CN102581147A - 一种风力发电机组的冷却装置的制造方法 - Google Patents

一种风力发电机组的冷却装置的制造方法 Download PDF

Info

Publication number
CN102581147A
CN102581147A CN2011100052619A CN201110005261A CN102581147A CN 102581147 A CN102581147 A CN 102581147A CN 2011100052619 A CN2011100052619 A CN 2011100052619A CN 201110005261 A CN201110005261 A CN 201110005261A CN 102581147 A CN102581147 A CN 102581147A
Authority
CN
China
Prior art keywords
mounting groove
cooling tube
cooling
generating set
cooling device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011100052619A
Other languages
English (en)
Inventor
于祥喜
陆香顺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SUZHOU MAIDER MACHINERY CO Ltd
Original Assignee
SUZHOU MAIDER MACHINERY CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SUZHOU MAIDER MACHINERY CO Ltd filed Critical SUZHOU MAIDER MACHINERY CO Ltd
Priority to CN2011100052619A priority Critical patent/CN102581147A/zh
Publication of CN102581147A publication Critical patent/CN102581147A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Wind Motors (AREA)

Abstract

本发明公开了一种风力发电机组的冷却装置的制造方法,包含以下步骤:(1)将冷却管放入安装槽内,冷却管直径稍小于安装槽,安装槽的深度与冷却管的直径相当;(2)碾压安装板的安装槽开口处,使安装槽包裹住冷却管;同时安装槽内壁与冷却管的外壁紧密接触;本发明的风力发电机组的冷却装置的制造方法,利用碾压技术使安装槽内壁与冷却管的外壁紧密接触可以防止用胶料物质带来的不足,同时不易脱落,产品导热性能稳定。

Description

一种风力发电机组的冷却装置的制造方法
技术领域
本发明涉及一种风力发电机组的冷却装置的制造方法,特别是一种不易脱落、导热性能稳定的风力发电机组的冷却装置的制造方法,属于加工工艺改进技术领域。
背景技术
通常,风力发电机组的冷却装置(见附图1),包含安装板1、冷却管2、安装槽3;所述安装槽3开在安装板1上;所述安装槽3呈U”型;所述冷却管2设置在安装槽3内;所述冷却管2用胶粘接在安装槽3内;所述冷却管2的材质基本采用紫铜来制造加工,其优势:紫铜管材质屈服度较好,便于弯曲与加工不同的几何形状,产品质量容易得到保障;被镶嵌的安装板1一般采用金属材料:铝或钢;当两种不同材质而产品需要镶嵌在一起时;由于材质、密度、熔点各不相同,故目前铸造行业还无法实现和完成这一体化制造加工的方法;而通常机械加工制造,现有的加工方法和工艺,只能将冷却管的圆管(¢)镶嵌在“U”型槽内,镶嵌后的产品两侧就呈现“V”带状,再通过选用其它非金属材料,最常用的为胶类物质来填充或镶嵌于“V”带状空隙,固化后以保障产品的密封效果。然而:就这两侧看似不起眼的“V”带状内的胶类物质,却给产品本身带来了很大的品质瑕疵,埋下了质量隐患。主要有以下几点,譬如:
由于胶料物质固有的特性,传导性能极差,不能全面导递能量;胶料因长期受高温焙烤,极易龟裂和老化,以及散发不良气味;因两种材质不同,粘合附着力较差,很容易收缩、脱离、剥落。
发明内容
针对上述存在的技术问题,本发明的目的是:提出了一种不易脱落、导热性能稳定的风力发电机组的冷却装置的制造方法。
本发明的技术解决方案是这样实现的:一种风力发电机组的冷却装置的制造方法,包含以下步骤:
(1)、将冷却管放入安装槽内,冷却管直径稍小于安装槽,安装槽的深度与冷却管的直径相当;
(2)、碾压安装板的安装槽开口处,使安装槽包裹住冷却管;同时安装槽内壁与冷却管的外壁紧密接触。
由于上述技术方案的运用,本发明与现有技术相比具有下列优点:
本发明的风力发电机组的冷却装置的制造方法,利用碾压技术使安装槽内壁与冷却管的外壁紧密接触可以防止用胶料物质带来的不足,同时不易脱落,产品导热性能稳定。
附图说明
下面结合附图对本发明技术方案作进一步说明:
图1为本发明的风力发电机组的冷却装置的立体图;
其中:1、安装板;2、冷却管;3、安装槽。
具体实施方式
本发明所述的一种风力发电机组的冷却装置的制造方法,包含以下步骤:
(1)、将冷却管放入安装槽内,冷却管直径稍小于安装槽,安装槽的深度与冷却管的直径相当;
(2)、碾压安装板的安装槽开口处,使安装槽包裹住冷却管;同时安装槽内壁与冷却管的外壁紧密接触。
由于上述技术方案的运用,本发明与现有技术相比具有下列优点:
本发明的风力发电机组的冷却装置的制造方法,利用碾压技术使安装槽内壁与冷却管的外壁紧密接触可以防止用胶料物质带来的不足,同时不易脱落,产品导热性能稳定。
上述实施例只为说明本发明的技术构思及特点,其目的在于让熟悉此项技术的人士能够了解本发明的内容并加以实施,并不能以此限制本发明的保护范围,凡根据本发明精神实质所作的等效变化或修饰,都应涵盖在本发明的保护范围内。

Claims (1)

1.一种风力发电机组的冷却装置的制造方法,包含以下步骤:
(1)、将冷却管放入安装槽内,冷却管直径稍小于安装槽,安装槽的深度与冷却管的直径相当;
(2)、碾压安装板的安装槽开口处,使安装槽包裹住冷却管;同时安装槽内壁与冷却管的外壁紧密接触。
CN2011100052619A 2011-01-12 2011-01-12 一种风力发电机组的冷却装置的制造方法 Pending CN102581147A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011100052619A CN102581147A (zh) 2011-01-12 2011-01-12 一种风力发电机组的冷却装置的制造方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011100052619A CN102581147A (zh) 2011-01-12 2011-01-12 一种风力发电机组的冷却装置的制造方法

Publications (1)

Publication Number Publication Date
CN102581147A true CN102581147A (zh) 2012-07-18

Family

ID=46470692

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011100052619A Pending CN102581147A (zh) 2011-01-12 2011-01-12 一种风力发电机组的冷却装置的制造方法

Country Status (1)

Country Link
CN (1) CN102581147A (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106653521A (zh) * 2016-12-21 2017-05-10 广东威特真空电子制造有限公司 一种磁控管

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2416748A1 (fr) * 1978-02-13 1979-09-07 Renault Machine a sertir un tube dans une feuille metallique a gorge preformee de reception du tube
JPS5832535A (ja) * 1981-08-20 1983-02-25 Mitsubishi Keikinzoku Kogyo Kk 板材と管との接合方法及びそのための装置
JPS58112617A (ja) * 1981-12-26 1983-07-05 Hakusan Seisakusho:Kk 太陽熱集熱管の製造方法
CN1522811A (zh) * 2003-02-19 2004-08-25 萧复元 散热器的制作方法及其结构

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2416748A1 (fr) * 1978-02-13 1979-09-07 Renault Machine a sertir un tube dans une feuille metallique a gorge preformee de reception du tube
JPS5832535A (ja) * 1981-08-20 1983-02-25 Mitsubishi Keikinzoku Kogyo Kk 板材と管との接合方法及びそのための装置
JPS58112617A (ja) * 1981-12-26 1983-07-05 Hakusan Seisakusho:Kk 太陽熱集熱管の製造方法
CN1522811A (zh) * 2003-02-19 2004-08-25 萧复元 散热器的制作方法及其结构

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106653521A (zh) * 2016-12-21 2017-05-10 广东威特真空电子制造有限公司 一种磁控管

Similar Documents

Publication Publication Date Title
CN102581147A (zh) 一种风力发电机组的冷却装置的制造方法
CN207820461U (zh) 高导热、高电磁屏蔽铜网增强石墨复合泡棉
CN201904399U (zh) 一种用于提高电池电性能的极耳极片构造
CN103607872B (zh) 散热壳体
CN203618272U (zh) 一种新型导热绝缘结构
CN202911224U (zh) 一种石墨复合金属材料
CN205364688U (zh) 一种导热石墨片
CN202927508U (zh) 直接在立体散热支撑灯具载体上制作线路的led灯具模组
CN103648253B (zh) 一种新型导热绝缘结构
CN202534796U (zh) 复合金属接地体
CN203633047U (zh) 散热壳体
CN204023225U (zh) 一种洗衣机减速离合器制动带
CN203246133U (zh) 光电缆用屏蔽型钢塑复合带
CN210139681U (zh) 一种防腐蚀软包电池用铝塑膜结构
CN202698805U (zh)
CN103649007A (zh) 用于产生热电流的元件及其制备方法
CN206364103U (zh) 一种极耳倒角治具
CN203644574U (zh) 高可靠导通的拔插触点
CN204066857U (zh) 一种交联聚乙烯护套绝缘变频电缆
CN202374622U (zh) 一种散热器型材
CN203250573U (zh) 线缆用防脱落型复合带
CN203246136U (zh) 屏蔽型铝塑复合带
CN102581146A (zh) 一种碾压机
CN202997063U (zh) 一种铜铝连接管
CN203595379U (zh) 一种用于烘道外侧进行隔热的构造

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20120718