CN102545119A - 一种变电所内母线耐张线夹的液压压接方法 - Google Patents

一种变电所内母线耐张线夹的液压压接方法 Download PDF

Info

Publication number
CN102545119A
CN102545119A CN2012100256894A CN201210025689A CN102545119A CN 102545119 A CN102545119 A CN 102545119A CN 2012100256894 A CN2012100256894 A CN 2012100256894A CN 201210025689 A CN201210025689 A CN 201210025689A CN 102545119 A CN102545119 A CN 102545119A
Authority
CN
China
Prior art keywords
crimping
mode
mould
steel anchor
outwards
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012100256894A
Other languages
English (en)
Inventor
王远航
冯浩
焦明航
张�浩
张琳
艾伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
LIAONING ELECTRIC POWER CO Ltd LIAOYANG POWER SUPPLY Co
State Grid Corp of China SGCC
Original Assignee
LIAONING ELECTRIC POWER CO Ltd LIAOYANG POWER SUPPLY Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by LIAONING ELECTRIC POWER CO Ltd LIAOYANG POWER SUPPLY Co filed Critical LIAONING ELECTRIC POWER CO Ltd LIAOYANG POWER SUPPLY Co
Priority to CN2012100256894A priority Critical patent/CN102545119A/zh
Publication of CN102545119A publication Critical patent/CN102545119A/zh
Pending legal-status Critical Current

Links

Images

Abstract

本发明涉及一种变电所内母线耐张线夹的液压压接方法,包括以下步骤:①第一模a的压接:将铝线钢锚中,从钢锚的管口端处向外进行第一模a的压接;②第二模b的压接:在第一模压接后的基础上,第二模沿第一模顺势向外进行压接;③第三模c的压接:在第二模压接后的基础上,第三模沿第二模顺势向外进行压接,同时预留出钢锚部分;④第四模d的压接:在预留的钢锚部分与引线板间进行第四模d的压接;⑤压接完成后将毛刺磨平。本发明操作简单易行,克服了导线压接后出现“灯笼花”的现象,提高了导线压接质量和效率、提高导线美观程度、导电效果和承受的拉力。节省了因施工质量不合格带来的导线和线夹浪费,增强了电网抵御外力破坏的能力。

Description

一种变电所内母线耐张线夹的液压压接方法
技术领域
    本发明涉及一种变电所内母线耐张线夹的液压压接方法。
背景技术
  随着近十几年来电网建设和改造的大规模进行,新产品、新技术的广泛应用,原先应用于架空送电线路导线液压压接的工艺广泛的应用到变电所内的生产与建设上来。但是,在变电工程当中,如果按照图1所示的“架空送电线路导线及避雷线液压施工工艺规程SDJ 226-87(试行)”进行操作,自铝线3的端头N处向管口施压,然后再返回在钢锚2的凹槽处施压,会遇到耐张线夹的液压压接后在其导线侧端部出现“灯笼花”即导线散股现象,尤其是变电所内母线上的作业,由于母线档距短且引流线多,引流线夹使用T型液压压接线夹,“灯笼花”现象更加突出,灯笼花的大小不一,最大的达到原导线直径的3倍不止,不但不美观,更影响导线的导电效果和承受的拉力减小,严重拖延了工作的进度。
发明内容   
本发明要解决的技术问题是提供一种变电所内母线耐张线夹的液压压接方法,该方法是把架空送电线路导线及避雷线液压施工工艺规程SDJ 226-87(试行)规范的压接顺序改变,颠倒过来执行,该方法克服了导线压接后出现“灯笼花”的现象。
    为了解决现有技术存在的问题,本发明采用的技术方案是:
一种变电所内母线耐张线夹的液压压接方法,包括以下步骤:①第一模a的压接:将铝线插入钢锚中,从钢锚的管口端处向外进行第一模a的压接;②第二模b的压接:在第一模压接后的基础上,第二模沿第一模顺势向外进行压接;③第三模c的压接:在第二模压接后的基础上,第三模沿第二模顺势向外进行压接,同时预留出钢锚部分;④第四模d的压接:在预留的钢锚部分与引线板间进行第四模d的压接;⑤压接完成后将毛刺磨平。
    本发明所具有的优点与效果是:
本发明一种变电所内母线耐张线夹的液压压接方法,是在“架空送电线路导线及避雷线液压施工工艺规程SDJ 226-87(试行)规范”的基础上,将其压接顺序改变,颠倒过来执行,操作简单易行,克服了导线压接后出现“灯笼花”的现象,提高了导线压接质量和效率、提高导线美观程度、导电效果和承受的拉力。节省了因施工质量不合格带来的导线和线夹浪费,增强了电网抵御外力破坏的能力。将本发明的方法应用到220kV耿家变电站主母线更换工程中,更换主母线5档,最短一档仅仅10米,引下线3条,没有出现一点灯笼花现象,该工程得到东北电网监理有限公司监理人员的一致好评。将本发明的方法应用到220kV铁西变改造工程中,整个铁西变全部设备及母线更换,配制220kV主母线2档(2×400),横母线7档;66kV主母线20档(2×400),横母线22档,其中复导线7档,单导线15档;工程量非常大,按照总工期提前了2个月。在66kV岭泉变和峨嵋变两个66kV变电所整体改造工程中使用本发明的方法,没有出现一处灯笼花现象。
附图说明
图1为现有技术中钢锚液压部位及操作顺序;
图2为本发明方法中钢锚液压部位及操作顺序。
图中:引线板1;钢锚2;铝线3;第一模a;第二模b;第三模c;第四模d不压区e;不压区f。
具体实施方式
本发明一种变电所内母线耐张线夹的液压压接方法是在原“架空送电线路导线及避雷线液压施工工艺规程SDJ 226—87(试行)”上关于耐张线夹的压接工艺方法的基础上,没有按照工艺规程的要求的顺序进行压接施工,而是反其道而行。
如图2所示的钢锚液压部位及操作顺序:第一模a压接:首先将铝线3插入液压耐张线夹的钢锚2中,从钢锚2的管口端M处向外进行第一模a的压接;第二模b的压接:在第一模压接后的基础上,第二模沿第一模顺势向外进行压接。压接时要涵盖住第一模压接完的一部分,以起到可靠压接的作用。第三模c的压接:在第二模压接后的基础上,第三模沿第二模顺势向外进行压接。压接时要涵盖住第二模压接完的一部分,同时预留出钢锚部分,预留的钢锚部分的长度为 e、d、f 三区的长度总和。第四模d的压接:整个工序的最后一步。在预留的钢锚部分e、d、f三区与引线板1间进行第四模d的压接,此模起着固定引线板1和钢锚2的作用,防止打转。压接完成后将毛刺磨平。

Claims (1)

1.一种变电所内母线耐张线夹的液压压接方法,其特征在于包括以下步骤:①第一模a的压接:将铝线插入钢锚中,从钢锚的管口端处向外进行第一模a的压接;②第二模b的压接:在第一模压接后的基础上,第二模沿第一模顺势向外进行压接;③第三模c的压接:在第二模压接后的基础上,第三模沿第二模顺势向外进行压接,同时预留出钢锚部分;④第四模d的压接:在预留的钢锚部分与引线板间进行第四模d的压接;⑤压接完成后将毛刺磨平。
CN2012100256894A 2012-02-07 2012-02-07 一种变电所内母线耐张线夹的液压压接方法 Pending CN102545119A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012100256894A CN102545119A (zh) 2012-02-07 2012-02-07 一种变电所内母线耐张线夹的液压压接方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012100256894A CN102545119A (zh) 2012-02-07 2012-02-07 一种变电所内母线耐张线夹的液压压接方法

Publications (1)

Publication Number Publication Date
CN102545119A true CN102545119A (zh) 2012-07-04

Family

ID=46351350

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012100256894A Pending CN102545119A (zh) 2012-02-07 2012-02-07 一种变电所内母线耐张线夹的液压压接方法

Country Status (1)

Country Link
CN (1) CN102545119A (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105490130A (zh) * 2015-11-25 2016-04-13 国网辽宁省电力有限公司锦州供电公司 钢芯铝绞线耐张线夹液压压接工艺
CN107221904A (zh) * 2017-05-28 2017-09-29 国网山东省电力公司寿光市供电公司 一种异形导线防脱落连接的方法
CN113964731A (zh) * 2021-10-27 2022-01-21 国网山东省电力公司建设公司 一种钢芯铝绞线外侧安装耐张线夹的设备

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101335435A (zh) * 2008-07-30 2008-12-31 南京线路器材厂 塔上液压紧线方法及其系统
CN202094576U (zh) * 2010-12-30 2011-12-28 国家电网公司 一种1000kV交流特高压同塔双回路扩径导线用耐张线夹

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101335435A (zh) * 2008-07-30 2008-12-31 南京线路器材厂 塔上液压紧线方法及其系统
CN202094576U (zh) * 2010-12-30 2011-12-28 国家电网公司 一种1000kV交流特高压同塔双回路扩径导线用耐张线夹

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
郎福堂等: "减轻1000mm2大截面导线压接散股程度的措施", 《电力建设》, vol. 31, no. 12, 31 December 2010 (2010-12-31) *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105490130A (zh) * 2015-11-25 2016-04-13 国网辽宁省电力有限公司锦州供电公司 钢芯铝绞线耐张线夹液压压接工艺
CN107221904A (zh) * 2017-05-28 2017-09-29 国网山东省电力公司寿光市供电公司 一种异形导线防脱落连接的方法
CN113964731A (zh) * 2021-10-27 2022-01-21 国网山东省电力公司建设公司 一种钢芯铝绞线外侧安装耐张线夹的设备

Similar Documents

Publication Publication Date Title
CN102545119A (zh) 一种变电所内母线耐张线夹的液压压接方法
CN202712789U (zh) 钢芯铝绞线用耐张线夹
CN202997418U (zh) 一种10kV配电线路架空导线快速修复装置
CN216084350U (zh) 电缆铜铝复合导体绝缘芯
CN202721273U (zh) 一种压接式连接器
CN203056527U (zh) 一种电缆牵引头
CN201608487U (zh) 碳纤维复合芯铝绞线用耐张线夹
CN203056463U (zh) 一种新型单芯高压电缆牵引头
CN201185093Y (zh) 一种分支电缆
CN202662838U (zh) 一种高强度钢芯铝合金绞线用接续管
CN204333286U (zh) 铝合金芯高导电率铝绞线接续管
CN202678533U (zh) 一种导体连接用的连接体和连接装置
CN206451857U (zh) 一种低压电缆分支箱专用铜铝鼻子
CN203012211U (zh) 一种带隔离底座的光缆交接箱
CN202917657U (zh) 一种高电压设备用线夹
CN201837646U (zh) 变电站一次设备预防性试验断引处用绝缘固定装置
CN202333164U (zh) 漏电保护器连接端子
CN205159994U (zh) 一种大跨越及大截面导线用耐张夹具
CN204375491U (zh) 电缆成缆牵引装置
CN215870691U (zh) 一种电缆固定线夹
CN204463960U (zh) 一种管道过渡折弯铜排
CN202957357U (zh) 一种井道用电缆线分支头结构
CN204130222U (zh) 一种预制分支合金电缆
CN201655991U (zh) 软铝导线压接金具
CN102751596B (zh) 一种导体连接用的连接体和连接装置及其冷接工艺

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: STATE ELECTRIC NET CROP.

Effective date: 20120926

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20120926

Address after: 111000 Liaoyang City, Liaoning province Taizihe District South Street No. 81

Applicant after: Liaoning Electric Power Co., Ltd. Liaoyang Power Supply Company

Applicant after: State Grid Corporation of China

Address before: 111000 No. 81, south suburb street, Liaoning, Liaoyang

Applicant before: Liaoning Electric Power Co., Ltd. Liaoyang Power Supply Company

C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20120704