CN102538476A - Rapid slag removing method of heating furnace - Google Patents
Rapid slag removing method of heating furnace Download PDFInfo
- Publication number
- CN102538476A CN102538476A CN2012100134153A CN201210013415A CN102538476A CN 102538476 A CN102538476 A CN 102538476A CN 2012100134153 A CN2012100134153 A CN 2012100134153A CN 201210013415 A CN201210013415 A CN 201210013415A CN 102538476 A CN102538476 A CN 102538476A
- Authority
- CN
- China
- Prior art keywords
- slag
- furnace
- slagging
- heating furnace
- trays
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Furnace Details (AREA)
Abstract
A rapid slag removing method of a heating furnace is disclosed, which aims at alleviating the labor intensity, improving the working environment and improving the slag removing efficiency. In the invention, four mounting holes are respectively arranged in slag discharging furnace doors corresponding to a steel platform channel outside the four slag discharging furnace doors on each side of the heating furnace, and two slag sliding grooves communicated to the bottom of the furnace are installed on each mounting hole, namely eight slag sliding grooves are arranged; two of the slag sliding grooves can change the slag sliding direction; these two slag sliding grooves enable half of the high-temperature steel slag in the furnace to directly and alternately slide in two slag hoppers which are arranged at the new slag hoisting points on the bottom of the furnace and are arranged in parallel, the other six slag sliding grooves enable the residual steel slag to slide in a slag transporting trolley arranged on the ground of the bottom of the furnace, the residual steel slag is transported to the new slag hoisting point and fed in the slag hoppers for hoisting, the two slag hoppers are hoisted by turns to work continuously, so that the slag removing efficiency of the heating furnace is improved.
Description
Technical field
The present invention relates to a kind of method that improves heater for rolling steel scarfing cinder efficient.
Background technology
Heater for rolling steel is an equipment common in the iron and steel enterprise; General structure is that every heating furnace both sides have four little fire doors of slagging tap; Annual heating furnace maintenance is the host node project of all fronts annual overhaul project, and the time spent has often surpassed the rolling line repair time, and heating furnace scarfing cinder operation is to drop into the project that manpower is maximum, man-hour is maximum in the annual overhaul project completely; During each scarfing cinder operation in the stove slag temperature up to 600 ℃ about; Operating environment is very abominable, and each four little fire door goes out clearly the high temperature slag from both sides, heating furnace north and south, is deposited on the steel platform passage of stove both sides absolute altitude-2.2m; The overhead traveling crane of again slag of each slag point being transported to the burner place through steel platform passage hangs the slag point, and the slag bucket of packing into after concentrating hangs away.Present large-scale walking beam furnace generally all respectively is provided with four fire doors of slagging tap in its both sides, the steel platform passage of both sides is passages of maintenance scarfing cinder; The equipment hoisting hole is provided with for the handling of furnace bottom equipment.The subject matter that exists is that the steel platform passage of absolute altitude-2.2m has only 600mm wide, and four of every sides are slagged tap and a little can not be slagged tap simultaneously, otherwise passage is blocked.Hang slag point place and can only put a slag bucket, fill and to work continuously after hanging away.Therefore cause each scarfing cinder activity duration oversize.
Summary of the invention
The objective of the invention is to overcome the deficiency of above-mentioned prior art, provide a kind of and can reduce labor intensity, improve operating environment, improve the quick clinker removal method of heating furnace of scarfing cinder efficient.
The present invention hangs slag point and utilizes the installation slagging tray to improve heating furnace scarfing cinder efficient through change.The concrete grammar method is:
The correspondence fire door place of slagging tap opens four installing holes (400*400mm) respectively on four slag-tap boilers steel platform passage outdoors of the every side of heating furnace, and two slagging trays that lead to furnace bottom, totally eight slagging trays are installed at each installing hole place; Two slagging trays that can change slide slag direction are wherein arranged; These two slagging trays are slipped into newly hanging in two slag buckets that slag point place is arranged side by side of furnace bottom with the cock wheel of two of furnace high-temperature slag/always stream; Other six slagging trays slip to remaining slag in the dolly of placing on furnace bottom ground of mucking haulage; Be transported to respectively again and newly hang the slag point place slag bucket of packing into and hang away; Thereby four of the every sides of realization heating furnace are slagged tap and are a little slagged tap simultaneously, and two slag buckets lift in turn works continuously, and has improved the efficient of heating furnace scarfing cinder.
Newly hang the slag point and be positioned at the corresponding furnace bottom ground, equipment hoisting hole of heating furnace, absolute altitude is-8.8m; Here and discharge two slag buckets, guarantee two slag buckets in turn lifting work continuously.The absolute altitude of the steel platform passage of the fire door correspondence of slagging tap is-2.2m.
Can change on the slide slag direction slagging tray activity-oriented chute that can change slide slag direction is installed; Two slagging trays that can change slide slag direction are located at the corresponding fire door place of slagging tap of heating furnace soaking zone; The slag temperature is the highest in the soaking zone, amount is maximum; Account for 1/2nd of high temperature slag, the slagging tray is here directly slipped into the high temperature slag in two slag buckets that furnace bottom hole for hoist place is arranged side by side in turn; Remaining slagging tray directly slips to the high temperature slag in the dolly of placing at the furnace bottom place of mucking haulage, and is transported to respectively newly to hang the slag point slag bucket of packing into and hang away.
Method of the present invention is fit to the narrower large-scale step-by-step movement heater for rolling steel of all passages of mucking haulage.Hang slag point and utilize slagging tray to improve heating furnace scarfing cinder efficient through change, alleviated labour intensity, improved operating environment.Guaranteed two slag buckets in turn lifting work continuously with 4 slag tap and a little slag tap simultaneously, improved the scarfing cinder efficient of heating furnace, realized rolling line operation in 24 hours in advance.
Description of drawings
Fig. 1 is the wherein skiagraph of two heating furnaces of walking beam furnace.
Fig. 2 is the side section sketch map of single seat heating furnace.
Fig. 3 is for changing the activity-oriented chute structural representation of slide slag direction.
Among the figure: 1. heating furnace I; 2. heating furnace II; 3. slag bucket; 4. the heating furnace II furnace bottom north side passage of newly mucking haulage; 5. the heating furnace I furnace bottom southern side passage of newly mucking haulage; 6. the heating furnace II soaking zone north side corresponding slagging tray of fire door of slagging tap; 7. the heating furnace I soaking zone southern side corresponding slagging tray of fire door of slagging tap; 8. equipment hoisting hole; 9. steel platform passage; 10. the heating furnace fire door of slagging tap; The slagging tray that the corresponding steel platform of fire door is installed 11. heating furnace is slagged tap; The dolly 12. furnace bottom is mucked haulage; 13. activity-oriented chute; 14. chute steady pin.
The specific embodiment
Newly hang slag point absolute altitude under the equipment hoisting hole and be the furnace bottom place of-8.8m, newly hang slag point place and discharge 3, two slag buckets of two slag buckets 3 in turn lifting work continuously.
On four of every every side of heating furnace slagged tap the steel platform passage 9 of the corresponding absolute altitudes of fire doors for-2.2m, slagging tray 7,11 was installed in perforate respectively, and slagging tray 7,11 is processed by the 8mm steel plate.
Respectively install one on corresponding outdoors two slagging trays installing of two slag-tap boilers of soaking zone and can change and slip the activity-oriented chute 13 of slag direction, directly the high temperature slag is slipped in two slag buckets 3 that furnace bottom hole for hoist place is arranged side by side; Remaining six slagging tray 11 directly slip to the high temperature slag in the dolly 12 of mucking haulage of hearth level for-8.8m place placement, are transported to respectively to hang the slag point and pack into and hang away in the slag bucket 3 again.
Claims (3)
1. quick clinker removal method of heating furnace is characterized in that on four slag-tap boilers steel platform passage outdoors of the every side of heating furnace the correspondence fire door place of slagging tap opens four installing holes respectively, installs two slagging trays that lead to furnace bottom, totally eight slagging trays at each installing hole place; Two slagging trays that can change slide slag direction are wherein arranged; These two slagging trays are slipped into newly hanging in two slag buckets that slag point place is arranged side by side of furnace bottom with the cock wheel of two of furnace high-temperature slag/always stream; Other six slagging trays slip to remaining slag in the dolly of placing on furnace bottom ground of mucking haulage; Be transported to respectively again and newly hang the slag point place slag bucket of packing into and hang away; Two slag buckets lift in turn works continuously, and improves the efficient of heating furnace scarfing cinder;
Newly hang the slag point and be positioned at the corresponding furnace bottom ground, equipment hoisting hole of heating furnace; Can change to slip and be equipped with one on the slagging tray of slag direction and can change and slip the activity-oriented chute of slag direction, two can change and slip the slagging trays of slag direction and be located at the corresponding fire door place of slagging tap of heating furnace soaking zone.
2. the quick clinker removal method of heating furnace as claimed in claim 1 is characterized in that newly hanging the slag point and is positioned under the equipment hoisting hole absolute altitude and is-place, 8.8m furnace bottom ground, here and discharge two slag buckets.
3. the quick clinker removal method of heating furnace as claimed in claim 1 is characterized in that the absolute altitude of slag-tap boiler steel platform passage outdoors is-2.2m, and the corresponding fire door place of slagging tap opens the installing hole of four 400*400mm respectively on steel platform passage.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210013415.3A CN102538476B (en) | 2012-01-08 | 2012-01-08 | Rapid slag removing method of heating furnace |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210013415.3A CN102538476B (en) | 2012-01-08 | 2012-01-08 | Rapid slag removing method of heating furnace |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102538476A true CN102538476A (en) | 2012-07-04 |
CN102538476B CN102538476B (en) | 2014-05-07 |
Family
ID=46345997
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210013415.3A Active CN102538476B (en) | 2012-01-08 | 2012-01-08 | Rapid slag removing method of heating furnace |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102538476B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105352326A (en) * | 2015-12-14 | 2016-02-24 | 芜湖新兴铸管有限责任公司 | Slag removing structure of walking beam furnace |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH03202420A (en) * | 1989-12-28 | 1991-09-04 | Kurosaki Refract Co Ltd | Skimmer for molten steel suction pipe of vacuum degassing equipment |
JPH05117736A (en) * | 1991-10-28 | 1993-05-14 | Hamada Juko Kk | Method and equipment for treating steel slag |
CN101148685A (en) * | 2007-08-16 | 2008-03-26 | 中冶宝钢技术服务有限公司 | Slag removing method |
CN201155927Y (en) * | 2007-12-19 | 2008-11-26 | 中冶南方(武汉)威仕工业炉有限公司 | Walking beam type heating stove dregs-scraping device |
CN201555447U (en) * | 2009-12-08 | 2010-08-18 | 武汉钢铁(集团)公司 | Novel slag scraper for walking beam furnace |
CN202083227U (en) * | 2011-05-20 | 2011-12-21 | 长沙有色冶金设计研究院有限公司 | Chute device for molten slag of non-ferrous metallurgical furnace |
-
2012
- 2012-01-08 CN CN201210013415.3A patent/CN102538476B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH03202420A (en) * | 1989-12-28 | 1991-09-04 | Kurosaki Refract Co Ltd | Skimmer for molten steel suction pipe of vacuum degassing equipment |
JPH05117736A (en) * | 1991-10-28 | 1993-05-14 | Hamada Juko Kk | Method and equipment for treating steel slag |
CN101148685A (en) * | 2007-08-16 | 2008-03-26 | 中冶宝钢技术服务有限公司 | Slag removing method |
CN201155927Y (en) * | 2007-12-19 | 2008-11-26 | 中冶南方(武汉)威仕工业炉有限公司 | Walking beam type heating stove dregs-scraping device |
CN201555447U (en) * | 2009-12-08 | 2010-08-18 | 武汉钢铁(集团)公司 | Novel slag scraper for walking beam furnace |
CN202083227U (en) * | 2011-05-20 | 2011-12-21 | 长沙有色冶金设计研究院有限公司 | Chute device for molten slag of non-ferrous metallurgical furnace |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105352326A (en) * | 2015-12-14 | 2016-02-24 | 芜湖新兴铸管有限责任公司 | Slag removing structure of walking beam furnace |
Also Published As
Publication number | Publication date |
---|---|
CN102538476B (en) | 2014-05-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106435087B (en) | A kind of converter vaporization flue piecewise combination installation method | |
CN104846143B (en) | Construction method for replacing steelmaking converter flue | |
CN106086263B (en) | A kind of collaboration hanging method of blast furnace cooling stave | |
CN101363069B (en) | Simple upper furnace repair equipment and furnace repair technology | |
CN106276601A (en) | A kind of technique in place for fired power generating unit π formula boiler furnace arch, furnace nose integral lifting | |
CN203782169U (en) | Upper furnace repairing device for fixed waste heat flue of converter | |
CN102492437A (en) | Method for short-time on-line replacement of coke dry quenching furnace water sealed tank | |
CN102538476B (en) | Rapid slag removing method of heating furnace | |
JP2017137446A (en) | In-pile import method of module block | |
CN104976897B (en) | Calcium carbide production Intelligent transport cooling system actuating device | |
CN110241285A (en) | Converter mouth petticoat pipe more changing device, replacement structure and replacing options | |
CN103342321B (en) | The integral replacing hanging method of in-service nuclear power station steam generator | |
CN105438982A (en) | A rapid replacing method of a grate of a hot-blast stove of a blast furnace | |
CN108913832B (en) | Method for dismantling refractory material in oversize hot blast stove | |
CN103954134A (en) | Overhaul technique for online replacement of furnace bottom roller of heat treatment furnace | |
CN203869520U (en) | Stable mining and metallurgy furnace low temperature waste heat recovery system | |
CN105387723A (en) | Dry quenching furnace stereoscopic modular overhaul tool | |
CN107487713B (en) | integral combination hoisting and positioning process for upper part of water behind pi-shaped boiler | |
CN104930491A (en) | Mounting system and method of internal heating face component of secondary reheat ultra-supercritical tower-type boiler | |
CN102134620B (en) | Blast furnace shaft upper part rapid heating for producing lining by wet method | |
CN105821203B (en) | Calcining molybdenum ore concentrate multiple hearth furnace removes and installs device with rake arms and removes and installs method | |
CN111824931B (en) | Mounting tool for gas return pipeline of reheating coke oven and construction method thereof | |
CN203924659U (en) | Hanging frame type construction platform device | |
CN206570361U (en) | Device is built by laying on a kind of mammoth conveter furnace lining | |
CN107805812B (en) | High-efficiency transfer mechanism and method for enamel coating and sintering processes of enamel pipe of air preheater |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |