CN102518441A - 一种溶沟地层盾构进洞施工方法 - Google Patents

一种溶沟地层盾构进洞施工方法 Download PDF

Info

Publication number
CN102518441A
CN102518441A CN2011104177204A CN201110417720A CN102518441A CN 102518441 A CN102518441 A CN 102518441A CN 2011104177204 A CN2011104177204 A CN 2011104177204A CN 201110417720 A CN201110417720 A CN 201110417720A CN 102518441 A CN102518441 A CN 102518441A
Authority
CN
China
Prior art keywords
shield
station
steel loop
shield tunnel
constructing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011104177204A
Other languages
English (en)
Other versions
CN102518441B (zh
Inventor
王宗勇
雷军
高治双
毋海军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 12th Bureau Group Co Ltd
Second Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd
Original Assignee
China Railway 12th Bureau Group Co Ltd
Second Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 12th Bureau Group Co Ltd, Second Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd filed Critical China Railway 12th Bureau Group Co Ltd
Priority to CN201110417720.4A priority Critical patent/CN102518441B/zh
Publication of CN102518441A publication Critical patent/CN102518441A/zh
Application granted granted Critical
Publication of CN102518441B publication Critical patent/CN102518441B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

本发明涉及溶沟地层盾构进洞施工技术,具体为一种溶沟地层盾构进洞施工方法,解决传统方法存在诸多缺点的问题,步骤一、优化洞门钢环结构:在洞门钢环内部设弹性橡胶止水环,最外端设橡胶止水帘布,周圈设注浆孔、注浆管;步骤二、车站围护结构施工时,采用玻璃纤维筋,盾构机直接切除进洞;步骤三、车站主体施工时,盾构快速前移使橡胶止水帘布外侧的折叠翻板搭接在刀盘上,通过注浆孔向两道止水帘布之间注入盾尾油脂;步骤四、拼装完成盾构进洞管片并用工字钢连接成一体,当盾尾进入两道止水帘布之间后,进行二次补注浆。确保盾构机安全、快速进洞,工序简单,技术先进,安全可靠,填补了非加固盾构进洞施工技术的空白,推广前景好。

Description

一种溶沟地层盾构进洞施工方法
技术领域
本发明涉及溶沟地层盾构进洞洞门防管涌、防坍陷施工技术,具体为一种溶沟地层盾构进洞施工方法。
背景技术
中国城市地铁建设进入飞跃发展阶段,盾构掘进最关键技术就是盾构进出洞,目前只能采取各种加固方式进行端头加固,再进行盾构进洞,然而,在砂卵石地层,无论采取哪种加固均无法满足盾构安全进洞,导致盾构进洞发生事故是目前盾构施工的最大风险源。
目前,地铁盾构进洞通常采用预加固、冷冻或钢套筒进行进洞,这些技术要求高,安全、质量不可控,费用也高,常常需要一些辅助措施才能实现盾构安全进洞,在实际施工中均存在各自不同的优缺点,具体分析如下:
⑴端头注浆加固后盾构进洞
注浆加固种类较多,有袖阀管注浆和旋喷加固,也有水平旋喷注浆;
优点:注浆工艺成熟;
缺点:注浆质量不可控、费用高、存在加固盲区,盾构进洞发生安全事故概率较大。
⑵端头冷冻后盾构进洞
地下水丰富,采用加固后效果较差,在盾构进洞前1个月,端头插入冷冻管进行冷冻,使水成冰固结土层;
优点:补救冷冻效果好;
缺点:操作困难、工期长、费用高、不环保、进洞后溶沉较大。
⑶利用钢套筒进行盾构接收
采用端头加固效果差,在进洞洞门外加工一个封闭的钢套筒,并在钢套筒里充填砂,然后使盾构进洞后直接掘进到封闭的钢套筒内,最后进行背后注浆后拆除钢套筒;
优点:安全;
缺点:盾构进洞工期长、费用高、工序转换繁杂。
然而,全国城市地铁施工已进入高峰期,特别对老城区地铁是“车随人走”的设计理念,也就是盾构进洞周边一般都是构筑物,这就对盾构进洞的要求更高。相关的文献报道均是盾构进洞发生的安全事故案例,到目前为止,还没有切实可行的盾构进洞施工方法能够完全避免盾构进洞安全事故。
发明内容
本发明为了解决目前盾构溶沟地层进洞时所采用的传统方法均存在各自不同缺点的问题,提供一种溶沟地层盾构进洞施工方法,以实现盾构机在非加固条件下安全进洞。
本发明是采用如下技术方案实现的:一种溶沟地层盾构进洞施工方法,包括以下步骤:
步骤一、优化洞门钢环结构:根据车站主体结构厚度调整洞门钢环宽度,在洞门钢环内部并且位于洞门钢环与车站围护结构面之间的位置增设至少一道弹性橡胶止水环,在洞门钢环最外端增设一道内翻式橡胶止水帘布,橡胶止水帘布外侧间隔分布若干折叠翻板;洞门钢环周圈、且位于弹性橡胶止水环与橡胶止水帘布之间的部位间隔开设注浆孔及与注浆孔连通的注浆管;步骤二、车站围护结构施工时,采用玻璃纤维筋,盾构机直接切除进洞,在盾构机破除完车站围护结构瞬间,弹性橡胶止水环紧紧挡住刀盘与车站围护结构间隙;步骤三、车站主体施工时,盾构刀盘破除车站围护结构后快速前移使得橡胶止水帘布外侧的折叠翻板搭接在刀盘上,此时立即通过洞门钢环上预留的注浆孔及注浆管向橡胶止水帘布及弹性橡胶止水环之间的空隙注入盾尾油脂;步骤四、洞门钢环注入盾尾油脂密封好后,快速前移盾构机并拼装完成盾构进洞管片,并用工字钢把进洞成型隧道管片连接成一体,当盾尾进入橡胶止水帘布与弹性橡胶止水环之间后,立即对最后几环管片进行二次补注浆,即完成了溶沟地层盾构进洞的施工。
与现有技术相比,本发明所述的方法具有以下优点:
⑴优化车站围护结构,并采用玻璃纤维筋,杜绝盾构进洞围护结构无钢筋或工字钢,确保盾构机直接切除进洞,解决了传统盾构进洞前破除洞门而使洞门失稳的难题;
⑵通过优化洞门钢环结构,在洞门钢环内侧增设内翻式弹性橡胶止水环与橡胶止水帘布,并且在弹性橡胶止水环与橡胶止水帘布之间注入盾尾油脂,确保盾体进洞时,洞门的密封效果,杜绝盾构进洞涌砂涌水的现象,确保盾构机安全、快速进洞,杜绝安全事故发生,而且减少盾构进洞前进行注浆加固的工序,解决了传统盾构进洞涌水的技术难题;
⑶快速完成盾构进洞管片拼装与同步注浆,而且用工字钢把进洞管片连成一体,当盾尾进入两道止水帘布之间后,立即进行二次补注浆,解决了传统盾构进洞后由于地面下沉和管片松驰而漏水的质量通病;
总之,本发明所述的方法可以确保盾构机安全、快速进洞,杜绝安全事故发生,整个施工工序简单,技术先进,安全可靠,填补了非加固盾构进洞施工技术的空白,开创了砂卵石地层盾构进洞无喷砂涌水的先河,推动了盾构施工技术向前发展,推广前景好。
附图说明
图1为本发明盾构进洞施工时的平剖图;
图2为本发明盾构进洞施工时的横剖图;
图3为本发明盾构进洞施工时的纵剖图;
图中:1-洞门钢环;2-车站围护结构;3-弹性橡胶止水环;4-橡胶止水帘布;5-折叠翻板;6-注浆孔;7-注浆管;8-车站主体;9-盾构主机;10-盾构接收架;11-钢压板。
具体实施方式
一种溶沟地层盾构进洞施工方法,包括以下步骤:
步骤一、优化洞门钢环结构
根据车站主体结构厚度调整洞门钢环宽度,在洞门钢环1内部并且位于洞门钢环与车站围护结构2面之间的位置增设至少一道弹性橡胶止水环3,本发明采用两道橡胶止水环,并采用钢压板进行定位,钢压板及橡胶止水环通过螺栓与洞门钢环固定,在洞门钢环最外端固定一道内翻式橡胶止水帘布4,橡胶止水帘布外侧间隔分布若干折叠翻板5,橡胶止水帘布与折叠翻板通过螺栓与洞门钢环固定,折叠翻板为现有公知结构;洞门钢环周圈、且位于弹性橡胶止水环3与橡胶止水帘布4之间的部位间隔开设注浆孔6及与注浆孔连通的注浆管7;
步骤二、车站围护结构2施工时,采用玻璃纤维筋,盾构机直接切除进洞,在盾构机破除完车站围护结构瞬间,弹性橡胶止水环紧紧挡住刀盘与车站围护结构间隙,杜绝喷砂涌水;
步骤三、车站主体8施工时,盾构刀盘破除车站围护结构后快速前移使得橡胶止水帘布外侧的折叠翻板搭接在刀盘上,起到密封作用,此时立即通过洞门钢环上预留的注浆孔6及注浆管7向橡胶止水帘布4及弹性橡胶止水环3之间的空隙注入盾尾油脂,实现洞门钢环密封效果;
步骤四、洞门钢环注入盾尾油脂密封好后,快速前移盾构机并拼装完成盾构进洞管片,并用工字钢把进洞成型隧道管片连接成一体,当盾尾进入橡胶止水帘布与弹性橡胶止水环之间后,立即对最后几环管片进行二次补注浆,即完成了溶沟地层盾构进洞的施工。
工程实例:
本发明所述的非加固盾构进洞施工方法用于长沙地铁2号线芙蓉广场站到五一广场站区间左右线,该区间进洞均处于溶沟地段砂卵石地层,首先优化设计洞门钢环,并在内部增设至少一道弹性橡胶止水环和橡胶止水帘布,并在车站主体结构施工时进行定位安装;其次,当盾构快进洞时,进行盾构姿态调整,降低掘进速度向围护结构掘进,当盾构破除围护结构一半时,采用敞开式掘进,同时停止向仓内添加任何液体。然后,当盾构刀盘破除围护结构后快速前移使外侧止水帘布搭接在盾体上,并立即在预留注浆孔及注浆管内注入盾尾油脂,填满止水帘布空隙;最后,快速前移盾构机和拼装完成盾构进洞管片,并用工字钢把进洞成型隧道管片连接成一体,当盾尾进入两道止水帘布后,实施二次补注浆。
该方法实现盾构进洞端头不加固,在进洞时无喷砂涌水,地面沉降控制在允许范围内,杜绝管片松弛,开创了溶沟地层非加固盾构进洞施工无安全隐患的先河。
推广情况
该技术由于安全可靠,工序简单、成本较低,解决了传统盾构进洞涌砂、沉降大等技术难题。在左线实践后被推广到同一区间右线,也取得较好的效果。实践证明,该技术方案先进,功效高,成本低,特别是填补了国内盾构溶沟地层非加固进洞施工技术的空白,开创了砂卵石地层盾构进洞无喷砂涌水的先河,长沙地铁还有几条线穿越溶沟,大部分盾构进洞地层为砂卵石,地下水丰富,安全风险大,推广前景好。

Claims (1)

1.一种溶沟地层盾构进洞施工方法,其特征是包括以下步骤:
步骤一、优化洞门钢环结构
根据车站主体结构厚度调整洞门钢环宽度,在洞门钢环(1)内部并且位于洞门钢环与车站围护结构(2)面之间的位置增设至少一道弹性橡胶止水环(3),在洞门钢环最外端增设一道内翻式橡胶止水帘布(4),橡胶止水帘布外侧间隔分布若干折叠翻板(5);洞门钢环周圈、且位于弹性橡胶止水环(3)与橡胶止水帘布(4)之间的部位间隔开设注浆孔(6)及与注浆孔连通的注浆管(7);
步骤二、车站围护结构(2)施工时,采用玻璃纤维筋,盾构机直接切除进洞,在盾构机破除完车站围护结构瞬间,弹性橡胶止水环紧紧挡住刀盘与车站围护结构间隙;
步骤三、车站主体(8)施工时,盾构刀盘破除车站围护结构后快速前移使得橡胶止水帘布外侧的折叠翻板搭接在刀盘上,此时立即通过洞门钢环上预留的注浆孔(6)及注浆管(7)向橡胶止水帘布(4)及弹性橡胶止水环(3)之间的空隙注入盾尾油脂;
步骤四、洞门钢环注入盾尾油脂密封好后,快速前移盾构机并拼装完成盾构进洞管片,并用工字钢把进洞成型隧道管片连接成一体,当盾尾进入橡胶止水帘布与弹性橡胶止水环之间后,立即对最后几环管片进行二次补注浆,即完成了溶沟地层盾构进洞的施工。
CN201110417720.4A 2011-12-14 2011-12-14 一种溶沟地层盾构进洞施工方法 Active CN102518441B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110417720.4A CN102518441B (zh) 2011-12-14 2011-12-14 一种溶沟地层盾构进洞施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110417720.4A CN102518441B (zh) 2011-12-14 2011-12-14 一种溶沟地层盾构进洞施工方法

Publications (2)

Publication Number Publication Date
CN102518441A true CN102518441A (zh) 2012-06-27
CN102518441B CN102518441B (zh) 2014-10-08

Family

ID=46289479

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110417720.4A Active CN102518441B (zh) 2011-12-14 2011-12-14 一种溶沟地层盾构进洞施工方法

Country Status (1)

Country Link
CN (1) CN102518441B (zh)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103266898A (zh) * 2013-04-26 2013-08-28 中交第二航务工程局有限公司 盾构隧道洞门密封装置及方法
CN103277108A (zh) * 2013-04-19 2013-09-04 中铁隧道集团有限公司 泥水盾构水下到达施工工法
CN104047607A (zh) * 2013-03-14 2014-09-17 上海市城市建设设计研究总院 盾构机围护结构条件下吊出工法
CN104806256A (zh) * 2015-04-16 2015-07-29 粤水电轨道交通建设有限公司 一种盾构突遇溶腔洞内处理方法
CN108104828A (zh) * 2017-11-02 2018-06-01 上海市政建设有限公司 一种顶管机直接磨除洞门的进出洞方法
CN109826643A (zh) * 2019-03-26 2019-05-31 江苏建筑职业技术学院 一种排水隧洞盾构洞门预埋结构
CN110344834A (zh) * 2019-07-12 2019-10-18 中铁十二局集团有限公司 近河段富水粉砂层盾构机接收施工方法
CN111618974A (zh) * 2020-05-29 2020-09-04 中铁隧道集团二处有限公司 一种盾构掘进施工用钢筋混凝土管片预制成型施工方法
CN112159165A (zh) * 2020-10-23 2021-01-01 中铁二十五局集团有限公司 一种盾构冷冻开仓材料及其制备方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009235775A (ja) * 2008-03-27 2009-10-15 Alpha Civil Engineering:Kk 立坑の坑口装置
CN101660419A (zh) * 2008-08-27 2010-03-03 上海市机械施工有限公司 一种特殊地层中盾构进洞的施工方法
CN102022118A (zh) * 2010-12-15 2011-04-20 广东华隧建设股份有限公司 一种盾构机平衡到达的方法
CN102094659A (zh) * 2010-12-29 2011-06-15 上海隧道工程股份有限公司 盾构进洞弹簧铰链板密封装置
JP4818048B2 (ja) * 2006-10-02 2011-11-16 鉄建建設株式会社 シールド掘進機

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4818048B2 (ja) * 2006-10-02 2011-11-16 鉄建建設株式会社 シールド掘進機
JP2009235775A (ja) * 2008-03-27 2009-10-15 Alpha Civil Engineering:Kk 立坑の坑口装置
CN101660419A (zh) * 2008-08-27 2010-03-03 上海市机械施工有限公司 一种特殊地层中盾构进洞的施工方法
CN102022118A (zh) * 2010-12-15 2011-04-20 广东华隧建设股份有限公司 一种盾构机平衡到达的方法
CN102094659A (zh) * 2010-12-29 2011-06-15 上海隧道工程股份有限公司 盾构进洞弹簧铰链板密封装置

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
张公社: "超大直径泥水平衡式盾构机始发技术", 《铁道建筑技术》, 31 August 2009 (2009-08-31), pages 57 - 61 *
陈晓理等: "821BF遇水膨胀橡胶在地下工程中的应用", 《铁道建筑技术》, no. 5, 31 October 1997 (1997-10-31) *

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104047607A (zh) * 2013-03-14 2014-09-17 上海市城市建设设计研究总院 盾构机围护结构条件下吊出工法
CN104047607B (zh) * 2013-03-14 2016-04-13 上海市城市建设设计研究总院 盾构机围护结构条件下吊出工法
CN103277108A (zh) * 2013-04-19 2013-09-04 中铁隧道集团有限公司 泥水盾构水下到达施工工法
CN103266898A (zh) * 2013-04-26 2013-08-28 中交第二航务工程局有限公司 盾构隧道洞门密封装置及方法
CN104806256A (zh) * 2015-04-16 2015-07-29 粤水电轨道交通建设有限公司 一种盾构突遇溶腔洞内处理方法
CN108104828A (zh) * 2017-11-02 2018-06-01 上海市政建设有限公司 一种顶管机直接磨除洞门的进出洞方法
CN109826643A (zh) * 2019-03-26 2019-05-31 江苏建筑职业技术学院 一种排水隧洞盾构洞门预埋结构
CN109826643B (zh) * 2019-03-26 2024-02-09 江苏建筑职业技术学院 一种排水隧洞盾构洞门预埋结构
CN110344834A (zh) * 2019-07-12 2019-10-18 中铁十二局集团有限公司 近河段富水粉砂层盾构机接收施工方法
CN111618974A (zh) * 2020-05-29 2020-09-04 中铁隧道集团二处有限公司 一种盾构掘进施工用钢筋混凝土管片预制成型施工方法
CN111618974B (zh) * 2020-05-29 2022-05-24 中铁隧道集团二处有限公司 一种盾构掘进施工用钢筋混凝土管片预制成型施工方法
CN112159165A (zh) * 2020-10-23 2021-01-01 中铁二十五局集团有限公司 一种盾构冷冻开仓材料及其制备方法
CN112159165B (zh) * 2020-10-23 2021-12-17 中铁二十五局集团有限公司 一种盾构冷冻开仓材料及其制备方法

Also Published As

Publication number Publication date
CN102518441B (zh) 2014-10-08

Similar Documents

Publication Publication Date Title
CN102518441B (zh) 一种溶沟地层盾构进洞施工方法
CN104358575B (zh) 一种富水砂层泥水盾构始发密封装置及始发密封控制方法
CN101781993B (zh) 富含承压水软土层盾构进洞施工方法
CN103032073B (zh) 一种城市地铁泥岩地层联络通道与盾构掘进平行施工方法
CN103032078B (zh) 一种盾构接收洞门环梁与盾构过站平行施工方法
CN103410161B (zh) 斜向控制注浆钢锚管框架及其施工方法
CN102787846B (zh) 海底隧道断层破碎带上堵下排的施工方法
CN108442943A (zh) 一种渡线段隧道双侧壁导坑法施工方法
CN103821539B (zh) 一种盾构机盾尾同步内嵌式双液注浆装置
CN103266898A (zh) 盾构隧道洞门密封装置及方法
CN201412163Y (zh) 一种敞开式隧道掘进机施工的圆形隧道衬砌结构
CN101660419A (zh) 一种特殊地层中盾构进洞的施工方法
CN109356183B (zh) 一种沉井预留洞口封堵结构及其施工方法
CN110984236B (zh) 套接式明暗挖结构洞门接口连接点施工方法
CN106223967A (zh) 一种大埋深矩形或类矩形隧道盾构施工装置及方法
CN101781991A (zh) 盾构接收或始发端头的双井式加固方法及双井式盾构接收方法
CN209040835U (zh) 一种盾构空推通过暗挖隧道并二次始发的施工结构
CN104790960A (zh) 一种顶管与盾构转换设备及其施工方法
CN109403985A (zh) 极软弱破碎围岩层的门式挑顶工法
CN202325550U (zh) 地铁暗挖隧道二次衬砌拼装式挡头装置
CN105715277A (zh) 一种盾构隧道的施工装置及施工方法
CN103437772A (zh) 地下通道及隧道结构的顶管施工方法
CN104632228B (zh) 横通道进入正线施工方法及横通道
CN113669073A (zh) 一种控制临近建筑变形的富水砂性地层先隧后站施工方法
CN103604000B (zh) 江海底钢顶管对接施工方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant