CN102562161B - 冲击煤层巷道掘进后路能量释放范围的判定方法 - Google Patents

冲击煤层巷道掘进后路能量释放范围的判定方法 Download PDF

Info

Publication number
CN102562161B
CN102562161B CN201110378688.3A CN201110378688A CN102562161B CN 102562161 B CN102562161 B CN 102562161B CN 201110378688 A CN201110378688 A CN 201110378688A CN 102562161 B CN102562161 B CN 102562161B
Authority
CN
China
Prior art keywords
stress
dynamic
energy release
area
release range
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201110378688.3A
Other languages
English (en)
Other versions
CN102562161A (zh
Inventor
潘立友
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong University of Science and Technology
Original Assignee
Shandong University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong University of Science and Technology filed Critical Shandong University of Science and Technology
Priority to CN201110378688.3A priority Critical patent/CN102562161B/zh
Publication of CN102562161A publication Critical patent/CN102562161A/zh
Application granted granted Critical
Publication of CN102562161B publication Critical patent/CN102562161B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

本发明公开了一种冲击煤层巷道掘进后路能量释放范围的判定方法,它首先获得高应力区域;然后在高应力区域安装高敏感应力计,进行动应力趋向观测,获得定量的影响范围,将该范围划定为危险区域;最后在划定的危险区域内安设顶板动态仪,采用顶板动态观测法进行冲击危险性监测,根据监测数据定量描述巷道顶板动态应力分布规律,从而确定出危险程度,将具危险性的区域确定为能量释放范围。本发明通过在巷道后路安装敏感应力计,获得动态应力趋向特征,再在该区采用顶板动态法进行细微物理量的组合观测,定量描述顶态应力的分布规律,判定了巷道后路的早期扰动响应造成的危险程度,将具危险性的区域确定为能量释放范围。

Description

冲击煤层巷道掘进后路能量释放范围的判定方法
技术领域
本发明属于煤矿开采技术领域。
背景技术
随着矿井开采深度的增加,开采范围的扩大,开采的边界条件的复杂化,冲击地压的防治越来越严重,已经成为公认的世界级难题。目前深井巷道在掘进时后路冲击地压的防治主要采取解危措施,包括钻孔爆破卸压、钻孔卸压、顶板处理等措施。在解危时应首先判定能量释放范围才能有的放矢。所以对冲击地压能量释放范围进行科学的预测是冲击地压防治的关键。近几年来这方面的研究取得了一些进展。目前监测技术主要包括以下几个方面。
钻屑法:它的测定一般采用钻屑法探测。钻屑法是通过在煤层中打直径42~50mm的钻孔,根据排出的煤粉量及其变化规律和有关动力效应,鉴定冲击危险的一种方法。
声发射(地音)与微震监测:地音与微震监测方法是随电子技术的发展,尤其是电子计算机的普遍应用而得到发展的一种冲击地压预测预报方法。
应力预测法:煤体的应力变化是预测冲击地压的关键,应力变化的测量是实现冲击地压危险性预测的基础,目前大多采用钻孔应力计进行应力变化的监测,但由于应力监测体的刚度与煤体的刚度不匹配,其监测的数据不能代表煤体的真实应力。煤体应力变化的定量监测是冲击地压的预测的关键技术。
其它预测方法:如开采判定法,流动地音检测法,煤层含水量变化观测法,煤层围岩压力(变形)观测法,锤击波速法和顶板动态观测法等。
就巷道掘进期间后路冲击地压来说,如采用上述单一方法预测,具有“盲点”效应,主要表现在物理探测的物理量变化小,不容易建立判断准则。由于构造应力主要作用在顶底板,钻屑法对构造区域的巷道能量释放的判断不可靠。关于巷道后路冲击地压能量释放范围的组合判断方法还没有报导。
因此,采用多种方法进行综合预测已成为目前冲击地压预测的主要途径。
发明内容
本发明的目的是针对巷道掘进后路冲击地压能量释放范围问题,提出一种冲击煤层巷道掘进后路的能量释放范围的判定方法。
本发明采取的技术方案是:
第一步:获得高应力区域
在冲击地压危险煤层掘进巷道,特别是构造区域的掘进巷道,通过类比、相临采场冲击地压显现特征的分析、判定,同时采用钻屑法等监测手段进行现场检测,划分出高应力区域;
第二步:巷道动态应力趋向观测
在该高应力区域安装高敏感应力计,进行动应力趋向观测,获得定量的影响范围,将该范围划定为危险区域;
第三步:巷道冲击危险性监测
在划定的危险区域内安设顶板动态仪,采用顶板动态观测法进行冲击危险性监测,根据监测数据定量描述巷道顶板动态应力分布规律,从而确定出危险程度,将具危险性的区域确定为能量释放范围。
本发明的积极效果是:通过在巷道后路安装敏感应力计,获得动态应力趋向特征,预测巷道后路应力危险区域,再在该区采用顶板动态法进行细微物理量的组合观测,定量描述顶态应力的分布规律,判定了巷道后路的早期扰动响应造成的危险程度,将具危险性的区域确定为能量释放范围。这种综合观测的判断方法没有“盲点”效应,为在下一步解危时能有的放矢。
附图说明
下面结合附图说明本发明的实施例,附图为某矿3139工作面。
图1是高应力区域图;
图2是高应力区域监测仪器布置示意图
图3是动态应力分布观测示意图。
具体实施方式
如图所示,本发明冲击煤层巷道掘进后路的能量释放范围的判定方法步骤如下:
第一步:在冲击地压危险煤层掘进巷道,特别是构造区域的掘进巷道,在掘进前、掘进期间通过类比、相临采场冲击地压显现特征的分析、判定,同时采用钻屑法等监测手段进行现场检测,划分出高应力区域;见图1。
第二步:巷道动态应力趋向观测
在该区域安装高敏感应力计(见图2),进行动应力趋向观测,获得定量的影响范围,将该范围划定为危险区域;
第三步:巷道冲击危险性监测
在划定的危险区域内安设顶板动态仪(见图3),采用顶板动态观测法进行冲击危险性监测,根据监测数据定量描述巷道顶板动态应力分布规律,从而确定出危险程度,将具危险性的区域确定为能量释放范围。

Claims (1)

1.一种冲击煤层巷道掘进后路能量释放范围的判定方法,其特征在于,步骤如下:
第一步:获得高应力区域
在冲击地压危险煤层掘进巷道,通过类比、相临采场冲击地压显现特征的分析、判定,同时采用钻屑法监测手段进行现场检测,划分出高应力区域;
第二步:巷道动态应力趋向观测
在该高应力区域安装高敏感应力计,进行动应力趋向观测,获得定量的影响范围,将该范围划定为危险区域;
第三步:巷道冲击危险性监测
在划定的危险区域内安设顶板动态仪,采用顶板动态观测法进行冲击危险性监测,根据监测数据定量描述巷道顶板动态应力分布规律,从而确定出危险程度,将具危险性的区域确定为能量释放范围。
CN201110378688.3A 2011-11-14 2011-11-14 冲击煤层巷道掘进后路能量释放范围的判定方法 Expired - Fee Related CN102562161B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110378688.3A CN102562161B (zh) 2011-11-14 2011-11-14 冲击煤层巷道掘进后路能量释放范围的判定方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110378688.3A CN102562161B (zh) 2011-11-14 2011-11-14 冲击煤层巷道掘进后路能量释放范围的判定方法

Publications (2)

Publication Number Publication Date
CN102562161A CN102562161A (zh) 2012-07-11
CN102562161B true CN102562161B (zh) 2014-02-12

Family

ID=46408594

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110378688.3A Expired - Fee Related CN102562161B (zh) 2011-11-14 2011-11-14 冲击煤层巷道掘进后路能量释放范围的判定方法

Country Status (1)

Country Link
CN (1) CN102562161B (zh)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104653226B (zh) * 2014-12-26 2017-07-14 中国矿业大学 一种基于应力梯度的煤矿冲击地压危险区域的划分方法
CN106285782B (zh) * 2016-08-30 2018-11-13 中国矿业大学(北京) 一种复杂地质赋存环境下的冲击地压预警方法及系统
CN110107358A (zh) * 2019-05-01 2019-08-09 山东科技大学 一种巷道掘进期间的大范围岩爆危险性预测方法
CN110878694B (zh) * 2019-12-13 2021-06-04 山东科技大学 一种受采动影响的冲击危险巷道翻修期间的防护方法
CN112540400A (zh) * 2020-12-18 2021-03-23 山东科技大学 一种断层区动压显现强弱程度判断方法

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101581234B (zh) * 2009-06-29 2011-12-07 张平松 煤层采动顶底板岩层变形与破坏井下综合测试方法
CN201787903U (zh) * 2010-08-03 2011-04-06 泰安市计量测试所 顶板动态仪校准装置

Also Published As

Publication number Publication date
CN102562161A (zh) 2012-07-11

Similar Documents

Publication Publication Date Title
CN102392685B (zh) 密集巷道群冲击地压危险性预测方法
CN104454010B (zh) 一种深井巷道掘进施工动态综合监测预警系统与预警方法
Konicek et al. Stress changes and seismicity monitoring of hard coal longwall mining in high rockburst risk areas
CN102644482B (zh) 冲击地压预测预警方法
CN102562161B (zh) 冲击煤层巷道掘进后路能量释放范围的判定方法
Jayasinghe et al. Attenuation of rock blasting induced ground vibration in rock-soil interface
CN105626070B (zh) 一种深孔爆破卸压冲击地压防治方法
CN105179018B (zh) 一种煤矿冲击地压检测方法
Ramulu et al. Damage assessment of basaltic rock mass due to repeated blasting in a railway tunnelling project–A case study
CN105350965B (zh) 开采煤矿巷道冲击地压防治方法
CN110486007B (zh) 煤矿随钻围岩力学参数原位测试装置及方法
CN103176207B (zh) 一种微震监测系统及其安装方法
WO2018103324A1 (zh) 基于激光测距仪的巷道顶板岩体质量等级的随钻探测装置及方法
JP5867957B2 (ja) 岩盤強度の予測方法および予測システム
Gou et al. Attenuation assessment of blast-induced vibrations derived from an underground mine
Li et al. Survey of measurement-while-drilling technology for small-diameter drilling machines
Shirzadegan et al. Large scale dynamic testing of rock support system at Kiirunavaara underground mine
CN101963071B (zh) 当量钻屑量连续监测装置及方法
CN108489601A (zh) 一种隧道近距穿越地下管线的爆破振动监测及控制方法
Hu et al. Multiparameter monitoring and prevention of fault-slip rock burst
JP2002013381A (ja) 岩盤探査方法
CN106494460A (zh) 强矿震区域的高铁路基稳定性预警方法
CN101858715B (zh) 一种爆破中药包发生拒爆的识别及其拒爆药包的定位方法
Bahrampour et al. Instrumentation of a roof bolter machine for void detection and rock characterization
Wang et al. Experimental study of blast-induced vibration characteristics based on the delay-time errors of detonator

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140212

Termination date: 20211114

CF01 Termination of patent right due to non-payment of annual fee