y A T:Kk | 矩形断面構造物の補強構造 |
-
2012
- 2012-03-06 CN CN201210057532.XA patent/CN102587300B/zh active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1124320A (zh) * | 1994-12-05 | 1996-06-12 | 邓军 | 预制装配式钢筋混凝土隧道及道施工工艺 |
US20030143029A1 (en) * | 2002-01-30 | 2003-07-31 | Con/Span Bridge Systems Ltd. | Precast concrete culvert system |
US6854928B2 (en) * | 2002-01-30 | 2005-02-15 | Con/Span Bridge Systems Ltd. | Precast concrete culvert system |
JP2004019100A (ja) * | 2002-06-12 | 2004-01-22 | Kajima Corp | 地下構造物の構築方法および地下構造物 |
JP2012007410A (ja) * | 2010-06-25 | 2012-01-12 | Y A T:Kk | 矩形断面構造物の補強構造 |
CN201891088U (zh) * | 2010-12-08 | 2011-07-06 | 南京联众机电制造有限公司 | 一种半圆拱形涵管及其承载支座 |
CN102182151A (zh) * | 2011-04-09 | 2011-09-14 | 刘山健 | 一种钢筋混凝土涵洞 |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106702916A (zh) * | 2017-02-03 | 2017-05-24 | 中交第二公路勘察设计研究院有限公司 | U形装配式钢筋混凝土盖板涵洞及其施工方法 |
GB2590293A (en) * | 2018-08-13 | 2021-06-23 | Omachron Intellectual Property Inc | Cyclonic air treatment member and surface cleaning apparatus including the same |
GB2590293B (en) * | 2018-08-13 | 2023-02-08 | Omachron Intellectual Property Inc | Cyclonic air treatment member and surface cleaning apparatus including the same |
CN110318783A (zh) * | 2019-06-03 | 2019-10-11 | 北京城建集团有限责任公司 | 一种厚顶板拱形结构闭合钢筋框架及优化方法 |
CN110616647A (zh) * | 2019-09-26 | 2019-12-27 | 苏交科集团股份有限公司 | 一种全预制滑移拼装涵洞及其施工工艺 |
CN110616647B (zh) * | 2019-09-26 | 2021-08-10 | 苏交科集团股份有限公司 | 一种全预制滑移拼装涵洞及其施工工艺 |
Also Published As
Publication number | Publication date |
---|---|
CN102587300B (zh) | 2016-04-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101787708A (zh) | 一种装配整体式悬臂式挡土墙及其施工方法 | |
CN209227580U (zh) | 一种下置于筏板基础的塔吊基础结构 | |
CN105780623B (zh) | 复合式结构层及其铺设方法 | |
CN103835217A (zh) | 检查井周边路面破损下陷的防治方法 | |
CN110056000B (zh) | 一种衡重式挡土墙的施工方法及结构 | |
CN102839601A (zh) | 门式刚架天桥钢墩柱与承台固结结构及其施工方法 | |
CN205242181U (zh) | 一种新型板式无砟轨道结构 | |
CN102587300A (zh) | 一种预制装配叠合式钢筋混凝土拱涵 | |
CN208933989U (zh) | 一种塔吊基础结构 | |
CN105735076A (zh) | 枕梁式预制装配混凝土结构层及其装配方法 | |
CN108660952A (zh) | 一种装配式混凝土预制汽车箱通的顶推安装方法 | |
CN106049213A (zh) | 一种公路软土路基不均匀沉降的控制方法及结构 | |
CN109778905A (zh) | 预制装配式钢筋混凝土后背块顶进箱涵施工方法 | |
CN110409252A (zh) | 一种拼装式预制砼边沟同步道路分层施工方法 | |
CN202787055U (zh) | 钢结构天桥的墩台固结构造 | |
CN110670436B (zh) | 防止城市道路路基不均匀沉降结构及其施工方法 | |
CN208266912U (zh) | 一种路基段挡土墙 | |
CN110158602A (zh) | 一种软土地质深基坑支护开挖施工结构及施工方法 | |
CN205669211U (zh) | 一种预制重力式挡墙 | |
CN202830790U (zh) | 一种预制装配叠合式钢筋混凝土拱涵 | |
CN110093945B (zh) | 一种加装电梯钢结构底坑 | |
CN205529743U (zh) | 枕梁式预制装配混凝土结构层 | |
CN103437252B (zh) | 一种轨道路基结构及其施工方法 | |
CN113846547A (zh) | 一种现有跨河桥梁与新建堤防衔接结构及其施工方法 | |
CN211172070U (zh) | 一种拼装型钢筋混凝土构件装配式悬壁挡土墙结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |