CN102535354A - Bridge support checking ladder - Google Patents

Bridge support checking ladder Download PDF

Info

Publication number
CN102535354A
CN102535354A CN2011103656201A CN201110365620A CN102535354A CN 102535354 A CN102535354 A CN 102535354A CN 2011103656201 A CN2011103656201 A CN 2011103656201A CN 201110365620 A CN201110365620 A CN 201110365620A CN 102535354 A CN102535354 A CN 102535354A
Authority
CN
China
Prior art keywords
fixture block
bridge
ladder
montants
screw
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011103656201A
Other languages
Chinese (zh)
Inventor
彭跃立
齐春峰
张永生
严志安
汪卫平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 15th Bureau Group Co Ltd
Original Assignee
China Railway 15th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 15th Bureau Group Co Ltd filed Critical China Railway 15th Bureau Group Co Ltd
Priority to CN2011103656201A priority Critical patent/CN102535354A/en
Publication of CN102535354A publication Critical patent/CN102535354A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

A bridge support checking ladder relates to a bridge support checking device. A plurality of ladder stand cross rods (10) are arranged between two vertical rods (9), one sides of the lower ends of the vertical rods (9) are respectively connected with one ends of lifting rods (12), the other sides of the upper ends of the two vertical rods are respectively provided with a semi-circle hook (2), and one sides of two screws are respectively provided with a clamping block B (7). The upper portion of a vertical extending rod is provided with square openings corresponding to screw holes of the two semi-circle hooks, pins shafts (5) penetrate through side walls of two sides of the square openings to be in inserted connection with shaft holes (17), one ends of the two screws corresponding to the clamping blocks B are respectively provided with a clamping block A (6), and the other ends of the two screws are respectively fixedly connected with a rotating wheel (4). The bridge support checking ladder is in clamping connection with cement piers arranged on the upper portions of two sides of a bridge by the semi-circle hooks arranged on the upper portions of the vertical rods and is sleeved on a rail through semi-circle grooves arranged on the semi-circle hooks, and the bridge support checking ladder can be handheld so as to perform fault detection by utilizing a detecting instrument or a telescope or visual inspection to detect the bottom surface of the bridge or a bridge pier system. Due to the fact that the bridge support checking ladder is simple in structure, operation can be performed by one person.

Description

A kind of bridge pad inspection ladder
[technical field]
The present invention relates to a kind of bridge pad testing fixture, especially relate to a kind of inspection ladder that is applicable to the high ferro bridge pad.
[background technology]
Known, the effect of bridge pad is to bear whole loads that the top crossstructure transmits, and gives ground they and the bridge pier structure Load Transfer of bottom through bearing.Therefore, use with normal, not only require ground and basis that enough intensity, rigidity and resistance to overturning will be arranged, also require in service life, should regularly carry out maintenance, guarantee the normal operating conditions of bearing for bridge pad for the safety of full-bridge.
Existing bridge mainly is divided into; Beam bridge, arch formula bridge, cable stayed bridge, suspension bridge etc., bridge generally consists of the following components: bridge span structure, bridge pier and abutment, basis, superstructure, bearing and truncated cone banking etc.; Support system generally is divided into fixed bearing and freely movable bearing, is arranged on power transmission and linkage between the upper and lower structure of bridge; Its effect be the various Load Transfer of superstructure to pier, and adapt to mobile load, variations in temperature, concrete shrinkage and the displacement that factor produced such as creep, make the actual loading situation of bridge meet the structural calculation diagram; The design period of general bridge according to the Ministry of Construction 2000 put into effect about architectural design series of standards service life, regulation Bridges in Our Country design life is 100 years to 120 years; But since the support system of the bridge span structure of bridge bottom, bridge pier in long-term use or earthquake, for a long time during phenomenons generation such as structural displacement gradually; For the bridge span structure of bridge bottom, bridge pier bearing pad system check, in the layout of test or test point, when the especially inspection of support system, test near they very difficulties that seems.
Especially in the construction at full speed of high ferro or inter-city passenger rail; Large span, bridge be high to surpass comparatively common more than 10 meters; Because high ferro or inter-city passenger rail are much built in the personnel compact district; So the basic cat ladder that is not provided with from the bridge pier bottom is bigger for inspection, the difficulty of test of support system.
The inventor is at the bottom of the bridge that discloses a kind of bridge in the Chinese patent of first to file " at the bottom of a kind of bridge of bridge and support system inspection dolly; notice of authorization CN101476285B, the applying date on 01 09th, 2009 " and bearing inspection dolly; This patent is found the high ferro that incompatibility is present or the bearing inspection work of inter-city passenger rail in implementation process; Because weight length heavier and existing fence is lacked " length on every rhizosphere hurdle is about 15 meters "; Meet interface and just need unload installation once more down, very inconvenient.
[summary of the invention]
In order to overcome the deficiency in the background technology; The present invention discloses a kind of bridge pad inspection ladder; Said bridge pad inspection ladder connects through the clump subcard that semicircle hook and bridge two upper lateral parts are set on montant top or is enclosed within on the railing through the half slot that is provided with on the semicircle hook; Through hand-held as detection instrument or telescope or range estimation detects the bridge bottom surface or the bridge pier system detects a flaw because structure of the present invention is comparatively simple, but a just operation of people.
For realizing the foregoing invention purpose, the present invention adopts following technical scheme:
A kind of bridge pad inspection ladder; Comprise montant, cat ladder cross bar, suspension rod, platform cross bar, backguy, semicircle hook, spill spin block, runner, fixture block A, fixture block B and screw rod; Between two montants, be provided with complex root cat ladder cross bar, one side connects an end of suspension rod respectively through hinge in the lower end of two montants, between two suspension rods, is provided with many platform cross bars; The other end at two suspension rods is connected with an end of two backguys respectively, and the other end of two backguys connects the bottom of two montants; Opposite side two montant upper ends is respectively equipped with the semicircle hook; Link at two semicircles hook and two montants is respectively equipped with screw; Two screw rods respectively with the screw wire connection; One side towards semicircle hook bottom at two screw rods is respectively equipped with fixture block B, and the other end of linking up with at two semicircles is provided with to the perpendicular extension rod that extends below, the corresponding two semicircles hook screw side of being provided with, the top of said perpendicular extension rod opening; The both sides of two inherent two spill spin blocks of the spill spin block side of being separately positioned on opening are respectively equipped with axis hole; The bearing pin side of passing opening side walls and axis hole are pegged graft and are formed the adjustable angle of spill spin block, and two screw rods middle parts cooperate with the screw that the spill spin block middle part is provided with respectively, are respectively equipped with fixture block A at the end of the corresponding fixture block B of two screw rods; The other end at two screw rods is fixedly connected with runner respectively, and said two fixture block B and two fixture block A form being locked to railing.
Described bridge pad inspection ladder is provided with hinge and makes two montants form foldable structure at the middle part of said two montants.
Described bridge pad inspection ladder is provided with semicircle locked groove at the lateral surface middle part of fixture block A.
Described bridge pad inspection ladder is provided with the rubber antiskid face on the lateral surface of fixture block A.
Described bridge pad inspection ladder is provided with semicircle locked groove at the lateral surface middle part of fixture block B.
Described bridge pad inspection ladder is provided with the rubber antiskid face on the lateral surface of fixture block B.
Described bridge pad inspection ladder, the rounded structure of said runner is provided with at least two handles on the outer edge surface of circular configuration runner.
Described bridge pad inspection ladder is respectively equipped with on the top of two semicircles hooks and raises up, and the two ends of handrail raise up and are fixedly connected with two respectively.
Described bridge pad inspection ladder is provided with half slot at the undercut middle part of semicircle hook, and said half slot cover is stuck on the railing.
Because adopt aforesaid technical scheme, the present invention has following beneficial effect:
Bridge pad inspection ladder of the present invention; Through the semicircle hook is set on montant top, utilize the semicircle hook can directly hang on the Cement guard bar of fenceless bridge two upper lateral parts, also can go up the half slot that is provided with and be enclosed within on the railing through the semicircle hook; So that the bearing between inspection bridge and the bridge pier; The people stands on two platform cross bars between the suspension rod during inspection, observes through telescope during the bridge broad, can cross over to get on the bridge pier as carrier through plank when bridge is narrower and observe; In like manner, the present invention also can be through hand-held as detection instrument or telescope or range estimation detects the bridge bottom surface or the bridge pier system detects a flaw, if the position is improper; Can carry out operation so that arrive correct position through adjustment position of the present invention; The present invention is reclaimed in the inspection back that finishes, and the present invention is because structure is comparatively simple, can use light material such as aluminium alloys as montant, cat ladder cross bar, suspension rod and platform cross bar materials; Very light, but a just operation of people; It is heavy that the present invention has overcome existing checkout gear structure, and unhandy drawback is easy to apply.
[description of drawings]
Fig. 1 is a structural representation of the present invention;
Fig. 2 is spill spin block of the present invention and fixture block A and rotaring wheel structure sketch map;
Fig. 3 is the perspective view of fixture block B of the present invention and screw rod;
Fig. 4 is a railing type application structure sketch map of the present invention;
Fig. 5 is a Cement guard bar formula application structure sketch map of the present invention;
Among the figure: 1, handrail; 2, semicircle hook; 3, half slot; 4, runner; 5, bearing pin; 6, fixture block A; 7, fixture block B; 8, screw rod; 9, montant; 10, cat ladder cross bar; 11, hinge; 12, suspension rod; 13, platform cross bar; 14, backguy; 15, locked groove; 16, handle; 17, axis hole; 18, spill spin block; 19, rubber antiskid face; 20, railing; 21, bridge; 22, bearing; 23, bridge pier; 24, Cement guard bar.
[specific embodiment]
Can explain in more detail that through following embodiment the present invention, the present invention are not limited to following embodiment;
In conjunction with accompanying drawing 1 or 2 or 3 described bridge pad inspection ladders; Comprise montant 9, cat ladder cross bar 10, suspension rod 12, platform cross bar 13, backguy 14, semicircle hook 2, spill spin block 18, runner 4, fixture block A6, fixture block B7 and screw rod 8; Between two montants 9, be provided with complex root cat ladder cross bar 10; Be provided with hinge 11 at the middle part of said two montants 9 and make two montants 9 form foldable structure, a side connects an end of suspension rod 12 respectively through hinge 11 in the lower end of two montants 9, between two suspension rods 12, is provided with many platform cross bars 13; The other end at two suspension rods 12 is connected with an end of two backguys 14 respectively, and the other end of two backguys 14 connects the bottom of two montants 9; Opposite side two montant 9 upper ends is respectively equipped with semicircle hook 2, is respectively equipped with on the top of two semicircles hooks 2 to raise up, and the two ends of handrail 1 raise up and are fixedly connected with two respectively; Undercut middle part at semicircle hook 2 is provided with half slot 3, and said half slot 3 covers are stuck on the railing 20, and the link of linking up with 2 and two montants 9 at two semicircles is respectively equipped with screw; Two screw rods 8 respectively with the screw wire connection; The linking up with 2 bottoms, one side towards semicircle and be respectively equipped with fixture block B7 of two screw rods 8, be provided with semicircle locked groove 15 at the lateral surface middle part of fixture block B7, on the lateral surface of fixture block B7, be provided with rubber antiskid face 19; The other end at two semicircles hook 2 is provided with to the perpendicular extension rod that extends below; Corresponding two semicircles in the top of said perpendicular extension rod are linked up with the 2 screw side of being provided with openings, and the both sides of two inherent two spill spin blocks 18 of spill spin block 18 side's of being separately positioned on openings are respectively equipped with axis hole 17, and bearing pin 5 side's of passing opening side walls and axis hole 17 are pegged graft and formed the adjustable angle of spill spin block 18; Two screw rod 8 middle parts cooperate with the screw that spill spin block 18 middle parts are provided with respectively; End at the corresponding fixture block B7 of two screw rods 8 is respectively equipped with fixture block A6, is provided with semicircle locked groove 15 at the lateral surface middle part of fixture block A6, on the lateral surface of fixture block A6, is provided with rubber antiskid face 19; The other end at two screw rods 8 is fixedly connected with runner 4 respectively; Said runner 4 rounded structures are provided with at least two handles 16 on the outer edge surface of circular configuration runner 4, said two fixture block B7 and two fixture block A6 form being locked to railing 20.
The described bridge pad of embodiment of the present invention inspection ladder, in conjunction with the structure that accompanying drawing 1~5 provides, the guardrail that combines to have now bridge is two kinds of railing type or Cement guard bar formulas; The present invention just is being based on this, and montant 9 tops are set to semicircle hook 2, when on Cement guard bar 24, constructing; Utilize semicircle hook 2 to hang on the Cement guard bar 24; Length through screw rod 8 adjustment fixture block B7 withstands on Cement guard bar 24 lateral surfaces fixture block B7, utilizes bearing pin 5 adjustment spill spin blocks 18 then; Screw the handle 16 on the runner 4, fixture block A6 is withstood on Cement guard bar 24 medial surfaces; When constructing on the Cement guard bar with railing 20 24; Utilize the half slot 3 of semicircle hook 2 to hang on the railing 20; Length through screw rod 8 adjustment fixture block B7 withstands on the lateral surface of Cement guard bar 24 or middle part railing 20 fixture block B7, utilizes bearing pin 5 adjustment spill spin blocks 18 then; Screw the handle 16 on the runner 4; Fixture block A6 is withstood on the medial surface of Cement guard bar 24 or middle part railing 20, and the testing staff is through handrail 1 and utilize on the detection platform that cat ladder cross bar 10 times constitutes to suspension rod 12 and platform cross bar 13, so that the bearing 22 between inspection bridge 21 and the bridge pier 23 and the situation of bridge 21; When bridge 21 broads, observe through telescope, bridge 21 can be crossed over to get on the bridge pier 23 as carrier when narrower and observe through plank; In like manner, the present invention also can be through hand-held as detection instrument or telescope or range estimation detects the bridge bottom surface or the bridge pier system detects a flaw, if the position is improper; Can carry out operation so that arrive correct position through adjustment position of the present invention; The present invention is reclaimed in the inspection back that finishes, and the present invention is because structure is comparatively simple, can use light material such as aluminium alloys as montant 9, cat ladder cross bar 10, suspension rod 12 and platform cross bar 13 materials; Very light, but a just operation of people; It is heavy that the present invention has overcome existing checkout gear structure, and unhandy drawback is easy to apply.
The present invention does not detail part and is prior art.

Claims (9)

1. a bridge pad inspection is terraced; Comprise montant (9), cat ladder cross bar (10), suspension rod (12), platform cross bar (13), backguy (14), semicircle hook (2), spill spin block (18), runner (4), fixture block A (6), fixture block B (7) and screw rod (8); It is characterized in that: between two montants (9), be provided with complex root cat ladder cross bar (10); A side connects an end of suspension rod (12) respectively through hinge (11) in the lower end of two montants (9); Between two suspension rods (12), be provided with many platform cross bars (13); The other end at two suspension rods (12) is connected with an end of two backguys (14) respectively, and the other end of two backguys (14) connects the bottom of two montants (9); Opposite side in two montants (9) upper end is respectively equipped with semicircle hook (2); Link at two semicircles hooks (2) and two montants (9) is respectively equipped with screw; Two screw rods (8) respectively with the screw wire connection; One side towards semicircle hook (2) bottom at two screw rods (8) is respectively equipped with fixture block B (7); The other end at two semicircles hooks (2) is provided with to the perpendicular extension rod that extends below; Corresponding two semicircles hook (2) screw side of being provided with, the top of said perpendicular extension rod opening, the both sides of inherent two spill spin blocks of two spill spin blocks (18) side of being separately positioned on opening (18) are respectively equipped with axis hole (17), and bearing pin (5) side's of passing opening side walls and axis hole (17) are pegged graft and are formed the adjustable angle of spill spin block (18); Two screw rods (8) middle part cooperates with the screw that spill spin block (18) middle part is provided with respectively; End at the corresponding fixture block B (7) of two screw rods (8) is respectively equipped with fixture block A (6), is fixedly connected with runner (4) respectively at the other end of two screw rods (8), and said two fixture block B (7) and two fixture block A (6) form being locked to railing (20).
2. bridge pad inspection ladder according to claim 1 is characterized in that: be provided with hinge (11) at the middle part of said two montants (9) and make two montants (9) form foldable structure.
3. bridge pad inspection ladder according to claim 1 is characterized in that: the lateral surface middle part at fixture block A (6) is provided with semicircle locked groove (15).
4. according to claim 1 or 3 described bridge pad inspection ladders, it is characterized in that: on the lateral surface of fixture block A (6), be provided with rubber antiskid face (19).
5. bridge pad inspection ladder according to claim 1 is characterized in that: the lateral surface middle part at fixture block B (7) is provided with semicircle locked groove (15).
6. according to claim 1 or 5 described bridge pad inspection ladders, it is characterized in that: on the lateral surface of fixture block B (7), be provided with rubber antiskid face (19).
7. bridge pad inspection ladder according to claim 1, it is characterized in that: the rounded structure of said runner (4) is provided with at least two handles (16) on the outer edge surface of circular configuration runner (4).
8. bridge pad according to claim 1 inspection ladder is characterized in that: be respectively equipped with on the top of two semicircles hooks (2) and raise up, the two ends of handrail (1) raise up and are fixedly connected with two respectively.
9. bridge pad inspection ladder according to claim 1 is characterized in that: the undercut middle part at semicircle hook (2) is provided with half slot (3), and said half slot (3) cover is stuck on the railing (20).
CN2011103656201A 2011-11-17 2011-11-17 Bridge support checking ladder Pending CN102535354A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011103656201A CN102535354A (en) 2011-11-17 2011-11-17 Bridge support checking ladder

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011103656201A CN102535354A (en) 2011-11-17 2011-11-17 Bridge support checking ladder

Publications (1)

Publication Number Publication Date
CN102535354A true CN102535354A (en) 2012-07-04

Family

ID=46343260

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011103656201A Pending CN102535354A (en) 2011-11-17 2011-11-17 Bridge support checking ladder

Country Status (1)

Country Link
CN (1) CN102535354A (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104314458A (en) * 2014-09-06 2015-01-28 吴双双 Inner buckle type hanging ladder
CN104499926A (en) * 2014-12-03 2015-04-08 广西大学 Ladder with hook
CN104514485A (en) * 2013-09-27 2015-04-15 国家电网公司 Overhead-line rod working ladder
CN105888529A (en) * 2016-06-08 2016-08-24 苏州莲敬机械工程科技有限公司 Inspection well mouth ladder stand
CN109667532A (en) * 2019-01-03 2019-04-23 信义超薄玻璃(东莞)有限公司 Glass production line maintenance platform
CN110219581A (en) * 2019-04-24 2019-09-10 贵州电网有限责任公司 It is a kind of can quick lap joint maintenance ladder
CN110259368A (en) * 2019-05-24 2019-09-20 同济大学 A kind of portable bridge detection hanging ladder
CN111472528A (en) * 2019-12-18 2020-07-31 青岛康太源建设集团有限公司 High-rise building support frame
CN113309019A (en) * 2021-07-06 2021-08-27 中铁二院重庆勘察设计研究院有限责任公司 Maintainable shed tunnel structure
CN114016890A (en) * 2021-11-08 2022-02-08 国网山东省电力公司寿光市供电公司 Electric power maintenance auxiliary ladder

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4135605A (en) * 1977-08-01 1979-01-23 Matherne Michael M Welding ladder with folding and sliding rungs
US4143743A (en) * 1978-06-05 1979-03-13 Larson Dale W Eaves ladder grip
CN2148164Y (en) * 1993-03-24 1993-12-01 张大铭 Combined suspension ladder for work high above ground
JP2003160913A (en) * 2001-11-27 2003-06-06 Sumikei-Nikkei Engineering Co Ltd Suspended scaffold for inspecting bridge
CN101476285A (en) * 2009-01-09 2009-07-08 中铁十五局集团有限公司 Checking carriage for bottom and support system of bridge
CN202023158U (en) * 2011-03-31 2011-11-02 武汉理工大学 Movable maintenance device for bridge
CN202337950U (en) * 2011-11-17 2012-07-18 中铁十五局集团有限公司 Checking ladder for bridge bearing

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4135605A (en) * 1977-08-01 1979-01-23 Matherne Michael M Welding ladder with folding and sliding rungs
US4143743A (en) * 1978-06-05 1979-03-13 Larson Dale W Eaves ladder grip
CN2148164Y (en) * 1993-03-24 1993-12-01 张大铭 Combined suspension ladder for work high above ground
JP2003160913A (en) * 2001-11-27 2003-06-06 Sumikei-Nikkei Engineering Co Ltd Suspended scaffold for inspecting bridge
CN101476285A (en) * 2009-01-09 2009-07-08 中铁十五局集团有限公司 Checking carriage for bottom and support system of bridge
CN202023158U (en) * 2011-03-31 2011-11-02 武汉理工大学 Movable maintenance device for bridge
CN202337950U (en) * 2011-11-17 2012-07-18 中铁十五局集团有限公司 Checking ladder for bridge bearing

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104514485A (en) * 2013-09-27 2015-04-15 国家电网公司 Overhead-line rod working ladder
CN104314458A (en) * 2014-09-06 2015-01-28 吴双双 Inner buckle type hanging ladder
CN104499926A (en) * 2014-12-03 2015-04-08 广西大学 Ladder with hook
CN105888529A (en) * 2016-06-08 2016-08-24 苏州莲敬机械工程科技有限公司 Inspection well mouth ladder stand
CN109667532A (en) * 2019-01-03 2019-04-23 信义超薄玻璃(东莞)有限公司 Glass production line maintenance platform
CN110219581A (en) * 2019-04-24 2019-09-10 贵州电网有限责任公司 It is a kind of can quick lap joint maintenance ladder
CN110259368A (en) * 2019-05-24 2019-09-20 同济大学 A kind of portable bridge detection hanging ladder
CN111472528A (en) * 2019-12-18 2020-07-31 青岛康太源建设集团有限公司 High-rise building support frame
CN113309019A (en) * 2021-07-06 2021-08-27 中铁二院重庆勘察设计研究院有限责任公司 Maintainable shed tunnel structure
CN114016890A (en) * 2021-11-08 2022-02-08 国网山东省电力公司寿光市供电公司 Electric power maintenance auxiliary ladder
CN114016890B (en) * 2021-11-08 2024-02-23 国网山东省电力公司寿光市供电公司 Auxiliary ladder for electric power maintenance

Similar Documents

Publication Publication Date Title
CN102535354A (en) Bridge support checking ladder
CN201221206Y (en) Movable anti-electricity protection shed rack
CN205591111U (en) Portable type bridge of cantilever type bottom is repaired and is used platform device
CN102797222A (en) Hanging bracket hinge joint type bridge maintenance vehicle capable of avoiding bridge-side obstacles
CN104711927B (en) A kind of bridge inspection car
CN103898832A (en) Bridge cable hanging anchoring end detection working platform
CN202054588U (en) Hydraulic lift-type platform for overhaul and maintenance of GW-6 disconnecting links
CN201376848Y (en) Large-scale double-tower automatic-elevation hoisting equipment
CN202337950U (en) Checking ladder for bridge bearing
CN209210319U (en) It drives a vehicle dedicated maintenance hanging basket
CN102635066B (en) Hanger articulated bridge inspection vehicle
CN104195960A (en) Suspension type bridge maintenance air operation platform system
CN203096609U (en) Bridge girder cable hanging anchoring end detection work platform
KR100823859B1 (en) Inspection & repair method and the device for an elevated road
RU146202U1 (en) Dismountable flyovers for the quick arrangement of bridge crossings
CN203514368U (en) Side slope detection work platform
CN106090874B (en) A kind of boiler water wall hanging rack special
CN202730648U (en) Rotatably lifting overhauling platform
CN205999794U (en) High pier pier top Cast-in-place concrete bracket precompressed charger
CN105064581B (en) Modular awning steel structure
CN214459622U (en) A but multi-functional platform truck of walking for bridge detects and construction operation
CN213267479U (en) Boarding bridge capable of keeping horizontal in real time
CN210975570U (en) Operation platform for construction of large-section steel-concrete composite beam
CN210194449U (en) Tower beam temporary consolidation structure for construction of main beam of semi-floating body system cable-stayed bridge
CN208362940U (en) Sliding basket bridge maintenance system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20120704