CN102509515B - Electric energy meter automatic sealing apparatus - Google Patents

Electric energy meter automatic sealing apparatus Download PDF

Info

Publication number
CN102509515B
CN102509515B CN201110336891.4A CN201110336891A CN102509515B CN 102509515 B CN102509515 B CN 102509515B CN 201110336891 A CN201110336891 A CN 201110336891A CN 102509515 B CN102509515 B CN 102509515B
Authority
CN
China
Prior art keywords
automatic
electric energy
energy meter
cylinder
seal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201110336891.4A
Other languages
Chinese (zh)
Other versions
CN102509515A (en
Inventor
何志强
杨乃贵
徐二强
丁涛
李去病
王雍
武宏波
余义宙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHENGZHOU SMS ELECTRIC CO Ltd
MEASUREMENT CENTER OF HENAN ELECTRIC POWER CO Ltd
Original Assignee
ZHENGZHOU SMS ELECTRIC CO Ltd
MEASUREMENT CENTER OF HENAN ELECTRIC POWER CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHENGZHOU SMS ELECTRIC CO Ltd, MEASUREMENT CENTER OF HENAN ELECTRIC POWER CO Ltd filed Critical ZHENGZHOU SMS ELECTRIC CO Ltd
Priority to CN201110336891.4A priority Critical patent/CN102509515B/en
Publication of CN102509515A publication Critical patent/CN102509515A/en
Application granted granted Critical
Publication of CN102509515B publication Critical patent/CN102509515B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Manufacture Of Motors, Generators (AREA)
  • Basic Packing Technique (AREA)

Abstract

The invention discloses en electric energy meter automatic sealing apparatus comprising a frame. An automatic conveying mechanism, a positioning mechanism, a poking bar mechanism, a seal pedestal automatic installing mechanism, an automatic screw fixing machine, and a seal cap automatic installing mechanism are arranged on the frame. An output end of the automatic conveying mechanism is engaged with the front end of the poking bar mechanism. The seal pedestal automatic installing mechanism, the automatic screw fixing machine, and the seal cap automatic installing mechanism are arranged above the poking bar mechanism, and are arranged from the front part to the rear part along a conveying direction. The positioning mechanism is positioned on one side of an upper part working face of the poking bar mechanism. The apparatus provided by the invention is advantaged in reasonable design. An assembly line working mode is adopted, such that the automation degree is high, labor intensity of workers are sufficiently reduced, and production efficiency of electric energy meter sealing works can be improved. The apparatus is adapted to the production requirement of an electric energy meter automatic production line.

Description

A kind of automatic seal device of electric energy meter
Technical field
The invention belongs to electric energy meter and manufacture and detection technique field, be specifically related to a kind of automatic seal device of electric energy meter.
Background technology
Electric energy meter is called again watt-hour meter, is the instrument for measuring in real time electric energy, and electric energy meter seal is one important procedure in electric energy meter assembling process, installs additional in order to prevent user from privately sneaking current.Mostly adopt and manually electric energy meter is carried out to seal operation at present, not only labour intensity is large, and inefficiency, is extremely not suitable with the Production requirement on electric energy meter automatic assembly line.
Summary of the invention
The present invention, in order to solve weak point of the prior art, provides a kind of automatic seal device of electric energy meter that alleviates hand labor intensity, improves electric energy meter production efficiency.
For solving the problems of the technologies described above, the present invention adopts following technical scheme: a kind of automatic seal device of electric energy meter, comprise frame, frame is provided with automatic delivering mechanism, detent mechanism, lever body, seal base automatic installation mechanism, automatic screw loading machine and seal lid automatic installation mechanism, the output terminal of automatic delivering mechanism is connected with the front end of lever body, seal base automatic installation mechanism, automatic screw loading machine and seal lid automatic installation mechanism are located at lever body top and arrange from front to back along throughput direction, detent mechanism is positioned at a side of lever body top workplace.
Described automatic delivering mechanism comprises electric energy meter conveying pipeline, the top of electric energy meter conveying pipeline is provided with the vertical gear cylinder of stopping the supple of gas or steam, the vertical working end that keeps off the cylinder of stopping the supple of gas or steam is connected with baffle plate, and a side of electric energy meter conveying pipeline is provided with straight feeding cylinder, and the working end of straight feeding cylinder is connected with push pedal.
Described detent mechanism comprises horizontal location cylinder, the working end of horizontal location cylinder is connected with movable clamp, the opposite side of movable clamp is provided with stationary backplate, between movable clamp and stationary backplate, is provided with from front to back automatically upper seal base station, automatic screw loading station and automatically goes up seal lid station and backup station along throughput direction.
Described seal base automatic installation mechanism comprises the first crossbeam that is located at frame top, on first crossbeam, be provided with along its length the first horizontal air cylinder and the first slide rail, on the first slide rail, slide and be provided with the first sliding shoe being connected with the working end of the first horizontal air cylinder, below the first sliding shoe, be connected with the first vertical cylinder, the working end of the first vertical cylinder lower end is connected with handgrip cylinder.
Described seal lid automatic installation mechanism comprises the second cross beam that is located at frame top, on second cross beam, be provided with along its length the second horizontal air cylinder and the second slide rail, on the second slide rail, slide and be provided with the second sliding shoe being connected with the working end of the second horizontal air cylinder, below the second sliding shoe, be connected with the second vertical cylinder, the working end of the second vertical cylinder lower end is connected with sucker by vacuum valve.
Described frame outside is provided with the auto-sequencing machine of supplying respectively seal base and seal lid.
Adopt technique scheme, automatic delivering mechanism plays pipeline system transmission of electric energy table to the effect of waiting for seal position, and lever body plays electric energy meter is progressively delivered to automatically upper seal base station, automatic screw loading station and automatically goes up on seal lid station; Detent mechanism plays simultaneously and will automatically go up seal base station, automatic screw loading station and automatically go up the effect that the electric energy meter on seal lid station positions; Seal base automatic installation mechanism tightens screw to effect, automatic screw loading machine that seal base is installed in the electric energy meter of automatically upper seal base station to the electric energy meter on automatic screw loading station, and seal lid automatic installation mechanism is installed seal lid to the electric energy meter in automatically upper seal lid station.Auto-sequencing machine, can and put holding fix by seal base and seal lid auto-sequencing, waits for that seal base automatic installation mechanism and seal lid automatic installation mechanism capture respectively base and seal lid.
The present invention is reasonable in design, adopts pipelining form, and automaticity is high, has fully alleviated workman's labour intensity, has improved the production efficiency of electric energy meter seal operation, has greatly adapted to the Production requirement on electric energy meter automatic assembly line.
Brief description of the drawings
Fig. 1 is structural representation of the present invention;
Fig. 2 is the structural representation of seal base automatic installation mechanism in the middle of Fig. 1;
Fig. 3 is the structural representation of seal lid automatic installation mechanism in the middle of Fig. 1.
Embodiment
As shown in Figure 1, Figure 2 and Figure 3, a kind of automatic seal device of electric energy meter of the present invention, comprise frame 1, frame 1 is provided with automatic delivering mechanism, detent mechanism, lever body 2, seal base automatic installation mechanism, automatic screw loading machine 3 and seal lid automatic installation mechanism, the output terminal of automatic delivering mechanism is connected with the front end of lever body 2, seal base automatic installation mechanism, automatic screw loading machine 3 and seal lid automatic installation mechanism are located at lever body 2 tops and arrange from front to back along throughput direction, and detent mechanism is positioned at a side of lever body 2 top workplaces.Frame 1 outside is provided with auto-sequencing machine 4 and the auto-sequencing machine 31 of supplying respectively seal base and seal lid.
Automatic delivering mechanism comprises electric energy meter conveying pipeline 5, the top of electric energy meter conveying pipeline 5 is provided with the vertical gear cylinder 6 of stopping the supple of gas or steam, the vertical working end that keeps off the cylinder 6 of stopping the supple of gas or steam is connected with baffle plate 7, one side of electric energy meter conveying pipeline 5 is provided with straight feeding cylinder 8, and the working end of straight feeding cylinder 8 is connected with push pedal 9.
Detent mechanism comprises horizontal location cylinder 10, the working end of horizontal location cylinder 10 is connected with movable clamp 11, the opposite side of movable clamp 11 is provided with stationary backplate 12, between movable clamp 11 and stationary backplate 12, be provided with from front to back automatically upper seal base station 13, automatic screw loading station 14 and automatically go up seal lid station 15 and backup station 16 along throughput direction, wherein backup station 16 is the needs in order to operation in the future on seal work production line.
Seal base automatic installation mechanism is positioned at directly over automatically upper seal base station 13, comprise the first crossbeam 17 that is located at frame 1 top, on first crossbeam 17, be provided with along its length the first horizontal air cylinder 18 and the first slide rail 19, on the first slide rail 19, slide and be provided with the first sliding shoe 20 being connected with the working end of the first horizontal air cylinder 18, the working end that the first sliding shoe 20 is connected with the first vertical cylinder 21, the first vertical cylinder 21 lower ends is below connected with handgrip cylinder 22.
Seal lid automatic installation mechanism is positioned at directly over automatically upper seal lid station 15, comprise the second cross beam 23 that is located at frame 1 top, on second cross beam 23, be provided with along its length the second horizontal air cylinder 24 and the second slide rail 25, on the second slide rail 25, slide and be provided with the second sliding shoe 26 being connected with the working end of the second horizontal air cylinder 24, the working end that the second sliding shoe 26 is connected with the second vertical cylinder 27, the second vertical cylinder 27 lower ends is below connected with sucker 29 by vacuum valve 28.
Lever body 2, automatic screw loading machine 3, auto-sequencing machine 4 and auto-sequencing machine 31 are the existing mature technology of this area, and concrete structure repeats no more.The below that lever body 2 is positioned at above-mentioned automatically upper seal base station 13, automatic screw loading station 14 and automatically goes up seal lid station 15 and backup station 16, automatic screw loading machine 3 be positioned at automatic screw loading station 14 directly over.
Each cylinder can be fixed by cylinder body above, and piston rod is working end; Also can fix by piston rod, cylinder body is working end, and the present embodiment adopts cylinder body to fix, the mode that piston rod is working end.
Below the specific works step of electric energy meter seal operation:
1), in the time that first the electric energy meter of seal is transported to warehouse entry mouth by electric energy meter conveying pipeline 5, the stop the supple of gas or steam baffle plate 7 of cylinder 6 of vertical gear stops electric energy meter, the push pedal 9 of straight feeding cylinder 8 is shifted electric energy meter onto at 30 places, wait position of lever body 2 front ends;
2), electric energy meter is pushed automatically upper seal base station 13 by lever body 2;
3), the piston rod promotion activity clamp 11 of the horizontal location cylinder 10 of detent mechanism navigates to electric energy meter on the automatically upper seal base station 13 between movable clamp 11 and stationary backplate 12, automatic delivering mechanism is sent into next piece electric energy meter to wait for 30 places, position simultaneously;
4), the piston rod of the first horizontal air cylinder 18 promotes the first sliding shoe 20 and drives in the lump the first vertical cylinder 21 to move to the top that auto-sequencing machine 4 exports, the piston rod of the first vertical cylinder 21 stretches out downwards delivers to by handgrip cylinder 22 position that can catch seal base, the handgrip 32 of handgrip cylinder 22 closes up, catch seal base, the piston rod of the first vertical cylinder 21 upwards bounces back, the piston rod of the first horizontal air cylinder 18 moves back, handgrip cylinder 22 is delivered to the top of electric energy meter floor installation position, the piston rod of the first vertical cylinder 21 stretches out downwards, the handgrip 32 of handgrip cylinder 22 unclamps, seal base is put into electric energy meter seal floor installation position,
5), the piston rod of horizontal location cylinder 10 pulls movable clamp 11 to rollback, lever body 2 will automatically be gone up seal base station 13 and wait for that the electric energy meter at 30 places, position is sent to respectively automatic screw loading station 14 and automatically upper seal base station 13 simultaneously;
6), the piston rod promotion activity clamp 11 of horizontal location cylinder 10 navigates to electric energy meter on the automatically upper seal base station 13 and automatic screw loading station 14 between movable clamp 11 and stationary backplate 12, automatic delivering mechanism is sent into next piece electric energy meter to wait for 30 places, position simultaneously;
7), automatic screw loading machine 3 tightens the screw the electric energy meter in automatic screw loading station 14 and seal base, seal base automatic installation mechanism is given on the electric energy meter at automatically upper seal base station 13 places and is put seal base well simultaneously;
8), the piston rod of horizontal location cylinder 10 pulls movable clamp 11 to rollback, lever body 2 is by automatic screw loading station 14, automatically go up seal base station 13 and wait for that the electric energy meter at 30 places, position is sent to respectively automatically upper seal lid station 15, automatic screw loading station 14 and automatically goes up seal base station 13 simultaneously;
9), the piston rod promotion activity clamp 11 of horizontal location cylinder 10 navigates to electric energy meter automatically upper seal base station 13, the automatic screw loading station 14 between movable clamp 11 and stationary backplate 12 and automatically go up on seal lid station 15, automatic delivering mechanism is sent into next piece electric energy meter to wait for 30 place simultaneously;
10), the piston rod of the second horizontal air cylinder 24 promotes the second sliding shoe 26 and moves to along the second slide rail 25 top that seal lid auto-sequencing machine 31 exports, the piston rod of the second vertical cylinder 27 stretches out downwards delivers to by sucker 29 position that can catch seal lid, vacuum valve 28 is controlled sucker 29 and is picked up seal lid, the piston rod of the second vertical cylinder 27 upwards bounces back, the piston rod of the second horizontal air cylinder 24 moves back, sucker 29 is delivered to top, seal floor installation position on electric energy meter, the piston rod of the second vertical cylinder 27 stretches out downwards, by locked the snap close of seal lid and seal base, then vacuum valve 28 is controlled sucker 29 and is decontroled seal lid, the piston rod of the second vertical cylinder 27 upwards retracts to original position, meanwhile, automatic screw loading machine 3 tightens up a screw to the electric energy meter of automatic screw loading station 14, and seal base automatic installation mechanism installs seal base to the electric energy meter of automatically upper seal base station 13,
11), the piston rod of horizontal location cylinder 10 pulls movable clamp 11 to rollback, lever body 2 will automatically be gone up seal lid station 15, automatic screw loading station 14, and automatically go up seal base station 13 and wait for that the electric energy meter at 30 places, position is sent to respectively CD outlet simultaneously, automatically goes up seal lid station 15, automatic screw loading station 14 and automatically go up seal base station 13;
12), the piston rod promotion activity clamp 11 of horizontal location cylinder 10 navigates to electric energy meter automatically upper seal base station 13, the automatic screw loading station 14 between movable clamp 11 and stationary backplate 12 and automatically goes up on seal lid station 15, automatic delivering mechanism is sent into next piece electric energy meter to wait for 30 places, position simultaneously, and automatic material blanking mechanism is sent the electric energy meter of CD outlet.So iterative cycles above-mentioned steps, electric energy meter seal operation is carried out continuously.

Claims (2)

1. an automatic seal device of electric energy meter, it is characterized in that: comprise frame, frame is provided with automatic delivering mechanism, detent mechanism, lever body, seal base automatic installation mechanism, automatic screw loading machine and seal lid automatic installation mechanism, the output terminal of automatic delivering mechanism is connected with the front end of lever body, seal base automatic installation mechanism, automatic screw loading machine and seal lid automatic installation mechanism are located at lever body top and arrange from front to back along throughput direction, and detent mechanism is positioned at a side of lever body top workplace;
Described automatic delivering mechanism comprises electric energy meter conveying pipeline, the top of electric energy meter conveying pipeline is provided with the vertical gear cylinder of stopping the supple of gas or steam, the vertical working end that keeps off the cylinder of stopping the supple of gas or steam is connected with baffle plate, and a side of electric energy meter conveying pipeline is provided with straight feeding cylinder, and the working end of straight feeding cylinder is connected with push pedal;
Described detent mechanism comprises horizontal location cylinder, the working end of horizontal location cylinder is connected with movable clamp, the opposite side of movable clamp is provided with stationary backplate, between movable clamp and stationary backplate, is provided with from front to back automatically upper seal base station, automatic screw loading station and automatically goes up seal lid station and backup station along throughput direction;
Described seal base automatic installation mechanism comprises the first crossbeam that is located at frame top, on first crossbeam, be provided with along its length the first horizontal air cylinder and the first slide rail, on the first slide rail, slide and be provided with the first sliding shoe being connected with the working end of the first horizontal air cylinder, below the first sliding shoe, be connected with the first vertical cylinder, the working end of the first vertical cylinder lower end is connected with handgrip cylinder;
Described seal lid automatic installation mechanism comprises the second cross beam that is located at frame top, on second cross beam, be provided with along its length the second horizontal air cylinder and the second slide rail, on the second slide rail, slide and be provided with the second sliding shoe being connected with the working end of the second horizontal air cylinder, below the second sliding shoe, be connected with the second vertical cylinder, the working end of the second vertical cylinder lower end is connected with sucker by vacuum valve.
2. automatic seal device of electric energy meter according to claim 1, is characterized in that: described frame outside is provided with the auto-sequencing machine of supplying respectively seal base and seal lid.
CN201110336891.4A 2011-10-31 2011-10-31 Electric energy meter automatic sealing apparatus Expired - Fee Related CN102509515B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110336891.4A CN102509515B (en) 2011-10-31 2011-10-31 Electric energy meter automatic sealing apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110336891.4A CN102509515B (en) 2011-10-31 2011-10-31 Electric energy meter automatic sealing apparatus

Publications (2)

Publication Number Publication Date
CN102509515A CN102509515A (en) 2012-06-20
CN102509515B true CN102509515B (en) 2014-09-03

Family

ID=46221591

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110336891.4A Expired - Fee Related CN102509515B (en) 2011-10-31 2011-10-31 Electric energy meter automatic sealing apparatus

Country Status (1)

Country Link
CN (1) CN102509515B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103000081B (en) * 2012-06-27 2014-12-31 浙江省电力公司 Electric energy meter automatic sealing device and method
CN103018509B (en) * 2012-11-13 2014-12-10 杭州德创电子有限公司 Intelligent electric energy meter press seal and verification equipment and control method thereof
CN103093692B (en) * 2013-01-31 2014-08-27 郑州三晖电气股份有限公司 Electric energy meter single meter sealing device
CN103226161B (en) * 2013-05-07 2015-09-23 国家电网公司 A kind of three-phase electric energy meter automatic sealing package India side formula
CN105334485B (en) * 2015-09-15 2019-10-22 国家电网公司 A kind of automatic opening system and method on automatic inspection table line
CN107572200B (en) * 2017-08-16 2019-10-29 国网浙江省电力公司电力科学研究院 A kind of dedusting barcode scanning seal verifying integrated apparatus
CN110471022A (en) * 2018-05-10 2019-11-19 宁夏隆基宁光仪表股份有限公司 Smart lock screws apptss and method for automatic calibration of electric energy meter belt line

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101813718A (en) * 2010-04-30 2010-08-25 重庆电力科学试验研究院 Installation system of electric energy meter seal
CN101907695A (en) * 2010-07-28 2010-12-08 江门市大光明电力设备厂有限公司 Automatic feeding sealing verification process for electric power metering device
CN102128961A (en) * 2010-12-24 2011-07-20 杭州厚达自动化系统有限公司 Full-automatic meter sealing device of electric energy meter

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007278948A (en) * 2006-04-10 2007-10-25 Chugoku Electric Power Co Inc:The Terminal cover of watt-hour meter

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101813718A (en) * 2010-04-30 2010-08-25 重庆电力科学试验研究院 Installation system of electric energy meter seal
CN101907695A (en) * 2010-07-28 2010-12-08 江门市大光明电力设备厂有限公司 Automatic feeding sealing verification process for electric power metering device
CN102128961A (en) * 2010-12-24 2011-07-20 杭州厚达自动化系统有限公司 Full-automatic meter sealing device of electric energy meter

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
JP特开2007-278948A 2007.10.25

Also Published As

Publication number Publication date
CN102509515A (en) 2012-06-20

Similar Documents

Publication Publication Date Title
CN102509515B (en) Electric energy meter automatic sealing apparatus
CN202606605U (en) Material loading-unloading machine during bending for copper tube
CN203033433U (en) Automatic pipe installing device of work station frame
CN102528449A (en) Assembly machine of breathable covers of disposable cell culture flasks
CN102879759A (en) Automatic wire-feeding, sealing and calibrating equipment and method of power metering device
CN203076520U (en) Automatic assembling production line with additional plate chains
CN104918476A (en) Power amplifier assembly
CN203356958U (en) X-Y-R three-axis positioning and moving mechanism
CN204271184U (en) The materiel delivery system of fluid injection packaging machine
CN202045972U (en) Automatic film sticking machine
CN105690060A (en) Socket feeding device of power strip assembling machine
CN203599838U (en) Fully-automatic combination assembling mechanism of screws and nuts
CN204847362U (en) Automatic get table and seal aggregate unit
CN204369098U (en) Chip positioning feedway
CN204416348U (en) A kind of containing charging tray mechanism that is automatic and manual two sections of stroke feedings
CN102513816B (en) Press mounting device for mounting plug cap of air-conditioning condenser
CN204123054U (en) Piston automatic assembling machine
CN102615628A (en) Automatic installation device for elastic collar
CN206500332U (en) Desk-top point gum machine
CN203579058U (en) Flange positioning device
CN203509513U (en) Device for automatically assembling pins of locks
CN215573962U (en) Intelligent mineral powder sampling device
CN104528284A (en) Charging tray mechanism comprising automatic feeding travel and manual feeding travel
CN202461929U (en) Press mounting apparatus used for installing blanking cover of air-conditioning condenser
CN204076163U (en) A kind of core of membrane type gas meter body tightening buckle pressing machine

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140903

Termination date: 20151031

EXPY Termination of patent right or utility model