CN102522942B - 双馈风力发电机励磁控制方法 - Google Patents

双馈风力发电机励磁控制方法 Download PDF

Info

Publication number
CN102522942B
CN102522942B CN201110279355.5A CN201110279355A CN102522942B CN 102522942 B CN102522942 B CN 102522942B CN 201110279355 A CN201110279355 A CN 201110279355A CN 102522942 B CN102522942 B CN 102522942B
Authority
CN
China
Prior art keywords
stator
rotor
current
delta
axle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201110279355.5A
Other languages
English (en)
Other versions
CN102522942A (zh
Inventor
杨柳
刘嫣红
毛志怀
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Agricultural University
Original Assignee
China Agricultural University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Agricultural University filed Critical China Agricultural University
Priority to CN201110279355.5A priority Critical patent/CN102522942B/zh
Publication of CN102522942A publication Critical patent/CN102522942A/zh
Application granted granted Critical
Publication of CN102522942B publication Critical patent/CN102522942B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

一种双馈风力发电机的励磁控制方法,所述双馈风力发电机具有双馈电机,该电机具有向电网供电的定子,所述电网具有额定值的电压;与所述定子耦合的驱动转子,所述转子一端通过变速齿轮连接到风力涡轮机,所述转子绕组为三相绕线式转子绕组,电网通过变流器为转子供电,通过将定子电压、定子磁链分解到同步旋转dq坐标轴上,可以实现调节转子电流而控制发电机定子输出的功率。该方法无需进行矢量旋转变化等复杂的变换和计算,可实现有功、无功解耦控制,电流控制模块控制敏感度较低,变流器系统的电路参数、测量延时对电流控制都具有的影响较小,控制技术简单,控制器的成本也因此降低。

Description

双馈风力发电机励磁控制方法
技术领域
本发明涉及一种风力发电机,特别涉及连接到电网双馈风力发电机励磁控制方法。
背景技术
在能源消耗日益增长、环境污染日渐严重的今天,作为可再生绿色能源的风能受到世界各国的普遍重视,风力发电技术也成为近年来各国学者竞相研究的热点。风能是一种变化频繁的随机能源,变速恒频风力发电技术可以保证在绝大多数风速下的风能得到最大限度的捕获和利用,并具有传统恒速恒频风力发电技术所无法比拟的优越性,而双馈风力发电机能很好地满足变速恒频风力发电的技术要求,成为目前比较优化的一种控制策略。它是通过双PWM变流器在双馈发电机的转子侧施加三相交流电进行励磁,通过调节励磁电流的有效值、相位和频率,实现定子侧输出有功和无功功率的控制。
双馈风力发电机的的基本硬件拓扑如图1所示,发电机的定子直接连接到电网,转子绕组通过集电环经变流器与电网相连,通过控制转子电流的频率、有效值,相位和相序,利用双PWM变流器,通过SPWM控制技术,可以获得正弦波转子电流,以减小发电机中的谐波转矩,实现定子侧输出有功和无功功率的控制。
由于双馈发电机的电路存在磁路上的耦合,且其三相坐标系下的数学模型是非线性、时变的高阶系统。为了实现有功、无功解耦控制,通常采用矢量控制法,矢量控制根据矢量变换理论,采用按定子磁场方向定向,把转子电流矢量分解为在同步旋转坐标系中的两个互相垂直的电流分量,实现对发电机有功功率和无功功率的解耦调节。但为使电机实现解耦,需要简化电机模型,还要进行矢量旋转变化等复杂的变换和计算,而且电流控制模块控制敏感度较高,变流器系统的电路参数、测量延时以及锁相环性能对电流控制都具有较大的影响,这些因素造成了矢量控制法的鲁棒性偏低。当电路参数,测量延时以及其他系统因素发生变化时,控制器稳定性会发生明显改变,加大了控制器参数的调试难度。
发明内容
本发明的目的在于克服现有双馈风力发电机有功功率控制方法的不足,提供一种不需要进行矢量旋转变化等复杂的变换和计算,可实现有功、无功解耦控制的双馈风力发电机励磁控制方法。
设发电机的定子电压、电流、磁链矢量为
Figure BDA0000092667320000012
转子电压、电流、磁链矢量为
Figure BDA0000092667320000013
Figure BDA0000092667320000014
则在稳态运行时,电机电压方程为:
U · s = R s I · s + j ω s ψ · s - - - ( 1 )
U · r = R r I · r + j ( ω s - ω r ) ψ · s - - - ( 2 )
其中Rs、Rr、ωs、ωr分别为电机定子、转子每相电阻,定子同步旋转磁场、转子旋转磁场的旋转角速度,式中矢量在空间相对静止,均以同步速度旋转,在同步旋转坐标dq轴系下
Usd=RsIsdsψsq                     (3)
Usq=RsIsqsψsd                     (4)
其中ψsd、ψsq
Figure BDA0000092667320000021
在d、q轴上的分量,其值为:
ψsd=LsIsd+LMIrd                      (5)
ψsq=LsIsq+LMIrq                      (6)
其中,Isd、Isq分别为
Figure BDA0000092667320000022
在d、q轴上的分量,Ird、Irq分别为
Figure BDA0000092667320000023
在d、q轴上的分量。Ls为定子绕组自感,LM为定转子绕组互感,由式(3)、(4)可得:
I sd = U sd - ω s ψ sq R s - - - ( 7 )
I sq = U sq + ω s ψ sd R s - - - ( 8 )
将(7)、(8)代入(5)、(6)可得
U sd = R s ψ sd - R s L M I rd L s + ω s ψ sq - - - ( 9 )
U sq = R s ψ sq - R s L M I rq L s - ω s ψ sd - - - ( 10 )
而定子侧的有功功率P为:
P=UsdIsd+UsqUsq                       (11)
将式(9)、(10)代入(11)得:
P = U s 2 - ψ s 2 ω s 2 R s - ω s L M ( ψ sd I rq - ψ sq I rd ) L s - - - ( 12 )
设X2=ψsdIrqsqIrd
P = U s 2 - ω s 2 ψ s 2 R s - ω s L M L s X 2 - - - ( 13 )
而定子侧的无功功率Q为:
Q=UsqIsd-UsdIsq                       (14)
将式(9)、(10)代入(14)得:
Q = ω s L s ( ψ s 2 - ψ sd I rd - ψ sq I rq ) - - - ( 15 )
设X1=ψsdIrdsqIrq
Q = ω s L s ( ψ s 2 - X 1 ) - - - ( 16 )
由式(13)、(16)可知,当电机并联到无穷大电网时,Us恒定,ψS可近似为常数,Rs、Ls、LM、ωs也为常数,因此发电机定子输出的无功功率、有功功率分别只与X1、X2有关,控制X1、X2就能实现对定子输出的功率控制,图2是定子磁链,转子电流矢量在dq同步旋转坐标轴上的分布,由图2可知,
Figure BDA0000092667320000032
Figure BDA0000092667320000033
Figure BDA0000092667320000034
Figure BDA0000092667320000036
Figure BDA0000092667320000038
Figure BDA0000092667320000039
Figure BDA00000926673200000310
其中A、B分别为与d轴的夹角,
Figure BDA00000926673200000313
为定子磁链与转子电流矢量间的夹角,则双馈风力发电机有功功率控制方法如图3。
发电机预先给定一转子励磁电流Ir,在风力涡轮机拖动下,并入电网,则可测量定子输出的电压、电流U、I,并计算出定子输出的有功功率P,无功功率Q,根据磁链模型,可以计算出定子磁链。
给定定子输出有功率为P*、无功功率为Q*。比较P*与定子输出的有功功率P,得到二者差值;比较Q*与定子输出的无功功率Q,也得到二者差值,利用PI调节算法可得到转子励磁电流Ir的给定值控制器根据给定值
Figure BDA00000926673200000315
调节变流器控制脉冲,得到转子励磁电流的输出。
由于本发明采用上述技术方案,在风力发电稳态运行中,无需进行矢量旋转变化等复杂的变换和计算,也能实现有功、无功的解耦控制,电流控制模块控制敏感度较低,变流器系统的电路参数、测量延时对电流控制都具有的影响较小,虽然控制的实时性和精度有所降低,但控制技术非常简单,控制器的成本也因此降低。
附图说明
图1是双馈风力发电机的的基本硬件拓扑结构;
图2是根据本发明的双馈风力发电机定子磁链、转子电流矢量关系图;
图3是根据本发明的双馈风力发电机功率控制框图。
具体实施方式
下面结合具体实施例对本发明做进一步的详细说明。
双馈风力发电机的基本硬件拓扑结构如图1所示,电网通过变流器为双馈风力发电机的转子供电,发电机在风机驱动下,其定子向电网输出有功和无功。发电机参数测定有很多公知的方法,最常用的方法是利用空载和堵转试验来测定电机参数。利用文献1中的方法,也可以得到该发电机的参数,例如定子电阻Rs、定子绕组电感Ls、定转子绕组互感LM等参数。
文献1:《矢量控制系统中异步电动机参数的估算和测量》,马小亮,电气传动,2010年第40卷第7期。
通过光电编码盘可以检测发电机转子位置,进而通过微分可求出转子转速,从而得到电机转差频率ω2。而观测定子磁链有三类方法:直接检测法、间接计算法,基于高频信号注入的方法。直接检测法是在定子α轴和β轴的气隙处嵌放磁敏元件,直接检测出定子磁链在定子α轴和β轴的分量ψαs和ψβs。据此可求得定子磁链的有效值ψs以及与α轴的夹角。间接计算法通过定子电压、电流等物理量建立磁链观测模型,在控制中实时推算定子磁链的有效值和相位。传统的方法是采用电压模型来观测定子磁链,并通过对反电动势信号的积分计算来得到定子磁链。由于这种方法具有需要的电机参数少和不需要转速信息的优点而得到了广泛应用,其表达式为:
ψs=∫(Us-isRs)dt
基于高频信号注入的方法需要在异步电机的定子绕组中注入高频信号,通过电机的非理想特性如磁饱和效应等获取电机磁链的有效值和方向。
在对双馈风力发电机功率控制时,首先利用空载和堵转试验来测定电机定子电阻Rs、定子绕组电感Ls、定转子绕组互感LM等参数,发电机预先给定一转子励磁电流
Figure BDA0000092667320000042
在风力涡轮机拖动下,并入电网,则可测量定子输出的电压、电流U、I,并计算出定子输出的有功功率P和无功功率Q,根据磁链模型,可以计算出定子磁链的有效值ψs和在αβ坐标轴上的相位,将其转化到dq旋转轴上,将预先给定的转子励磁电流
Figure BDA0000092667320000043
也映射到dq旋转轴上,则在该坐标轴上,可得到定子磁链与转子励磁电流的夹角为
Figure BDA0000092667320000044
Figure BDA0000092667320000045
给定定子输出有功功率为P*,比较P*与定子输出的有功功率P,得到差ΔP=P*-P,利用PI增量调节算法可得到X2的增量ΔXK的值;给定定子输出无功功率为Q*,比较Q*与定子输出的无功功率Q,得到差ΔQ=Q*-Q,利用PI增量调节算法可得到X1的增量ΔYK的值
Δ X K = K P ( Δ P K - Δ P k - 1 + T T P Δ P K )
Δ Y K = K Q ( Δ Q K - Δ Q k - 1 + T T Q Δ Q K )
其中,Kp、KQ为比例系数,Tp、TQ为积分时间常数,可通过常规的参数整定方法确定。而ΔPK、ΔPk-1为第K次与第K-1次采样周期中给定定子输出有功功率与定子实际输出的有功功率的差;ΔQK、ΔQk-1为第K次与第K-1次采样周期中给定定子输出无功功率与定子实际输出的无功功率的差,T为一个采样周期的时间。则应输入控制有功的控制量为XK=X2+ΔXK,控制无功的控制量为YK=X1+ΔYK。令 可得到
Figure BDA00000926673200000411
Figure BDA00000926673200000412
由于定子磁链的相位已根据磁链模型得出,令其与同步旋转轴的d轴夹角为A,
Figure BDA00000926673200000413
为dq轴上定子磁链与转子电流矢量间的夹角,因此根据图2,可知,它与d轴夹角为
Figure BDA00000926673200000414
而转子电流矢量有效值为
Figure BDA00000926673200000415
因而,在变流控制器的控制作用下,向转子绕组输出与d轴夹角为
Figure BDA00000926673200000416
有效值为
Figure BDA00000926673200000417
频率为转差频率的转子电流,即可输出需要的有功和无功功率。

Claims (4)

1.一种双馈风力发电机的励磁控制方法,所述双馈风力发电机具有双馈电机,该电机具有向电网供电的定子,所述电网具有额定值的电压;与所述定子耦合的驱动转子,所述转子一端通过变速齿轮连接到风力涡轮机,所述转子绕组为三相绕线式转子绕组,电网通过变流器为转子供电,所述变流器通过电刷和集电环与转子绕组连接,所述方法包括如下步骤:
(a)利用空载和堵转试验来测定电机定子电阻Rs、定子绕组电感Ls、定转子绕组互感LM,转步骤(b);
(b)预先给定一转子励磁电流
Figure FDA0000367521590000011
在风力涡轮机拖动下,并入电网,转步骤(c);
(c)给定定子输出有功功率为P*,无功功率为Q*,转步骤(d);
(d)给定采样周期T,通过光电编码盘检测发电机转子位置,进而通过微分可求出转子转速,从而得到电机转差频率ω2,测量定子第K次输出的电压、电流矢量UK、IK,并计算出定子第K次输出的有功功率PK,其中K=1,2……,计算P*与PK的差ΔPK=P*-PK;计算出定子第K次输出的无功功率QK,比较Q*与QK,得到Q*与QK的差ΔQK=Q*-QK,并将ΔPK、ΔQK存储到控制器的存储单元中;测量出或根据磁链模型,计算出定子磁链的有效值ψs及其在静止αβ坐标轴上的相位,将其折算到dq同步旋转坐标轴上,得到定子磁链矢量与d轴夹角,令该夹角为A,将转子励磁电流
Figure FDA0000367521590000012
也映射到dq旋转轴上,在dq旋转轴上,可得到定子磁链与转子励磁电流的夹角
Figure FDA0000367521590000013
Figure FDA0000367521590000014
Figure FDA0000367521590000015
转步骤(e);
(e)在ΔPK、ΔQK的基础上,利用PI增量调节算法可得到X2与X1的增量ΔXK,ΔYK,转步骤(f);
(f)求出XK=X2+ΔXK,YK=X1+ΔYK,转步骤(g);
(g)给定在变流控制器的控制作用下,向转子绕组输出变换到同步旋转坐标轴dq上与d轴夹角为有效值为
Figure FDA0000367521590000018
频率为转差频率ω2的转子电流,转步骤(h);
(h)令K=K+1,在同步旋转坐标轴dq上令
Figure FDA0000367521590000019
的有效值为
Figure FDA00003675215900000110
其与d轴夹角为
Figure FDA00003675215900000111
转步骤(c)。
2.如权利要求1所述的双馈风力发电机的励磁控制方法,其中步骤(e)中,得到X2的增量ΔXK的方法以及X1的增量ΔYK的PI增量调节算法为:
Δ X K = K p ( Δ P K - Δ P k - 1 + T T p Δ Q K )
Δ Y K = K Q ( Δ Q K - Δ Q k - 1 + T T Q Δ Q K )
其中,Kp、KQ为比例系数,Tp、TQ为积分时间常数,可通过常规的参数整定方法确定,而ΔPK、ΔPk-1为第K次与第K-1次采样周期中给定定子输出有功功率与定子实际输出的有功功率的差;ΔQK、ΔQk-1为第K次与第K-1次采样周期中给定定子输出无功功率与定子实际输出的无功功率的差,T为一个采样周期的时间。
3.如权利要求1所述的双馈风力发电机的励磁控制方法,其中步骤(d)中,磁链模型为u-i电压电流模型。
4.如权利要求1所述的双馈风力发电机的励磁控制方法,其中步骤(d)中,在定子α轴和β轴的气隙处嵌放磁敏元件,直接检测出定子磁链在定子α轴和β轴的分量ψαs和ψβs,据此可求得定子磁链的有效值ψs以及与α轴的夹角。
CN201110279355.5A 2011-09-20 2011-09-20 双馈风力发电机励磁控制方法 Expired - Fee Related CN102522942B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110279355.5A CN102522942B (zh) 2011-09-20 2011-09-20 双馈风力发电机励磁控制方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110279355.5A CN102522942B (zh) 2011-09-20 2011-09-20 双馈风力发电机励磁控制方法

Publications (2)

Publication Number Publication Date
CN102522942A CN102522942A (zh) 2012-06-27
CN102522942B true CN102522942B (zh) 2014-01-22

Family

ID=46293761

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110279355.5A Expired - Fee Related CN102522942B (zh) 2011-09-20 2011-09-20 双馈风力发电机励磁控制方法

Country Status (1)

Country Link
CN (1) CN102522942B (zh)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104980075B (zh) * 2014-04-11 2018-05-01 维谛技术有限公司 一种双馈电机的控制系统及控制方法
CN109286347B (zh) * 2017-07-19 2020-05-05 北京金风科创风电设备有限公司 永磁同步发电机转子位置的补偿方法及装置
CN110086388B (zh) * 2018-01-25 2023-03-31 重庆和亚科技有限公司 离网运行的发电设备及其电压频率控制方法
CN111289894B (zh) * 2018-12-10 2022-02-25 广东威灵汽车部件有限公司 电机的堵转检测方法、系统、装置及存储介质

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101795007A (zh) * 2010-03-18 2010-08-04 清华大学 基于同步化模型的风电双馈电机定子功率控制方法
CN101814893A (zh) * 2010-04-16 2010-08-25 合肥阳光电源有限公司 双馈式风力发电机组定子电流不平衡抑制方法
CN101958683A (zh) * 2010-08-09 2011-01-26 重庆科凯前卫风电设备有限责任公司 一种双馈风电机组定子电压冗余信号的获取方法
CN101977008A (zh) * 2010-09-24 2011-02-16 重庆大学 双馈风电机组关键传感器故障的判断方法

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4155196B2 (ja) * 2004-01-13 2008-09-24 株式会社日立製作所 回転電機制御装置および発電システム

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101795007A (zh) * 2010-03-18 2010-08-04 清华大学 基于同步化模型的风电双馈电机定子功率控制方法
CN101814893A (zh) * 2010-04-16 2010-08-25 合肥阳光电源有限公司 双馈式风力发电机组定子电流不平衡抑制方法
CN101958683A (zh) * 2010-08-09 2011-01-26 重庆科凯前卫风电设备有限责任公司 一种双馈风电机组定子电压冗余信号的获取方法
CN101977008A (zh) * 2010-09-24 2011-02-16 重庆大学 双馈风电机组关键传感器故障的判断方法

Also Published As

Publication number Publication date
CN102522942A (zh) 2012-06-27

Similar Documents

Publication Publication Date Title
CN102332727B (zh) 一种利用直流侧飞轮储能单元平滑永磁直驱风力发电系统输出有功功率的方法
CN100486093C (zh) 风力发电用全功率型交直交变流器的控制结构
CN105896600B (zh) 一种永磁同步直驱风力发电机并网系统控制方法
Gajewski et al. Advanced control of direct-driven PMSG generator in wind turbine system
CN103078341B (zh) 一种基于dfig的直流并网发电系统及其控制方法
CN103138672A (zh) 一种直驱永磁同步风力发电系统自抗扰控制方法
CN104579060B (zh) 笼型转子无刷双馈风力发电机的间接功率控制方法
CN102723727A (zh) 双馈风力发电机并网控制方法
CN110460106B (zh) 一种不平衡电网下的dfig虚拟同步控制方法及系统
CN102355192B (zh) 双馈风力发电机无功功率的控制方法
Abolhassani et al. A sensorless integrated doubly-fed electric alternator/active filter (IDEA) for variable speed wind energy system
CN102522942B (zh) 双馈风力发电机励磁控制方法
CN102148603B (zh) 双馈发电机转子初始位置零位偏差的辨识方法及控制装置
CN108039843A (zh) 一种dfig-dc系统的定子频率控制方法
Wen et al. Vector control strategy for small-scale grid-connected PMSG wind turbine converter
CN202696533U (zh) 一种变速永磁交流发电机系统
CN102332861B (zh) 双馈风力发电机有功功率的控制方法
CN105099320A (zh) 永磁直驱风力发电机输出有功功率控制方法及装置
Fan et al. A new sensorless control strategy used in direct-drive PMSG wind power system
CN103684173A (zh) 一种双馈风力发电机的变流器控制方法
CN104333283A (zh) 基于回路成形的双馈电机定子电流鲁棒控制方法
Hao et al. A novel sensorless control strategy of doubly fed induction generator based on stator voltage
Serhoud et al. Maximal wind energy tracing of brushless doubly-fed generator under flux oriented vector control
Gajewski et al. Performance of sensorless control of permanent magnet synchronous generator in wind turbine system
Elbashir et al. Modeling and analysis of DFIG in wind energy conversion system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140122

Termination date: 20140920

EXPY Termination of patent right or utility model