CN102535806B - Stone material point hanging installation structure - Google Patents
Stone material point hanging installation structure Download PDFInfo
- Publication number
- CN102535806B CN102535806B CN201110431736.0A CN201110431736A CN102535806B CN 102535806 B CN102535806 B CN 102535806B CN 201110431736 A CN201110431736 A CN 201110431736A CN 102535806 B CN102535806 B CN 102535806B
- Authority
- CN
- China
- Prior art keywords
- stone material
- body bar
- installation structure
- stone
- point hanging
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Floor Finish (AREA)
- Finishing Walls (AREA)
Abstract
The invention discloses a kind of stone material point hanging installation structure, it includes stone material (1), stone material back of the body bar (2), rendering layer (4) or steel frame (5), the back side of stone material (1) is by cementing agent bonding fixing stone back of the body bar (2).Stone material back of the body bar (2) is bonded and fixed on rendering layer (4) or steel frame (5) by cementing agent.The present invention can solve lost labor's problem, reduces construction cost; Quality, the safety problem such as avoid stone material hollowing, come off; Reduce the stone material accumulation of salt in the surface soil and return the unfavorable factors such as slurry, work consuming are time-consuming, floor load.
Description
Technical field
The present invention relates to a kind of stone material point hanging installation structure.
Background technology
Along with socioeconomic develop rapidly, the pursuit degree of people to quality of life is also more and more higher, the output of architectural decoration is also along with cumulative year after year, but the construction technology of parts of traditional is not changed always, cause seizing in a large number of social resources, the stone material of such as hotel guest room washroom is pasted, what adopt is the construction technology of cement mortar wet combining always, a large amount of use water, cement, the resources such as yellow ground, and need a large amount of manpowers to go to carry out vertical transport, the work such as stirring, add construction cost, waste social resources, cause environment pollution, and the easily hollowing such as wall-surface stone, come off, produce quality, security problems.
Summary of the invention
The object of the invention is: provide a kind of stone material point hanging installation structure, it can solve lost labor's problem, reduces construction cost; Quality, the safety problem such as avoid stone material hollowing, come off; Reduce the stone material accumulation of salt in the surface soil and return the unfavorable factors such as slurry, work consuming are time-consuming, floor load.
Technical scheme of the present invention is: a kind of stone material point hanging installation structure, and it includes stone material, installs basic unit, and the back side of stone material is provided with stone material back of the body bar, and stone material back of the body bar is fixed on to be installed in basic unit.
Below technique scheme is described further:
Described stone material back of the body bar is bonded and fixed at by cementing agent to be installed in basic unit.
Described stone material back of the body bar is fixed on by epoxide resin AB glue bond to be installed in basic unit.
The back side of described stone material is by cementing agent bonding fixing stone back of the body bar.
The back side of described stone material is by epoxide resin AB glue bond fixing stone back of the body bar.
Described installation basic unit is rendering layer.
Described installation basic unit is steel frame.
Advantage of the present invention is: the present invention can solve lost labor's problem, reduces construction cost; Quality, the safety problem such as avoid stone material hollowing, come off; Reduce the stone material accumulation of salt in the surface soil and return the unfavorable factors such as slurry, work consuming are time-consuming, floor load.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the invention will be further described:
Fig. 1 is the use schematic diagram (pasting rendering layer) of the embodiment of the present invention;
Fig. 2 is the use schematic diagram (pasting steel frame) of the embodiment of the present invention;
Fig. 3 is that the point of the embodiment of the present invention hangs schematic perspective view;
Fig. 4 is the stone material of the embodiment of the present invention and " V " type groove schematic diagram of stone material seam;
Fig. 5 is the stone material assembly schematic diagram of the embodiment of the present invention;
Wherein: 1 stone material; 2 stone material back of the body bars; 3 epoxide resin AB glue; 4 rendering layers; 5 steel frames; 6 grooves.
Detailed description of the invention
Embodiment: as shown in Figure 1, Figure 2, Figure 3 shows, a kind of stone material point hanging installation structure, it includes stone material 1, and the back side of stone material 1 is adhesively fixed with stone material back of the body bar 2 by epoxide resin AB glue 3, and stone material back of the body bar 2 is bonded and fixed on rendering layer 4 or steel frame 5 by epoxide resin AB glue 3.
Fig. 4 is the present embodiment node deepen drawing, and stone material 1 adopts " V " type groove of 3mm with the seam of stone material 1; Stone material 1 and end face close up and adopt " L " type groove of 8mm × 6mm, avoid uneven, add globality and perception.
Fig. 5 is the enforcement of commercialization theory of the present invention, avoids pillar polylith and installs, affect the attractive in appearance of external corner; Assembly can be ensured the quality of products, and can save timeliness again; Polylith stone material 1 is combined into one in producer, marches into the arena after edging, chamfering.
With reference to figure 1, Fig. 2, Fig. 3, the point of the present embodiment hangs constructure scheme:
1, according to final scheme, precisely release rendering layer 4 and complete upper thread, ground punching position, make ash cake.
2, carry out cement mortar whitewash in strict accordance with completing upper thread and ash cake, before whitewashing, first will criticize an interfacial agents; The match ratio of cement mortar must controlled well is entered, and prevents that cement consumption is very few causes rendering layer insufficient strength; Must control the quality of whitewashing well, planeness, verticality and squareness must meet the requirements, and rendering layer 4 must not hollowing cracking; Hardware position adds powder, adds powder THICKNESS CONTROL and stone material and carries on the back bar 2 with high.
3, the groundwork thickness needed according to the construction technology determined is released stone material 1 and is completed upper thread;
4, after electric pipeline, plumbing, waterproof construction (washroom metope waterproof accomplishes top) acceptance(check), carry out stone material 1 typesetting, eject stone material 1 separator bar, make node sample.
5, do stone material 1 when deepening, indicating stone material back of the body bar 2 width dimensions is 30mm, and length is less than 600mm, middlely paste a stone material back of the body bar 2, is greater than 600mm, pastes two stone materials and carry on the back bars 2; In order to ensure stone material 1 decorative pattern and color consistency, every block stone material 1 must finish room number, size; Hardware installation position precisely should section out on drawing; Stone material 1 is except the back side, and polishing all will be carried out in other faces.
6, stone material 1 and stone material 1 seam adopt " V " type groove 6 of 3mm, avoid uneven, add globality and perception.
7, after stone material 1 acceptance(check), walkthrough is carried out, Timeliness coverage problem; Contrast drawing, after five metals piece bores accomplished fluently by stone material 1, carries out cladding operation.
8, epoxide resin AB glue 3 is coated in stone material the back of the body bar 2 on, directly paste carried out waterproof rendering layer 4 or steel frame 5 on.The cladding holding capacity will considering rendering layer 4 or steel frame 5 of stone material 1.
It should be pointed out that for the present invention through absolutely proving, also can have the embodiment of multiple conversion and remodeling, be not limited to the specific embodiment of above-mentioned embodiment.Above-described embodiment is as just explanation of the present invention, instead of restriction.In a word, protection scope of the present invention should comprise those apparent conversion or alternative and remodeling to those skilled in the art.
Claims (5)
1.
a kind of stone material point hanging installation structure, is characterized in that: it includes stone material (1), installs basic unit, and the back side of stone material (1) is provided with stone material back of the body bar (2), and stone material back of the body bar (2) is fixed on to be installed in basic unit;
described stone material back of the body bar (2) is bonded and fixed at by cementing agent installs in basic unit;
the back side of described stone material (1) is by cementing agent bonding fixing stone back of the body bar (2).
2.
stone material point hanging installation structure according to claim 1, is characterized in that: described stone material back of the body bar (2) is bonded and fixed at by epoxide resin AB glue (3) and installs in basic unit.
3.
stone material point hanging installation structure according to claim 1, is characterized in that: the back side of described stone material (1) is by epoxide resin AB glue (3) bonding fixing stone back of the body bar (2).
4.
stone material point hanging installation structure according to claim 1, is characterized in that: described installation basic unit is rendering layer (4).
5.
stone material point hanging installation structure according to claim 1, is characterized in that: described installation basic unit is steel frame (5).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110431736.0A CN102535806B (en) | 2011-12-21 | 2011-12-21 | Stone material point hanging installation structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110431736.0A CN102535806B (en) | 2011-12-21 | 2011-12-21 | Stone material point hanging installation structure |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102535806A CN102535806A (en) | 2012-07-04 |
CN102535806B true CN102535806B (en) | 2015-09-16 |
Family
ID=46343700
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201110431736.0A Active CN102535806B (en) | 2011-12-21 | 2011-12-21 | Stone material point hanging installation structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102535806B (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102561639A (en) * | 2011-12-22 | 2012-07-11 | 苏州金螳螂建筑装饰股份有限公司 | Point-hung stone for point-hung construction |
CN105569238B (en) * | 2015-12-24 | 2018-03-27 | 曹颖 | A kind of stone curtain wall dry hanging construction method irrigated with AB glue, resin glue |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2283688Y (en) * | 1996-05-06 | 1998-06-10 | 谢林丰 | Decorative material colour glass brick for building |
CN1718963A (en) * | 2005-07-26 | 2006-01-11 | 王光胜 | Construction technology of artificial board or stone material curtain wall |
CN2873930Y (en) * | 2005-09-20 | 2007-02-28 | 隽大实业股份有限公司 | Fixing improving structure for ceramic tile and stone material |
KR100987116B1 (en) * | 2010-04-15 | 2010-10-11 | (주)유일엔지니어링종합건축사사무소 | An outer wall of three dimensions and method of execution |
CN201809923U (en) * | 2010-09-20 | 2011-04-27 | 孟德明 | Stone and wood composite plate |
CN202055458U (en) * | 2011-04-07 | 2011-11-30 | 深圳市洪涛装饰股份有限公司 | Mounting structure for locally thickening slabstone for architectural decoration |
CN202467066U (en) * | 2011-12-21 | 2012-10-03 | 苏州金螳螂建筑装饰股份有限公司 | Point-suspension mounting structure of stone |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH06307057A (en) * | 1993-04-28 | 1994-11-01 | N S P:Kk | Natural stone panel |
-
2011
- 2011-12-21 CN CN201110431736.0A patent/CN102535806B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2283688Y (en) * | 1996-05-06 | 1998-06-10 | 谢林丰 | Decorative material colour glass brick for building |
CN1718963A (en) * | 2005-07-26 | 2006-01-11 | 王光胜 | Construction technology of artificial board or stone material curtain wall |
CN2873930Y (en) * | 2005-09-20 | 2007-02-28 | 隽大实业股份有限公司 | Fixing improving structure for ceramic tile and stone material |
KR100987116B1 (en) * | 2010-04-15 | 2010-10-11 | (주)유일엔지니어링종합건축사사무소 | An outer wall of three dimensions and method of execution |
CN201809923U (en) * | 2010-09-20 | 2011-04-27 | 孟德明 | Stone and wood composite plate |
CN202055458U (en) * | 2011-04-07 | 2011-11-30 | 深圳市洪涛装饰股份有限公司 | Mounting structure for locally thickening slabstone for architectural decoration |
CN202467066U (en) * | 2011-12-21 | 2012-10-03 | 苏州金螳螂建筑装饰股份有限公司 | Point-suspension mounting structure of stone |
Also Published As
Publication number | Publication date |
---|---|
CN102535806A (en) | 2012-07-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202467027U (en) | Point-hanging stone for point-hanging construction | |
CN102535806B (en) | Stone material point hanging installation structure | |
CN202467066U (en) | Point-suspension mounting structure of stone | |
CN109403520A (en) | A kind of viscous anchor combination ceramic thin plate decoration wall and its installation method | |
CN102561639A (en) | Point-hung stone for point-hung construction | |
CN202467072U (en) | Point-hanging installation structure for porcelain plates | |
CN201933740U (en) | Decorating ceramic tile | |
CN202055458U (en) | Mounting structure for locally thickening slabstone for architectural decoration | |
CN217379585U (en) | Firmly-bonded plate body | |
CN104153539B (en) | A kind of Novel floor brick and manufacture method thereof | |
CN202467065U (en) | Point-hanging porcelain plate for point-hanging construction | |
CN204645701U (en) | Construction walling surface reconditioning structure | |
CN107965122A (en) | A kind of novel decorative lines of metal composite EPS | |
CN102561644A (en) | Point-hanging installation structure for porcelain plates | |
CN203145378U (en) | Dry hanging thin stone wallboard structure | |
CN204983380U (en) | Waterproof wallboard | |
CN204163304U (en) | The integrated large plate of interior decoration | |
CN103621346A (en) | Stone side flowerpot and manufacturing method | |
CN206917140U (en) | A kind of ceramic tile veneering structure for paperbacked plasterboard wall | |
CN203393861U (en) | External wall thermal insulation structure using EPS (expandable polystyrene) fire-proof plates | |
CN102535804A (en) | Point hanging porcelain plate for point hanging construction | |
CN201074388Y (en) | Surface-hanging light composite thermal insulation panel wall plate | |
CN106121137B (en) | Parapet of roofing bears down on one water bar and its construction method | |
CN203834712U (en) | Polyurethane waterproof heat preserving board for outer wall | |
CN203846673U (en) | Waterproof and light composite plate with steel-skeleton concrete |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |