CN202467066U - Point-suspension mounting structure of stone - Google Patents
Point-suspension mounting structure of stone Download PDFInfo
- Publication number
- CN202467066U CN202467066U CN 201120539131 CN201120539131U CN202467066U CN 202467066 U CN202467066 U CN 202467066U CN 201120539131 CN201120539131 CN 201120539131 CN 201120539131 U CN201120539131 U CN 201120539131U CN 202467066 U CN202467066 U CN 202467066U
- Authority
- CN
- China
- Prior art keywords
- stone material
- stone
- mounting structure
- point
- body bar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Floor Finish (AREA)
Abstract
The utility model discloses a point-suspension mounting structure of stone. The point-suspension mounting structure comprises the stone (1), a stone back strip (2) and a painting layer (4) or a steel framework (5), and the stone back strip (2) is fixedly adhered on the back of the stone (1) by adhesive. The stone back strip (2) is fixedly adhered onto the painting layer (4) or the steel framework (5) by adhesive. By the aid of the point-suspension mounting structure of the stone, the problem of waste of labor can be solved, construction cost is reduced, quality and safety problems such as hollowing and falling of stone are avoided, and adverse factors of efforescence and slurry return of the stone, labor and time wastage, high load of floors and the like are reduced.
Description
Technical field
The utility model relates to a kind of stone material point and hangs mounting structure.
Background technology
Along with rapid development of social economy, people are also increasingly high to the pursuit degree of quality of life, and the output of architectural decoration is also along with cumulative year after year; But the construction technology of parts of traditional does not obtain changing always, causes seizing in a large number of social resources, pastes such as the stone material of hotel guest room washroom; What adopt is the construction technology of cement mortar wet combining always, a large amount of resources such as water, cement, yellow ground that make, and need great amount of manpower to go to carry out work such as vertical transport, stirring; Increase construction cost, wasted social resources; Cause environment pollution, and metope stone material etc. easily hollowing, come off, produce quality, security problems.
The utility model content
The purpose of the utility model is: provide a kind of stone material point to hang mounting structure, it can solve lost labor's problem, reduces construction cost; Quality, safety problem such as avoid the stone material hollowing, come off; Reduce the stone material accumulation of salt in the surface soil return slurry, when consuming expenses of labour, unfavorable factor such as floor load.
The technical scheme of the utility model is: a kind of stone material point is hung mounting structure, and it includes stone material, basic unit is installed, and the back side of stone material is provided with stone material back of the body bar, and stone material back of the body bar is fixed on to be installed in the basic unit.
Below technique scheme is described further:
Said stone material back of the body bar is bonded and fixed at through cementing agent to be installed in the basic unit.
Said stone material back of the body bar is fixed on through the epoxide resin AB glue bond to be installed in the basic unit.
The back side of said stone material is through cementing agent bonding fixing stone back of the body bar.
The back side of said stone material is through epoxide resin AB glue bond fixing stone back of the body bar.
Said installation basic unit is a rendering layer.
Said installation basic unit is a steel frame.
The utility model has the advantages that: the utility model can solve lost labor's problem, reduces construction cost; Quality, safety problem such as avoid the stone material hollowing, come off; Reduce the stone material accumulation of salt in the surface soil return slurry, when consuming expenses of labour, unfavorable factor such as floor load.
Description of drawings
Below in conjunction with accompanying drawing and embodiment the utility model is done further to describe:
Fig. 1 is the use sketch map (pasting rendering layer) of the utility model embodiment;
Fig. 2 is the use sketch map (pasting steel frame) of the utility model embodiment;
Fig. 3 is that the point of the utility model embodiment is hung schematic perspective view;
Fig. 4 is the stone material of the utility model embodiment and " V " type groove sketch map of stone material seam;
Fig. 5 is the stone material assembly sketch map of the utility model embodiment;
Wherein: 1 stone material; 2 stone materials back of the body bar; 3 epoxide resin AB glue; 4 rendering layers; 5 steel frames; 6 grooves.
The specific embodiment
Embodiment: like Fig. 1, Fig. 2, shown in Figure 3; A kind of stone material point is hung mounting structure; It includes stone material 1, and the back side of stone material 1 is adhesively fixed with stone material back of the body bar 2 through epoxide resin AB glue 3, and stone material back of the body bar 2 is bonded and fixed on rendering layer 4 or the steel frame 5 through epoxide resin AB glue 3.
Fig. 4 is a present embodiment node deepen drawing, and the seam of stone material 1 and stone material 1 adopts " V " type groove of 3mm; Stone material 1 closes up with end face and adopts " L " type groove of 8mm * 6mm, has avoided uneven, has increased globality and impression.
Fig. 5 is the enforcement of the utility model commercialization theory, has avoided the pillar polylith to install, and influences the attractive in appearance of external corner; Assembly can be ensured the quality of products, and can save timeliness again; Polylith stone material 1 is combined into one in producer, marches into the arena after edging, the chamfering.
With reference to figure 1, Fig. 2, Fig. 3, the point of present embodiment is hung constructure scheme:
1,, precisely emits rendering layer 4 and accomplish upper thread, ground punch position, make ash cake according to final scheme.
2, carry out cement mortar and whitewash in strict accordance with accomplishing upper thread and ash cake, before whitewashing, criticize interfacial agents earlier one time; The match ratio of cement mortar must controlled well is advanced, and prevents the very few rendering layer insufficient strength that causes of cement consumption; Must control the quality of whitewashing well, planeness, verticality and squareness must meet the requirements, and rendering layer 4 must not the hollowing cracking; The hardware position adds powder, adds powder THICKNESS CONTROL and stone material back of the body bar 2 with high.
3, emit stone material 1 according to the groundwork thickness of the construction technology needs of confirming and accomplish upper thread;
4, after electric pipeline, plumbing, waterproof construction (washroom metope waterproof the is accomplished the top) acceptance(check), carry out stone material 1 and set type, eject stone material 1 separator bar, make the node sample.
When 5, doing stone material 1 in-depth, indicating stone material back of the body bar 2 width dimensions is 30mm, and length is less than 600mm, middlely pastes a stone material back of the body bar 2, greater than 600mm, pastes two stone materials and carry on the back bars 2; In order to guarantee stone material 1 decorative pattern and color consistency, every block of stone material 1 must be finished room number, size; The hardware installation position should precisely section out on drawing; Stone material 1 is except the back side, and other faces all will carry out polishing.
6, stone material 1 and stone material 1 seam adopt " V " type groove 6 of 3mm, have avoided uneven, have increased globality and impression.
7, after stone material 1 acceptance(check), carry out walkthrough, in time pinpoint the problems; The contrast drawing after stone material 1 is accomplished fluently the hardware hole, carries out cladding operation.
8, epoxide resin AB glue 3 is coated on the stone material back of the body bar 2, directly pastes on the rendering layer 4 or steel frame 5 of having carried out waterproof.The stone material 1 cladding holding capacity that will consider rendering layer 4 or steel frame 5.
Should be pointed out that for the utility model also to have the embodiment of multiple conversion and remodeling, be not limited to the specific embodiment of above-mentioned embodiment through proving absolutely.The foregoing description is as just the explanation of the utility model, rather than restriction.In a word, the protection domain of the utility model should comprise those conspicuous to those skilled in the art conversion or substitute and remodeling.
Claims (7)
1. a stone material point is hung mounting structure, it is characterized in that: it includes stone material (1), basic unit is installed, and the back side of stone material (1) is provided with stone material back of the body bar (2), and stone material back of the body bar (2) is fixed on to be installed in the basic unit.
2. stone material point according to claim 1 is hung mounting structure, it is characterized in that: said stone material back of the body bar (2) is bonded and fixed at through cementing agent and installs in the basic unit.
3. stone material point according to claim 1 is hung mounting structure, it is characterized in that: said stone material back of the body bar (2) is bonded and fixed at through epoxide resin AB glue (3) and installs in the basic unit.
4. stone material point according to claim 1 is hung mounting structure, it is characterized in that: the back side of said stone material (1) is through cementing agent bonding fixing stone back of the body bar (2).
5. stone material point according to claim 1 is hung mounting structure, it is characterized in that: the back side of said stone material (1) is through epoxide resin AB glue (3) bonding fixing stone back of the body bar (2).
6. stone material point according to claim 1 is hung mounting structure, it is characterized in that: said installation basic unit is rendering layer (4).
7. stone material point according to claim 1 is hung mounting structure, it is characterized in that: said installation basic unit is steel frame (5).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201120539131 CN202467066U (en) | 2011-12-21 | 2011-12-21 | Point-suspension mounting structure of stone |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201120539131 CN202467066U (en) | 2011-12-21 | 2011-12-21 | Point-suspension mounting structure of stone |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202467066U true CN202467066U (en) | 2012-10-03 |
Family
ID=46915233
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201120539131 Expired - Fee Related CN202467066U (en) | 2011-12-21 | 2011-12-21 | Point-suspension mounting structure of stone |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202467066U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102535806A (en) * | 2011-12-21 | 2012-07-04 | 苏州金螳螂建筑装饰股份有限公司 | Stone material point hanging installation structure |
-
2011
- 2011-12-21 CN CN 201120539131 patent/CN202467066U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102535806A (en) * | 2011-12-21 | 2012-07-04 | 苏州金螳螂建筑装饰股份有限公司 | Stone material point hanging installation structure |
CN102535806B (en) * | 2011-12-21 | 2015-09-16 | 苏州金螳螂建筑装饰股份有限公司 | Stone material point hanging installation structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202467027U (en) | Point-hanging stone for point-hanging construction | |
CN202467066U (en) | Point-suspension mounting structure of stone | |
CN102535806B (en) | Stone material point hanging installation structure | |
CN202467072U (en) | Point-hanging installation structure for porcelain plates | |
CN102561639A (en) | Point-hung stone for point-hung construction | |
CN109403520A (en) | A kind of viscous anchor combination ceramic thin plate decoration wall and its installation method | |
CN104153539B (en) | A kind of Novel floor brick and manufacture method thereof | |
CN202467065U (en) | Point-hanging porcelain plate for point-hanging construction | |
CN201406811Y (en) | Rear reinforcing device for outer wall plate | |
CN2913498Y (en) | Hall column of wood structure building | |
CN217379585U (en) | Firmly-bonded plate body | |
CN202055458U (en) | Mounting structure for locally thickening slabstone for architectural decoration | |
CN102561644A (en) | Point-hanging installation structure for porcelain plates | |
CN201991169U (en) | Stone tiling composite board | |
CN103621346A (en) | Stone side flowerpot and manufacturing method | |
CN203640191U (en) | Novel EPS decorative component | |
CN202100119U (en) | Door pocket line | |
CN206917140U (en) | A kind of ceramic tile veneering structure for paperbacked plasterboard wall | |
CN210342280U (en) | Expansion joint structure of parapet on window side | |
CN102535804A (en) | Point hanging porcelain plate for point hanging construction | |
CN203257036U (en) | External wall tile | |
CN205558022U (en) | Take composite wall panel of glue holding tank | |
CN201074388Y (en) | Surface-hanging light composite thermal insulation panel wall plate | |
CN204163309U (en) | Unitary modular warming plate used for building exterior wall | |
CN214273309U (en) | Heat-insulation and decoration integrated window board |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20121003 Termination date: 20171221 |
|
CF01 | Termination of patent right due to non-payment of annual fee |