CN102540105A - Method for testing AC and DC on/off machines - Google Patents
Method for testing AC and DC on/off machines Download PDFInfo
- Publication number
- CN102540105A CN102540105A CN2011104600275A CN201110460027A CN102540105A CN 102540105 A CN102540105 A CN 102540105A CN 2011104600275 A CN2011104600275 A CN 2011104600275A CN 201110460027 A CN201110460027 A CN 201110460027A CN 102540105 A CN102540105 A CN 102540105A
- Authority
- CN
- China
- Prior art keywords
- tested
- power module
- power switch
- address
- control computer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Abstract
The invention provides a method for testing AC and DC on/off machines, which is used for a power supply module of a server. The method for testing an AC on/off machine comprises the following steps: switching on a power switch to enable the AC input of the to-be-detected power supply module to be switched on; inputting up level to a power port of the to-be-detected power supply module through a USB controller, so as to start up the to-be-detected power supply module; leading-in a preset IP address from a network card of the to-be-detected power supply module, and performing Ping testing to the IP address through a main-control computer; and recording the result of the Ping testing in a log of the main-control computer, and ordering the power switch to be switched off.
Description
Technical field
Present invention relates in general to internet arena, more specifically, relate to AC, DC method for testing open/close machine.
Background technology
Server power supply is one of most important component in the server system, and the power supply of total system is provided.The stability of power supply has directly determined the reliability of server system.Therefore the stability test for power supply is one of most important link in the server test.In all power supply tests, the most frequently used to also be that the easiest method of testing is exactly switching on and shutting down test.Because server system has related to sequential configuration of power supply power-on and power-off, server master board and power supply or the like in the switching on and shutting down process.
On the one hand, operating system control is adopted in existing DC switching on and shutting down test usually, and system restarts.Yet, adopt the mode of software control, have certain difference with the application conditions of reality.Can't cover in the actual moving process, there is test blindspot in the mode of operation of server reset button.
On the other hand, the mode that the existing AC switching on and shutting down controlling schemes personnel that adopt usually plug the AC connecting line is by hand carried out, and perhaps presses the switch realization of wiring board through manual work.But so just need the special messenger to keep an eye on, efficient is not high.And the record data in the test process can not guarantee complete standard.
Summary of the invention
For addressing the above problem, the invention provides a kind of interchange AC method for testing open/close machine, be used for the server power supply module, may further comprise the steps: power switch closes a floodgate, and tested power module AC input is connected; Through the power port input high level of USB controller, to start tested power module to tested power module; Network interface card by tested power module imports predefined IP address, by main control computer the Ping Test operation is carried out in this IP address; And the result of Ping Test operation charged in the daily record of main control computer, and the order power switch breaks off.
In the equal access network system of tested power module, main control computer and power switch, be assigned the IP address that differs from one another.
In the Ping Test operation, communicate by letter successfully, then expression starts successfully, waits for surpassing communication in 60 seconds success not yet, and then expression starts failure.
After the step that the order power switch breaks off, power switch closes a floodgate again, proceeds AC switching on and shutting down test, is 500 times until the test cumulative number.
Be 5 seconds the interval time between the step that step that the order power switch breaks off and power switch close a floodgate again.
In addition, a kind of direct current DC method for testing open/close machine is provided also, has been used for the server power supply module, may further comprise the steps: power switch closes a floodgate, and tested power module AC input is connected; Through the power port input high level of USB controller, to start tested power module to tested power module; Network interface card by tested power module imports predefined IP address, by main control computer the Ping Test operation is carried out in this IP address; And the result that Ping Test is operated charges in the daily record of main control computer.
In the equal access network system of tested power module, main control computer and power switch, be assigned the IP address that differs from one another.
In the Ping Test operation, communicate by letter successfully, then expression starts successfully, waits for surpassing communication in 60 seconds success not yet, and then expression starts failure.
This method also comprises: order USB controller activates the reseting port of tested power module with high level, proceeds DC switching on and shutting down test, is 500 times until the accumulative total testing time.
Description of drawings
When combining accompanying drawing to read, can understand the present invention better according to following detailed description.Should be emphasized that according to the standard practices in the industry, various parts are not drawn in proportion.In fact, in order clearly to discuss, the size of various parts can be by any increase or minimizing
Fig. 1 shows the process flow diagram according to the interchange AC method for testing open/close machine of exemplary embodiment of the present invention;
Fig. 2 shows the process flow diagram according to the direct current DC method for testing open/close machine of exemplary embodiment of the present invention; And
Fig. 3 shows the block diagram according to the test macro of exemplary embodiment of the present invention.
Embodiment
For the different parts of embodiment of the present invention, below describe many various embodiment or example are provided.The particular example of below describing element and layout is to simplify the present invention.Certainly these only are that example does not plan to limit.Moreover; First parts are formed on and can comprise on second parts that wherein first and second parts are with the embodiment of direct contact formation in below describing; And can comprise that also wherein additional parts formation is inserted into the embodiment in first and second parts, make first and second parts directly not contact.For the sake of simplicity with clear, can be at random with the various parts of different plotted.
In order to promote server research and development quality, strengthen the standardization of method of testing.Proposed a kind of standardized power-supply system loop test scheme especially, different tested machines has been verified, realized robotization, the standardization of test with the mode of hardware and software platform.
To combine accompanying drawing to describe exemplary embodiment of the present invention in detail below.
Fig. 1 shows the process flow diagram according to the interchange AC method for testing open/close machine of exemplary embodiment of the present invention.As shown in Figure 1, the invention provides a kind of interchange AC method for testing open/close machine, be used for the server power supply module, may further comprise the steps: S101, power switch closes a floodgate, and tested power module AC input is connected; S103 is through the power port input high level of USB controller to tested power module, to start tested power module; S105 imports predefined IP address by the network interface card of tested power module, by main control computer the Ping Test operation is carried out in this IP address; And S107, the result that Ping Test is operated charges in the daily record of main control computer, and the order power switch breaks off.
Preferably, in the equal access network system of tested power module, main control computer and power switch, be assigned the IP address that differs from one another.
Preferably, in the Ping Test operation, communicate by letter successfully, then expression starts successfully, waits for surpassing communication in 60 seconds success not yet, and then expression starts failure.
Preferably, after the step that the order power switch breaks off, power switch closes a floodgate again, proceeds AC switching on and shutting down test, is 500 times until the test cumulative number.
Preferably, be 5 seconds the interval time between the step that step that the order power switch breaks off and power switch close a floodgate again.
Fig. 2 shows the process flow diagram according to the direct current DC method for testing open/close machine of exemplary embodiment of the present invention.As shown in Figure 2, the present invention also provides a kind of direct current DC method for testing open/close machine, is used for the server power supply module, may further comprise the steps: S201, and power switch closes a floodgate, and tested power module AC input is connected; S203 is through the power port input high level of USB controller to tested power module, to start tested power module; S205 imports predefined IP address by the network interface card of tested power module, by main control computer the Ping Test operation is carried out in this IP address; And S207, the result that Ping Test is operated charges in the daily record of main control computer.
Preferably, in the equal access network system of tested power module, main control computer and power switch, be assigned the IP address that differs from one another.
Preferably, in the Ping Test operation, communicate by letter successfully, then expression starts successfully, waits for surpassing communication in 60 seconds success not yet, and then expression starts failure.
Preferably, this method also comprises: order USB controller activates the reseting port of tested power module with high level, proceeds DC switching on and shutting down test, is 500 times until cumulative number.
Fig. 3 shows the block diagram according to the test macro of exemplary embodiment of the present invention.
As shown in Figure 3, main technical schemes of the present invention is for coming the power-supply system of tested machine is tested with the whole test platform of a cover.The composition of test platform has comprised master control PC 301, network Hub303, the power switch 304 of band IP control, USB controller 302.
In the test process, tested machine 305, master control PC301 in the power switch 304 equal access network systems, distribute different IP addresses.After the test beginning, power switch 304 closes a floodgate, and the AC input of tested machine 305 is connected; 302 high level of USB controller are given power (power supply) interface of tested machine 305; Tested machine 305 starts, and the network interface card of tested machine 305 imports preset IP address, and the Ping that master control PC 301 can not stop presets the IP value; Communicate by letter and successfully then represent to start successfully, if surpass 60 seconds then overtime failure.No matter success or failure are all charged in the daily record of master control PC 301, say the word simultaneously to power switch 304, break off AC power supplies, wait for after 5 seconds, and reclose AC power supplies, beginning is tested for the second time.Accomplish a circulation.More than be AC switching on and shutting down 301 test loop.
In addition, can carry out DC switching on and shutting down testing scheme as follows: after the test beginning, power switch 304 closes a floodgate; Tested machine 305AC input is connected, and 302 high level of USB controller are given the power interface of tested machine 305, and tested machine 305 starts; The network interface card of tested machine 305 imports preset IP address; The Ping that master control PC301 can not stop presets the IP value, and the then expression of communicating by letter successfully starts successfully, if surpass 60 seconds then overtime failure.No matter success or failure are all charged in the daily record of master control PC 301, say the word simultaneously to USB controller 302, activate the SR interface of tested machine 305 with high level, and beginning is test for the second time.Accomplish a circulation.It more than is DC switching on and shutting down test loop.
The testing scheme of hardware and software platform of the present invention can adapt to various tested machine, realizes test automation and standardization simultaneously.
Discuss the parts of some embodiment above, made those of ordinary skills can understand various aspects of the present invention better.It will be understood by those skilled in the art that can use at an easy rate the present invention design or change as the basis other be used to reach with here the identical purpose of the embodiment that introduces and/or realize the processing and the structure of same advantage.Those of ordinary skills should be appreciated that also this equivalent constructions does not deviate from the spirit and scope of the present invention, and under the situation that does not deviate from the spirit and scope of the present invention, can carry out multiple variation, replacement and change.
Claims (9)
1. one kind exchanges the AC method for testing open/close machine, is used for the server power supply module, it is characterized in that, may further comprise the steps:
Power switch closes a floodgate, and tested power module AC input is connected;
Through the power port input high level of USB controller, to start said tested power module to said tested power module;
Network interface card by said tested power module imports predefined IP address, by main control computer the Ping Test operation is carried out in this IP address; And
The result of said Ping Test operation is charged in the daily record of said main control computer, and order said power switch to break off.
2. method according to claim 1 is characterized in that, in said tested power module, said main control computer and the equal access network system of said power switch, is assigned the IP address that differs from one another.
3. method according to claim 1 is characterized in that, in said Ping Test operation, communicates by letter successfully, and then expression starts successfully, waits for surpassing communication in 60 seconds success not yet, and then expression starts failure.
4. method according to claim 1 is characterized in that, after the step that the said power switch of order breaks off, said power switch closes a floodgate again, proceeds AC switching on and shutting down test, is 500 times until the test cumulative number.
5. method according to claim 4 is characterized in that, be 5 seconds the interval time between the step that step that the said power switch of order breaks off and said power switch close a floodgate again.
6. a direct current DC method for testing open/close machine is used for the server power supply module, it is characterized in that, may further comprise the steps:
Power switch closes a floodgate, and tested power module AC input is connected;
Through the power port input high level of USB controller, to start said tested power module to said tested power module;
Network interface card by said tested power module imports predefined IP address, by main control computer the Ping Test operation is carried out in this IP address; And
The result of said Ping Test operation is charged in the daily record of said main control computer.
7. method according to claim 6 is characterized in that, in said tested power module, said main control computer and the equal access network system of said power switch, is assigned the IP address that differs from one another.
8. method according to claim 6 is characterized in that, in said Ping Test operation, communicates by letter successfully, and then expression starts successfully, waits for surpassing communication in 60 seconds success not yet, and then expression starts failure.
9. method according to claim 6 is characterized in that, also comprises: ordering said USB controller to activate the reseting port of said tested power module with high level, proceed DC switching on and shutting down test, is 500 times until the accumulative total testing time.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011104600275A CN102540105A (en) | 2011-12-31 | 2011-12-31 | Method for testing AC and DC on/off machines |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011104600275A CN102540105A (en) | 2011-12-31 | 2011-12-31 | Method for testing AC and DC on/off machines |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102540105A true CN102540105A (en) | 2012-07-04 |
Family
ID=46347452
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011104600275A Pending CN102540105A (en) | 2011-12-31 | 2011-12-31 | Method for testing AC and DC on/off machines |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102540105A (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107729204A (en) * | 2017-11-09 | 2018-02-23 | 英业达科技有限公司 | Test equipment and method of testing |
CN107765119A (en) * | 2017-09-30 | 2018-03-06 | 四川九州电子科技股份有限公司 | A kind of automatic detection machine starts abnormal method |
CN108052423A (en) * | 2017-11-24 | 2018-05-18 | 英业达科技有限公司 | The test method and device of server |
CN108982137A (en) * | 2018-05-28 | 2018-12-11 | 北京安控科技股份有限公司 | A kind of RTU starting fatigue experimental device and method |
CN109803139A (en) * | 2019-01-07 | 2019-05-24 | 四川天邑康和通信股份有限公司 | XPON terminal and set-top box Power Cycle test macro and test method |
CN110672946A (en) * | 2019-09-29 | 2020-01-10 | 苏州浪潮智能科技有限公司 | Fatigue test system |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20030160620A1 (en) * | 2002-02-25 | 2003-08-28 | Miesterfeld Frederick O. | Addressable open connector test circuit |
CN101192760A (en) * | 2006-11-22 | 2008-06-04 | 鸿富锦精密工业(深圳)有限公司 | Remote digital switch control system and method |
CN101196842A (en) * | 2006-12-08 | 2008-06-11 | 鸿富锦精密工业(深圳)有限公司 | Electric power loop test method |
CN101957606A (en) * | 2009-07-17 | 2011-01-26 | 鸿富锦精密工业(深圳)有限公司 | High-temperature test monitoring system and method |
-
2011
- 2011-12-31 CN CN2011104600275A patent/CN102540105A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20030160620A1 (en) * | 2002-02-25 | 2003-08-28 | Miesterfeld Frederick O. | Addressable open connector test circuit |
CN101192760A (en) * | 2006-11-22 | 2008-06-04 | 鸿富锦精密工业(深圳)有限公司 | Remote digital switch control system and method |
CN101196842A (en) * | 2006-12-08 | 2008-06-11 | 鸿富锦精密工业(深圳)有限公司 | Electric power loop test method |
CN101957606A (en) * | 2009-07-17 | 2011-01-26 | 鸿富锦精密工业(深圳)有限公司 | High-temperature test monitoring system and method |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107765119A (en) * | 2017-09-30 | 2018-03-06 | 四川九州电子科技股份有限公司 | A kind of automatic detection machine starts abnormal method |
CN107729204A (en) * | 2017-11-09 | 2018-02-23 | 英业达科技有限公司 | Test equipment and method of testing |
CN107729204B (en) * | 2017-11-09 | 2020-10-27 | 英业达科技有限公司 | Test equipment and test method |
CN108052423A (en) * | 2017-11-24 | 2018-05-18 | 英业达科技有限公司 | The test method and device of server |
CN108982137A (en) * | 2018-05-28 | 2018-12-11 | 北京安控科技股份有限公司 | A kind of RTU starting fatigue experimental device and method |
CN109803139A (en) * | 2019-01-07 | 2019-05-24 | 四川天邑康和通信股份有限公司 | XPON terminal and set-top box Power Cycle test macro and test method |
CN109803139B (en) * | 2019-01-07 | 2022-03-11 | 四川天邑康和通信股份有限公司 | xPON terminal and set top box Power Cycle test system and test method |
CN110672946A (en) * | 2019-09-29 | 2020-01-10 | 苏州浪潮智能科技有限公司 | Fatigue test system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102540105A (en) | Method for testing AC and DC on/off machines | |
CN102855146B (en) | Firmware update system and method | |
CN107632219B (en) | Automatic startup and shutdown test system and test method thereof | |
US20120136489A1 (en) | Rack server system | |
CN102339242A (en) | Computer system data recovery device | |
CN103842968A (en) | Migration method, computer and device of stored data | |
CN101562906A (en) | Method and device for automatically adapting to wireless data cards with multiple formats | |
CN103701707B (en) | Network equipment | |
CN104901848A (en) | Automated testing system and method for startup and shutdown of router | |
CN103149526A (en) | Printed circuit board assembly (PCBA) board testing system and PCBA board testing method | |
CN103827834A (en) | Migration method of in-memory data, computer and device | |
CN102073602B (en) | Computer system, connection control device as well as connecting and disconnecting method | |
CN105955911A (en) | Hot-plug control circuit and control method thereof | |
CN106055440A (en) | Testing method and system for realizing abnormal power failure of server through BMC | |
US20130166896A1 (en) | Management system for network card | |
CN101923505A (en) | Test system and method of peripheral component interconnection rapid slot | |
CN104994459B (en) | Terminal digital power amplifier configuration method and device | |
CN102983989A (en) | Removing method, device and equipment of server virtual address | |
CN106502749A (en) | Based on the method and system that program write with a brush dipped in Chinese ink by CAN multimachine | |
CN105426334B (en) | Parallel extensive usb expansion device and working method, system | |
CN109815070A (en) | A kind of HOST-BOX server stability test method, apparatus, terminal and storage medium | |
CN102915265A (en) | BMC (baseboard management controller) loop test method and system | |
CN102799248A (en) | Wake-on-local access network (LAN) device, computer and wake-on-LAN method | |
CN104158709A (en) | Optical module identification method and port extender | |
CN105357662A (en) | Electric site acquisition SIM (Subscriber Identity Module) card detection system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20120704 |