CN102529166A - Automatic mounting machine for carton handles - Google Patents

Automatic mounting machine for carton handles Download PDF

Info

Publication number
CN102529166A
CN102529166A CN2012100424584A CN201210042458A CN102529166A CN 102529166 A CN102529166 A CN 102529166A CN 2012100424584 A CN2012100424584 A CN 2012100424584A CN 201210042458 A CN201210042458 A CN 201210042458A CN 102529166 A CN102529166 A CN 102529166A
Authority
CN
China
Prior art keywords
band
handle
handle band
carton
carton board
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012100424584A
Other languages
Chinese (zh)
Other versions
CN102529166B (en
Inventor
裴志忠
胡景旺
孙云振
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BAODING HANDE NEW MATERIAL TECHNOLOGY Co Ltd
Original Assignee
BAODING HANDE NEW MATERIAL TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BAODING HANDE NEW MATERIAL TECHNOLOGY Co Ltd filed Critical BAODING HANDE NEW MATERIAL TECHNOLOGY Co Ltd
Priority to CN201210042458.4A priority Critical patent/CN102529166B/en
Publication of CN102529166A publication Critical patent/CN102529166A/en
Application granted granted Critical
Publication of CN102529166B publication Critical patent/CN102529166B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Making Paper Articles (AREA)

Abstract

The invention relates to an automatic mounting machine for carton handles, comprising a carton paper carrying and feeding device, a conveying portion, a mounting portion, a discharging portion and a master control panel which are sequentially serially connected. The mounting portion mainly consists of a circulating positioning conveying mechanism, an adhesive pre-spraying mechanism, a reinforcement belt conveying mechanism, a reinforcement belt mounting mechanism, a handle belt conveying mechanism and a handle belt mounting mechanism. By the aid of the automatic mounting machine, a carton handle is mechanically automatically mounted. Compared with traditional manual mounting operation, the automatic mounting machine has the advantages that production efficiency is greatly improved, a large quantity of labor is saved, and production cost is greatly lowered. In addition, a series of possible problems of difficult management, high accident rate, instability of the quality of products and the like in manual operation are simultaneously avoided by the aid of mechanical operation.

Description

The carton eye ring automatic mounting machine
Technical field
The present invention relates to a kind of carton eye ring automatic mounting machine.
Background technology
Small-sized outer packing box often to be carried easy to carry and is equipped with handle in order to carry.Existing carton eye ring is plastic material mostly; The installation of carton eye ring adopts handwork to carry out; Mounting means is roughly: on carton board, go out earlier two handle aperture; The plastics stiffening ring that to make in advance then is pasted on the hole week of handle aperture, and the two ends with the plastic handles band penetrate respectively in two plastics stiffening rings in the handle aperture again, promptly accomplishes handle and installs.The manual mode shortcoming that carton eye ring is installed clearly, and is promptly time-consuming, cost is high, efficient is low, unstable product quality, exists also simultaneously that manpower is difficult to manage and handwork is prone to cause the problem of industrial accident.
Summary of the invention
The technical problem that the present invention will solve is: at present with the manpower manual mode install carton eye ring exist time-consuming, cost is high, efficient is low, be prone to the shortcoming that causes worker's fingers injured, and a kind of carton eye ring automatic mounting machine is provided in order to address this problem.This machine is that the handle that carton is installed is a kind of high-intensity fabric strip.
The technical solution adopted for the present invention to solve the technical problems is: a kind of carton eye ring automatic mounting machine; Include carton board material containing feed arrangement, transmission portion, installation portion, the blanking portion of serial connection successively; And supervisory control desk, wherein installation portion mainly is made up of circulation location conveying mechanism, preparatory glue-spraying mechanism, reinforcing band tape-feed, reinforcing band installing mechanism, handle band tape-feed, handle band installing mechanism again;
Described carton board material containing feed arrangement mainly includes limit for height discharging opening and material containing push belt driven by stepper motors;
Described transmission portion and blanking portion all mainly are made up of driven roller, conveyer belt and locating clip wheel;
Described circulation location conveying mechanism includes underframe, reversing frame; Be provided with in the reversing frame pair of parallel, by the revolution chain belt of chain wheel drive; Be provided with carton board location rank folder at two revolution chain belt upper holders, be provided with the carton board location corresponding rank of rank folder in the end positions of reversing frame and press from both sides top opening;
Described preparatory glue-spraying mechanism includes light sensation formula spray glue main frame, reinforcing band pastes the position glue spraying head and the handle band is pasted the position glue spraying head; In the location conveying mechanism that circulates, be disposed with reinforcing band by the throughput direction that turns round chain belt and paste a position glue spraying head, reinforcing band installing mechanism, a handle band stickup position glue spraying head, handle band installing mechanism;
Described reinforcing band tape-feed and handle band tape-feed all mainly are made up of with guide wheels at different levels the strip winding wheel;
Described reinforcing band installing mechanism includes carton board carriage, forward (FWD) wheel, forward (FWD) belt and the reinforcing band cutting knife, the reinforcing band that are driven by cam driving gear overlay piece and carton board punching cutter, and reinforcing band forward (FWD) wheel, reinforcing band cutting knife, reinforcing band overlay piece and carton board punching cutter all is arranged on above the carton board carriage;
Handle band installing mechanism includes carton board carriage, forward (FWD) wheel, forward (FWD) belt equally; Also including handle brings belt wheel, handle band supporting plate, handle band dividing plate into and wears apical organ and handle band by handle band cutting knife, handle band withstanding tight block, handle band that cam driving gear drives and allocate and overlay piece; Handle is brought belt wheel, handle band supporting plate, handle band dividing plate and handle band cutting knife into and all is arranged on carton board carriage below; Handle band withstanding tight block is arranged under the handle band dividing plate; The handle band wear apical organ be arranged on again handle band withstanding tight block under, the handle band is worn apical organ and is made up of device seat and two top flats, the handle band is allocated and is overlayed piece and be arranged on carton board carriage top.
The handgrips that before the course of work and the principle of this carton eye ring automatic mounting machine of explanation, at first will have carton eye ring structure and this machine now and be carton making is done an explanation:
Existing carton eye ring band is generally plastic products; The handle band leans on two ends retaining head to be connected in the handle aperture on the carton; And in order to strengthen the peripheral intensity in carton eye ring hole; Prevent hole periderm handle band tearing from breaking and the Zhou Zengshe plastic ring in the hole often, the handle band then penetrates in the plastic ring of handle aperture with manual mode; And this machine reinforcing band (being equivalent to above-mentioned plastic ring) that to be carton install is the high strength fibre band with the handle band; This high strength fibre band has frivolous softness, comfortable feel, intensity height, is prone to bonding advantage; This machine is that the handgrips and the conventional carton handgrips of carton making is roughly the same; Different is the material of having replaced the handle band, and has replaced plastic ring with reinforcing band, simultaneously handle band and reinforcing band all be with bonding form fix to carton.
The final effect of handgrips that by this machine is carton making is referring to Fig. 4, Fig. 5.Can be found out that by Fig. 4 only inwall is provided with (stickup) to reinforcing band in the outside of each handle aperture of carton, the handle band adhesive portion major part that penetrates in the carton eye ring hole is bonded on the reinforcing band, and fraction directly is bonded on the carton.
The course of work and the principle of this carton eye ring automatic mounting machine are following: at first carton board material containing feed arrangement utilizes push belt driven by stepper motors will neatly be stacked in carton board on the push belt to begin ground bottommost and push to transmission portion (only can pass through a piece of paper boxboard because the height of limit for height discharging opening limits once) at interval from the limit for height discharging opening; When carton board has just walked to circulation location conveying mechanism by transmission portion; Just in time by the carton board location rank of revolution on the chain belt clamp location (carton board location rank is pressed from both sides eve and is held in the mouth and press from both sides the top opening top opening, thus immediately again auto-closing clamp the carton board edge); Carton board is with the motion of revolution chain belt then;, carton board sensed when marching to reinforcing band stickup position glue spraying head by the probe of the light sensation on the glue spraying head; Glue spraying head sprays glue to the precalculated position of carton board immediately, and the carton edges of boards are advanced by the glue limit, has promptly marched to the reinforcing band installing mechanism behind the glued bundle of spray; The reinforcing band installing mechanism detect through light sensation probe carton board arrive at the carton board carriage in place after; The top, spray glue position (reinforcing band is pasted the position glue spraying head and sprayed) that its forward (FWD) wheel drive forward (FWD) belt is delivered to carton board with the reinforcing band (forward (FWD) length is measured by detecting encoder) of fixed length is in place; Reinforcing band cutting knife, reinforcing band overlay piece and carton board punching cutter moves under the driving of cam driving gear immediately; The reinforcing band cutting knife downcuts the reinforcing band of fixed length; Reinforcing band overlays piece the reinforcing band that downcuts is overlayed the spray glue position in carton board simultaneously; The cutter of carton board punching is meanwhile accomplished the punching operation to carton board precalculated position (spray glue position is inboard), reinforcing band has been installed then and is continued to advance with the revolution chain belt towards the carton board of good handle aperture; Then the light sensation probe of being pasted the position glue spraying head by the handle band is sensed and is sprayed glue (in the precalculated position) once more, and carton board gets into handle band installing mechanism subsequently; Handle band installing mechanism detect through light sensation probe carton board arrive at the carton board carriage in place after; Its forward (FWD) wheel drive forward (FWD) belt is delivered between handle band supporting plate and the handle band dividing plate handle band (forward (FWD) length is measured by detecting encoder) of fixed length in place; Handle band cutting knife downcuts fixed length handle band under the driving of cam driving gear immediately; (length of handle band withstanding tight block and handle band dividing plate is all less than fixed length handle band thereby handle band withstanding tight block top and handle band dividing plate under the driving of cam driving gear clamp the mid portion of fixed length handle band jointly; Handle band dividing plate has certain thickness; The purpose that handle band dividing plate is set cooperates location handle band except making it with handle band supporting plate, also is to wear the hand spacing in order to make to be formed with between carton and the mounted handle band simultaneously), meanwhile the handle band is worn apical organ and also under the driving of cam driving gear, is upwards lifted the top; Two top flats that the handle band is worn apical organ eject the two end portions of handle band from two handle aperture (hole that the carton board punching cutter promptly the reinforcing band installing mechanism dashes carton board) of carton board; Top flat descends immediately and withdraws from handle aperture, and the handle band is allocated and overlayed part that piece passes handle aperture with the handle band and be close to carton board and dial laterally then, makes its spray glue position that is bonded to carton board (the handle band is pasted a position glue spraying head and sprayed); Playback then; So far handle band installation, handle band withstanding tight block falls after rise and unclamps mounted handle band immediately, and carton board continues to advance under the drive of revolution chain belt; When waiting to walk to the junction with blanking portion; Carton board location rank folder on the revolution chain belt is again by top opening; Throw off carton board and with the reversion of revolution chain belt, carton board then enters on the conveyer belt of blanking portion, the end of blanking portion is by 1~2 workman be responsible for connecting material (can be provided with the platform that connects material).
In this machine; Reinforcing band cutting knife in the reinforcing band installing mechanism, reinforcing band overlay piece, carton board punching cutter; Handle band cutting knife in the handle band installing mechanism, handle band withstanding tight block, handle band are worn apical organ and handle band and are allocated and overlay piece except adopting cam driving gear drives; Also can adopt cylinder to drive, the set-up mode of each parts can be flexible and changeable thus, but operation principle is changed ten thousand times without leaving the original aim or stand.
Say further; Described reinforcing band tape-feed and handle band tape-feed all also include a buffer memory tape drum that has traction wheel and light sensation probe; Reinforcing band on the strip winding wheel or handle band get in the buffer memory tape drum through the traction wheel of buffer memory tape drum, and the cassette containing box of postponing is drawn after caused the forward (FWD) belt of reinforcing band installing mechanism or handle band installing mechanism by guide wheel.The purpose that the buffer memory tape drum is set be for let forward (FWD) wheel in reinforcing band installing mechanism and the handle band installing mechanism can be constantly light forward (FWD), to guarantee the precision of fixed length forward (FWD).If do not establish the buffer memory tape drum, the forward (FWD) belt advances to send the resistance of reinforcing band or handle band can be bigger, possibly cause skidding between the two, thereby influences the precision of fixed length forward (FWD).In case the light sensation of buffer memory tape drum probe detects when in the box belt being arranged; Traction wheel promptly rotates, and the belt on the strip winding wheel is drawn a part in advance to the buffer memory tape drum, because the thickness of buffer memory tape drum and space are limited (width that thickness can be made as with belt adapt); Along with introducing increasing of belt; Belt will upwards pile up, and when being stacked to certain altitude, just can be located at the light sensation probe on box top and sense, and traction wheel stops traction then.
In order to make this machine handle is installed for the carton of different size, a described carton board reinforcing band stickup position glue spraying head, reinforcing band installing mechanism, carton board handle band are pasted a position glue spraying head, handle band installing mechanism all is arranged on the slide rail through the slide block of removable adjusting.
Say further again; The location clip wheel of said blanking portion is arranged on the position that the bond site of reinforcing band and handle band and carton board just in time can be passed through; So, when the carton board that installs handle during via the conveyer belt of blanking portion, just bonding position will further be consolidated.
The invention has the beneficial effects as follows: this carton eye ring automatic mounting machine has realized that the mechanization of carton eye ring installs automatically; Fact proved that it is compared with the traditional hand installation exercise; Production efficiency greatly improves, and has saved a large amount of manual works, greatly reduces production cost; Mechanized also avoided simultaneously manual work maybe problem, the problem includes: a series of problems such as management is difficult, accident rate is high, unstable product quality.
Description of drawings
Below in conjunction with accompanying drawing and embodiment the present invention is described further.
Fig. 1 is a structural representation sketch of the present invention;
Fig. 2 is the main TV structure simplified schematic diagram of reinforcing band installing mechanism of the present invention;
Fig. 3 is the side-looking structural representation sketch of reinforcing band installing mechanism of the present invention;
Fig. 4 is the structural representation sketch of handle band installing mechanism of the present invention;
Fig. 5 is the structure sketch map by the made carton eye ring of the present invention;
Fig. 6 is the Facad structure sketch map by the made carton eye ring of the present invention.
Figure: 1. Carton board material feeding device 2. Transmission section 3-1. Loop positioning conveying mechanism 3-1-1 turret 3-1-2 3-1-3 rotation chain belt. Cartonboard positioning title clip 3-2-1. strengthen the glue head 3-2-2 with sticky bit. Handle with sticky bit glue head 3-3. reinforcing belt strap feeding mechanism 3-4. reinforcing belt mounting mechanism 3-4 - (1) Strengthen belt cutter 3-4-2 Strengthening block with pressure stickers 3-4-3. Carton Punching 3-5. Handle with strap feeding mechanism 3-6. handles with mounting mechanism 3-6 - 1 handle with pallet 3-6-2. Handle with partition 3-6-3. Handle with cutting 3-6-4. handles with top tight block 3-6-5. Handle with wear ejector 3-6-6. handles pressure attached with distribution block 4. cutting portion 5. caching cassette 6 cam drive 7. cardboard plate 8. reinforcing strip 9. Handle with 10. Handle Hole
The specific embodiment
A kind of carton eye ring automatic mounting machine; As shown in Figure 1; It includes carton board material containing feed arrangement 1, transmission portion 2, installation portion, the blanking portion 4 of serial connection successively; And supervisory control desk, wherein installation portion mainly is made up of circulation location conveying mechanism 3-1, preparatory glue-spraying mechanism, reinforcing band tape-feed 3-3, reinforcing band installing mechanism 3-4, handle band tape-feed 3-5, handle band installing mechanism 3-6 again;
Carton board material containing feed arrangement 1 mainly includes limit for height discharging opening and material containing push belt driven by stepper motors;
Transmission portion 2 and blanking portion 4 all mainly are made up of driven roller, conveyer belt and locating clip wheel;
Circulation location conveying mechanism 3-1 includes underframe, reversing frame 3-1-1; Be provided with in the reversing frame 3-1-1 pair of parallel, by the revolution chain belt 3-1-2 of chain wheel drive; Be provided with carton board location rank folder 3-1-3 at two revolution chain belt 3-1-2 upper holders, be provided with the carton board location corresponding rank of rank folder 3-1-3 in the end positions of reversing frame 3-1-1 and press from both sides top opening;
Glue-spraying mechanism includes light sensation formula spray glue main frame in advance, reinforcing band pastes position glue spraying head 3-2-1 and the handle band is pasted position glue spraying head 3-2-2; In the location conveying mechanism 3-1 that circulates, be disposed with reinforcing band by the throughput direction that turns round chain belt 3-1-2 and paste a position glue spraying head 3-2-1, reinforcing band installing mechanism 3-4, a handle band stickup position glue spraying head 3-2-2, handle band installing mechanism 3-6;
Reinforcing band tape-feed 3-3 and handle band tape-feed 3-5 all mainly are made up of with guide wheels at different levels the strip winding wheel;
As shown in Figure 2; Reinforcing band installing mechanism 3-4 includes carton board carriage, forward (FWD) wheel, forward (FWD) belt and the reinforcing band cutting knife 3-4-1, the reinforcing band that are driven by cam driving gear 6 overlay piece 3-4-2 and carton board punching cutter 3-4-3, and reinforcing band cutting knife 3-4-1, reinforcing band overlay piece 3-4-2 and carton board punching cutter 3-4-3 all is arranged on carton board carriage top;
As shown in Figure 3; Handle band installing mechanism 3-6 includes carton board carriage, forward (FWD) wheel, forward (FWD) belt equally; Also include handle band supporting plate 3-6-1, handle band dividing plate 3-6-2 and wear apical organ 3-6-5 and handle band by handle band cutting knife 3-6-3, handle band withstanding tight block 3-6-4, handle band that cam driving gear 6 drives and allocate and overlay piece 3-6-6; Forward (FWD) wheel, handle band supporting plate 3-6-1, handle band dividing plate 3-6-2 and handle band cutting knife 3-6-3 all are arranged on carton board carriage below; Handle band withstanding tight block 3-6-4 is arranged under the handle band dividing plate 3-6-2; The handle band wear apical organ 3-6-5 be arranged on again handle band withstanding tight block 3-6-4 under, the handle band is worn apical organ 3-6-5 and is made up of device seat and two top flats, the handle band is allocated and is overlayed piece 3-6-6 and be arranged on carton board carriage top.
Reinforcing band tape-feed 3-3 and handle band tape-feed 3-5 all also include a buffer memory tape drum 5 that has traction wheel and light sensation probe; Reinforcing band on the strip winding wheel or handle band get in the buffer memory tape drum 5 through the traction wheel of buffer memory tape drum 5, and the cassette containing box 5 of postponing is drawn after caused the forward (FWD) belt of reinforcing band installing mechanism 3-4 or handle band installing mechanism 3-6 by guide wheel.
A carton board reinforcing band stickup position glue spraying head 3-2-1, reinforcing band installing mechanism 3-4, carton board handle band are pasted a position glue spraying head 3-2-2, handle band installing mechanism 3-6 all is arranged on the slide rail through the slide block of removable adjusting.
The location clip wheel of blanking portion 4 is arranged on the position that the bond site of reinforcing band and handle band and carton board just in time can be passed through.
This machine is that reinforcing band and the handle band that carton is installed is the high strength fibre band, and this high strength fibre band has frivolous softness, comfortable feel, intensity height, is prone to bonding advantage.The final effect of handgrips that by this machine is carton making is referring to Fig. 4, Fig. 5.Can be found out that by Fig. 4 only inwall is provided with (stickup) to reinforcing band in the outside of each handle aperture of carton, the handle band adhesive portion major part that penetrates in the carton eye ring hole is bonded on the reinforcing band, and fraction directly is bonded on the carton.
This machine course of work and principle are following: at first carton board material containing feed arrangement 1 utilizes push belt driven by stepper motors will neatly be stacked in carton board 7 on the push belt to begin ground bottommost and push to transmission portion 2 (only can pass through a piece of paper boxboard 7 because the height of limit for height discharging opening limits once) at interval from the limit for height discharging opening; When carton board 7 has just walked to circulation location conveying mechanism 3-1 by transmission portion; Just in time by the carton board location rank folder 3-1-3 on the revolution chain belt 3-1-2 clamp location (carton board location rank folder 3-1-3 eve is held in the mouth presss from both sides the top opening top opening, thus immediately again auto-closing clamp carton board 7 edges); Carton board 7 is with revolution chain belt 3-1-2 motion then;, carton board 7 sensed when marching to reinforcing band stickup position glue spraying head 3-2-1 by the probe of the light sensation on the glue spraying head; Glue spraying head sprays glue to the precalculated position of carton board 7 immediately; Carton board 7 limits are advanced by the glue limit, have promptly marched to reinforcing band installing mechanism 3-4 behind the glued bundle of spray; Reinforcing band installing mechanism 3-4 detect through light sensation probe carton board 7 arrive at the carton board carriage in place after; The top, spray glue position (reinforcing band is pasted position glue spraying head 3-2-1 and sprayed) that its forward (FWD) wheel drive forward (FWD) belt is delivered to carton board 7 with the reinforcing band 8 (forward (FWD) length is measured by detecting encoder) of fixed length is in place; Reinforcing band cutting knife 3-4-1, reinforcing band overlay piece 3-4-2 and carton board punching cutter 3-4-3 moves under the driving of cam driving gear 6 immediately; Reinforcing band cutting knife 3-4-1 downcuts the reinforcing band of fixed length; Reinforcing band overlays piece 3-4-2 the reinforcing band 8 that downcuts is overlayed the spray glue position in carton board 7 simultaneously; The cutter of carton board punching meanwhile 3-4-3 accomplishes the punching operation to carton board 7 precalculated positions (spray glue position is inboard), reinforcing band 8 has been installed then and is continued to advance with revolution chain belt 3-1-2 towards the carton board 7 of good handle aperture 10; Then the light sensation probe of being pasted position glue spraying head 3-2-2 by the handle band is sensed and is sprayed glue (in the precalculated position) once more, and carton board 7 gets into handle band installing mechanism 3-6 subsequently; Handle band installing mechanism 3-6 detect through light sensation probe carton board 7 arrive at the carton board carriage in place after; Its forward (FWD) wheel drive forward (FWD) belt is delivered between handle band supporting plate 3-6-1 and the handle band dividing plate 3-6-2 handle band 9 (forward (FWD) length is measured by detecting encoder) of fixed length in place; Handle band cutting knife 3-6-3 downcuts fixed length handle band 9 under the driving of cam driving gear 6 immediately; (length of handle band withstanding tight block 3-6-4 and handle band dividing plate 3-6-2 is all less than fixed length handle band 9 thereby handle band withstanding tight block 3-6-4 top and handle band dividing plate 3-6-2 under the driving of cam driving gear 6 clamp the mid portion of fixed length handle band 9 jointly; Handle band dividing plate 3-6-2 has certain thickness; The purpose that handle band dividing plate 3-6-2 is set cooperates location handle band 9 except making it with handle band supporting plate 3-6-1; Also be to wear the hand spacing simultaneously) in order to make to be formed with between carton and the mounted handle band 9; Meanwhile the handle band is worn apical organ 3-6-5 and also under the driving of cam driving gear 6, is upwards lifted the top; Two top flats that the handle band is worn apical organ 3-6-5 eject the two end portions of handle band 9 from two handle aperture 10 (hole that the carton board punching cutter 3-4-3 promptly the reinforcing band installing mechanism 3-4 is dashed carton board 7) of carton board 7; Top flat descends immediately and withdraws from handle aperture 10, and the handle band is allocated and overlayed part that piece 3-6-6 passes handle aperture 10 with handle band 9 and be close to 7 groups of carton board laterally then, makes its spray glue position that is bonded to carton board 7 (the handle band is pasted a position glue spraying head 3-2-2 and sprayed); Playback then; So far handle band 9 installations, handle band withstanding tight block 3-6-4 falls after rise and unclamps mounted handle band 9 immediately, and carton board 7 continues to advance under the drive of revolution chain belt 3-1-2; When waiting to walk to the junction with blanking portion 4; Carton board location rank folder 3-1-3 on the revolution chain belt 3-1-2 is again by top opening; Throw off carton board 7 and with revolution chain belt 3-1-2 reversion; Carton board 7 then enters on the conveyer belt of blanking portion 4, and the end of blanking portion 4 is by 1~2 workman be responsible for connecting material (can be provided with the platform that connects material).
The purpose that buffer memory tape drum 5 is set be for let forward (FWD) wheel among reinforcing band installing mechanism 3-4 and the handle band installing mechanism 3-6 can be constantly light forward (FWD), to guarantee the precision of fixed length forward (FWD).If do not establish the buffer memory tape drum, the forward (FWD) belt advances to send the resistance of reinforcing band 8 or handle band 9 can be bigger, possibly cause skidding between forward (FWD) belt and the belt, thereby influence the precision of fixed length forward (FWD).In case the light sensation of buffer memory tape drum 5 probe detects when in the box belt being arranged; Traction wheel promptly rotates, and the belt on the strip winding wheel is drawn a part in advance to buffer memory tape drum 5, because the thickness of buffer memory tape drum 5 and space are limited (width that thickness can be made as with belt adapt); Along with introducing increasing of belt; Belt will upwards pile up, and when being stacked to certain altitude, just can be located at the light sensation probe on box top and sense, and traction wheel stops traction then.
In this machine; Reinforcing band cutting knife 3-4-1 among the reinforcing band installing mechanism 3-4, reinforcing band overlay piece 3-4-2, carton board punching cutter 3-4-3; Handle band cutting knife 3-6-3 among the handle band installing mechanism 3-6, handle band withstanding tight block 3-6-4, handle band are worn apical organ 3-6-5 and handle band and are allocated and overlay piece 3-6-6 except adopting cam driving gear 6 drives; Also can adopt cylinder to drive, the set-up mode of each parts can be flexible and changeable thus, but operation principle is changed ten thousand times without leaving the original aim or stand.

Claims (4)

1. carton eye ring automatic mounting machine; It is characterized in that: include carton board material containing feed arrangement (1), transmission portion (2), installation portion, the blanking portion (4) of serial connection successively; And supervisory control desk, wherein installation portion mainly is made up of circulation location conveying mechanism (3-1), preparatory glue-spraying mechanism, reinforcing band tape-feed (3-3), reinforcing band installing mechanism (3-4), handle band tape-feed (3-5), handle band installing mechanism (3-6) again;
Described carton board material containing feed arrangement (1) mainly includes limit for height discharging opening and material containing push belt driven by stepper motors;
Described transmission portion (2) and blanking portion (4) all mainly are made up of driven roller, conveyer belt and locating clip wheel;
Described circulation location conveying mechanism (3-1) includes underframe, reversing frame (3-1-1); Be provided with in the reversing frame (3-1-1) pair of parallel, by the revolution chain belt (3-1-2) of chain wheel drive; Be provided with carton board location rank folder (3-1-3) at two revolution chain belt (3-1-2) upper holders, be provided with rank corresponding in the end positions of reversing frame (3-1-1) and press from both sides top opening with carton board location rank folder (3-1-3);
Described preparatory glue-spraying mechanism includes light sensation formula spray glue main frame, reinforcing band pastes position glue spraying head (3-2-1) and the handle band is pasted position glue spraying head (3-2-2); In conveying mechanism (3-1) is located in circulation, be disposed with reinforcing band by the throughput direction that turns round chain belt (3-1-2) and paste position glue spraying head (3-2-1), reinforcing band installing mechanism (3-4), a handle band stickup position glue spraying head (3-2-2), handle band installing mechanism (3-6);
Described reinforcing band tape-feed (3-3) all mainly is made up of with guide wheels at different levels the strip winding wheel with handle band tape-feed (3-5);
Described reinforcing band installing mechanism (3-4) includes carton board carriage, forward (FWD) wheel, forward (FWD) belt and the reinforcing band cutting knife (3-4-1), the reinforcing band that are driven by cam driving gear (6) overlay piece (3-4-2) and carton board punching cutter (3-4-3), and reinforcing band cutting knife (3-4-1), reinforcing band overlay piece (3-4-2) and carton board punching cutter (3-4-3) all is arranged on above the carton board carriage;
Handle band installing mechanism (3-6) includes carton board carriage, forward (FWD) wheel, forward (FWD) belt equally; Also include handle band supporting plate (3-6-1), handle band dividing plate (3-6-2) and wear apical organ (3-6-5) and handle band by handle band cutting knife (3-6-3), handle band withstanding tight block (3-6-4), handle band that cam driving gear (6) drives and allocate and overlay piece (3-6-6); Forward (FWD) wheel, handle band supporting plate (3-6-1), handle band dividing plate (3-6-2) and handle band cutting knife (3-6-3) all are arranged on carton board carriage below; Handle band withstanding tight block (3-6-4) is arranged under the handle band dividing plate (3-6-2); The handle band wear apical organ (3-6-5) be arranged on again handle band withstanding tight block (3-6-4) under; The handle band is worn apical organ (3-6-5) and is made up of device seat and two top flats, and the handle band is allocated and overlayed piece (3-6-6) and be arranged on carton board carriage top.
2. carton eye ring automatic mounting machine according to claim 1; It is characterized in that: described reinforcing band tape-feed (3-3) all also includes a buffer memory tape drum (5) that has traction wheel and light sensation probe with handle band tape-feed (3-5); Reinforcing band on the strip winding wheel or handle band get in the buffer memory tape drum (5) through the traction wheel of buffer memory tape drum (5), and the cassette containing box of postponing (5) is drawn after caused the forward (FWD) belt of reinforcing band installing mechanism (3-4) or handle band installing mechanism (3-6) by guide wheel.
3. carton eye ring automatic mounting machine according to claim 1 is characterized in that: a described carton board reinforcing band stickup position glue spraying head (3-2-1), reinforcing band installing mechanism (3-4), carton board handle band are pasted a position glue spraying head (3-2-2), handle band installing mechanism (3-6) all is arranged on the slide rail through the slide block of removable adjusting.
4. carton eye ring automatic mounting machine according to claim 1 is characterized in that: the location clip wheel of said blanking portion (4) is arranged on the position that the bond site of reinforcing band and handle band and carton board just in time can be passed through.
CN201210042458.4A 2012-02-14 2012-02-14 Automatic mounting machine for carton handles Active CN102529166B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210042458.4A CN102529166B (en) 2012-02-14 2012-02-14 Automatic mounting machine for carton handles

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210042458.4A CN102529166B (en) 2012-02-14 2012-02-14 Automatic mounting machine for carton handles

Publications (2)

Publication Number Publication Date
CN102529166A true CN102529166A (en) 2012-07-04
CN102529166B CN102529166B (en) 2017-09-12

Family

ID=46337783

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210042458.4A Active CN102529166B (en) 2012-02-14 2012-02-14 Automatic mounting machine for carton handles

Country Status (1)

Country Link
CN (1) CN102529166B (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103129017A (en) * 2013-02-06 2013-06-05 北京印刷学院 Transverse band sticking device for band punch of corrugated case
CN103231546A (en) * 2013-04-02 2013-08-07 金红叶纸业集团有限公司 Hand strap mounting equipment
CN107215000A (en) * 2016-03-22 2017-09-29 安徽赛耐尔机械制造有限公司 A kind of carton eye ring erecting device
WO2018006651A1 (en) * 2016-07-08 2018-01-11 深圳市动力飞扬自动化设备有限公司 Bonding method for non-woven fabric handle of packaging box
CN108515729A (en) * 2018-03-28 2018-09-11 江苏南江智能装备股份有限公司 A kind of portable former of clamping jaw trolley type and portable forming method
CN108819343A (en) * 2018-07-05 2018-11-16 唐山众兴印刷机械科技有限公司 A kind of carton gift box handle mounting production line
CN109016644A (en) * 2018-08-27 2018-12-18 唐山新联印刷机械集团有限公司 A kind of method and apparatus that packing case installs plastic handles
CN109940924A (en) * 2019-04-08 2019-06-28 云南云派包装有限公司 A kind of automation installation handle is in the device on carton
CN112208148A (en) * 2020-09-18 2021-01-12 温州职业技术学院 Three-station handle belt feeding device of handle belt mounting machine and using method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101653996A (en) * 2009-07-17 2010-02-24 大连佳林设备制造有限公司 High-speed case unpacking machine
CN201950841U (en) * 2010-12-01 2011-08-31 段敏丽 Reinforcing paper tape installing device for handheld carton paper tape
CN102173102A (en) * 2011-03-09 2011-09-07 保定市汉德新材料科技有限公司 Device for installing carton handles
CN202045917U (en) * 2011-04-19 2011-11-23 无锡道裕科技有限公司 Automatic handle mounting machine
EP2397318A1 (en) * 2010-06-16 2011-12-21 Flat System S.r.l. Handle-forming machine
CN202528506U (en) * 2012-02-14 2012-11-14 保定市汉德新材料科技有限公司 Automatic installation machine of carton handle

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101653996A (en) * 2009-07-17 2010-02-24 大连佳林设备制造有限公司 High-speed case unpacking machine
EP2397318A1 (en) * 2010-06-16 2011-12-21 Flat System S.r.l. Handle-forming machine
CN201950841U (en) * 2010-12-01 2011-08-31 段敏丽 Reinforcing paper tape installing device for handheld carton paper tape
CN102173102A (en) * 2011-03-09 2011-09-07 保定市汉德新材料科技有限公司 Device for installing carton handles
CN202045917U (en) * 2011-04-19 2011-11-23 无锡道裕科技有限公司 Automatic handle mounting machine
CN202528506U (en) * 2012-02-14 2012-11-14 保定市汉德新材料科技有限公司 Automatic installation machine of carton handle

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103129017A (en) * 2013-02-06 2013-06-05 北京印刷学院 Transverse band sticking device for band punch of corrugated case
CN103129017B (en) * 2013-02-06 2015-03-11 北京印刷学院 Transverse band sticking device for band punch of corrugated case
CN103231546A (en) * 2013-04-02 2013-08-07 金红叶纸业集团有限公司 Hand strap mounting equipment
CN103231546B (en) * 2013-04-02 2015-04-01 金红叶纸业集团有限公司 Hand strap mounting equipment
CN107215000A (en) * 2016-03-22 2017-09-29 安徽赛耐尔机械制造有限公司 A kind of carton eye ring erecting device
WO2018006651A1 (en) * 2016-07-08 2018-01-11 深圳市动力飞扬自动化设备有限公司 Bonding method for non-woven fabric handle of packaging box
CN108515729A (en) * 2018-03-28 2018-09-11 江苏南江智能装备股份有限公司 A kind of portable former of clamping jaw trolley type and portable forming method
CN108819343A (en) * 2018-07-05 2018-11-16 唐山众兴印刷机械科技有限公司 A kind of carton gift box handle mounting production line
CN108819343B (en) * 2018-07-05 2024-06-11 唐山众兴印刷机械科技有限公司 Carton gift box handle installation production line
CN109016644A (en) * 2018-08-27 2018-12-18 唐山新联印刷机械集团有限公司 A kind of method and apparatus that packing case installs plastic handles
CN109940924A (en) * 2019-04-08 2019-06-28 云南云派包装有限公司 A kind of automation installation handle is in the device on carton
CN112208148A (en) * 2020-09-18 2021-01-12 温州职业技术学院 Three-station handle belt feeding device of handle belt mounting machine and using method thereof
CN112208148B (en) * 2020-09-18 2022-10-25 温州职业技术学院 Three-station handle belt feeding device of handle belt mounting machine and using method thereof

Also Published As

Publication number Publication date
CN102529166B (en) 2017-09-12

Similar Documents

Publication Publication Date Title
CN202528506U (en) Automatic installation machine of carton handle
CN102529166A (en) Automatic mounting machine for carton handles
CN1046233C (en) Method equipment and apparatus for making of layered paper
CN104528088B (en) Labeling machine
CN107031893A (en) A kind of SMD carries general receiver
CN107264905B (en) A kind of automation feeding device for labeling
CN201951749U (en) Automatic mounting production device of a paper box fiber hand-held paper tape
CN100540400C (en) The banding system and the method that are used for banding piled products
CN103171807B (en) Wire labelling mechanism and method
CN107082311A (en) A kind of automatic laminating machine utilizing
CN108046014A (en) The bonding machine of the new and old SMT splicings band of one kind of multiple thickness specifications
CN203485497U (en) Automatic carton packaging machine
CN105269865A (en) Continuous package box production technology
CN104553234B (en) One kind stripping sticker adhesive dispenser
CN104494982B (en) A kind of full-automatic labeling system
CN104495437B (en) The paper feed mechanism and paper carrying method with printing equipment are packed for platen
CN102975916A (en) Label paper pasting machine
CN107985704A (en) A kind of device for books automatic labeling
CN102729523A (en) Quick double-paper jointing and bonding device
CN103010543A (en) Automatic label fetching and sticking method and equipment
CN107814018A (en) A kind of cable labeller
CN209096119U (en) A kind of box gluing machine carton counts automatically stacks conveying device
CN107088500A (en) A kind of fluorescent tube dispensing cure system
CN204769419U (en) Full autoloading labelling machine
CN207433985U (en) A kind of cable labeller

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant