CN102556645A - Conveying production line and workbench for same - Google Patents
Conveying production line and workbench for same Download PDFInfo
- Publication number
- CN102556645A CN102556645A CN2012100259680A CN201210025968A CN102556645A CN 102556645 A CN102556645 A CN 102556645A CN 2012100259680 A CN2012100259680 A CN 2012100259680A CN 201210025968 A CN201210025968 A CN 201210025968A CN 102556645 A CN102556645 A CN 102556645A
- Authority
- CN
- China
- Prior art keywords
- bench board
- group
- belt conveyor
- belt
- conveyor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Abstract
The invention provides a conveying production line comprising a workbench and the workbench for the same, which overcome shortcomings of low integral production efficiency and waste of labor power and material resource due to the fact takt time of processes is inconsistent, some processes are idle but workpieces in some processes are stacked during assembly production of a workbench for a production line in the prior art. The workbench comprises a base, an upper seat, a lifting device and at least two groups of conveying belts, the upper seat is arranged above the base, the lifting device is used for lifting the upper seat, the conveying belts in two groups are arranged on the upper seat from top to bottom, and each group of conveying belts is provided with a driving device. By the aid of the conveying production line and the workbench for the same, the takt time of the processes is basically consistent, idleness of the processes is avoided, and operating efficiency is improved.
Description
Technical field
The present invention relates to a kind of manufacturing line with bench board and transmission production line.
Background technology
In manufacturing line, by the belt conveyor conveying work pieces, each belt conveyor is the bench board of an operation at present, and the workman carries out workpiece assembling on the belt conveyor body, by belt conveyor the workpiece of preceding working procedure assembled is sent to next procedure.Because the complexity of each operation is different; Preceding working procedure usually can occur and not accomplish assembly working, and the assembly working of this procedure has been accomplished in next procedure, the situation of preceding working procedures such as next procedure; Total like this some workman is idle at work, causes production efficient low.
Summary of the invention
The objective of the invention is to solve in the prior art manufacturing line with bench board in the assembling production process; The inter process productive temp is inconsistent; To making some operations idle, and the workpiece of some operation is piled up, thereby causes production efficient low; The deficiency of waste of manpower and material resources provides a kind of essentially identical manufacturing line of beat of inter process that makes to use bench board.
Another object of the present invention provides a kind of transmission production line that can make each inter process productive temp keep basically identical.
The objective of the invention is to realize through following technical scheme:
A kind of manufacturing line is used bench board, comprise base, be arranged on end top the seat of honour, the up-down seat of honour jacking system and be arranged at least two group belt conveyor on the seat of honour by from top to bottom direction, said each group belt conveyor is provided with actuating device;
The described seat of honour is composed of a fixed connection by the multilayer support body, and one group of belt conveyor is set on every layer of support body;
The group number of described belt conveyor is two groups, is made up of upper conveyor belt group and lower conveyor belt group, and the described seat of honour is composed of a fixed connection by upper strata support body and lower floor's support body, and the upper conveyor belt group is arranged on the support body of upper strata, and said lower conveyor belt group is arranged on lower floor's support body;
The said belt conveyor of respectively organizing vertically is provided with up and down;
Described belt conveyor is to be with at least two belt conveyor of every group of setting synchronously;
Described jacking system is the pneumatic/hydraulic cylinder jacking system.
A kind of transmission production line, comprise one and more than above-mentioned bench board;
Described bench board is at least two, and butt joint is provided with;
One group of bench board is set at least, a bench board is set at least in every group, described every group of bench board is provided with by common conveyer at interval, and said bench board docks setting with said common conveyer.
Adopt the manufacturing line of structure of the present invention to use bench board, owing to have the many groups belt conveyor that is provided with up and down, every group of belt conveyor forms one deck belt conveyor; Every group of belt conveyor has independently driving device, but every group of belt conveyor individual operation, and the belt conveyor that can go up and down as required; Make wherein certain layer of belt conveyor and last/next station or on/next procedure docks; Workpiece is sent to needed station or operation,, realizes a plurality of bench board of one procedure so the quantity of this bench board can be set according to the beat of per pass operation work; Beat between each procedure is consistent basically, has improved work efficiency.Also can workpiece be delivered to certain designating step on request, and need not transmit workpiece by procedure according to the arrangement of operation.
Adopt the transmission production line of structure of the present invention, in transmission production line, comprise at least one bench board, each bench board has the many groups belt conveyor that is provided with up and down; Every group of belt conveyor forms one deck belt conveyor; Every group of belt conveyor has independently driving device, but every group of belt conveyor individual operation, and the belt conveyor that can go up and down as required; Certain layer of belt conveyor wherein docked with following/last bench board or following/last process; So can avoid the idle of operation according to the needs of each operation conveying work pieces at any time, improve the efficient of whole piece transmission production line.
Description of drawings
Fig. 1 for manufacturing line of the present invention with bench board example structure scheme drawing;
Fig. 2 is the birds-eye view of Fig. 1;
Fig. 3 and Fig. 4 transmit scheme drawing for utilizing bench board of the present invention to carry out workpiece processing;
Fig. 5 and Fig. 6 are transmission production line example structure scheme drawing of the present invention.
1-upper conveyor belt group 2-lower conveyor belt group 3-pneumatic/hydraulic cylinder 4-base 5-lower conveyor belt actuating device 6-seat of honour 7-upper conveyor belt actuating device 8-is synchronously with the common conveyer of belt body 9-upper strata this operation of the support body 11-of the support body 10-lower floor preceding working procedure 12-13-first bench board 14-, second another workpiece of bench board 15-workpiece 16-17-bench board group 18-
The specific embodiment
Below in conjunction with accompanying drawing and embodiment the present invention is done further description:
Shown in Fig. 1-2; Manufacturing line of the present invention comprises at least two group belt conveyor with bench board, and every group of belt conveyor is provided with actuating device, and each is organized belt conveyor and is arranged on the seat of honour 6 by from top to bottom direction; The seat of honour 6 is connected to form by the multilayer support body; One group of belt conveyor is set on every layer of support body, and every group of belt conveyor constitutes one deck belt conveyor, captives joint with the piston rod head end of the pneumatic/hydraulic cylinder 3 of tape guide in the seat of honour 6; The cylinder body of pneumatic/hydraulic cylinder 3 is captiveed joint with base 4, is promoted or the landing seat of honour 6 by pneumatic/hydraulic cylinder.
Every group of belt conveyor can be a belt conveyor, also can be many coaxial settings of belt conveyor.Each belt conveyor can be a flat rubber belting, also can be flat belt conveyor.In the preferred embodiments of the present invention, each belt conveyor is synchronous band, and it comprises belt wheel, wheel shaft and synchronous band belt body, and belt body is around being arranged on the belt wheel synchronously, and belt wheel is fixedly installed on the wheel shaft, and wheel shaft is arranged on the seat of honour 6.When adopting synchronous band, every group of belt conveyor is at least two.
In the preferred version of the present invention; The belt conveyor group is upper and lower two groups; Be that this bench board has two-layer belt conveyor up and down; The seat of honour 6 is the support body of the framed structure that is made up of upper strata support body 9 and lower floor's support body 10, and upper conveyor belt group 1 and upper conveyor belt actuating device 7 are fixedly installed on the upper strata support body 9, and lower conveyor belt group 2 and lower conveyor belt actuating device 8 are fixedly installed on lower floor's support body 10.
The belt conveyor group that is positioned at the top can be vertically upper and lower layout with the belt conveyor group that is positioned at the below; The line of centers that is to say belt conveyor group that is positioned at the top and the belt conveyor group that is positioned at the below is positioned at same perpendicular; Also can be that part is staggeredly arranged, the belt conveyor group that just is positioned at the top be positioned at different perpendiculars with the line of centers of the belt conveyor group that is positioned at the below.
Shown in Fig. 3-6; Because the beat of each procedure is different on the transmission production line; The operation of length consuming time can be provided with the bench board of an above structure of the present invention, and butt joint is provided with between bench board, and the operation of weak point consuming time is provided with a common individual layer conveyer as bench board.Operating personal can the belt conveyor of one deck in office on operation, this moment, the belt conveyor of other layer was responsible for conveying work pieces.For easy to operate operation on the belt conveyor of the superiors usually, by the belt conveyor conveying work pieces that is positioned at lower floor.Can obtain the transmission production line of being provided with of multiple arrangement mode arrangement works platform of the present invention like this; As the bench board of a structure of the present invention can be set in this operation; And preceding working procedure 11 and later process are common conveyer 18; As long as can the workpiece of preceding working procedure be sent on request to the bench board of this operation, can the workpiece that this operation is accomplished be sent to next procedure and get final product.The bench board group 17 that also can be made up of the bench board of structure of the present invention at interval common conveyer is common conveyer like preceding working procedure, and this operation is by two and above bench board butt joint setting of the present invention, and later process is common conveyer.Also can be that this procedure and preceding/later process are the bench board of structure of the present invention, back/preceding working procedure be common conveyer, and preceding again/back operation is the bench board of at least one structure of the present invention, and bench board docks setting with common conveyer.All this kind distortion is all in protection scope of the present invention.
With this operation 12 of transmission production line the bench board that two double-deck belt conveyor form being set below is that example is carried out operation instructions.At upper conveyor belt group 1 enterprising line operate, is that example describe by lower conveyor belt group 2 conveying work pieces with operating personal.
The bench board of the preceding working procedure 11 of this operation is a common band conveyer.First bench board 13 of this operation 12 and the band conveyer of second bench board 14 and preceding working procedure are corresponding to be provided with.
As shown in Figure 3; When preceding working procedure 11 has workpiece will be sent to first bench board 13 of this operation 12; The cylinder of first bench board 13 descends, and upper conveyor belt group 1 is alignd with the belt conveyor of preceding working procedure 11, and a workpiece 15 is sent on the upper conveyor belt group 1 of first bench board 13; The cylinder piston rod of first bench board 13 rose after transmission put in place; Workman's operation on the upper conveyor belt group 1 of first bench board 13, this moment, the lower conveyor belt group 2 of first bench board 13 was alignd with the belt conveyor of preceding working procedure 11, and the cylinder of second bench board 14 descends simultaneously; The upper conveyor belt group 1 of second bench board 14 is alignd with the lower conveyor belt group 2 of first bench board; The next workpiece 16 of preceding working procedure 11 is sent on the upper conveyor belt group 1 of second bench board 14 through the lower conveyor belt group 1 of first bench board 13, and the cylinder that another workpiece 16 is transmitted back second bench board 14 that puts in place rises the workman of second bench board operation on the upper conveyor belt group 2 of second bench board 14.Completion is to the supply of this operation all working platform workpiece.
When workpiece 15 completion of processing of first bench board 13 need to the next procedure conveying work pieces; The cylinder piston rod of first bench board 13 descends; The upper conveyor belt group 2 of first bench board 13 is alignd with the lower conveyor belt group 2 of second bench board 14, and workpiece 15 is sent to later process through the lower conveyor belt group 2 of second bench board 14.When 14 operations of second bench board finish, the cylinder piston rod of second bench board 14 descends, and the upper conveyor belt group 2 of second bench board 14 is alignd with the belt conveyor of later process, and another workpiece 16 is sent to later process, cycle operation like this.
This transmission production line; The bench board of varying number can be set in each operation by the efficient of each operation; Can transmit a plurality of workpiece and process in same operation, improve the completion rate of the workpiece of complicated procedures of forming, the whole production line work tempo is consistent or basically identical; Reduce or avoided the idle phenomenon of operation, improved the work efficiency of whole production line.Can calculate the quantity of each operation bench board according to common multiple or least common multiple, make each operation in the identical time, accomplish the workpiece of equal number, bring into play the work efficiency of whole production line to greatest extent.Because each bench board all is provided with two-layer above belt conveyor group; Wherein one deck belt conveyor group is the workpiece processing layer at least, is on the position of workpiece processing layer the position of the conveying work pieces that remainder layer belt conveyor group is in; When via this bench board conveying work pieces; Need not stop processing, just can other workpiece be sent to required bench board, so efficient is high this bench board workpiece.
Claims (9)
1. a manufacturing line is used bench board; It is characterized in that; Comprise base (4), be arranged on base (4) top the seat of honour (6), the up-down seat of honour (6) jacking system and be arranged at least two group belt conveyor on the seat of honour by from top to bottom direction, said each group belt conveyor is provided with actuating device.
2. manufacturing line as claimed in claim 1 is used bench board, it is characterized in that, the described seat of honour (6) are composed of a fixed connection by the multilayer support body, and one group of belt conveyor is set on every layer of support body.
3. manufacturing line as claimed in claim 1 is used bench board; It is characterized in that; The group number of described belt conveyor is two groups, is made up of upper conveyor belt group (1) and lower conveyor belt group (2), and the described seat of honour (6) are composed of a fixed connection by upper strata support body (9) and lower floor's support body (10); Upper conveyor belt group (1) is arranged on the upper strata support body (9), and said lower conveyor belt group (2) is arranged on lower floor's support body (10).
4. manufacturing line as claimed in claim 1 is used bench board, it is characterized in that, the said belt conveyor of respectively organizing vertically is provided with up and down.
5. use bench board like claim 1 or 2 or 3 described manufacturing lines, it is characterized in that, described belt conveyor is to be with at least 2 belt conveyor of every group of setting synchronously.
6. manufacturing line as claimed in claim 1 is used bench board, it is characterized in that, described jacking system is pneumatic/hydraulic cylinder (a 3) jacking system.
7. a transmission production line is characterized in that, comprises one and above like the described bench board of claim 1-5.
8. transmission production line as claimed in claim 7 is characterized in that, described bench board is at least two, and butt joint is provided with.
9. like claim 7 or 8 described transmission production lines; It is characterized in that, one group of bench board is set at least, a bench board is set at least in every group; Described every group of bench board is provided with by common conveyer (18) at interval, and said bench board docks setting with said common conveyer.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210025968.0A CN102556645B (en) | 2012-01-21 | 2012-01-21 | Production line workbench and transmission production line |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210025968.0A CN102556645B (en) | 2012-01-21 | 2012-01-21 | Production line workbench and transmission production line |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102556645A true CN102556645A (en) | 2012-07-11 |
CN102556645B CN102556645B (en) | 2016-12-28 |
Family
ID=46403547
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210025968.0A Active CN102556645B (en) | 2012-01-21 | 2012-01-21 | Production line workbench and transmission production line |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102556645B (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102991983A (en) * | 2012-03-30 | 2013-03-27 | 秦皇岛博硕光电设备股份有限公司 | Method for conveying workpiece by workbench on production line |
CN104692107A (en) * | 2015-03-04 | 2015-06-10 | 昆山平成电子科技有限公司 | Automatic material changing mechanism |
CN105217262A (en) * | 2014-06-20 | 2016-01-06 | 昆山杰士德精密工业有限公司 | Sectional type automatic lifting streamline mechanism |
CN109176446A (en) * | 2018-09-04 | 2019-01-11 | 莱芜钢铁集团有限公司 | High-altitude maintenance device and application method inside memorial archway formula milling train |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3030829A1 (en) * | 1979-08-16 | 1981-03-26 | Air Industrie S.A., Courbevoie, Hauts-de-Seine | MACHINE FOR REMOVING ITEMS IN ROWS ON A CONTINUOUS TREADMILL |
CN201087031Y (en) * | 2007-07-23 | 2008-07-16 | 江苏天奇物流系统工程股份有限公司 | Double-layer rotating rolling bed |
CN201106267Y (en) * | 2007-09-20 | 2008-08-27 | 杨玉霞 | Assembly line of composite thermal insulation wall plate and external heat-insulation board for external wall |
CN201332652Y (en) * | 2008-12-25 | 2009-10-28 | 北京有色金属研究总院 | Conveyer used in process of food production |
CN201423791Y (en) * | 2009-04-28 | 2010-03-17 | 秦皇岛瑞晶太阳能科技有限公司 | Multilayer thermal insulation system for amorphous silicon solar battery module laminator |
CN201713103U (en) * | 2010-01-29 | 2011-01-19 | 上海欧菲滤清器有限公司 | Double-layer production line conveyor belt |
CN202575204U (en) * | 2012-01-21 | 2012-12-05 | 秦皇岛博硕光电设备股份有限公司 | Production-line workbench and conveying production line |
-
2012
- 2012-01-21 CN CN201210025968.0A patent/CN102556645B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3030829A1 (en) * | 1979-08-16 | 1981-03-26 | Air Industrie S.A., Courbevoie, Hauts-de-Seine | MACHINE FOR REMOVING ITEMS IN ROWS ON A CONTINUOUS TREADMILL |
CN201087031Y (en) * | 2007-07-23 | 2008-07-16 | 江苏天奇物流系统工程股份有限公司 | Double-layer rotating rolling bed |
CN201106267Y (en) * | 2007-09-20 | 2008-08-27 | 杨玉霞 | Assembly line of composite thermal insulation wall plate and external heat-insulation board for external wall |
CN201332652Y (en) * | 2008-12-25 | 2009-10-28 | 北京有色金属研究总院 | Conveyer used in process of food production |
CN201423791Y (en) * | 2009-04-28 | 2010-03-17 | 秦皇岛瑞晶太阳能科技有限公司 | Multilayer thermal insulation system for amorphous silicon solar battery module laminator |
CN201713103U (en) * | 2010-01-29 | 2011-01-19 | 上海欧菲滤清器有限公司 | Double-layer production line conveyor belt |
CN202575204U (en) * | 2012-01-21 | 2012-12-05 | 秦皇岛博硕光电设备股份有限公司 | Production-line workbench and conveying production line |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102991983A (en) * | 2012-03-30 | 2013-03-27 | 秦皇岛博硕光电设备股份有限公司 | Method for conveying workpiece by workbench on production line |
CN102991983B (en) * | 2012-03-30 | 2016-01-27 | 秦皇岛博硕光电设备股份有限公司 | Utilize the method for bench board conveying work pieces on a production line |
CN105217262A (en) * | 2014-06-20 | 2016-01-06 | 昆山杰士德精密工业有限公司 | Sectional type automatic lifting streamline mechanism |
CN104692107A (en) * | 2015-03-04 | 2015-06-10 | 昆山平成电子科技有限公司 | Automatic material changing mechanism |
CN109176446A (en) * | 2018-09-04 | 2019-01-11 | 莱芜钢铁集团有限公司 | High-altitude maintenance device and application method inside memorial archway formula milling train |
Also Published As
Publication number | Publication date |
---|---|
CN102556645B (en) | 2016-12-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102991983B (en) | Utilize the method for bench board conveying work pieces on a production line | |
CN104384358A (en) | Stamping die change system and method | |
CN103203409A (en) | Pipe fitting production line | |
CN102556645A (en) | Conveying production line and workbench for same | |
CN107081446B (en) | A kind of oil Pump rotor class Workpiece boring special for automatic production line | |
CN107161649A (en) | Working plate does not shut down Automatic-feeding method and its feeding device | |
CN101279514B (en) | Punching machine, automatic processing system with the punching machine and method for processing sheet material | |
CN207596049U (en) | A kind of assembly line feeding device for being used for two station balancing machines | |
CN202317673U (en) | Automatic production line of container | |
CN207859344U (en) | A kind of nut feeder | |
CN105396752B (en) | Slide rail automatic oiling device and its operating method | |
CN203109696U (en) | Automatic riveting shaft feeding device | |
CN207171490U (en) | A kind of Material moving device of the full-automatic square hole machine of axle | |
CN202575204U (en) | Production-line workbench and conveying production line | |
CN206939854U (en) | Work piece buffer and the streamline using the work piece buffer | |
CN203265382U (en) | Production line for machining pipes | |
CN203812572U (en) | On-line PBA (Printed Board Arrangement) EEPROM (Electrically Erasable Programmable Read-Only Memory) burning system | |
CN203738030U (en) | Pneumatic conveying mechanical hand | |
CN102991966B (en) | Beat transmission equipment of production line | |
CN215100087U (en) | Lower ring automatic feeding mechanism | |
CN103041957A (en) | Automatic glue dispensing device and method | |
CN203126018U (en) | Lower lifting air cushion device with function of hydraulic cushioning for multiple-station double-point press machine | |
CN203664434U (en) | Automatic corrugating device | |
CN204250861U (en) | Steel ring automatic supplier | |
CN107539739A (en) | A kind of vehicle glass gluing bound edge production line |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |