CN106121137A - Parapet of roofing bears down on one water bar and construction method thereof - Google Patents

Parapet of roofing bears down on one water bar and construction method thereof Download PDF

Info

Publication number
CN106121137A
CN106121137A CN201610682766.1A CN201610682766A CN106121137A CN 106121137 A CN106121137 A CN 106121137A CN 201610682766 A CN201610682766 A CN 201610682766A CN 106121137 A CN106121137 A CN 106121137A
Authority
CN
China
Prior art keywords
water bar
parapet
bar body
roofing
bears down
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610682766.1A
Other languages
Chinese (zh)
Other versions
CN106121137B (en
Inventor
梁晓劼
庄发玉
陈继新
戴文首
王珠明
黄哲熹
林海溪
陈圣洪
陈洪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Construction Engineering Group Co., Ltd
FUJIAN JIANGONG GROUP Co.,Ltd.
Original Assignee
FUJIAN CONSTRUCTION ENGINEERING GROUP Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FUJIAN CONSTRUCTION ENGINEERING GROUP Co filed Critical FUJIAN CONSTRUCTION ENGINEERING GROUP Co
Priority to CN201610682766.1A priority Critical patent/CN106121137B/en
Publication of CN106121137A publication Critical patent/CN106121137A/en
Application granted granted Critical
Publication of CN106121137B publication Critical patent/CN106121137B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D3/00Roof covering by making use of flat or curved slabs or stiff sheets
    • E04D3/38Devices for sealing spaces or joints between roof-covering elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D13/00Special arrangements or devices in connection with roof coverings; Protection against birds; Roof drainage ; Sky-lights
    • E04D13/16Insulating devices or arrangements in so far as the roof covering is concerned, e.g. characterised by the material or composition of the roof insulating material or its integration in the roof structure
    • E04D13/1687Insulating devices or arrangements in so far as the roof covering is concerned, e.g. characterised by the material or composition of the roof insulating material or its integration in the roof structure the insulating material having provisions for roof drainage

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Finishing Walls (AREA)

Abstract

The invention provides a kind of parapet of roofing to bear down on one water bar, including a water bar body, be a hollow cavity in the middle part of described water bar body, described water bar body side opening is provided with a upper shed, and water bar body bottom portion offers a under shed;Described water bar body upper shed is pressed on parapet bears down on one, under shed embeds decoration of exterior wall face, the space that described upper shed and parapet bear down on one utilizes benefit clay and foaming agent to clog, being sealed by silicone weather resistant glue at the closing in that described upper shed and parapet bear down on one, described under shed outer is concordant with decoration of exterior wall surface layer;The corner at described water bar body two ends is an inclined-plane.Time and labour saving of the present invention, water bar straight attractive in appearance, be connected firmly, it is ensured that dash line effect.

Description

Parapet of roofing bears down on one water bar and construction method thereof
Technical field
The present invention relates to technical field of building construction, bear down on one water bar and construction party thereof particularly to a kind of parapet of roofing Method.
Background technology
At present, external wall of high-rise building typically uses external coating or sprays true mineral varnish, in order to prevent rainwater pollution wall face Typically bearing down on one at parapet during construction and arrange dash lines, the setting of dash lines also should accomplish lines except meeting functional requirement Straight, attractive in appearance.Traditional parapet bears down on one dash traditional method: 1, paint out cement mortar dash line (Fig. 1), in Fig. 1: cement Mortar dash line 1 ', exterior wall finish 2 ', parapet bears down on one 3 ', parapet 4 ';This way requires that muddy water workman scene is painted, and becomes Product concordance is poor, and perception depends on the technical merit of operator, and finished product is not easy protection, and cement mortar dash line is fragile Damage;2, common practice is paving stone material water bar (Fig. 2), in Fig. 2: stone material water bar 5 ', stone material glue 6 ', silicone weather resistant glue 7 ', Exterior wall finish 8 ', parapet bears down on one 9 ', parapet 10 ';This way wants on-site cutting to become fillet stone material, and material is easily wasted, And use stone material glue by stone material and stickup of bearing down on one, and usually to paste the fullest, flatness is not easily controlled, and durability is poor, The problems such as dash line comes off are caused after cementing material is aging.
Although parapet bears down on one, dash uses the way painting out cement mortar dash line not waste material, but compares expense Time take a lot of work, paint lines presentation quality out and can not be guaranteed, and finished product easily can be destroyed;If using paving stone material The way of water bar can with time and labour saving, but stone material wants on-site cutting to become fillet stone material material easily to waste, and uses stone Material glue, by stone material and stickup of bearing down on one, is pasted the fullest meeting and is caused local seep water or come off, and the flatness of stone material junction is not easy to Control, the overall perception of impact.
Summary of the invention
One of the technical problem to be solved in the present invention, is to provide a kind of parapet of roofing to bear down on one water bar, time and labour saving, Water bar straight attractive in appearance, be connected firmly, it is ensured that dash line effect.
The present invention is that one of problem is achieved in that: a kind of parapet of roofing bears down on one water bar, including a water bar body, Being a hollow cavity in the middle part of described water bar body, described water bar body side opening is provided with a upper shed, at the bottom of water bar body Portion offers a under shed;Described water bar body upper shed is pressed on parapet bears down on one, and under shed embeds decoration of exterior wall face, institute Stating the space that upper shed and parapet bear down on one utilizes benefit clay and foaming agent to clog, and described upper shed and parapet bear down on one Being sealed by silicone weather resistant glue at closing in, described under shed outer is concordant with decoration of exterior wall surface layer;Described water bar body The corner at two ends is an inclined-plane.
Further, described inclined-plane is with the horizontal 45 degree.
Further, described water bar body is that aluminum alloy material is made.
Further, described water bar body width is 20~30mm, and height is more than 50mm.
Further, described under shed embeds in decoration of exterior wall face 8~12mm.
The two of the technical problem to be solved in the present invention, are to provide a kind of parapet of roofing to bear down on one water bar construction method, Time and labour saving, water bar straight attractive in appearance, be connected firmly, it is ensured that dash line effect.
The present invention is that the two of problem is achieved in that: a kind of parapet of roofing bears down on one water bar construction method, uses described Parapet of roofing bear down on one water bar;
Described construction method is: select the water bar body of hollow cavity, uses cutting bed machining, at water bar body Side opening is provided with a upper shed, and water bar body bottom portion offers a under shed;It is oblique that water bar body corner should cut into one Face;
Reserved in exterior wall finish layer relevant position according to water bar body height or cut 8~12mm deep lines with cutting machine Groove, during installation, first paving benefit clay in the range of 20~26mm outside parapet of roofing bears down on one surface;Then water bar is laid originally Body, water bar body upper shed is pressed on parapet of roofing bears down on one, and under shed buckles into decoration of exterior wall face;Two water bar bodies are handed over The place's of connecing fluid sealant sketches the contours;
After benefit clay intensity reaches requirement, between water bar body and parapet bear down on one, benefit clay fills insatiable hunger everywhere, Filling foaming agent;
After decoration of exterior wall face and the hygienic cleaning that bears down on one are clean, upper shed and parapet of roofing bear down on one, and to break silicone resistance in junction Wait glue.
Further, described water bar body is that aluminum alloy material is made.
It is an advantage of the current invention that: the parapet of roofing of the present invention bear down on one water bar contrast traditional method, can factory sizing Changing batch production, good product consistency, finished product is straight attractive in appearance, simple installation, time and labour saving, is connected firmly, and difficult drop-off is difficult to Infiltration.Overcome that rendering concrete mortar dash line is time-consuming takes a lot of work, paint that lines out are the most straight and finished product is the most damaged makes Become the problem such as do over again, also solve the infiltration of paving stone material water bar simultaneously, come off and flatness is not easy to control and causes and do over again Problem.
Accompanying drawing explanation
The present invention is further illustrated the most in conjunction with the embodiments.
Fig. 1 prior art cement mortar dash line structure schematic diagram.
Fig. 2 prior art stone material water bar structural representation.
Fig. 3 is the structural representation of the water bar body of the present invention.
Fig. 4 is the structural representation of the corner of the water bar body of the present invention.
Fig. 5 is the structural representation after the present invention constructs.
Detailed description of the invention
Referring to shown in Fig. 3 to Fig. 5, a kind of parapet of roofing bears down on one water bar, including a water bar body 1, described gear Being a hollow cavity in the middle part of water bar body 1, described water bar body 1 side opening is provided with a upper shed 11, bottom water bar body 1 Offer a under shed 12;So water bar body 1 is formedType;Described water bar body 1 upper shed 11 is pressed in parapet Bearing down on one on 2, under shed 12 embeds decoration of exterior wall face 3, described upper shed 11 and parapet bear down on one 2 space utilize benefit clay 4 and Foaming agent 5 is clogged, described upper shed 11 bear down on one with parapet 2 closing at sealed by silicone weather resistant glue 6, described Under shed 12 outer is concordant with 3 layers of decoration of exterior wall face;The corner at described water bar body 1 two ends is an inclined-plane 13.
Wherein, the described inclined-plane 13 of the present invention is with the horizontal 45 degree.It is easy to corner straight attractive in appearance, it is possible to factory shapes Change batch production.Described water bar body 1 is made for aluminum alloy material.Described water bar body 1 width is 20~30mm, highly More than 50mm.Described under shed 12 embeds in decoration of exterior wall face 3 8~12mm.Aluminium alloy water bar body under shed 12 is facilitated to detain Enter.
A kind of parapet of roofing of the present invention bears down on one water bar construction method, and the parapet of roofing described in employing bears down on one dash Bar;
Described construction method is: select the water bar body 1 of hollow cavity, uses cutting bed machining, at water bar originally Body 1 side opening is provided with a upper shed 11, and water bar body bottom portion offers a under shed 12;This 1 body corner of water bar should be cut It is slit into an inclined-plane 13;It is easy to corner straight attractive in appearance, it is possible to factory's canalization batch production;
Reserved in 3 layers of relevant position of exterior wall finish according to water bar body 1 height or deep with cutting machine cutting 8~12mm Wire casing, during installation, first outside parapet of roofing bears down on one 2 surfaces, paving benefit clay is (inside aluminum alloy bar also in the range of 20~26mm Can insert benefit clay, benefit clay denseness should be the not biggest);Then laying water bar body 1, water bar body 1 upper shed 11 is pressed in On parapet of roofing bears down on one, under shed 12 buckles into decoration of exterior wall face;Two water bar body junction fluid sealants sketch the contours;
After benefit clay intensity reaches requirement, bear down on one between 2 at water bar body 1 and parapet, and benefit clay fills insatiable hunger Everywhere, filling foaming agent;
After decoration of exterior wall face 3 and the hygienic cleaning that bears down on one are clean, silicone is broken in upper shed and parapet of roofing junction of bearing down on one Weather-resistant glue.Exterior wall finish layer carries out last procedure construction.Wherein, described water bar body is that aluminum alloy material is made.
In a word, the parapet of roofing of the present invention bears down on one water bar contrast traditional method, can factory canalization batch production, produce Product concordance is good, and finished product is straight attractive in appearance, simple installation, time and labour saving, is connected firmly, difficult drop-off, is difficult to infiltration.Overcome powder Swabbing cement mortar dash line is time-consuming takes a lot of work, and rendering lines out are the most straight and finished product is the most damaged causes problems such as doing over again, Also solve the infiltration of paving stone material water bar simultaneously, come off and flatness is not easy to control and causes problems such as doing over again.

Claims (7)

1. a parapet of roofing bears down on one water bar, it is characterised in that: include a water bar body, in the middle part of described water bar body Being a hollow cavity, described water bar body side opening is provided with a upper shed, and water bar body bottom portion offers a under shed;Institute Stating water bar body upper shed to be pressed on parapet bears down on one, under shed embeds decoration of exterior wall face, described upper shed and parapet pressure The space on top utilizes benefit clay and foaming agent to clog, and passes through silicone weather resistant at the closing in that described upper shed and parapet bear down on one Glue seals, and described under shed outer is concordant with decoration of exterior wall surface layer;The corner at described water bar body two ends is one oblique Face.
Parapet of roofing the most according to claim 1 bears down on one water bar, it is characterised in that: described inclined-plane is with the horizontal 45 Degree.
Parapet of roofing the most according to claim 1 bears down on one water bar, it is characterised in that: described water bar body is that aluminum closes Gold material is made.
Parapet of roofing the most according to claim 1 bears down on one water bar, it is characterised in that: described water bar body width is 20~30mm, height is more than 50mm.
Parapet of roofing the most according to claim 1 bears down on one water bar, it is characterised in that: described under shed embeds exterior wall dress In facing 8~12mm.
6. a parapet of roofing bears down on one water bar construction method, it is characterised in that: use roofing female as claimed in claim 1 Youngster's wall bears down on one water bar;
Described construction method is: select the water bar body of hollow cavity, uses cutting bed machining, at this body side surface of water bar Offering a upper shed, water bar body bottom portion offers a under shed;Water bar body corner should cut into an inclined-plane;
It is reserved in exterior wall finish layer relevant position according to water bar body height or cut 8~12mm deep wire casings with cutting machine, During installation, first paving benefit clay in the range of 20~26mm outside parapet of roofing bears down on one surface;Then water bar body is laid, gear Water bar body upper shed is pressed on parapet of roofing bears down on one, and under shed buckles into decoration of exterior wall face;Two water bar body junctions Sketch the contours with fluid sealant;
After benefit clay intensity reaches requirement, between water bar body and parapet bear down on one, benefit clay fills insatiable hunger everywhere, filling Foaming agent;
After decoration of exterior wall face and the hygienic cleaning that bears down on one are clean, silicone weather resistant is beaten in upper shed and parapet of roofing junction of bearing down on one Glue.
Parapet of roofing the most according to claim 6 bears down on one water bar construction method, it is characterised in that: described water bar this Body is that aluminum alloy material is made.
CN201610682766.1A 2016-08-18 2016-08-18 Parapet of roofing bears down on one water bar and its construction method Active CN106121137B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610682766.1A CN106121137B (en) 2016-08-18 2016-08-18 Parapet of roofing bears down on one water bar and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610682766.1A CN106121137B (en) 2016-08-18 2016-08-18 Parapet of roofing bears down on one water bar and its construction method

Publications (2)

Publication Number Publication Date
CN106121137A true CN106121137A (en) 2016-11-16
CN106121137B CN106121137B (en) 2018-09-28

Family

ID=57278633

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610682766.1A Active CN106121137B (en) 2016-08-18 2016-08-18 Parapet of roofing bears down on one water bar and its construction method

Country Status (1)

Country Link
CN (1) CN106121137B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109826375A (en) * 2019-01-21 2019-05-31 天厦建筑设计(厦门)有限公司 A kind of parapet of roofing water proof structure

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4619100A (en) * 1981-06-17 1986-10-28 Emblin Robert T Method for fabricating a water impervious roof membrane
CN203247782U (en) * 2013-05-27 2013-10-23 天津住宅集团建设工程总承包有限公司 Fireproof heat-insulative parapet wall construction structure
US20160010336A1 (en) * 2014-07-09 2016-01-14 Thomas L. Kelly Sustainable energy efficient roof system
CN205296618U (en) * 2015-12-28 2016-06-08 江苏跃发建设工程有限公司 Steel construction building parapet connection structure that bears down on one
CN205955031U (en) * 2016-08-18 2017-02-15 福建建工集团总公司 Roofing parapet water bar that bears down on one

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4619100A (en) * 1981-06-17 1986-10-28 Emblin Robert T Method for fabricating a water impervious roof membrane
CN203247782U (en) * 2013-05-27 2013-10-23 天津住宅集团建设工程总承包有限公司 Fireproof heat-insulative parapet wall construction structure
US20160010336A1 (en) * 2014-07-09 2016-01-14 Thomas L. Kelly Sustainable energy efficient roof system
CN205296618U (en) * 2015-12-28 2016-06-08 江苏跃发建设工程有限公司 Steel construction building parapet connection structure that bears down on one
CN205955031U (en) * 2016-08-18 2017-02-15 福建建工集团总公司 Roofing parapet water bar that bears down on one

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109826375A (en) * 2019-01-21 2019-05-31 天厦建筑设计(厦门)有限公司 A kind of parapet of roofing water proof structure

Also Published As

Publication number Publication date
CN106121137B (en) 2018-09-28

Similar Documents

Publication Publication Date Title
CN104018598B (en) A kind of external wall structure and construction installation method
CN106284706A (en) The construction method of external wall outer insulation rock cotton board
CN208293929U (en) A kind of roofing flashing structure
CN204002298U (en) A kind of anti-seep window
CN109750758A (en) The construction method that prefabricated sandwich heat preservation shear wall exterior wall is laterally stitched and vertically stitched
CN104294993A (en) Building brick and wall built by brick
CN100494594C (en) Process for producing outer heat insulation wall by on-site pouring polyurethane heat insulation layer real stone paint decoration surface
CN106121137A (en) Parapet of roofing bears down on one water bar and construction method thereof
CN104453011A (en) Light outer wall structure and construction method thereof
CN205955031U (en) Roofing parapet water bar that bears down on one
CN101892729A (en) Finished heat-insulating decorative plate with invisible latch and installation method thereof
CN109184103A (en) Building masonry wall exempts from plastering construction technique
CN104612343A (en) Method for constructing extruded polystyrene board molding of building outer wall
CN203834826U (en) Novel staircase water drip tank
CN204112570U (en) A kind of building brick and the body of wall built up by this brick
CN103291093A (en) Stepped stand building surface layer laying method
CN205955513U (en) Waterproof construction at windowsill position
CN200985568Y (en) Cast-in-place polyurethane insulation coating real mineral varnish decorative face exterior thermal insulation substance
CN101487303A (en) Energy-saving wall building technique by positive positioned L-shaped energy-saving building blocks
CN204510701U (en) A kind of imitative stone material GRC integrated plate for heat insulation hanging structure
CN204626832U (en) Exterior wall enclosure structure
CN107675880B (en) Decorative moulding and double-dripping-line construction process
CN107152103A (en) A kind of clear water brick decorative wall
CN202882240U (en) Waterproof roll metal strip reducing opening structure
CN205296610U (en) Limit structure is received to waterproofing membrane facade flashing

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 350000 Fuzhou, Gulou District, Fujian, No. 54, No. 36, landmark Plaza, floor 89

Applicant after: Fujian construction engineering Refco Group Ltd

Address before: 350000 Fuzhou, Gulou District, Fujian, No. 54, No. 36, landmark Plaza, floor 89

Applicant before: FUJIAN CONSTRUCTION ENGINEERING GROUP COMPANY

GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200917

Address after: 350000, 36 floor, landmark 89, 54 Road, Gulou District, Fujian, Fuzhou

Patentee after: FUJIAN JIANGONG GROUP Co.,Ltd.

Patentee after: Fujian Construction Engineering Group Co., Ltd

Address before: 350000, 36 floor, landmark 89, 54 Road, Gulou District, Fujian, Fuzhou

Patentee before: FUJIAN JIANGONG GROUP Co.,Ltd.