CN102556677B - Green brick stacking machine - Google Patents

Green brick stacking machine Download PDF

Info

Publication number
CN102556677B
CN102556677B CN201210011818.4A CN201210011818A CN102556677B CN 102556677 B CN102556677 B CN 102556677B CN 201210011818 A CN201210011818 A CN 201210011818A CN 102556677 B CN102556677 B CN 102556677B
Authority
CN
China
Prior art keywords
green brick
fork
frame
adobe
brick stacking
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201210011818.4A
Other languages
Chinese (zh)
Other versions
CN102556677A (en
Inventor
陈玉春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201210011818.4A priority Critical patent/CN102556677B/en
Publication of CN102556677A publication Critical patent/CN102556677A/en
Application granted granted Critical
Publication of CN102556677B publication Critical patent/CN102556677B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Furnace Charging Or Discharging (AREA)

Abstract

The invention discloses a green brick stacking machine and belongs to the technical field of building materials. A walking wheel moving on two parallel rails is arranged on the bottom parts of two upright posts of a door-shaped machine frame of the green brick stacking machine respectively; a sliding sleeve is arranged on each of the two upright posts for connecting a green brick stacking frame work table, and a lifting motor arranged at the top part of the machine frame is connected with the sliding sleeve through a cable wire; a transverse framework is arranged on the work table, a longitudinal framework is arranged on the transverse framework, and a green brick fork with a height capable of approaching to the ground is connected on the front surface of the longitudinal framework; and a green brick conveying platform is connected and fixed on the bottom pin of one upright post of the machine frame, and frame plates for placing green bricks in a number corresponding to that of a fork rod groups on the green brick fork are longitudinally arranged on the platform. Each group of fork rods of the green brick fork of the green brick stacking machine can be used for forking 3-5 green bricks at one time and forking 30-50 green bricks from 7-10 plate frames in total, which improves the production efficiency by 20 times than manpower and relieves the labor intensity of workers.

Description

Green brick stacking machine
Technical field: the present invention relates to a kind of building material machinery, the facility of the code frame adobe of especially a kind of brick field use.
Background technology: the brickmaking base process of brick field, a kind of is manually with mold, to deviate from adobe, stiff slightly after by the natural seasoning of setting up of artificial code.Another kind is to make adobe by brick press, then is set up and be dried by artificial code.These artificial code frame method work efficiency are low, and recruitment is many, is badly in need of replacing manual work with a kind of machinery.
Summary of the invention: the object of the invention is to design a kind of Green brick stacking machine, the adobe that brick press is made is set up at ready ground code, alleviates artificial heavy manual labor, increases work efficiency.For realizing this goal, adopted such technical scheme: a kind of Green brick stacking machine, it is comprised of portal frame, traveling gear, bench board, setting machine structure, blank feeding mechanism, motor-driven by first, to move on a two parallel orbits road wheel is arranged respectively at two column bottoms of portal frame; On two columns, respectively have a slip cap, Green brick stacking bench board is fixed on two slip caps, and frame top has lifting motor to be connected slip cap by pulley with steel rope; The transverse frame that has transverse shifting on bench board in setting machine structure on Green brick stacking bench board, has the longitudinal framing vertically moving thereon above transverse frame, connect an adobe fork for face highly accessibly before longitudinal framing; Adobe fork is the device that is fixed wtih the adobe fork arm of some groups of levels installations on a cross bar, has two cylindrical nib steel forks in every group of fork arm.
Root position at the fork arm near on adobe fork has a baffle plate being connected and fixed with transverse frame, and fork arm passes in baffle plate interstitial hole; Transverse frame is pulled by the second motor left and right, at shift motion two ends, has travel switch; Longitudinal framing, by pulling before and after the 3rd motor, also has travel switch at shift motion two ends.
On column footing of portal frame, connecting and sending base platform, the platform other end has road wheel; The rolling body that send the upper surface of base platform that several rows of protuberate is housed, can longitudinally place the frame plate of putting adobe corresponding to group number of quantity and adobe fork upper wishbone on platform.Send base platform front edge to have a push pedal that can vertically move along table top, push pedal and each group frame plate front end join; Send base platform lagging dege to have a pair of right adobe backing block, in every pair of backing block, the spacing of two backing blocks equals frame plate width.
The adobe of Green brick stacking machine is pitched every group of fork arm and is forked 3-5 piece brick at every turn, altogether can from 7-10 frame plate, fork the adobe of 30-50 piece simultaneously, then adobe fork moves by side to opposite side with adobe from bench board one, and by adobe code, in desired location, every day, Green brick stacking 10-20 was ten thousand.And manually at every turn can only an adobe of code, every day can only Green brick stacking 8,000 to 10,000, and machine, than artificial 20 times of the work efficiency that improve, has alleviated hand labor intensity simultaneously.
Accompanying drawing explanation: Fig. 1 is the structural representation of Green brick stacking machine.
The specific embodiment: be further described below in conjunction with accompanying drawing.Green brick stacking machine is comprised of frame, traveling gear, bench board, setting machine structure, blank feeding mechanism.The road wheel 12 of, a movement that can on two parallel orbits 13 that drive by the first motor 11 is arranged respectively at two columns bottom of portal frame 10.This traveling gear can make Green brick stacking machine move forward and backward smoothly in Green brick stacking process.On two columns, respectively have a slip cap 9, Green brick stacking bench board 8 is fixed on two slip caps.Frame top has lifting motor 1 to be connected slip cap by pulley 4 with steel rope.By the operation of switch 2, realize the lifting of bench board.The transverse frame 3 that has transverse shifting on bench board in setting machine structure on Green brick stacking bench board, above transverse frame, there is the longitudinal framing 6 vertically moving thereon, transverse frame is pulled by the second motor 14 left and right, drive longitudinal framing on bench board, to laterally move together, at shift motion two ends, there is travel switch 7, automatic train stop when framework is moved into place.Longitudinal framing is pulled by the 3rd motor 5 front and back, on transverse frame, vertically moves, and at shift motion two ends, also has travel switch.Before longitudinal framing, connect an adobe fork 16 for face highly accessibly, adobe fork is the device that is fixed wtih the fork arm of some groups of levels installations on a cross bar, and every group of fork arm has two cylindrical nib steel forks.In the position near fork arm root, have a baffle plate 15 being connected and fixed with transverse frame, fork arm passes in baffle plate interstitial hole.On a column footing of portal frame, connect and send base platform 19, the platform other end has road wheel 17, guarantees that platform follows frame and move together.The rolling body 21 that send base platform upper surface to have several rows of protuberate, send the frame plate of putting adobe 22 corresponding to group number that can longitudinally place quantity and adobe fork upper wishbone on base platform.Under the effect of rolling body, frame plate can move easily on platform.Send base platform front edge have one can be along the push pedal 20 of moving playing surface, push pedal and each group frame plate front end joins, and is used on platform mobile frame plate backward.Send the lagging dege of base platform to have adobe backing block 23 in pairs, in every pair of backing block, the interval of two backing blocks equals the width of frame plate, is less than again the length of adobe simultaneously.Frame plate can be vertically moved at two Zhi Dong Kuai Inter, and the adobe on frame plate is blocked at the lagging dege that send base platform.
The frame plate that is placed with adobe of coming from brick press is longitudinally placed on and send on base platform, transverse frame on bench board moves to and send base platform opposite, and longitudinal framing moves forward and stretches out fork arm, adobe on fork, then bench board rises, transverse frame is traversing to opposite side, and bench board declines, and makes adobe fork put down adobe, longitudinal framing retreats, push pedal props up adobe, and fork arm exits from adobe, and it is safe that adobe is placed on ground.Operation repeatedly like this, adobe, first at ground release ground floor, is piled up after sufficient length, by frame, move forward and backward and bench board oscilaltion, the left and right of transverse frame and longitudinal framing, move forward and backward and coordinate, make adobe pile up again the second layer, the 3rd layer, until pile up enough height.Sending on base platform, every fork is walked a collection of adobe, can vacate a position on frame plate, need to manually by send the push pedal on base platform that each frame plate is passed backward, until the adobe on frame plate is stopped piece, block, and assurance fork is got the process of adobe and carried out smoothly.Also can help adobe and can not fall down by manually push pedal being arrived to adobe rear end, adobe last on frame plate can successfully be pitched by adobe fork.

Claims (4)

1. a Green brick stacking machine, it is comprised of portal frame, traveling gear, bench board, setting machine structure, blank feeding mechanism, it is characterized in that: a road wheel (12) that driven by the first motor (11), that above move at two parallel orbits (13) is arranged respectively at (10) two column bottoms of portal frame; On two columns, respectively have a slip cap (9), Green brick stacking bench board (8) is fixed on two slip caps, and frame top has lifting motor (1) to be connected slip cap by pulley (4) with steel rope; The transverse frame (3) that has transverse shifting on bench board in setting machine structure on Green brick stacking bench board, above transverse frame, there is the longitudinal framing (6) vertically moving thereon, connect an adobe fork (16) for face highly accessibly before longitudinal framing; At the fork arm root position near adobe fork, have a baffle plate (15) being connected and fixed with transverse frame, fork arm passes in baffle plate interstitial hole; On column footing of portal frame, connecting and sending base platform (19), the platform other end has road wheel (17); Send on base platform and can longitudinally place quantity and the frame plate of putting adobe (22) corresponding to adobe fork upper wishbone group number, send base platform front edge to have a push pedal that can vertically move along table top (20), push pedal and each group frame plate front end join; Send base platform lagging dege to have a pair of right adobe backing block (23), in every pair of backing block, the spacing of two backing blocks equals frame plate width.
2. Green brick stacking machine as claimed in claim 1, is characterized in that: transverse frame (3) is pulled by the second motor (14) left and right, has travel switch (7) at shift motion two ends; Longitudinal framing, by pulling before and after the 3rd motor (5), also has travel switch at shift motion two ends.
3. Green brick stacking machine as claimed in claim 1 or 2, is characterized in that: the adobe fork (16) on longitudinal framing (6) is the device that is fixed wtih the fork arm of some groups of levels installations on a cross bar, has two cylindrical nib steel forks in every group of fork arm.
4. Green brick stacking machine as claimed in claim 1, is characterized in that: send the upper surface of base platform (19) that the rolling body (21) of several rows of protuberate is housed.
CN201210011818.4A 2012-01-05 2012-01-05 Green brick stacking machine Expired - Fee Related CN102556677B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210011818.4A CN102556677B (en) 2012-01-05 2012-01-05 Green brick stacking machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210011818.4A CN102556677B (en) 2012-01-05 2012-01-05 Green brick stacking machine

Publications (2)

Publication Number Publication Date
CN102556677A CN102556677A (en) 2012-07-11
CN102556677B true CN102556677B (en) 2014-01-29

Family

ID=46403574

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210011818.4A Expired - Fee Related CN102556677B (en) 2012-01-05 2012-01-05 Green brick stacking machine

Country Status (1)

Country Link
CN (1) CN102556677B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103482291B (en) * 2013-09-30 2015-07-22 宁波海良精机有限公司 Stacking machine
CN105059957B (en) * 2015-08-04 2017-12-29 山东交通职业学院 Automatic shovel watt machine
CN107117454A (en) * 2017-06-21 2017-09-01 浙江亿诺自动化有限公司 Logistics delivery band pusher
CN107416546A (en) * 2017-08-31 2017-12-01 烟台海德汽车零部件有限责任公司 Packing case automatic loading device
CN108190530A (en) * 2018-01-03 2018-06-22 河钢股份有限公司承德分公司 A kind of offline batch heat treatment bar distribution device and distributing method
CN108608587A (en) * 2018-04-25 2018-10-02 安徽昆蒙新型建材有限公司 A kind of hollow brick production auto-dividing device
CN110667944B (en) * 2019-10-30 2021-01-22 吴月娇 Processing method of flexible environment-friendly antibacterial eraser

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0146643A1 (en) * 1983-12-06 1985-07-03 Icoma Packtechnik GmbH Pallet loader
CN2040084U (en) * 1988-12-14 1989-06-28 吴栋梁 Overhead walking type stacking machine
AU659958B2 (en) * 1992-12-03 1995-06-01 Mcneall Industrial Technologies Pty Limited A palletizer
CN201321289Y (en) * 2008-12-10 2009-10-07 姚明杰 Automatic grouping setting machine
CN201458360U (en) * 2009-08-03 2010-05-12 潜江市景福新型墙体材料厂 Full-automatic brick stacking and dropping machine
CN202400631U (en) * 2012-01-05 2012-08-29 陈玉春 Green brick piling machine

Also Published As

Publication number Publication date
CN102556677A (en) 2012-07-11

Similar Documents

Publication Publication Date Title
CN102556677B (en) Green brick stacking machine
CN203701626U (en) Automatic wall building machine
CN104925531B (en) A kind of Full automatic loading brick stacking machine
CN203612655U (en) Tile automatic stacking device
CN103741955A (en) Automatic wall building machine
CN105569359A (en) Wall building robot
CN203855169U (en) Gate-type brick stacking machine
CN103625932B (en) Automatic elevator guide rail stacker
CN103253518B (en) Physical distribution tray stacking support
CN103112724A (en) Hacking machine for bricks
CN202400631U (en) Green brick piling machine
CN105417149A (en) Framework robot
CN204525743U (en) A kind of wallboard automatic demoulding, piling, separation equipment
CN109570396B (en) Automatic feeding numerical control steel bar bending center
CN208531586U (en) A kind of building template conveys continuous transfer device online
CN204324347U (en) One pushes away bag palletizing system automatically
CN204780607U (en) Stride thrustor
CN204643181U (en) A kind of improved type gate-type brick stacking machine
CN205346337U (en) Brick board separation pile up neatly device
CN103692547B (en) Automatically remove the aerated concrete equipment overturning platform capable of green brick waste
CN207226456U (en) A kind of planer-type brick plate separates stacking machine
CN201106172Y (en) Automatic testboring machine
CN111115132B (en) A suspension type conveying equipment for pyrotechnic composition
CN207404509U (en) Co-ordinate-type automatic setting machine
CN204247548U (en) Building steel tube sorting machine

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140129

Termination date: 20150105

EXPY Termination of patent right or utility model