CN110878694B - 一种受采动影响的冲击危险巷道翻修期间的防护方法 - Google Patents

一种受采动影响的冲击危险巷道翻修期间的防护方法 Download PDF

Info

Publication number
CN110878694B
CN110878694B CN201911282963.4A CN201911282963A CN110878694B CN 110878694 B CN110878694 B CN 110878694B CN 201911282963 A CN201911282963 A CN 201911282963A CN 110878694 B CN110878694 B CN 110878694B
Authority
CN
China
Prior art keywords
roadway
mining
soft layer
interception
area
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201911282963.4A
Other languages
English (en)
Other versions
CN110878694A (zh
Inventor
潘立友
刘宏军
毕强
孙久政
张若祥
陈理强
欧阳振华
陈建强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong University of Science and Technology
Original Assignee
Shandong University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong University of Science and Technology filed Critical Shandong University of Science and Technology
Priority to CN201911282963.4A priority Critical patent/CN110878694B/zh
Publication of CN110878694A publication Critical patent/CN110878694A/zh
Application granted granted Critical
Publication of CN110878694B publication Critical patent/CN110878694B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • E21C41/18Methods of underground mining; Layouts therefor for brown or hard coal
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/006Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries by making use of blasting methods
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/01Methods or apparatus for enlarging or restoring the cross-section of tunnels, e.g. by restoring the floor to its original level

Abstract

本发明公开了一种受采动影响的冲击危险巷道翻修期间的防护方法,其特征在于,在回采期间,首先确定受采动影响的冲击危险区域,同时取得该工作面在回采期间的周期来压步距;再在该区域以外的位置制造截流软层,截流软层的宽度为一个周期来压步距;当某段巷道达到必须翻修的程度时,按以下要求进行:如该段巷道处于冲击危险区域和截流软层区域时,则需停止工作面的回采后进行翻修;如该段巷道处截流软层区域以外时,可以边回采边翻修,但回采速度不能大于翻修速度,避免翻修动态扰动对冲击危险区域造成的影响,同时又避免了回采对翻修造成的影响,从根本上保障翻修期间的人身安全。

Description

一种受采动影响的冲击危险巷道翻修期间的防护方法
技术领域
本发明属于煤矿开采技术领域。
背景技术
冲击地压问题是世界性难题,其发生机理、预测与防控还没有从根本上得到解决。随着矿井开采深度的增加,开采范围的扩大,开采边界的复杂化,冲击地压的治理越来越难。深部开采巷道冲击地压造成的危险性不断增加,巷道冲击危险不仅仅发生在掘进期间,而且在巷道维修或翻修期间也出现冲击危险,特别是受到采动影响的高应力巷道,在翻修期间常常伴随较大的冲击显现。主要原因是极限状态的巷道围岩(煤层)对动压扰动非常敏感,翻修期间受到采动扰动极易引起冲击地压。随着开采深度增加,因煤层采动扰动对巷道翻修时造成的冲击地压越来越严重。如果采用常规的钻孔爆破和钻孔卸压措施,会波及及到工作面的连锁反应,造成大面积能量释放和系统性的强破坏。因此,在采动影响作用下,高应力、大埋深条件下的巷道翻修冲击地压的有效控制和防护问题,到目前为止还没有从根本上完全解决。
发明内容
本发明的目的是针对上述问题,提出一种采用中间隔离层防护翻修巷道的方法。
本发明的技术方案是:一种受采动影响的冲击危险巷道翻修期间的防护方法,其特征在于,在回采期间,首先对该工作面的巷道通过实际矿压观测、类比冲击地压显现特征,同时采用钻屑法等常规检测手段进行现场检测,确定受采动影响的冲击危险区域,同时取得该工作面在回采期间的周期来压步距;再在该区域以外的位置制造截流软层,截流软层的宽度b为一个周期来压步距;制造截流软层的方法是,在巷道两帮进行深孔爆破,爆破孔沿巷道布置一排,间距2-3米,直径42mm,孔深10-12m,距巷道底板1.0~1.3m,钻孔仰角0~3度,装药长度4.0-5.0m,每次起爆 2-3个孔,爆破后使煤层松软;
当某段巷道达到必须翻修的程度时,按以下要求进行:如该段巷道处于冲击危险区域和截流软层区域时,则需停止工作面的回采再进行翻修;如该段巷道处截流软层区域以外时,由于已有软层截流,可以边回采边翻修,但回采速度不能大于翻修速度。
本发明的积极效果是:由于定量确定巷道翻修与回采的时空关系和制造截流软层,避免翻修动态扰动对冲击危险区域造成的影响,同时又避免了回采对翻修造成的影响,从根本上保障翻修期间的人身安全,对煤矿安全生产具有重大意义。
附图说明
下面结合附图说明本发明的实施
图1是实施例的示意图。
具体实施方式
本领域技术人员按照发明内容所述的技术方案和图1所示的内容即可实施,在此不再详述。

Claims (1)

1.一种受采动影响的冲击危险巷道翻修期间的防护方法,其特征在于,在回采期间,首先对工作面的巷道通过实际矿压观测、类比冲击地压显现特征和钻屑法常规检测手段进行现场检测,确定受采动影响的冲击危险区域,同时取得该工作面在回采期间的周期来压步距;再在该区域以外的位置制造截流软层,截流软层的宽度为一个周期来压步距;制造截流软层的方法是,在巷道两帮进行深孔爆破,爆破孔沿巷道布置一排,间距2-3米,直径42mm,孔深10-12m,距巷道底板1.0~1.3m,钻孔仰角0~3度,装药长度4.0-5.0m,每次起爆 2-3个孔,爆破后使煤层松软;
当巷道某段达到必须翻修的程度时,按以下要求进行:如该段巷道处于冲击危险区域和截流软层之内的区域时,则停止工作面的回采后进行翻修;如该段巷道处于截流软层以外区域时,则边回采边翻修,但回采速度不能大于翻修速度。
CN201911282963.4A 2019-12-13 2019-12-13 一种受采动影响的冲击危险巷道翻修期间的防护方法 Active CN110878694B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911282963.4A CN110878694B (zh) 2019-12-13 2019-12-13 一种受采动影响的冲击危险巷道翻修期间的防护方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911282963.4A CN110878694B (zh) 2019-12-13 2019-12-13 一种受采动影响的冲击危险巷道翻修期间的防护方法

Publications (2)

Publication Number Publication Date
CN110878694A CN110878694A (zh) 2020-03-13
CN110878694B true CN110878694B (zh) 2021-06-04

Family

ID=69731521

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911282963.4A Active CN110878694B (zh) 2019-12-13 2019-12-13 一种受采动影响的冲击危险巷道翻修期间的防护方法

Country Status (1)

Country Link
CN (1) CN110878694B (zh)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112483097A (zh) * 2020-12-18 2021-03-12 山东科技大学 一种基于翻修的立体煤柱下采场巷道防冲方法

Family Cites Families (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2219340C1 (ru) * 2002-04-15 2003-12-20 ОАО "Шахта им. Ленина" Способ разработки мощных пологих угольных пластов с труднообрушаемыми породами кровли
CN101876520A (zh) * 2009-04-29 2010-11-03 宝钢集团新疆八一钢铁有限公司 大倾角煤层坚硬顶板超前预爆破工艺
CN101725368B (zh) * 2009-11-28 2011-08-17 山东科技大学 厚煤层大采高工作面沿空留巷方法
CN102392685B (zh) * 2011-09-12 2014-02-05 山东科技大学 密集巷道群冲击地压危险性预测方法
CN102562161B (zh) * 2011-11-14 2014-02-12 山东科技大学 冲击煤层巷道掘进后路能量释放范围的判定方法
CN102425418A (zh) * 2011-11-14 2012-04-25 山东科技大学 煤矿构造区域人造缺陷体防治冲击地压的方法
CN103334790B (zh) * 2013-07-23 2015-10-28 辽宁工程技术大学 基于高压气体爆破的煤层顶板超前预裂方法
CN104141506B (zh) * 2014-07-15 2016-01-20 青岛本末岩控技术有限公司 一种强烈矿压显现综采放顶煤工作面的矿压控制方法
CN104100266B (zh) * 2014-08-04 2016-08-24 山东科技大学 防治沿空巷道冲击地压的方法
CN105626070B (zh) * 2015-12-14 2018-01-16 辽宁工程技术大学 一种深孔爆破卸压冲击地压防治方法
CN106285680B (zh) * 2016-10-20 2018-07-20 山东科技大学 冲击性软煤层巷道后路冲击地压防治方法
CN106930691B (zh) * 2017-04-25 2018-09-28 山东科技大学 一种沿空回采巷道卸压孔的钻孔施工方法
CN109915143A (zh) * 2019-04-13 2019-06-21 山东科技大学 不等宽护巷煤柱工作面冲击地压的防治方法

Also Published As

Publication number Publication date
CN110878694A (zh) 2020-03-13

Similar Documents

Publication Publication Date Title
AU2017413518B2 (en) Stress-transfer method in tunnel with high ground pressure based on fracturing ring
Zhu et al. Mechanism and risk assessment of overall-instability-induced rockbursts in deep island longwall panels
WO2019148788A1 (zh) 一种主动强化支护与主动卸压防治冲击地压的方法
CN109339786B (zh) 一种预制裂缝定向水力压裂起裂方法
CN104763432B (zh) 一种高应力巷道围岩卸压控制大变形的方法
CN103216264B (zh) 预裂爆破回采巷道基本顶岩层控制围岩变形的方法
WO2011103620A1 (en) A method of reducing subsidence or windblast impacts from longwall mining
CN112780340B (zh) 一种煤矿井上下区域超前防治冲击地压的方法
CN108343418B (zh) 从地表定向水压致裂预裂基岩控制采动影响范围的方法
CN110878694B (zh) 一种受采动影响的冲击危险巷道翻修期间的防护方法
WO2024027030A1 (zh) 煤矿顶板区域压裂源头防治冲击地压方法
CN110005431A (zh) 一种不规则孤岛煤柱工作面冲击地压防治方法
CN115680658A (zh) 一种冲击地压源头防治方法
CN111625940B (zh) 一种基于冲击地压的孤岛工作面可开采性论证方法
CN114320318B (zh) 一种煤矿巷道围岩原位改性防冲方法
Liu et al. Mechanisms of floor heave in roadways adjacent to a goaf caused by the fracturing of a competent roof and controlling technology
CN110905528A (zh) 强扰动和分段进行翻修冲击地压危险巷道的方法
CN110985123A (zh) 一种高压水力预裂解危冲击矿压顺槽巷道钻孔布置方法
CN106285777B (zh) 大水矿山矿房超前放水的方法
Konicek Destressing
Córdova Geomechanical risk management and control at Andes Norte project: El Teniente mine
CN107956475A (zh) 一种保护开拓巷道围岩稳定性的结构及构筑方法
CN105275495B (zh) 一种判定冲击波危害性的方法
CN207598238U (zh) 一种保护开拓巷道围岩稳定性的结构
CN111553614B (zh) 一种孤岛工作面防冲安全开采论证方法

Legal Events

Date Code Title Description
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 266590 No. 579, Bay Road, Huangdao District, Shandong, Qingdao

Applicant after: Shandong University of Science and Technology

Address before: 271000 Shandong Province, Tai'an city Taishan District mountain Street No. 223 Tai'an campus of Shandong University of Science and Technology

Applicant before: Shandong University of Science and Technology

GR01 Patent grant
GR01 Patent grant