CN102581136B - 一种拉延模具 - Google Patents
一种拉延模具 Download PDFInfo
- Publication number
- CN102581136B CN102581136B CN201210059895.7A CN201210059895A CN102581136B CN 102581136 B CN102581136 B CN 102581136B CN 201210059895 A CN201210059895 A CN 201210059895A CN 102581136 B CN102581136 B CN 102581136B
- Authority
- CN
- China
- Prior art keywords
- die
- fillets
- blank holder
- recessed fillet
- punch
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Shaping Metal By Deep-Drawing, Or The Like (AREA)
- Mounting, Exchange, And Manufacturing Of Dies (AREA)
Abstract
本发明提供一种拉延模具,一种拉延模具,其包括:凸模、凹模以及压边圈,所述凸模、凹模以及压边圈设有若干凸圆角及若干凹圆角,凹模的凸圆角被压边圈和/或凸模的凹圆角所径向收容,压边圈的凸圆角和/或凸模的凸圆角被凹模的凹圆角所径向收容,在任意一组径向收容的凹圆角与凸圆角中,所述凹圆角的曲率大于其径向收容的凸圆角的曲率。通过这样的结构,可有效地避免拉延模具的凹圆角与产品圆角发生干涉,提高拉延模具加工钣金件的产品质量,并有效节约人力成本。
Description
技术领域
本发明涉及一种拉延模具,尤其涉及一种用于制造带有凹圆角的拉延模具,属于冲压模具领域。
背景技术
拉延模具在汽车钣金件制造领域起着非常重要的作用,汽车上大部分的钣金件都是使用拉延模具冲压制成的。
在现有技术中,拉延模具通常是由凸模、凹模及压边圈三大件构成。在以往的钣金件的型面加工中,由于所使用的型面加工数据均为工艺数模直接加工,或扣除一个料板厚度加工。这样加工出来的型面凹圆角是正好与钣金件的凸圆角一致的。而在实际的模具拉延过程中间,起到成形作用的为凸圆角,凹圆角在整个成形过程中未参与成形。型面加工是由点成线再成面的加工原理,不可避免的会有残余量,还有机床误差等多方面因素决定了凹圆角不可能与钣金件的凸圆角完全一样。在实际生产过程中,经常发生凹圆角与凸圆角的干涉,从而压伤钣金件,为此需要花费大量的人力对凹圆角进行人工打磨,保证一个料厚的间隙,避免压伤。
有鉴于此,有必要对现有的拉延模具予以改进,以解决上述问题。
发明内容
本发明的目的在于提供一种拉延模具,可有效避免拉延模具的凹圆角与凸圆角发生干涉,提高拉延模具加工钣金件的产品质量,并有效节约人力成本。
为实现上述发明目的,本发明的一种拉延模具,其包括:凸模、凹模以及压边圈,所述凸模、凹模以及压边圈设有若干凸圆角及若干凹圆角,凹模的凸圆角被压边圈和/或凸模的凹圆角所径向收容,压边圈的凸圆角和/或凸模的凸圆角被凹模的凹圆角所径向收容,
在任意一组径向收容的凹圆角与凸圆角中,所述凹圆角的曲率大于其径向收容的凸圆角的曲率。
与现有技术相比,本发明的有益效果是:通过在任意一组径向收容的凹圆角与凸圆角中,凹圆角的曲率大于其径向收容的凸圆角的曲率这样的设置,可有效地避免拉延模具的凹圆角与产品圆角发生干涉,提高拉延模具加工钣金件的产品质量,并有效节约人力成本。
附图说明
图1为本发明一具体实施方式中拉延模具冲压板料的拉延模具的局部示意图;
图2为图1中凹模的凸圆角与压边圈的凹圆角冲压板料以及凹模的凹圆角与压边圈的凸圆角在“闭模”状态的局部放大图;
图3为图1中凹模的凹圆角与凸模的凸圆角在“闭模”状态的局部放大图;
图4为图1中凹模的凸圆角与凸模的凹圆角在“闭模”状态的局部放大图。
具体实施方式
下面结合附图所示的各实施方式对本发明进行详细说明,但应当说明的是,这些实施方式并非对本发明的限制,本领域普通技术人员根据这些实施方式所作的功能、方法、或者结构上的等效变换或替代,均属于本发明的保护范围之内。
参图1所示的本发明一具体实施方式。在本实施方式中,一种拉延模具100,其包括:凸模20、凹模10以及压边圈30。在拉延模具100在冲压板料的整个过程中,通常经过“开模”、“闭模”、“开模”这三个过程,其整个过程被定义为一个冲程。“开模”时,压边圈30会顶起,其比凸模20略高,然后将板料40投入拉延模具100中间。然后由凹模10向下运动,开始进入“闭模”状态。先由凹模10和压边圈30将板料40压住后,持续向下运动使凸模20带着整张板料40进入凹模10,从而完成整个拉延过程。在整个过程中凹模10、凸模20以及压边圈30中间任意一个部件的工作部分都是有凸圆角参与拉延成形,凹圆角本身不参与拉延成形。
结合图2至图4所示的本发明一具体实施方式。在本实施方式中,该凸模20设有若干凸模凸圆角21以及凸模凹圆角22。该凹模10设有若干凹模凸圆角11及若干凹模凹圆角12。该压边圈30设有若干压边圈凸圆角31及若干压边圈凹圆角32。当拉延模具100处于“闭模”状态时,
凹模的凸圆角11可被压边圈凹圆角32所径向收容,该压边圈凹圆角32的曲率大于其径向收容的凹模的凸圆角11的曲率。
凹模凸圆角11可被凸模凹圆角22所径向收容,该凸模凹圆角22的曲率大于其径向收容的凹模凸圆角11的曲率。
压边圈凸圆角31可被压边圈凹圆角12所径向收容,该压边圈凹圆角12的曲率大于其径向收容的压边圈凸圆角31的曲率。
凹模凸圆角11可被压边圈凹圆角32所径向收容,该压边圈凹圆角32的曲率大于其径向收容的凹模凸圆角11的曲率。
这样就使相互收容的凸圆角和凹圆在板料40成型后,在板料40与凹模凹圆角12或者凸模凹圆角22或者压边圈凹圆角32之间形成一定空隙,从而防止凹模凹圆角12或者凸模凹圆角22或者压边圈凹圆角32与产品圆角产生干涉,避免压伤零件,提高拉延模具加工钣金件的产品质量,并有效节约人力成本。
上文所列出的一系列的详细说明仅仅是针对本发明的可行性实施方式的具体说明,它们并非用以限制本发明的保护范围,凡未脱离本发明技艺精神所作的等效实施方式或变更均应包含在本发明的保护范围之内。
对于本领域技术人员而言,显然本发明不限于上述示范性实施例的细节,而且在不背离本发明的精神或基本特征的情况下,能够以其他的具体形式实现本发明。因此,无论从哪一点来看,均应将实施例看作是示范性的,而且是非限制性的,本发明的范围由所附权利要求而不是上述说明限定,因此旨在将落在权利要求的等同要件的含义和范围内的所有变化囊括在本发明内。不应将权利要求中的任何附图标记视为限制所涉及的权利要求。
此外,应当理解,虽然本说明书按照实施方式加以描述,但并非每个实施方式仅包含一个独立的技术方案,说明书的这种叙述方式仅仅是为清楚起见,本领域技术人员应当将说明书作为一个整体,各实施例中的技术方案也可以经适当组合,形成本领域技术人员可以理解的其他实施方式。
Claims (1)
1.一种拉延模具,其包括:凸模、凹模以及压边圈,所述凸模、凹模以及压边圈设有若干凸圆角及若干凹圆角,凹模的凸圆角被压边圈和/或凸模的凹圆角所径向收容,压边圈的凸圆角和/或凸模的凸圆角被凹模的凹圆角所径向收容,其特征在于:在任意一组径向收容的凹圆角与凸圆角中,所述凹圆角的曲率大于其径向收容的凸圆角的曲率;相互收容的凸圆角和凹圆角在板料成型后,在板料与凹模凹圆角或者凸模凹圆角或者压边圈凹圆角之间形成空隙。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210059895.7A CN102581136B (zh) | 2012-03-08 | 2012-03-08 | 一种拉延模具 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210059895.7A CN102581136B (zh) | 2012-03-08 | 2012-03-08 | 一种拉延模具 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102581136A CN102581136A (zh) | 2012-07-18 |
CN102581136B true CN102581136B (zh) | 2015-03-04 |
Family
ID=46470681
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210059895.7A Expired - Fee Related CN102581136B (zh) | 2012-03-08 | 2012-03-08 | 一种拉延模具 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102581136B (zh) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109506121B (zh) * | 2018-12-27 | 2024-01-23 | 东风汽车集团股份有限公司 | 过拉延结构、冲压产品及冲压模具 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5398572A (en) * | 1992-09-18 | 1995-03-21 | Fuji Jukogyo Kabushiki Kaisha | Press die assembly and method for producing the same |
CN101028638A (zh) * | 2007-04-09 | 2007-09-05 | 重庆大学 | 一种冲压拉延模具 |
CN101293264A (zh) * | 2007-04-26 | 2008-10-29 | 现代自动车株式会社 | 压机的压延筋成形单元 |
CN202447531U (zh) * | 2012-03-08 | 2012-09-26 | 无锡同捷汽车设计有限公司 | 一种拉延模具 |
-
2012
- 2012-03-08 CN CN201210059895.7A patent/CN102581136B/zh not_active Expired - Fee Related
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5398572A (en) * | 1992-09-18 | 1995-03-21 | Fuji Jukogyo Kabushiki Kaisha | Press die assembly and method for producing the same |
CN101028638A (zh) * | 2007-04-09 | 2007-09-05 | 重庆大学 | 一种冲压拉延模具 |
CN101293264A (zh) * | 2007-04-26 | 2008-10-29 | 现代自动车株式会社 | 压机的压延筋成形单元 |
CN202447531U (zh) * | 2012-03-08 | 2012-09-26 | 无锡同捷汽车设计有限公司 | 一种拉延模具 |
Also Published As
Publication number | Publication date |
---|---|
CN102581136A (zh) | 2012-07-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103624155A (zh) | 锻造用切边冲孔整形复合模具 | |
CN204035566U (zh) | 粉末冶金结构件的整形模具 | |
CN104438997A (zh) | 大型十字型锻件自由锻工艺 | |
CN203235812U (zh) | 一种压弯卷圆工件连续模 | |
CN202447531U (zh) | 一种拉延模具 | |
CN102581136B (zh) | 一种拉延模具 | |
CN101658895B (zh) | 航空发动机ta19钛合金机匣厚板局部加载成形方法 | |
CN102205487A (zh) | 利用激光切割和数控冲床的钣金加工方法 | |
CN103831593B (zh) | 空调风机端圈的成型方法 | |
CN204194583U (zh) | 针对薄壁冲压件用的护形精冲模具 | |
CN103240576A (zh) | 一种分体淬火型模加工方法 | |
CN202683762U (zh) | 一种s形折弯弹簧模 | |
CN102229036A (zh) | 利用数控冲床和下料模具的钣金件的加工方法 | |
CN109955032A (zh) | 下横臂衬板生产工艺 | |
CN104162768B (zh) | 链条零件成型加工方法 | |
CN202683772U (zh) | 一种usb端子模具 | |
CN104289593B (zh) | 一种液化气打火装置成型工艺 | |
CN208261616U (zh) | 一种倒角冲头 | |
CN110900109A (zh) | 汽车前横梁下板冷冲压生产工艺 | |
CN203221124U (zh) | 机油滤清器下壳级进模 | |
CN202910156U (zh) | 一种汽车内覆盖件的盒形件落料拉延复合成形装置 | |
CN202137273U (zh) | 一种带有一次回压工站的电气控制柜料桥架模具 | |
CN103722113A (zh) | 锻出突缘叉端齿工艺设计方法 | |
EP3397407A1 (en) | A die assembly for forming sheet metal at a single stroke with a single press and a line system integrated therewith | |
CN206415495U (zh) | 一种多工序复合模 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150304 Termination date: 20180308 |