CN106121137B - Parapet of roofing bears down on one water bar and its construction method - Google Patents

Parapet of roofing bears down on one water bar and its construction method Download PDF

Info

Publication number
CN106121137B
CN106121137B CN201610682766.1A CN201610682766A CN106121137B CN 106121137 B CN106121137 B CN 106121137B CN 201610682766 A CN201610682766 A CN 201610682766A CN 106121137 B CN106121137 B CN 106121137B
Authority
CN
China
Prior art keywords
water bar
parapet
roofing
bears down
ontology
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610682766.1A
Other languages
Chinese (zh)
Other versions
CN106121137A (en
Inventor
梁晓劼
庄发玉
陈继新
戴文首
王珠明
黄哲熹
林海溪
陈圣洪
陈洪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Construction Engineering Group Co., Ltd
FUJIAN JIANGONG GROUP Co.,Ltd.
Original Assignee
Fujian Construction Engineering Refco Group Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Construction Engineering Refco Group Ltd filed Critical Fujian Construction Engineering Refco Group Ltd
Priority to CN201610682766.1A priority Critical patent/CN106121137B/en
Publication of CN106121137A publication Critical patent/CN106121137A/en
Application granted granted Critical
Publication of CN106121137B publication Critical patent/CN106121137B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D3/00Roof covering by making use of flat or curved slabs or stiff sheets
    • E04D3/38Devices for sealing spaces or joints between roof-covering elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D13/00Special arrangements or devices in connection with roof coverings; Protection against birds; Roof drainage; Sky-lights
    • E04D13/16Insulating devices or arrangements in so far as the roof covering is concerned, e.g. characterised by the material or composition of the roof insulating material or its integration in the roof structure
    • E04D13/1687Insulating devices or arrangements in so far as the roof covering is concerned, e.g. characterised by the material or composition of the roof insulating material or its integration in the roof structure the insulating material having provisions for roof drainage

Abstract

Bear down on one water bar, including a water bar ontology the present invention provides a kind of parapet of roofing, is a hollow cavity in the middle part of the water bar ontology, described this body side surface of water bar offers to be open on one, and water bar body bottom portion offers a under shed;Opening is pressed on parapet bears down on one on the water bar ontology, under shed is embedded in decoration of exterior wall face, the upper opening is clogged with the gap that parapet bears down on one using beneficial clay and foaming agent, it is sealed by silicone weather resistant glue at the upper closing in beared down on one with parapet that is open, the under shed outer is concordant with decoration of exterior wall face layer;The corner at water bar ontology both ends is an inclined-plane.Time and labour saving of the present invention, water bar it is straight it is beautiful, be connected firmly, ensure that water blocking line effect.

Description

Parapet of roofing bears down on one water bar and its construction method
Technical field
The present invention relates to technical field of building construction, more particularly to a kind of parapet of roofing bears down on one water bar and its construction party Method.
Background technology
Currently, external wall of high-rise building generally uses external coating or spray lacquer, in order to prevent rainwater pollution wall face Generally bear down on one in parapet when construction and water blocking lines are set, the setting of water blocking lines should also accomplish lines in addition to meeting functional requirement It is straight, beautiful.Traditional parapet bears down on one water blocking traditional method:1, cement mortar water blocking line (Fig. 1) is painted out, in Fig. 1:Cement Mortar water blocking line 1 ', exterior wall finish 2 ', parapet bear down on one 3 ', parapet 4 ';This way requires the painting of muddy water worker scene, at Product consistency is poor, and perception depends on the technical merit of operator, and finished product is not easy to protect, and cement mortar water blocking line is fragile Damage;2, common practice is paving stone material water bar (Fig. 2), in Fig. 2:Stone material water bar 5 ', stone material glue 6 ', silicone weather resistant glue 7 ', Exterior wall finish 8 ', parapet bear down on one 9 ', parapet 10 ';This way wants on-site cutting at fillet stone material, and material is easy waste, And by stone material and beared down on one stickup using stone material glue, usually to paste not full, flatness is not easily controlled, and durability is poor, The problems such as causing water blocking line to fall off after cementing material aging.
Although parapet bears down on one, water blocking does not waste material using the way for painting out cement mortar water blocking line, compares expense When take a lot of work, the lines presentation quality for painting out cannot be guaranteed, and finished product be easy can be destroyed;If using paving stone material The way of water bar can be with time and labour saving, but stone material wants on-site cutting to be easy waste at fillet stone material material, and uses stone Material glue is by stone material and stickup of bearing down on one, and stickup is not full to cause part to seep water or fall off, and the flatness of stone material junction is not easy to Control, influences whole perception.
Invention content
One of the technical problem to be solved in the present invention is to provide a kind of parapet of roofing and bears down on one water bar, time and labour saving, The straight beauty of water bar is connected firmly, and ensure that water blocking line effect.
The present invention is that one of problem is achieved:A kind of parapet of roofing bears down on one water bar, including a water bar ontology, It is a hollow cavity in the middle part of the water bar ontology, described this body side surface of water bar offers to be open on one, water bar ontology bottom Portion offers a under shed;Opening is pressed on parapet bears down on one on the water bar ontology, and under shed is embedded in decoration of exterior wall face, institute Opening is stated to be clogged using beneficial clay and foaming agent with the gap that parapet bears down on one, what the upper opening was beared down on one with parapet It is sealed by silicone weather resistant glue at closing in, the under shed outer is concordant with decoration of exterior wall face layer;The water bar ontology The corner at both ends is an inclined-plane.
Further, the inclined-plane and horizontal plane are at 45 degree.
Further, the water bar ontology is made of aluminum alloy material.
Further, the water bar body width is 20~30mm, is highly more than 50mm.
Further, 8~12mm under shed insertion decoration of exterior wall face.
The second technical problem to be solved by the present invention is to provide a kind of parapet of roofing and bears down on one water bar construction method, Time and labour saving, is connected firmly at the straight beauty of water bar, ensure that water blocking line effect.
The present invention is the two of problem to be achieved:A kind of parapet of roofing bears down on one water bar construction method, using described Parapet of roofing bear down on one water bar;
The construction method is:The water bar ontology for selecting hollow cavity, is machined using cutting bed, in water bar ontology Side offers and is open on one, and water bar body bottom portion offers a under shed;Water bar ontology corner should cut into one tiltedly Face;
According to water bar body height the line of 8~12mm depths is reserved or is cut with cutting machine in exterior wall finish layer corresponding position Slot when installation, first bears down on one outside surface the beneficial clay of paving within the scope of 20~26mm in parapet of roofing;Then water bar sheet is placed Body, opening is pressed on parapet of roofing bears down on one on water bar ontology, and under shed buckles into decoration of exterior wall face;Two water bar ontologies are handed over It is sketched the contours with fluid sealant at the place of connecing;
After beneficial clay intensity reaches requirement, between water bar ontology and parapet bear down on one, beneficial clay fills insatiable hunger everywhere, Clog foaming agent;
After decoration of exterior wall face and the hygienic cleaning that bears down on one are clean, upper opening is beared down on one with parapet of roofing, and to break silicone resistance to for junction Wait glue.
Further, the water bar ontology is made of aluminum alloy material.
The advantage of the invention is that:The present invention parapet of roofing bear down on one water bar comparison traditional method, can factory sizing Change batch production, good product consistency, the straight beauty of finished product, simple installation, is connected firmly at time and labour saving, not easily to fall off, is not easy Infiltration.It is time-consuming to overcome rendering concrete mortar water blocking line, the lines for painting out are not straight and finished product is easy to be damaged and make The problems such as at doing over again, at the same also solve paving stone material water bar infiltration, fall off and flatness be not easy to control cause to do over again Problem.
Description of the drawings
The present invention is further illustrated in conjunction with the embodiments with reference to the accompanying drawings.
Fig. 1 prior art cement mortar water blocking cable architecture schematic diagrames.
Fig. 2 prior art stone material water bar structural schematic diagrams.
Fig. 3 is the structural schematic diagram of the water bar ontology of the present invention.
Fig. 4 is the structural schematic diagram of the corner of the water bar ontology of the present invention.
Fig. 5 is the structural schematic diagram after present invention construction.
Specific implementation mode
It please refers to shown in Fig. 3 to Fig. 5, a kind of parapet of roofing bears down on one water bar, including a water bar ontology 1, the gear The middle part of water bar ontology 1 is a hollow cavity, and 1 side of water bar ontology, which offers, is open 11 on one, 1 bottom of water bar ontology Offer a under shed 12;The formation of water bar ontology 1 in this wayType;Opening 11 is pressed in parapet on the water bar ontology 1 Bear down on one on 2, under shed 12 is embedded in decoration of exterior wall face 3, the upper opening 11 and parapet bear down on one 2 gap using beneficial clay 4 and Foaming agent 5 is clogged, it is described it is upper opening 11 bear down on one with parapet 2 closing at be sealed by silicone weather resistant glue 6, it is described 12 outer of under shed is concordant with 3 layers of decoration of exterior wall face;The corner at 1 both ends of water bar ontology is an inclined-plane 13.
Wherein, the inclined-plane 13 of the invention and horizontal plane are at 45 degree.It, also can factory's sizing convenient for the straight beauty in corner Change batch production.The water bar ontology 1 is made of aluminum alloy material.1 width of water bar ontology is 20~30mm, height More than 50mm.The under shed 12 is embedded in 8~12mm in decoration of exterior wall face 3.Aluminium alloy water bar ontology under shed 12 is facilitated to detain Enter.
A kind of parapet of roofing of the present invention bears down on one water bar construction method, is beared down on one water blocking using the parapet of roofing Item;
The construction method is:The water bar ontology 1 for selecting hollow cavity, is machined using cutting bed, in water bar sheet 1 side of body, which offers, is open 11 on one, water bar body bottom portion offers a under shed 12;1 body corner of water bar sheet should be cut It is cut into an inclined-plane 13;It, also can factory's regularization batch production convenient for the straight beauty in corner;
It is reserved or with cutting machine cutting 8~12mm depths in 3 layers of corresponding position of exterior wall finish according to 1 height of water bar ontology Wire casing when installation, first bears down on one outside 2 surfaces within the scope of 20~26mm the beneficial clay of paving (inside aluminum alloy bar also in parapet of roofing Beneficial clay can be inserted, beneficial clay consistency should not be too big);Then water bar ontology 1 is placed, opening 11 is pressed on water bar ontology 1 On parapet of roofing bears down on one, under shed 12 buckles into decoration of exterior wall face;It is sketched the contours with fluid sealant two water bar ontology junctions;
After beneficial clay intensity reaches requirement, bear down on one between 2 in water bar ontology 1 and parapet, and beneficial clay fills insatiable hunger Everywhere, foaming agent is clogged;
After decoration of exterior wall face 3 and the hygienic cleaning that bears down on one are clean, upper opening breaks silicone with parapet of roofing junction of bearing down on one Weather-resistant glue.Exterior wall finish layer carries out last procedure construction.Wherein, the water bar ontology is made of aluminum alloy material.
The water bar comparison traditional method in short, the parapet of roofing of the present invention bears down on one, can factory regularization batch production, production Product consistency is good, and the straight beauty of finished product, simple installation, is connected firmly at time and labour saving, not easily to fall off, is not easy to seep water.Overcome powder Swabbing cement mortar water blocking line is time-consuming, and the lines for painting out are not straight and finished product is easy to be damaged the problems such as causing to do over again, It also solves the infiltration of paving stone material water bar simultaneously, fall off and flatness is not easy to the problems such as control causes to do over again.

Claims (7)

  1. The water bar 1. a kind of parapet of roofing bears down on one, it is characterised in that:Including a water bar ontology, in the middle part of the water bar ontology For a hollow cavity, described this body side surface of water bar offers to be open on one, and water bar body bottom portion offers a under shed;Institute It states on water bar ontology opening to be pressed on parapet bears down on one, under shed is embedded in decoration of exterior wall face, the upper opening and parapet pressure The gap on top is clogged using beneficial clay and foaming agent, passes through silicone weather resistant at the closing in that the upper opening is beared down on one with parapet Glue is sealed, and the under shed outer is concordant with decoration of exterior wall face layer;The corner at water bar ontology both ends is one oblique Face.
  2. The water bar 2. parapet of roofing according to claim 1 bears down on one, it is characterised in that:The inclined-plane is with horizontal plane at 45 Degree.
  3. The water bar 3. parapet of roofing according to claim 1 bears down on one, it is characterised in that:The water bar ontology closes for aluminium Golden material is made.
  4. The water bar 4. parapet of roofing according to claim 1 bears down on one, it is characterised in that:The water bar body width is 20~30mm is highly more than 50mm.
  5. The water bar 5. parapet of roofing according to claim 1 bears down on one, it is characterised in that:The under shed insertion exterior wall dress 8~12mm in facing.
  6. The water bar construction method 6. a kind of parapet of roofing bears down on one, it is characterised in that:Using roofing female as described in claim 1 Youngster's wall bears down on one water bar;
    The construction method is:The water bar ontology for selecting hollow cavity, is machined using cutting bed, in this body side surface of water bar It offers and is open on one, water bar body bottom portion offers a under shed;Water bar ontology corner should cut into an inclined-plane;
    The wire casing of 8~12mm depths is reserved or is cut with cutting machine in exterior wall finish layer corresponding position according to water bar body height, When installation, first bear down on one outside surface the beneficial clay of paving within the scope of 20~26mm in parapet of roofing;Then water bar ontology, gear are placed Opening is pressed on parapet of roofing bears down on one on water bar ontology, and under shed buckles into decoration of exterior wall face;Two water bar ontology junctions It is sketched the contours with fluid sealant;
    After beneficial clay intensity reaches requirement, between water bar ontology and parapet bear down on one, beneficial clay filling insatiable hunger everywhere, is clogged Foaming agent;
    After decoration of exterior wall face and the hygienic cleaning that bears down on one are clean, upper opening beats silicone weather resistant with parapet of roofing junction of bearing down on one Glue.
  7. The water bar construction method 7. parapet of roofing according to claim 6 bears down on one, it is characterised in that:The water bar sheet Body is made of aluminum alloy material.
CN201610682766.1A 2016-08-18 2016-08-18 Parapet of roofing bears down on one water bar and its construction method Active CN106121137B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610682766.1A CN106121137B (en) 2016-08-18 2016-08-18 Parapet of roofing bears down on one water bar and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610682766.1A CN106121137B (en) 2016-08-18 2016-08-18 Parapet of roofing bears down on one water bar and its construction method

Publications (2)

Publication Number Publication Date
CN106121137A CN106121137A (en) 2016-11-16
CN106121137B true CN106121137B (en) 2018-09-28

Family

ID=57278633

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610682766.1A Active CN106121137B (en) 2016-08-18 2016-08-18 Parapet of roofing bears down on one water bar and its construction method

Country Status (1)

Country Link
CN (1) CN106121137B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109826375B (en) * 2019-01-21 2020-08-11 天厦建筑设计(厦门)有限公司 Roof parapet waterproof construction

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4619100A (en) * 1981-06-17 1986-10-28 Emblin Robert T Method for fabricating a water impervious roof membrane
CN203247782U (en) * 2013-05-27 2013-10-23 天津住宅集团建设工程总承包有限公司 Fireproof heat-insulative parapet wall construction structure
US9322176B2 (en) * 2014-07-09 2016-04-26 Thomas L. Kelly Sustainable energy efficient roof system
CN205296618U (en) * 2015-12-28 2016-06-08 江苏跃发建设工程有限公司 Steel construction building parapet connection structure that bears down on one
CN205955031U (en) * 2016-08-18 2017-02-15 福建建工集团总公司 Roofing parapet water bar that bears down on one

Also Published As

Publication number Publication date
CN106121137A (en) 2016-11-16

Similar Documents

Publication Publication Date Title
CN106284706A (en) The construction method of external wall outer insulation rock cotton board
CN101586388B (en) Method for mounting insulating and decorating integrative board
CN104912275A (en) Integrated external wall insulation decorating plate structure and construction technology thereof
CN204531025U (en) A kind of syndeton of external wall insulation
CN104294993A (en) Building brick and wall built by brick
CN106121137B (en) Parapet of roofing bears down on one water bar and its construction method
CN205955031U (en) Roofing parapet water bar that bears down on one
CN204112570U (en) A kind of building brick and the body of wall built up by this brick
CN203834826U (en) Novel staircase water drip tank
CN103526832B (en) High-rise outer wall dividing joint construction
CN205955513U (en) Waterproof construction at windowsill position
CN205875541U (en) Anti -drop's roof waterproof structure
CN202882240U (en) Waterproof roll metal strip reducing opening structure
CN204728562U (en) A kind of building brick, the wall at band turning built up by this brick
CN103291093A (en) Stepped stand building surface layer laying method
CN203383420U (en) Stainless steel flashing construction structure of roof parapet
CN208072648U (en) Outer wall screw hole plugging structure
CN205907921U (en) Waterproof structure of parapet wall
CN207647092U (en) A kind of metope tapestry brick mounting structure
CN205296610U (en) Limit structure is received to waterproofing membrane facade flashing
CN204282656U (en) Clear water mould precast concrete antique glazed tile enclosure wall bears down on one
CN204199585U (en) A kind of decoration of exterior wall integrated plate for heat insulation
CN204199449U (en) drip structure
CN214273309U (en) Heat-insulation and decoration integrated window board
CN214835690U (en) Stone waterproof window sleeve structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 350000 Fuzhou, Gulou District, Fujian, No. 54, No. 36, landmark Plaza, floor 89

Applicant after: Fujian construction engineering Refco Group Ltd

Address before: 350000 Fuzhou, Gulou District, Fujian, No. 54, No. 36, landmark Plaza, floor 89

Applicant before: FUJIAN CONSTRUCTION ENGINEERING GROUP COMPANY

CB02 Change of applicant information
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20200917

Address after: 350000, 36 floor, landmark 89, 54 Road, Gulou District, Fujian, Fuzhou

Patentee after: FUJIAN JIANGONG GROUP Co.,Ltd.

Patentee after: Fujian Construction Engineering Group Co., Ltd

Address before: 350000, 36 floor, landmark 89, 54 Road, Gulou District, Fujian, Fuzhou

Patentee before: FUJIAN JIANGONG GROUP Co.,Ltd.

TR01 Transfer of patent right